Loading...
HomeMy WebLinkAbout20210728 Ver 1_Shoreline Stabilization_20210514Shoreline Stabilization Application Form 15ANCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization FORM SSGP 10-2013 DRAFT -NOT FOR USE AT THIS TINE Submission Form Pre -Filing Meeting Information Before submitting this form please ensure you have submitted the Pre -Filing Meeting Request Form as we will not be able to accept your application without this important first step. The Pre -Filing Meeting Request Form is used in accordance with 40 C.F.R. Section 121.4(a) "At least 30 days prior to submitting a certification request, the project proponent shall request a pre -filing meeting with the certifying agency" and in accordance with 40 C.F.R. Section 121.5(b)(7), and (c)(5) all certification requests shall include documentation that a pre -filing meeting request was submitted to the certifying authority at least 30 days prior to submitting the certification request. Click here to read more information on when this form is needed prior to application submission or here to view the form. Attach documentation of Pre -Filing Meeting Request here: DWR Pre -Filing Meeting Request Form 51.76KB (16).pdf Pre -fling Meeting or Request Date 6/1/2021 ID# 20210728 I. Applicant Information [15A NCAC 02H .0502(a)] Version 1 Please note: fields marked with a red asterisk * below are required. You will not be able to submit the form until all mandatory questions are answered. Primary Contact Email * rclaws35@earthhnk.net Rease provide an email address for payment and requests for more information here. Owner Information: Name: * Email: * Phone Number:* Mailing Address:* David Mayhew davidmayhew38@yahoo.com (704)577-9306 (xxx)xxx-xxxx Street Address 7806 Knox Ridge Rd Address Line 2 City Huntersville Rasta) / Zip Code 28078-5695 State / F1 ovine / Region NC Country US Is there an agent working on the project? * r Yes C: No Project Information [15A NCAC 02H .0502(a) & (b)] Project Name:* 144 Summer Shoal Place If your project has a formal name please use this. If your project does not have a formal name, please identify your project by the owner name and proposed activity (Jones Property Access Road, Smith Guest House, etc.) List in parentheses any other names that have been used to identify the project in the past. 1. Provide a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads.* F Upload File r Look up address Upload Map: 144 Summer ShoalDirections.pdf 786.86KB Latitude:* 35.092900 Longitude:* 810,241.000000 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram under section 12.normal pool lake level/normal water level* 144 Summer Shoal Sketch.pdf 429.78KB Please use the diagram at the link below: https://edocs.deq.nc.gov/WaterResources/0/edoc/616616/Shoreline%20Layout.docx 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.)* 144 Summer Shoal Lot 88.pdf 8.35MB 4. Location of the property (where work is to be conducted) Nearest Town:* Belmont County:* Gaston Lake/ river/ ocean adjacent to Lake Wylie property: Subdivisions name or site address:* McLean -South Shore Lot 88 hclude phase/lot nunber Directions to site:* See Map Rease include road narres and numbers, landmarks etc. 5. Describe the existing land use or condition of the site at the time of this application:* Future Home Site Residential, undeveloped, etc. 6. Property Size 1.57 Acres 7. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): More Lake traffic and higher water levels are eroding property as seen in pictures. 8. How will the work be done?* 17 From Land r From Water 9. Total amount of disturbance below the normal pool lake level/ normal water level:* (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) 439 sq.ft. square feet 10. Total amount of disturbance above the normal pool lake level/ normal water level and 50 feet land -ward:* (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) 5048.5 square feet 11. Please describe the vegetation above the normal pool lake level/ normal water level and 50 feet landward to be impacted:* (nurrber of trees, for instance) 5 larger trees raging from 5" to 14". Very little under brush. Property was pasture. Sketch: 144 Summer Shoal Sketch.pdf 429.78KB Application Fee: Once the application has been accepted. You will need to send a corresponding fee in with the appropriate DWR#. The application fee is as follows (pursuant to G.S. 143-215.3D): o $240.00 for impacts to lake (below normal water level) of less than 1 acre o $570.00 for impacts to lake (below normal water level) of greater or equal to 1 acre By digitally signing below, I certify that: o I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief o I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. o I agree that submission of this Shoreline Stabilization online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the Shoreline Stabilization online form. Full Name:* Signature: Randall Clawson I-r zer7l'6llrir,et ! Initial Review Is this accepted into the review fr Yes 0 No process?* Project Number:* 20210728 Select Reviewer:* Select Reviewing Office: Has payment been received?* What amount is owed?* Version:* 1 Alan Johnson:eads\adjohnsonl Mooresville Regional Office - (704) 663-1699 r No Payment Needed r Fee Received C' Need Fee - send electronic notification C' $240.00 r $570.00 5/13I2021 South Point High School to 144 Summer Shoal Pi, Belmont, NC 28012 - Google Maps Go gie Maps South Point High School to 144 Summer Shoal PI, Drive 6,1 miles, 11 min Belmont, NC 28012 • -e e ti±f Natuts tstory T. �.i�# tit •^qF iti F#- 74 iCx } F rjr?--M047i1 Mil.9. ` '+' : t ,. • • 9J & V a..40 tiptietstegy ti Daniel Sitree. $t:rcivi Gardt, 744 Summer SiVai naCe 7. { vtaNC-273S 11 min Fastest route, the usual traffic 6.1 miles via Armstrong Ford Rd and NC-279 E 15 min 7.9 miles Explore 144 Summer Shoal PI • Co Restaurants Hotels has stations Parking Lots More 4 r-: S 7- a: 1140. Map data ©2021 1 mi •- ..• Park 1. JRHI CliTaricAe F nteraM inn 31 `elf Alf; Ft l ROM) o C L 41C1-4 eft 4 � t s: www. l . Im s it South+Point+High+SC L,+S +Point+Roar;+ t t,+ C 1 +S m r+S 1+P1 + I t, -NC+2 2 @3 . «� _ 111 • .f I ftftok (% 110. • f 1 i 4.3T•t4k C 4%*41Tybiph-N wm•Itt,,t6.411%t ra"zs't ?"agaft th t‘'N.31 4.04 41<- )14 "gas 7,4410 s-ft%c' Q 0 ry% r (1 4F9k (\1 4„„ k_,N1 „ " IV\ -,?4 1� �J ("3 1 e-N46 7%4- • Cr) sfZ(k CI) 1 Iftk k.� ilv?-,5 s !°fri-1 .....c4 II • ti • t • k7F 4 • 41E4. a +Fs- -f • .f I ftftok (% 110. • f 1 i 4.3T•t4k C 4%*41Tybiph-N wm•Itt,,t6.411%t ra"zs't ?"agaft th t‘'N.31 4.04 41<- )14 "gas 7,4410 s-ft%c' Q 0 ry% r (1 4F9k (\1 4„„ k_,N1 „ " IV\ -,?4 1� �J ("3 1 e-N46 7%4- • Cr) sfZ(k CI) 1 DWR Pre -Filing Meeting Request Form ID#* Regional Office * Reviewer List* 20210728 Version* 1 Mooresville Regional Office - (704) 663-1699 Alan Johnson Pre -Filing Meeting Request submitted 4/9/2021 Contact Name * Randall Clawson Contact Email Address* rclaws35@earthlink.net Project Name * 144 Summer Shoal Place, Belmont Project Owner* David Mayhew Project County* Gaston Owner Address: Street Address 7806 Know Ridge Rd. Address Line 2 City State / Rovince / Region Huntersville NC Fbstal / Zip Code Country 28078 Mecklenburg Is this a transportation project?* C Yes ( No Type(s) of approval sought from the DWR: I— 401 Water Quality Certification - I— 401 Water Quality Certification - Reg ula r Express I— Individual Permit I— Modification rJ Shoreline Stabilization Does this project have an existing project ID#?* C Yes ( No Do you know the name of the staff member you would like to request a meeting with? Alan Johnson Please give a brief project description below and include location information.* Clean up and Rip Rap Approx. 439' of Shoreline. This project is in McLean/South Shore subdivision Please give a couple of dates you are available for a meeting. 5/3/2021 5/5/2021 Please attach the documentation you would like to have the meeting about. pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • !also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 4/9/2021