Loading...
HomeMy WebLinkAboutNC0039594_staff comments_20050207Maiden Color Effluent Limit Ff:4f,,i',,, WC0031S'ty Subject: Maiden Color Effluent Limit From: Tom Belnick <tom.belnick@ncmail.net> Date: Mon, 07 Feb 2005 17:20:50 -0500 To: tclark@ci.maiden.nc.us CC: Bobby Blowe <Bobby.Blowe@ncmail.net>, Dave Goodrich <Dave.Goodrich@ncmail.net>, alovinggod@mcgillengineers.com, sergei chernikov <sergei.chernikov@ncmail.net>, Mike Templeton <Mike.Templeton@ncmail.net> Todd- As a follow-up to our meeting on 1/12/2005 regarding the potential color limit for Maiden should Delta Apparel connect, I offer the following comments. • Current Situation. Based on Delta's current permit which expires 5/31/2006, Delta will need to comply with a monthly average color limit of 863 ADMI (or lower based on performance) beginning 10/1/2005, as well as implementing another color treatment technology by that same date. • Proposed Connection/Limits. It is the Division's understanding that should Delta connect to Maiden, Delta will continue to operate their facility as a color pretreatment plant, while Maiden takes on the treatment for BOD/TSS/etc. Under this connection scenario, the Division is amenable to setting color effluent limits at Maiden based on the color treatment performance being acheived by Delta prior to connection, and assuming Delta is complying with terms of their current permit. A Color Reopener would also be included, which would allow the permit to be reopened with imposition of additional requirements if data show that water quality standards for color are being violated. tom.belnick@ncmail.net N.C. DENR/DWQ/NPDES 919-733-5083,ext. 543 1 of 1 2/7/2005 5:23 PM