Loading...
HomeMy WebLinkAboutWQ0040163_Regional Office Historical File Pre 2018W11!3;.3r ReSOCII3L C35 4,,,,,ROwLN r July 24, 2018 Rickillowell, City Manager. City of Shelby 824 West Grover Street Shelby, NC 2815.0 RC '1 COOPER Governor MICHA.EL S. REGAN ,5ecretary LINDA CULPEPPER Interim Director Subject,: Penrfit No, WQ0040163 City of Shelby Gidney Street. Wastewater Collection System Extension Permit Cleveland County Dear .Mr. In accordance with your application received July19, 2018,.we are forwarding herewith Permit No. WQ0040163 dated July 24, 2018 to the City of Shelby (Permittee) for the construction and gperation upon certification of the subject wastewater collection system. extension.. This permit shallbe effective from the date of issuance until rescinded and shall be subject to the conditions and limitations as specified therein. This cover letter shall be considered a part of this permit and is therefore incorporatedtherein by reference. Please pay particular attention to the following conditions contained within this permit: Condition This permit shall not he automatically transferable; a request must be made and approved. Condition 1L4: Requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2T .0403 or any individual system -wide collection system permit issued to the Permittee. It shall be the responsibility of the Permittee to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply rnay result in penalties in accordance with North Carolina General Statute §143-215.6A through § 43-215.6C, construction of additional or replacement wastewater collection facilities, andfor referral of the North Carolina -licensed Professional Engineer to the licensing board. State of-N:(10-th CarOala Envuonmental Quality Reauurees WakeT Quality Regional Operata3na Slo.oreavii le Regt.onal Office io5 East Center AVerille, Suite 30 MOtinCS'I'111.e. Noah Carcairt:a 1.5 704 663. If any parts, requirements rae limitations aantainn d in thispermit are unaee ptahle, you have the right to request an adjudicatory r hearing upon written request within 0 days following receipt f this permit. This request must be in the form of a written petition, conforming to Chapter 150B of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Se ice Center, Raleigh, N( 76 9-6i'71 , 1 else such demands' are made, this permit shall be final and binding, need additional via e-mail at a a D cuu ign d by; cone ernin . this matter„ please a onta ? 61FE3 A2D84A3 r by VVB C oref,, Basinger, Regional Supervise r Water Duality Regional Operations Section Division of Water Resources, NCDEQ David Odom 1'l (1: -copy) Regional Office Files, P1 R S it 704) 2 21 0 Page of Ern, frorunenui Quakty STATE OF NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENTAL QUALITY WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT In accordance with the provisions of .Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to the City of Shelby Cleveland County for the construction and operation of approximately 650 linear feet of 8-inch public gravity sewer, to serve four 3-bedroom homes as part of the Gindey Street development project, and the discharge of 1,440 gallons per day of collected wastewater into the City of Shelby existing sewerage system, pursuant to the application received July 19, 2018, and in conformity with 15A. NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 1.2, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1. 2000, as applicable; and other supporting data subsequently filed and approved hy the Department of Environmental Quality and considered a. part of this permit. This permit shall be effective front the date of issuance until rescinded and shall be subject to the specified conditions and limitations contained therein. rA ' DocuSigned by: ' +41.1.1144/ 11 PZ1444 for - F 16 FE369A2D84A3,. by W. Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ By authority of the Environmental Management Commission Permit Number: .WQ0040163 Permit Issued: July 24,2018 Page 3 of 8 SUPPLEMENT TO PERMIT COVER SHEET City of Shelby is hereby authorized to: Construct, and then t)perate upon certification the aforementioned wastewater collection extension. The sewage and 'wastewater collected by this system shall he treated in the City of Shelby First Broad RiverWatewater Treatment Plant in accordance: with Permit Number NC0024538„ Permitting of this project does not constitute an acceptance of any part of the project that does not meet 15,A. NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted Rine 1, 2000, as applicable, unless specifically mentioned herein. Division approval is -based on acceptance of the certification provided by a North Carolina -licensed Professional Engineer in the application. It shall he the Permittee's responsibility- to ensure that the as -constructed project meets the appropriate design criteria and rules. Construction and operation is contingent upon compliance with the Standard Conditions and any Special Conditions identified below, I. SPECIAL CONDITIONS I.) No flow in excess of the quantity permitted herein., 1,440 GPD, shall be made tributary to the subject sewer system until an application for permit, modification (Or an increase in flow has been submitted to and approved by the Division. [1,5A NCAC 02T:0304 (b)[„ IL STANDARD CONDITIONS 1, 'This permit is not transferable. In the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change of the Permittee,a formal permit request shall he submitted to the Division accompanied by documentation from the parties involved, and other supporting materials as may he appropriate. The approval of this request shall be considered on its merits and may or may not be approved. [15A NCAC 02'1,0'104; G.S 143-215.1(d3)i '['his permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this pertnin 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design. Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials unless specifically mentioned herein. [15A NCAC 021,0110] 3. This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. [I5A NCAC 02T .0110] 4. The wastewater collection facilities shall be properly maintained and operated at all nines. The Permittee shall maintain compliance with an individual system -wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2T .0401 If an individual permit is not required, the following performance criteria shall be met: [15,A NCAC 02T ,0108(b)]: Page 4 of 8 The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and to prevent any contravention of groundwater standards or surface water standards. b. A map of the sewer system shall he developed and shall be actively maintained_ c. An operation and maintenance plan including pump station inspection frequency, preventative maintenance schedule, spare parts inventory and overflow response has been developed and implemented, d. Pump stations that are not connected to a telemetry system shall be inspected every day (i.e. 365 days per year). Rump stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer lines shall be inspected at least once per every six months and inspections documented. f. A general observation. of the entire sewer system shall be conducted at least once per year. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 2B .0506(a), and public notice shall he provided as required by North Carolina General Statute §143,-215.1C. Li . A Grease Control Program is in place as follows: 1. For public owned collection systems, the Grease Control Program shall include at least. biannual distribution of educational materials for both commercial and residential users and the legal means to require grease interceptors at existing establishments. The plan shall also include legal means for inspections of the grease interceptors, enforcement for violators and the legal means to control grease entering the system -from other public and private satellite sewer systems. 2. For privately owned collection systems, the Grease Control Program shall include at least bi- annual distribution of grease education materials to users of the collection system by the permittee or its representative. 3. Grease education materials shall be distributed more often than required in Parts (1) and (2) of this Subparagraph if necessary to prevent grease -related sanitary sewer overflows. Right-of-ways and easements shall be maintained in the .full easement width for personnel and equipment accessibility, j. Documentation shall he kept for Subparagraphs (a) through (i) of this Rule for a minimum of three years with exception of the map, which shall be maintained for the life of the system. 5. The Permittee shall report by telephone to a water resources staff member at the Mooresville Regional Office, telephone number (704) 663-1699, as soon as possible, but in no case nore than 24 hours. following the occurrence or first knowledge of the occurrence of either of the following: a, Any process unitfailure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc..; or h. Any SS() andlor spill over 1,000 galkms; or c. Any SS() and/or spin, regardless of volume, that reaches surface water Page 5 of 8 Voice mail messages or faxed .information is permissible, but this shall not be considered as the initial verbal report. Overflows and spills occurring, outside normal business hours may also be reported to the Division. of Emergency Management at telephone number (800) 858-0368 or (919) 733-3300. Persons reporting any of the above occurrences shall file a spill report by completing and submitting Part 1 of Form CS-SSO (or the most current Division approved fotm) within five days following first knowledge of the occurrence. 'Ibis report must outline the actions taken or proposed to be taken to ensure that the problem does not recur. Part II of Form CS-SSO (or the most current Division approved form) can also be completed to show that the SS() was beyond control, [G S. 1,43- 215.1C(a1)] 6. Construction of the gravity sewers, puny stations, and force mains shall be scheduled so as not to, interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. []5A NCAC 02T,0108(b)1 7. Upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form attached. to this permit shall be submitted with the required supporting documents to the address providedon the form. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considereda violation of the permit and shall subject the Permittee to appropriate enforcement actions. If the permit is issued to a private entity with an Operational Agreement, then a copy of the Articles of I.n.corporation. Declarations/Covenants/Restrictions„ and Bylaws that have been appropriately filed with the applicable Couris Register of Deeds office shall be submitted with the certification. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Supporting documentation shall include the following: i. One copy of the project construction record drawings (plan & profile views of sewer lines & force mains) of the wastewater collection system extension. Final record drawings should be clear on the plans or on digital media (CD or DVD disk) and are defined as the design drawings that are marked up or annotated with after construction information and show required buffers, separation distances, material changes, etc. b. One copy of the supporting applicable design calculations including pipe and pump sizing, .vel.ocity, pump cycle times, and level control settings, pump station buoyancy, wet well storage, surge protection, detention time in the wet well, and force main, ability to flush low points in force mains with a pump cycle, and downstream sewer capacity analysis. If a portable power source or pump is dedicated to multiple stations, an evaluation of all the pump stationsstorage capacities and the rotation schedule of the portable power source or pump, include travel timefrarnes, shall be provided. Changes to the project that do not result in non-compliance with this permit, regulations, or the Minimum Design Criteria should be clearly, identified on the record drawings, on the certification in the space provided, or in .written summary form,. Prior to Certification (Final or Partial): Permit modifications are required for any changes resulting in non-compliance with this permit (including pipe length increases of 10% or greater, increased llow„ pump station design capacity design increases of 5% or greater, and increases in the number/type of connections), regulations, or the Minimum Design Criteria. Requested modifications Page 6 of 8 or variances to the Minimum Design Criteria will be reviewed on a case -by -case basis and each on its own merit Please note that variances to the Minimum Design Criteria should be requested and approved during the permitti g process prior to construction. After -construction requests are discouraged by the Division and may not be approved, thus requiring replacement or repair prior to certification & activation. [15,A NCAC 02T .0116] 8. Gravity sewers installed greater than ten percent 'below the minimum required slope per the Division's Gravity Sewer Minimum. Design Criteria shall not be acceptable and shall not be certified until corrected. If there is an unforeseen obstacle in the field where all viable solutions have been examined, a slope variance can be requested from the Division with firm supporting documentation, This shall be done through a permit modification with fee. Such variance requests will he evaluated on a case -by -case basis. Resolution of such request shall be evident prior to completing and submitting the construction certification. [ I5A NCAC 02T,01050)1 9, A copy of the construction record drawings shall be maintained an file by the Permittee for the life of the wastewater collection facilities. [15A NCAC 02T .011611 10. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T; the Division's Gravity Sewer Design Criteria adopted February 12, 1996,.as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000, as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes 043-21.5,6A. through §143-2156C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. [15A NCAC 02T .0104; 15A. NCAC 02T ,0108(b-c)] 11. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including. those as may be required by this,Division, such as the construction of additional or replacement facilities. [15A NCAC 021 .0110; 15A NCAC 021 .0108(b)] 12. The issuance of this permit shall not exempt the Pennittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by the Division any other Federal. State, or Local government agencies which have jurisdiction or obtaining other permits 'which maybe required by the Division or any other Federal. State, of Local government agencies. [G.S, 143-215.1(b)] Page 7 of 8 FAST TRACK SEWER ENGINEERING CERTIFICATION PERMITTEE: CITY OF SHELBY PERMIT #: WQ0040163 PROJECT: GIDNEY STREET ISSUE DATE: JULY 24, 2018 This project shall not be considered complete nor allowed to operate in accordance with standard Condition 7 of this permit until the Division has received this Certification and all required supporting documentation. It should be submitted. in a manner that documents the Division's receipt. Send the required documentation to the Regional Supervisor, Water Quality Regional Operations Section at the address noted in the page footer. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up until a final certification is received by the Division. A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted. PERMIT-IF:CS CERTIFICATION I, the undersigned agent for the Pemnttee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, and the Permittee is prepared to operate & maintain. the wastewater collection system permitted herein or portions thereof Printed Name, Title Signature Date ENGINEER'S CERTIFICATION , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe ( periodically, [1:1 weekly, 11 full time) the construction of the project name and location as referenced above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 1.5A NCAC 02T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February .12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force 'Mains adopted June 1,. 2000, as applicable; and other supporting materials. North Carolina .Professional Engineer's Seal w/signature & date: Final Partial (include description) Certification Comments/Qualifiers (attach if necessary): NC DWR — Water Quality Regional Operations Section 610 East Center Avenue, Suite 301, Mooresville, NC 28115 Mooresville Regional Office Phone: (704) 663-1699 FAX: (704)-633-6040 DivUlm of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources ISA NCAC 02T .0300 — VAST TRACK SEWER SYSTEM EXTENSION APPLICATION IFTA 04-16 & SUPPORTING DOCUMENTATION ff Application Number: r qq(-)( k2,3 (to be completed by DWR) All items must be conipeted ppliesition will be returned I. APPLICANT INFORMATION: 1. Applicant's name: City of Shelby (company, municipality, MA, utility, etc.) 2. Applicant type: Individual 0 Federal Ej Corporation 0 General Partnership 0 State/County 0 Privately -Owned Public Utility Municipal El Other 3. Signature authority's name: per . RECE,IVE.D.N":,DEN-":10wR Title: City Manager 4. Applicant's mailing address: PO Box 707 City:, State: NC: Zip:28151- mOOR \,,ELLE RE. tE, W31,4 AL OF:F IC E 5. Applicant's contact .information: Phone number: (704),484-6840 Email Address: rick.howellgeitvofshel y.corn II. PROJECT INFORMATION: 1 „Project name: City of Shelby Qidney Street 2, Application/Project status: Proposed (New Permit) 0 Existing Permit/Project If a modification, provide the existing permit number: WQOO and issued date: If new construction but part of a master plan, provide the existing permit number: WQ 0_ 3. County where project is located: Cleveland 4, Approximate Coordinates (Decimal Degrees): Latitude: 35,164 ILongitude: 315' 5, Parcel ID (if applicable): 23282 (or Parcel ID to closest downstream sewer) DI. CONSULTANT INFORMATION: 1, Professional Engineer: David Odom License Number.Z1130 Firm: Odom Engineering,PUC Mailing address: 169 OakStreet City: Forest City State: NC Zip: 28043- Phone number: (828) 24774495 Email Address: davidodomgodomengineering.coln IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 14. 1 Facility Name: .First Br o River Wastewater Trent:pig-it Plant Permit Number: N4_5:31,3 Owner Name: City of Shelby V. RECEIVING DOWNSTREAM SEWILR NFORMATION (if different than WWTF): 1, Permit Number(s): WQ__ Downstream (Receiving) Sewer Size: inch "..• "4: WOCS00037 Owner Name(s): Ci FORM: ETA 04-16 Page 1 of 5 GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Pu lftlae Applicant is a Developer of lots to be sot If the Applicant is a 4. Origin of w tewater: (check all that Residential Owned 0 Residential Leased Q School / preschool / day care Q Food and drink facilities Q Businesses / offices / factories ifity, has a Certificate of Public Convenience and Necessi © Yes QNo % 'N/A I„ has a ❑ Yes QNo ON/A 0 Yes QNa 11N/A. pply) Retail (stores, centers, real Retail with food preparationt'se; Medical / dental / veterinary .facilitie Church Nursing Home Nature of wastewater : IQ©_% Domestic./Commercial % Commercial G/ Industrial Is there a Pretreatment Program in effect? 6Has a ow reduction been approved under 10 If tes,orgvidc a, ppy al,flow reduction approv 7. Summarize wastewater generated by project: Establishment Type (see 2,?,,,1 Residental Q Yes Q No Daily Design Flow''' 120 gal/day/br gal/ gab gal/ gab! gal/ beTn attached? been attached? n attached? © CraWash Q Hotel and/or Motels Q Swimming Pool /Clubhouse © Swimming Pool/Filter Backwash Q Other (Explain in Attachment) No No. of Units Total stow 1440 GPD GPD GPI? GPD GPD GP[" 1440 GPD a See for caveats to wastewater design Clow rates (Le., minimum flow per dwelling, proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in) b Per 15A NCAC 021 .0114(c), design flow rates for establishments trot identified [in table shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured d Wastewater generated by project: 1440 GPD (per Do not include future flows or previously permi If permitted flow is zero, indicate why: 0 Pump Station or Gravity Sewer where flow will 1 Q Flow has already been allocated in Permit Number: Q Rehabilitation or replacement of ex Q Other (Explain): d allocations permitted i ubsequent permits that connect to this line ting sewer with no new flow expected FORM: FTA 04-16 Page 2 of 5 VIL GRAVITY SEWER DESIGN CRITERIA (If Appliusble) & 1, Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8 650 SDR-2I PVC ): Section II & III of the MDC for Permitting of Gravity Sewers contains infomiation related to design criteria • Section III contains information related to minimum slopes for gravity sewer(s) • Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC PUMP STATION DESIGN CRITERIA (1,1Applicable), & ETE FO E CII U P T ON I PRO E 1, Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: 3. Design tlow of the pump station: millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): gallons per minute at feet total dynamic head (MU) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 6. Power reliability in accordance with El Standby power source or pump with automatic activation and telemetry - 15,A NCAC 02T .0305(hXIXB) /0 Required for ail pump stations with an average daily flow greater than or equal to 15,000 gallons per day • Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: 0 Portable power source with manual activation, quick -connection receptacle and telemetry 1 A NCAC 02T .0305(h)( 1 XC) or E] Portable pumping unit with plu ed emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C): >. It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station, ifthe portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel tirneframes, shall be provided in the case of a multiple station power outage. FORM.: PTA 4-16 Page 3 of 5 1X., SETBACKS & SEPARATIONS — (0211.0200 & 1.5A NCAC 02T .030 1. Does the project comply with all separations found in • 15.A NCAC 021.0305(1) cotaains minimum separations that shall be provided for sewer sstems: Setback Parameter* Separation Required Storm sewers and other utilities not listed below (vertical) 24 inches Water mains (vertical -water over sewer includintin. benched trenches) 18 inches Water maina(horizontal) 10 feet Reclaimed water lines (vertical reclaimed over sewer) 18 inches Reclaimed water lines thorizontal - reclaimed over sewer 2 feet **Any private or public water supply source, including any wells, WS-I waters of Class for Class 11 impounded reservoirs used as a SOUree of drinking water *Waters classified WS (except WS-1 or WS-V), B, SA, ORW, HQW, or SB from normal high water (or tide elevation) and wetlands (see item IX.2) 50 feet *Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches Any building foundation Any basement Top slope ofembankment or cutscutsof2 feet or more vertieda height 100 feet 10 feet 5 feet 10 feet 10 feet Drainage systems and interceptor drains 5 feet Any swimmiwools 10feet Final earthgraele (verticall 36 inches contains alternatives where separations in cannot be achieved. IA- **Stream classifications can be identified using the Division's • linoneompliance with sec Section X of this application Yes 2. Does the project comply with separation requirements for wetlands? (50 feet of separsition) Li Yes No /A. See the Division's draft separation requirements for situations where separation cannot be meet )0 No variance is required if the alternative design criteria specified is utilized in design and construction • As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per )0. This would include Trout Buffered Streams per No N/A DYesDNo N/A 4. Does the project require coverage/authorization under a 404 Nationwide or 0 Yes individual permits or 401 Water Quality Certifications? TA Information can be obtained from the 5. Does project comply with (additional permits/certifications)? 4 Yes U No Per , directly related environmental permits or certification plications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per , "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to trearnbanks th t is subject to erosion that undermines or deteriorates the sewer. 0 Yes 0 No N/A ./A If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 'Page 4 of 5 C.ERTIFIC :AT DNS: n Does the submitted system comply with and the If No, complete and submit the Vari review. Atatat"atvat of ti a re twee t is Professional Engineer's Certification: as applicable? Yes ©No ive Design Request application (VADC 10-14) anti supporting documents for aaa to aabraaittul of the Fast "Track Application and supporttlttr docituverrts. David W. Odom. P.E. nal Enginee arne from Application 1 attest that this application for has been reviewed by me and is accurate, complete and consistent with the in nation supplied in. the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that 1 have reviewed this mat and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 1.43-215.6A and 143-215,.68, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation, North Carolina Professional Engineer's seal, signature, and date: Applicant's Certificatio per 15A NCAC 02T 0106(b): Rick Nowell, C:aty Manager (Signature Authority's name & title from Applicatio has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this .non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution, I will make no claim against the Division of Water Resources should a condition of this permit be violated. t also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete_ NOTE'. — In accordance with General Statutes and > any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,00.0 as well as civil penalties up to $25,000 per violation, Signature, Date: FORM: ETA 04-16 Page 5 of 5 Tuvia, Ori A From: Sent: To: Subject: David Odom <davidodom@odomengineering.com> Tuesday, July 24, 2018 1:24 PM Tuvia, Ori A [External] Gidney Street Sewer Application Capacity - City of Shelby Ono ee f achmen Ori Just to confirm the application is for four 3BR homes which results in the 12 bedrooms, Let me know if you need anything else. Dave lyr partrnent of IAivis; if North rolina rrnmental Quality of Water Resources acking/Aceeptancc for Sewer Extension Applications (FTSE 04-16) ntity Requesting Allocation City of Shelby Project Name for which flow is being requested: Habitat - Ciidne v Street me F"'ISL may be required for a single project r `the owner (.f'the lV "'"TP is plot responsible for all pump route oaf than proposed 'w wastewater lok 1. °c rnplate this section only if you are the owner of the wastewater ar ent plant. a. WWTP Facility Name: First Broad 'WWTP b. WWTP Facility Perrnit WC"0024538 c. W WF1"P facility's pet -nil tt d flow° d. Estimated obligated flow not yet tributary to the, ''TP 4.60 are in MGD e„ 'WWTP facility's actual avg. flow f: 'fowl flow for this specific request g. "Total actual and obligated flows to the facility h. Percent of permitted flow used 0.00144 3,780 62.99% . . Complete ttlis section for eaa ;h pump station you are responsible for along the route of this. proposed 1,vastewater flow, fist pump stations located between tite project eunnectic-rn point and the W ^FI P: (A) (tt') (C) +C) C)-(A-D) Design Obligated, Pump Average Daily Approx, Not Yet l°c tal Current Station FirmFlow** Current Avg, Tributary Flow Plus aName or Capacity, * Firm f pi), Daily Flow, ]Daily Flow, t:l li ated Available Number) MGD MGD MELD MUID How Capacity*** * The Firm Capacity of any pump static rr is defined pas the can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pi) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < O. Downstre.am Facility Name (Sewe Downstream Permit Number: pumper Page 1 of 6 Certification Statement: I Rick Howell, City Manager certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form indicateacceptance of this wastewater flow. Signing Page2of6 UN ITH&J 3T0."T Ns(DEPARTMENT` V3'F Th 175OLk3' ICAO SU STATE OF E7oRT'T3 COAOUNA Do.,amwtrr UP NA.TGpk#L RESMRCRA MPh1 COW KETSIS"Y D¢P$Lk"kMANT 141.1,147k, NORM CA7kOLMNA 8NEL9Y QUADRAh¢CILE N011N (4M!. CL4V14Li44U c:Q. i 961INU I! SRRIRR rtt1P CR.✓r.RM11.f Siaallket ^pr., SWUM N. C �tu.TTig.ww'b!D@ra9 � mw Aids July 1 , 2018 Wes Bell Mooresville Regional t ffic Water Quality Section 610E. Center Avenue Mooresville, NC 115 Subject: Fast Track Sewer System Extension Application Gidney Street, City of Shelby, Cleveland County Dear Mr. 169 Oak Street Forest City, ILK 28043 We are submitting a Fast Track Sewer System Extension Application for Gidney Street Project located in Cleveland County, This submittal includes the following items: Signed Fast Track Sewer Application (ETA 04-16) Check for application fee _ 4 0. 0 Signed Flow Tracking/Acceptance Fora FTSE 04 6) USGS Topographic Map If you have any questions or need additional information, tlease contact me at 28 24 -44 5 or 1ciavidgclom(03000mengineexin Rc rn, Sincerely, David Odom P.E.