Loading...
HomeMy WebLinkAboutWQ0039314_Regional Office Historical File Pre 2018Divlslon of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION FTA 04-16 & SUPPORTING k Applicatio All ber: to be completed by t)WR) ust be eonwleted or the nnptication will be. APPLICANT INFORMATION. 1, Applicant's name: Citv of Shelby (company, municipality, HOA, utility„ etc.) ?. Applicant type: El Individual E Corporation General Partnership State/County Ittnic"pal Signature atrtltority s:tame: Rick. Iowc11 per C 5A NCAC 02T .Olf)6(b) Title: City Manager 4. Applicant's mailing address: 3()0 5 "ashingtion Stre l City: Shelby State: NC Applicant's contact information: Phone number: (828) 484-6866 Entail Address: rick,howellgcity fshelbv.corn El Federal II. PROJECT INFORMATION: Zip: 28150- 1. Project name: 2017 tiWestaide Sewer System Improvements- riodifZc ation 2, ApplicationtlProject status: If a modification, provide t Q Other Proposed (New Permit) Existing Permit/Project sting permit number: WWQ0039314 and issued date: 7114 20➢7 If new construction but part of a master plan, provide the existing permit number:1WVQ00 County where project is located: Cleveland 4, Approximate Coordinates (Decimal Degrees): Latitude: 35 27443" Longitude: -81.61 633' 5, Parcel ID (if applicable): See plans (or Parcel 1D to closest downstream sewer) CONSULTANT INFORMATION: 1. Professional Engineer: 1t.J. M zeley License Nu ber: 037937 Firm. McGill. Associates Mailing adclr'ss: 1240 19`h Street Lane NW City: Hickory State. NC Zip: 28601- Phone number: (828) 328-2024 Email Address: ri.rnozeley(mcgdlassei STEWV.^ATER TREATMENT VAC (WWTF) INFORMATION: Facility Name: First Broad River Vi'WW PF Permit Number: NC0024538 Owner Name: City of Shelby, RECEIVING DOWNSTREAM SE WW ER INI' ORN ATION (if different than WWI'FF): 1., Permit NumberO: WO ilia Downstream (Receiving) Sewer Size: ilia inch System Wick: Collcctic sa SystemPerm"' Num" ffit' s 1f a pa) le . WWQCS00037 Owner Nam s): City of Sh.elh y-Owned Public C1tLEty FORM: FIA 04-16, Page 1 of 5 VI. GENERAL REQUIREMENTS I. If the Applicant is a..Privately-Owned Public Uniity, has a Certificate of Public Convenience and 'Necessity been attached? El Yes No N/A 2. If the Applicant is a Developer oF1ots to be sold, has a Developer's Opertioni) oreemenaFOR.M; DEVI been attached? 0 Yes 0No N/A is a hjejfroey O•wriers' A ssocjat , has an Ogyational AsNenjent ,(FORM: {j()A1 been attached? Yes 0No ZN/A 3. lithe Applicant 4. Origin of wastewater: (check all that apply): 0 Residential Owned 0 Residential Leased 0 School / preschool day care 0 Food and drink facilities Businesses / offices / factories 5, Nature of wastewater : ri Retail (stores, centers, malls) Ej Retail with food preparation/service 0 Medical / dental / veterinary facilities 0 Church 0 Nursing Home Car Wash Hotel andler Motels 0 Swimming Pool /Clubhouse 0 Swimming P•ool/Filter Backwash 0 Other (Explain in Attachment) DemestielCo•mmercial. % Commercial o Industrial (See 15A NCAC 02T .01031:20)) 'Is there a .Pretreatment Program in effect? 6. Has a flow reduction been approved under 1 NCAC 02T .0.114 t Yes 7., If ves, provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: Yes 4No No hment Type (see 02T.0114 Daily Design Flow No. of 'Units Flow NIA gallday gal/ al/ gall gal/ GPD GPI) GPD CiPD GPD gal/ GPD Total GPD See l 5A NCAC 02T ..01.14b), (d), (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential developrn.ent uses.; public access facilities located near high public use areas; and residential property located south or east ofthe Atlantic Intracoastal Waterway to be used as vacation rentals, as defined iri G.S. 42A-4). b Per 15A NCAC 021' .0114(c), .design flow rates for establishments not identified [in table 15A NCAC 02T.011.41 shall be determined using available flow; data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 0 GPD (per 15A NCAC 02T .0114) - Do not include future flows or previously permitted allocations [f permitted flow is zero, indicate why: 0 Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line Z Flow has already been allocated in Permit Number; W00039314 0 Rehabilitation or replacement of existing sewer with no new flow expected 0 Other (Explain): FORM; FTA. 04-16 Page 2 of 5 I. GRAVITY SEWER DESIGN CRITERIA (If Applicable) 02T All C (Gravity Sewersl: 1. Summarize gravity sewer to be permitted: Section II & ilt of the IVIDC for Permitting of Gravity Sewers contains information related to design criteria, Section HI contains information related to minimum slopes for gravity sewer(s) Oversizing lines to meet minimum slope requirement is not allowed and a violation of tbe MDC VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains: COMPLETE FOR EACH PUMP STATIONINCLUDED IN THIS PROJECT I. Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Longitude: 3. Design flow of the pump station: millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): gallons per minute at 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) N/A Length feet total dynamic head (TDH) 6, Power reliability in accordance with 15A NCAC 02T ,0305(h)(1): Ej Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B): • Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day • Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: • Portable power source with manual activation, quick-cormection receptacle and telemetry NCAC 02T .0305(h)(1)(C) Ell Portable 'pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C): • It shall be demonstrated to the Division that the portable source is owned or contracted by th.c applicant (draft agreement) and is compatible with the station. "?' If th.e portable power source or pump is dedicated to multiple pump stations, an evaluation of all the .pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timcframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 IX, SETBACKS & SEPARATIONS (02B .0200 & 1.5A NCAC 02T .0305(f)): 1. Does the project comply with all separations found in 15A NCAC 02'T .030.5(f) & (g) 5A. NCAC 02T,0305(0 comains minmurn scparat—tha shall for s t SC Wa Setback Para s ,ertical-water over sew Water mains (horizontal . Reclaimed water lines ('eitical- reclaimed over sewe Reclaimed water lines (horizontal- rcchirncd over s **Any private or public water supply source., including any wells, WS-I waters of Class 1 c Class 11 impoundcd reservoirs used as a source of drinking water 'Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal -1 water (or tide elevation) and wetlands (see item IX.2) **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches Any 'building founda Any basement ope of crnbankmeut er cuts of 2 f Drainage systems swimmini ptor drains Yes E No s• st ms: Separatwn Required 4 inches 18 inches 10 feet 8 inches 2 feet 0 50 feet 0 feet verticalheigh 0 e Final earth grade (vertical) 36 inches > 15A NCAC 02T.0305contatns alternatives where separations in 02T.0305(j) cannot be achieved. > **Stream classifications can be identified using the Division's NC Surface Water Classifications wet • If noncompliance with 02T.0305(f) or (g).., see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) El Yes E3 No Z N/A > See the Diviion's draft separation requirements for situations where separation cannot he meet • No variance s required if the alternative design criteria specified is utilized in design and construction .> As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B 0200? Yes El No fl NIA > This would include Trout Buffered Streams per 15A NCAC .213,0202 4, Does the project require coverage/authorization under a 404 Nationwide or individual permits or 401 Water Quality Certifications? .> information can be obtained from the 401 & Buetijncjj Z Yes 5. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifteations)? Yes No Per 1 5A NCACO2T.0105:ti)(6), directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority" Per 15A NCAC 02T,0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to strearnbank.s that is subject to erosion that undermines or deteriorates the sewer. E Yes No Z N/A > If yes, include an attachment ,ith details for each line, including type (aerial line, ,siz.e„ material,. and location), High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per I5A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA. 04-16 Page 4 of 5 X. CERTIFICATIONS: I. Does the submitted system comply with 15,A NCAC 02T the Minimum Detii m Criteriafor the Pcrinitiing,of Nita Stations antilloriKMAinsaaNst yelsjoill and the Greity SmerAltiiiintim Dojo Criteria Oiliest version.) as applicable? E3 Yes flNo I f No, complete and submit the Variance/Altemative Design Request application (V ADC 10-14) and supporting documents for review. Approval of the request is required prior to sub tni ttalof tite„Fast Track Application and supportingdcnten 2. Professional Engineer's Certification: ,.,,,•••fd_.,:AZ.:144_,-- (Profesosional Engineer's name from Apphcatioii auest thatapplication for has been reviewed by me and is :accurate., complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Iv1inimuin Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump. Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that 1 have reviewed. this material and have judged it to be consistent with the proposed design. NOTE - In accordance with General Statutes 143-215.6A and .143-215.6B, any person, who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a tine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. North Carolina Professional Engineer's seal, signature, and date: ,•., 0 • “'"/ ..4t- SEAL "r•4 r- - •037fl37 • • .3. Applicant's Certification per I5A NCAC 02T •0106i(b): , e (Signature Authority s name & title from Ap pplication for has been reviewed by me and is accurate and complete to the best of my knowledge. .1 understand that if all required parts of this application iire not completed and that if a11 required supporting documentation and attachments are not included. this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and or criminal prosecution. 1 will make. no claim against the Division of Water Resources should a condition of this permit be violated, .1 also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete, NOTE -10 accordance with General Statutes 143-2-,6A and 143-215,6B, any person who knowingly makes any .false statement., representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include. a fine not to exceed $10,000 as well as civil. penalties up to $25,000 per violation. Signature: Date: FORM: FTA 04-16 Pagc 5 of 5 State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Applications (FTSE 04-16) Entity Requesting Allocation: City of Shelby Project Name for which flow is being requested: 2017 Westside Sewer System Improve. More than one FTSE may be required fOr a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater 1. Complete this section only if you are the owner of the wastewater treatment plant, a. WWTP Facility Name: First Broad WWTP b, WWTP Facility Permit #: NC0024538 Allflows are in MGD c. WWTP facility's permitted flow 6.0 d. Estimated obligated flow not yet tributary to the WWTP 0.27 3.02 e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used 1.0 4.29 71% II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)—(B+C) (E)=(A-D) Design Obligated, Pump Average Daily Approx, Not Yet Total Current Station Firm Flow** Current Avg. Tributary Flow Plus (Name or Capacity, * (Firm / pi), Daily Flow, Daily Flow, Obligated Available Number) MGD MGD MGD MGD Flow Capacity*** Westside 4,896 1.958 0.8 1.0 1.8 0.158 ... * The Firm Capacity of any pump station is defined as the maximum pumped flow a can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump stationdivided by a peaking factor (pf) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < O. Downstream Facility Name (Sewer): N/A Downstream Permit Number: N A Page 1 of6 FTSE 04-16 111 Certification Statenient: 1 Rick Flowed, City Manager certify to the best °filly knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatntent plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data This certification applies to those items listed above in Sections 1 and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this nn indicates acceptance of this wastewater flow, Signing 'al Signature Page 2 of 6 FTSE 0446 State of North Carolinn Department of Environrrment Divis Division of Water Resources Watershed Along with this form, submit a +color copy of a USGS Topographic Map to identify the p Each map or maps must show the location of the sewer system and include location i traverses over or near waterbodies. The map should have location ICi's for eac corresponding classifications should be recorded. Include the completed form and map portions with the permit application for submittal to the appropriate review agency. A list of the Division's regional offices, their county coverage, and contact information can be obtained from: http://portal ncdenr. arg/web/ww/homejr° Location iD Narne of Waterbody' Stream Crossing 1 Stream UT Beaverdam Creek Crossing 2 River First Broad River UT Beaverdam Creek Cro&sing River Waterbody Waterbody Ba in index No, Classification Broad unknown C Broad unknown C Broad 9-50-(28) C If unnamed, indicate "unnamed tributary to X", where X is the named waterbody to which the unnamed tributary joins, certify that as a Registered Professional Engineer in the State of North Carolina that I have diligently followed the Division's instructions for classifying waterbodies and that the above classifications are inclusive of the stated project, complete and correct to the best of my knowledge and belief PE Seal, Signature and Date 4141 ‘0414 cAR NC Surface Water Classification May 3, 2017 Surface Wilier Classifications CITY OF SHELBY 2017 WESTSIDE SEWER SYSTEM IMPROVEMENTS STREAM CROSSING NO. 1 STREAM CROSSING NO. 1 Gill ASSOCIATES ERING•PLANNING•FINANCE ASU Vtilll, liC 211101 PH: MS) 11,2-0575 P911e MENSES 1 C4N 9 0,15 0 175 0 7 km Soortaa: Eeri HERE, DeCcrme, mlwrmep, hcmmenl E Cerp„ GEHCO, VSOS, FAO, NPS, 'NRCAN• Gadaese, IG Nu Kedmaler NI.„, Ordnance Survey, Ean dapen„ METI, Esn Cleaes iNtmg Kona}, aebiioropn, Mapmylnplu,ee4 ©per•SlreetUap conlntrulors, and One GIS SWIG of Nor% Camino POT, Ear, HERE, Germtn, INCREMENT P, Int./nap, USGS, WET' ASA, NCDENR ON, Weise Resources A, USDA NCDL`NR - DNIYDre of Weter Rea ones NC Surface Water Classi May 3, 2017 Surface Wolter Classifications ca ion CITY OF SHELBY 2017 WESTSIDE SEWER SYSTEM IMPROVEMENTS STREAM CROSSING NO. 2 STREAM CROSSING Na 2 McGill ASSOCIATES ENGINEERING•PLANNING•EINANCE 55 BROAD !MET ASHJMLLE, NC 2Stl®1 /IL 012612Sf457s FIRM UMW. ClNle 1:15,056 0,175 0_35 0,7 rni ©-35 0,7 1,4 krn S orcur Esri, MERE, Da1xme„ Inlernnep, ono amanl R Gonv,, CEBC0, USGS, FA©, NIPS, NR CAN„ CelenN ee, IGN. Kadeajet N1, Ordnance Survey, End Japan, METO, Fein China (Hone Keno), evesslopo,. Mepmyh+Wie,C 0cartSlreetMep wnlnbuionl, and Ice GIS NGOENR ©Ov, Wafer Rescurces SIM%of No Cafnena SOOT, Eml, HERE, Gemmel, el, INCREMENT P, InIarmap, U SGS, METI/NASA, EPA, USDA k NCOENR • Dieleion of Weiler R►smacbs [ NC Surface Water Classification May3, 2017 Surface water Classifications CITY OF SHELBY 2017 WESTSIDE SEWER SYSTEM IMPROVEMENTS RIVER CROSSING OF FIRST BROAD RIVER RIVER CROSSING ASSOCIATES ENGINEERNGPLANNINGFUJANCE 11 MAD SlikErr AflFVLLE211Se PEI tV1Z,12.03r5 MY LICENSE �C4439 1:18,056 0 0,175 0,35 OE7rni 0.35 07 14 len Sources, E,sp, ISERE, Celormo, Inlermap, mceruonl P Corp_ GEnco, outs, FAO, NPS4RCAN, GeoBase, G,Itsessuir NL, Orenence Stovay, Esc Japes, METI„ Eon Chins INooS Rose), wafts l000„ Mapreylnela,C sera trasiMep coribi boors, srur tna GIS NCPENFt D. WOW F1,4.11MAYS Slate of NW% C&1061.41 DOT , Eon, FitERE, C..',Arrnin, INCREMENT P, Inlermap, USGS, METUNASA„ EPA, USDA 1 NCOPNR Division ol Rne.X.N1 m:J >' \I E., V\r ± v<G w m»>» CITY OF S H E L B CrEVELAND COUNTY NORTH CAROLINA C 1 A T R S FR!* G 2;w & &!* G +!N N Ct mcgi November 15, 2019 Mr. Ori Tuvia Environmental Engineer Division of Water Resources Mooresville Regional Office 610 East Center Avenue, Suite 301 Mooresville, North Carolina 28115 RE: Fast Track Permit Modification - WQ0039314 2017 Westside Sewer System Improvements City of Shelby, North Carolina Dear Mr. Tuvia: ToTTOESTsMOTETOMENTTio„,„,s, In order to serve a new industry coming to Cleveland County, the City of Shelby has permitted the extension of a new 24" sewer line for an expanding customer in an existing industrial park property on Farmville Road. The sewer line project, permitted in 2017, included an additional 24- inch PVC and DIP line gravity sewer line. This modification to the standing permit includes a 30- inch DIP gravity sewer line in place of the currently permitted 24-inch line for 229 linear feet immediately upstream of the Crest pump station. On behalf of the City of Shelby, please find enclosed the required permit submittal package for the above referenced project. The submittal package consists of the following: 1. Application Fee Payment ($480.00) 2. Application Form (FTA 04-16)(1 original & 1 copy) 3. Flow Tracking/Acceptance Form (FTSE 04-16)(1 original & 1 copy) 4. Stream Classification (WCAS 01-15)(2 copies) 5. Site Maps (Topographic and Street Level)(2 copies) Following approval of this permit modification, the City and McGill will issue all certifications as necessary. Should you have any questions or need any additional information please feel free to call our office at 828-328-2024. Sincerely, McGILL ASSOCIATES, P.A. RJ MOZELEY Project Manager RJ:sa Cc: David Hux, City of Shelby LABroadstreerProy.,r2,1s',2G16,16 00:359\MIsc'APPLIC5 IONS',NCIDEQ'.30Ardi Malificatiow2 Covef Letter -3Cin GS Modficab docx MCGLL, ASSOCIATES SOO "TM T TOO T Too ,TT,„ FAST TRACK SEWER ENGINEERING CERTIFICATION P F Ri1 H TT E E: C I °fit f:) F° S E H E L.B PERM F #: V ()(l(J39 314 °leulditieaation. PROJECT; 2017 WESTSIDE-: SEWER. SYSTE\°t I vWROVErv1ENfSS ISSUE DATE: OC l Of31:R 25, 2019 sidered complete nc r allowed to operate in teee rdanee with standard pe<nnit until the Division ha reeei e.d this Ce.rtiliLatieAi and all required supporting It should be submitted in a manner that documents the Division's receipt. Send the d documentation to the Re ia.'anal Superv°isor,. \ Meter Quality Regional Operations Section at the dress noted in the page rooter, flow made trihtttar t the w°astewatcr cul1L t1t?n system t t.t nsat to prior to completion on shall be considered a violation of the permit and sha11 subject the Pennittee to appropriate enforeente nt actions, The Pennittee is responsible for tracking all partial certifications up until a final certification is received by the Division. A Final Certification shall be a complete set of record drain and design calculations regardless of whether partials have been submitted, PER P IITTEE'S CERTIF'ICATION I, the undersizttecl aetat for the lettttittoe the a.pplicahlc standards & requirement design `construction information to the Per wastewater collection system permitted herein EN+ hereby state that this project has been constructed pursuant to he Professional Engineer below has provided applicable and the Permitter is prepared to operate & maintain the its therct f, EEKS CERTIFFIC T as a dttj registered Pro'fessicnal Fttgittc,et rta the *Mate of North C`arctlittar9 iodically, weekly, full tune flee construction of the pros ! above for the above Pennittee hereby state that, to the best of my abilities, due earc and diligence was used in the observation of the following construction: such that the construction was observed to he built within. substantial compliance of this permit: 15A NCAC 02 F the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February 1.2, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting td Pump Stations and Force Mains adopted June 1, 2001) as applicable; and other supporting rmarteria North Carolina Professional Engineers Seal »l,ignature & date: Ina" 0 .Partial iinclude description) r Comments/Qualifiers (attar:eh if necessary): NC QWR -- Water Q Mooresvike Rego' R Opera3t?o ss Sectio st Center Avenue, Saute 301„ to lc eresva@1e,. Phone: j,ft?4l6,63--1699 FAX; (T04) }4t Shapqng Togetner October 31, 2019 Mr, Ori Tuvia NC DEQ Division of Water Resources Mooresville Regional Office 610 E. Center Avenue, Suite 301 Mooresville, North Carolina 28115 RE: Final Certification 2017 Westside Sewer System Improvements Permit No, WQ0039314 City of Shelby, North Carolina Dear Mr, Tuvia: Vf()0 flESV LI E. A G NA 1:„ f" F E To the best of my knowledge and in my profession& opinion the above referenced project has been constructed in substantial compliance with the approved plans and specifications. This final certification includes all proposed gravity sewer improvements, pump station improvements and force main sewer improvements. Enclosed for your use is the completed Certification page, A copy of the design calculations and a complete record drawing plan set for each contractual division of the project was transmitted to your office on July 3r©, 2019. Should you have any further questions or comments regarding this project's final certification, please do not hesitate to contact us at 828-328-2024. Sincerely, McGILL ASSOCIATES, RA. R.J. MOZELEY, PE / Project Manager RJM:sa Enclosures Cc: Mr. David Hux, City of Shelby Mr. Cameron Howell, City of Shelby OBrpacistre0,ergjgcls2016\16.Q0;359\Qonstruction Certification\DYVR-ippLcert 19:1 Q:3 Ttrvia, Ori A From: Sent: To: Subject: Ri Mozeley <Rj.Mozeley@ mcgillassociates.com> Thursday, September 05, 2019 5:17 AM Tuvia, Ori A RE: [External] RE: WQ0039314 - 2017 Westside Sewer syste engineering certification additional information. provements - final That 10" force main was constructed with the original pump station and permit dating back well before 2007 when the current triplex wet pit/dry pit PS was permitted and constructed. R.J. Mozeley, PE t Manager,. t F>cG. T 328 C 828 22 We launched a refreshed brand. Please note email changes abov°e. From: Tuvia, Ori A <ori.tuvia@ncdenr.gov> Sent: Wednesday, September 4, 2019 3:51 PM To: Ri Mozeley <Rj.Mozeley@mcgillassociates.com> Subject: RE: [External] RE: WQ0039314 - 2017 Westside Sewer system improvements _ final engineering certification additional information. Mr. Mozeley, After looking at the documents you provided, they appear to address my concerns with the project and it's variance from the permit (as long as the modification for the gravity sewer is completed as stated). One additional question that came up is regarding part 9 of the design memo, indicating there is a 10in FM, is that lone been previously permitted? Or is it a new line? Sincerely, Ori From: Ri Mozeley <Rj,Mozeley m giilassocia es.corn> Sent: Tuesday, September 03, 2019 4:18 PM To: Tuvia, Ori A <ori.tuvia@nccdenr.gov> Subject: RE: [External] RE: WQ0039314 - 2017 Westside Sewer system improvements - final engineering certification additional information. Mr. Tuvia, Attached to this message is a DRAFT response to the comments you'd provided below. Would you be available to discuss these responses sometime tomorrow over the phone? Thank you, Project Manager We launched a refreshed brand. Please note 1 I b address changes above. From: Tuvia, Ori A < ri.tuviaencden r.R Sent: Friday, July 12, 2019 10:40 AM To: RJ Mozeley <K, °icwz_ei Ly_@mcai lase clates..com> Subject: RE: [External] RE: W00039314 - 2017 Westside Sewer system improvements - final engineering certification additional information, Mr. Mozeley, Please see attached Hope it helps, Ori From: RJ Mozeley <RjmMozele_y( mcri9 Sent: Friday, July 12, 2019 10:23 AM To: Tuvia, Ori A <ori.tuviaclncdenr.gov> Subject: [External] RE: WQ003931.4 - 2017 Westside Sewer system improvements - final engineering certification additional information, 2 Mr. Tuvia, As we're preparing our responses to your comments we've begun looking for a copy of the application information and do not find a signed copy of the original FTA form or the FTSE form. Could you pull them from your files and scan back. to me please? Thank you, R.,J. Mozeley, PE 1240 i 9,'' t L ' NW, T 828,328,2024 C _ '.B 228 4230 mozeley3 fed t s "li.assocxi Fate We launched a refreshed a -and. Please note email / we address changes above. From: Tuvia, Ori A <ori.:uv a@ncden aYv> Sent: Wednesday, July 10, 2019 9:11 AM To: RJ Mozeley <J._MozeleyTrncgl:iscrn>, rick nu^cleititiy.cnm Cc: Fertenbaugh, Christyn L <ciiristyn, Subject: WQ0039314 - 2017 Westside Sewer system improvements - final engineering certification additional information. Good Morning Mr. Howell and Mr. Mozeley, pv> The Mooresville Regional Office is in receipt of the As -Built Plans for WQ0039314 on July 9, 2019, Review of the plans has resulted in the conclusion that the final certification for this project is deemed incomplete for the following reasons: 1. The peaking factor used to calculate peak flow for Grizzly industry was listed has 1.35 (or 1.803 combined for all). However per Minimum Design Criteria "Peaking factors for pump stations conveying industrial or other process wastewater shall be determined based on actual operating conditions of the facility; however, in no case shall the peaking factor be less than the minimum set forth in Section 2.02A.4.c.c. In no case shall a peaking factor less than 2.5 be used to calculate peak hourly wastewater flows for any pump station" In order for the project be permitted through the fast track program all minimum design criteria's must be met. If you wish to apply for a variance using a lower peaking factor for this project, please contact Christyn Fertenbaugh, (CCed). 2. The gravity sewer lines connecting Manholes 1-5 are all 30-inches in diameter. The permit was issued for 24-inch gravity sewer. A permit modification will be needed to address this issue, 3 The average flow listed for this project for at least this phase of it) .9 G(1. MGD for Grizzly, 0.3 other current 0.1 Other -future). The permit was issued for 1 MGD, in addition to the 0,8 MGD current average daily flow, equal to 1.8 MGD, less than the average flow expected. if you wish to increase the allocated flow a permit modification will be needed, or alternatively the flow listed for this project will need to be reduced; Please let me know if you have any questions Sincerely, Ori Tuvia Environmental Engineer NC C EO f Division of Water Resources 610 East Center Avenue Mooresville, NC 28115 Direct Line: (704) 2 -21 Fax: (704) 663- 04 Ori.toviaancrienrcov mcgd September 3, 2019 Mr. Ori Tuvia NC DEQ Division of Water Resources Mooresville Regional Office 610 E. Center Avenue, Suite 301 Mooresville, North Carolina 28115 i iµr'rvli'ii , Tog RE: Final Certification — Mooresville Regional Office R i Comments 2017 Westside Sewer System Improvements Permit No. WQ0039314 City of Shelby, North Carolina Dear Mr. Tuvia: We are in receipt of your comments in your email on July 10t, 2019. PIe response to that comment, Comment No. 1: The peak facto has 1.35 (or 1.803 co for pump stations c on actual operating less than the minimu than 2,5 be used to calcut�r the projed thro met, Respon project's more reliable equipment insta The prop " ;sign phase. ration from Il the Grizz Further, the City of She inal ce quote o he subject project as provided comment below along with our Grizzly industry was listed Criteria "Peaking factors shall be determined based in no edge shall the peaking factor be In no case shall a peaking factor less flows for any pump station" In order for all minimum design criteria's must be Grizzly flow has been reduced significantly since the in proposed wastewater discharge is based on zly process engineers and inclusion of process water re -use cility. anding Significant Industrial User (SW) program in place and has reached agreement the Grizzly facility in its pre-treatment permit to create on -site flow equalization tanks with a vo ume of 340,000 gallons and assist the industry in limiting its instantaneous wastewater discharge to the Westside basin to 350 GPM for the proposed expansion. Please review the revised design calculations which indicate the amount of each tributary flow planned for the Crest PS and with the associated peaking factors now at 2.5 for all flows. Comment No. 2: The gravity sewer lines connecting Manholes 1-5 are all 30-inches in diameter. The permit was issued for 24-inch gravity sewer. A permit modification will be needed to address this issue, MCGtlLL ASSOCIATES 1240 NW,Fi,..KOR4 MCGILL, Mr. Ori Tuvia September 3, 2019 Page 2 Response No. 2: Due to the expeditious nature of the project's overall original schedule the FTA was submitted early in the design process. During the sustained design process, the City desired to reduce its number of sewer lines crossing under the creek at the pump station and therefore the project's design was modified to combine the existing 1 6-inch diameter sewer with the proposed expansion project's sewer, Therefore, the proposed 24-inch diameter sewers under the creek were increased in size to 30-inches in diameter. As requested by Comment No. 2, please find enclosed with this submission an updated FTA to modify the previous FTA and replace 24-inch gravity sewers with 30-inch gravity sewers. Comment No. 3: The average flow listed for this project (or ,t this phase of it) is 1.9 MGD (1.5 MGD for Grizzly, 0.3 MGD other current, 0.1 Other f The permit was issued for 1 MGD, in addition to the 0.8 MGD current average daily � ,'� 1 to 1.8 MGD, less than the average flow expected. if you wish to increase the allocated flouerrnit modification will be needed, or alternatively the flow listed for this prs vill need to duced. Response No. 3.' The proposed additional Grr project's early design phase. The reduction it more reliable information from Grizzly process en equipment installed in the Grizzly faPlease rev indicate the amount of each tribute f i need fo We trust that these responses and rev you need anything further tissue the fin Sincerely, McGILL AS I ES, R.J. MOZEL Project Manage Enclosures: Modifieorandum has been reducsignificantly since the d wastewater disc is based on fusion of press water re -use vised design calculations which est PS, ess all of your comments, If us at (828) 328-2024. mcg l July 3, 2019 Ill l.l...lil_ Mr. Ori Tuvia NC DEQ Division of Water Resources Mooresville Regional Office 610 E. Center Avenue, Suite 301 Mooresville, North Carolina 28115 RE: Final Certification 2017 Westside Sewer System Improvements Permit No, WQ0039314 City of Shelby, North Carolina Dear Mr, Tuvia: To the best of my knowledge and in my professional opinion the above referenced project has been constructed in substantial compliance with the approved plans and specifications. This final certification includes all proposed gravity sewer improvements, pump station improvements and force main sewer improvements, Enclosed for your use is the completed Certification page, a copy of the design calculations and a complete record drawing plan set for each contractual division of the project. Should you have any questions or comments regarding this certification, please do not hesitate to contact us at 828-328-2024. Sincerely„ McGill ASSOCIATES, P.A. R,J, MOZELEY, P Project Manager ;rjm Enclosures Cc: Mr. David Hux, City of Shelby riEr VEDINCOENRIEMIE FAST TRACI( SEWER ENGINEERING CERTIFICATION PERMITTEE: City of Shelby PERMIT #: WQ0039314 PROJECT: 2017 Westside ISSUE DATE: July 14, 2017 System improvements WOHOE MOD:4E8V E REG VE)NA „ PiCE This project shall not be considered complete nor allowed to operate in accordance with Condition 7 of this permit until the Division has received this Certification and all required supporting documentation. It should be submitted in a manner that documents the Uvision's receipt, Send the required documentation the Regional Supervisor, Water Quality Regional Operations Section at the address at the bottom, Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Certification shall be considered a violation of the permit and shalt subject the Permittee to appropriate enforcement actions, The Permittee is responsible for tracking all partial certifications up until a final certification is received, A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted, PEMrrtEES CERTIFICATION I, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable designiconstruction information to the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herrrir porofls thereof. Printed Name, Title nature Et4GIINIEFFI'S CERTIFICATIO as registered Professional Eutineer in the State of North Carolina, having been autho izecl to observe eriodacally, [1 weekly, LI full time) the construction of the project name and location as referenced above for the above Permittee hereby state that, to the best of my abilities, due care and dirgence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 1SA NCAC 02T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materiais, North Carolina Professional Engineer's Seal wisignature & date: [ \/1Final Partial (Include description) Certification Comments/Qualifiers (attach if necessary): CA 'ix) S :4" SEAt 0479,37 44P4flitot Mato of North Caroltror Env:r ownsonl QUAr); WAtti Ria4,444;t5 i le Qoatiry RegirNo!! Operroium orikti 6101 111:1$! Curet! clog!, 5::!!!t 1131 Mooncv! 281.1!,1