Loading...
HomeMy WebLinkAboutNC0040797_staff comments_19920817Page 1 From: Date: Subject: To: Cc: Note for Ruth Swanek Steve Tedder Mon, Aug 17, 1992 3:24 PM RE: Hickory/Henry Fork WWTP Ruth Swanek Trevor Clements Ruth i5 `k • L� tnA,V tilt" , t�,� J0_Cl/ ro `p � 1 �� ���,,,//��t,' PkgrP- tom' Date ok ,please let Hamilton know your target dates. Thanks SWT From: Ruth Swanek on Mon, Aug 17, 1992 1:33 PM Subject: RE: Hickory/Henry Fork WWTP To: Steve Tedder I assigned this speculative to Jackie with a target date of 8/31. Is there a reason you will need it before then? I told Jackie to let me know if she would have trouble meeting this date. I will let you know if a later date is needed. From: Steve Tedder on Sat, Aug 15, 1992 12:27 PM Subject: Hickory/Henry Fork WWTP To: Trevor Clements Cc: Ruth Swanek I was contacted by Ray Hamilton of HDR 704-338-1800. They have been contracted to do some 201 modifications for this facility. The facility is currently permitted for 6.0 MGD with certain plans to go to 9.0 and possibly 12.0 to the Henry River. Ray wanted to know if we could look at our information and possibly provide them with speculative limits. I told him we would look at this but speculative would be just that, speculative. Nothing counts until and application is received and a full wla is performed. Please take a look and assign to appropriat staff to evaluate for 1 flow. 12.0 MGD. THEY are on a tight time table and I would like to be able to send HDR a response asap. SWT