HomeMy WebLinkAboutNC0089176_Inspection_20160708Water Resources"
ENVIRONMENTAL QUALITY
July 8, 2016
Letitia Edens
Hoke County
227 N Main St
Raeford, NC 28376
SUBJECT: 6/21/2016 Compliance Evaluation Inspection
Hoke County
Hoke'County.WWTP`
Permit:No: •:N00089176
Hoke County •
PAT MCCRORY
Governor
•
DONALD R. VAN DER VAART
Secretary
S. JAY ZIMMERMAN
Director
Dear Ms. Edens :
Enclosed-please.find a copy of•the`Cornpliance Evaluation'Inspection•form. from the'.inspection
conducted' on..6/21/2016:',The Compliance'Evaluation Inspection was conducted by Mark -Brantley,
Environmental Program:Consultant, of the.Fayetteville-Regional.Office.'_:.The-facility was-found_to be in
Compliance with permit NC0089176. The cooperation of Mr. Donavan Dennis; Facility ORC, and:Mr.
Mike Dean,. Hoke County Utilities Department, was greatly appreciated. As a reminder, preservation of
the Watersof the State can only_be achieved through consistent NPDES..Permit-compliance.,-•
•
Comments
Facility was clean and neat in appearance at the time of the inspection.
• 'The ORC logbook and operatorslog was up:to date. Please continue to make sure all
maintenance activities are recorded.
• Please rememberthat,an annual report is required as stated in the facility's .NPDES`permit. This.
report can be done either on a calendar year basis or a fiscal year basis.
Concerns
Lime feed system. The Division recommends that spare parts be maintained onsite for the
mixing unit in the lime slurry tank. The concern is that if the mixer is not operational then the
lime slurry will form a solid and will not be able to be used in the WWTP. -
Fayetteville Regional Office
225 Green Street, Suite 714, Fayetteville, North Carolina 28301-5095
Main Phone: 910-433-3300 1 Internet'. http://www.ncdenr.gov
An Equal Opportunity \ Affirmative Action Employer — Made in part by Recycled Paper
Ms. Edens
Page 2
July 8, 2016
• Alum feed. The concern is that the alum feed system is not properly sized for Total Phosphorus
removal at higher flows. It was explained during the inspection that the complete feed system
(2 alum feed pumps) was being used to dose one of the batch reactors to meet the NPDES
Phosphorus limit. The operations staff explained that if both batch reactors were online that
they could not feed enough alum for phosphorus removal which could result in NPDES permit
violations.
• Bar Screen. On the day of the inspection the automatic bar screen was out of service. If you
have not already done so, please evaluate the system and repair as necessary.
• Alarms/SCADA. The Fayetteville Regional Office is concerned there is not enough telemetry at
this facility to alert staff of problems after hours. Failure of some of the automated systems at
this facility could result in a bypass or wastewater spill. If a large bypass occurs the Director of
the Division of Water Resources could require 24 hour staffing to prevent further bypasses.
• Actuator valves. The actuator valve on batch reactor #1 has failed and the County is working
with the manufacturerto repair orreplace the valve. Please have the manufacture evaluate the
valve on reactor #2 to see if it needs to be replace before it fails. Also, from a safety point of
view please consider relocating these valves so the operations will not have to lean out over the
water to work on them.
• Blowers. The operations staff has expressed concern over the blowers (batch reactors and
digesters blowers) shutting down during the hot weather periods due to the overheating of the
motor oil. The Fayetteville Regional Office understands the Countyy is working with the -
engineering firm and the blower manufacturerto correct the overheating problem.
• UV. The air scrubber in the UV bath was not operational. Operations staff was having to clean
the UV bulbs by hand which is a.labor intensive process.
• Filters. Operations staff stated that filters had to be manually backwashed during the decant
cycle because the flow was too low for the filters to backwash automatically.
• Effluent sampler. The effluent sampler is currently not flow proportional. The facility is working
with the instrumentation company to solve the problem.
Ms. Edens
Page 3
July 8, 2016
Please respond in writing to the Fayetteville Regional Office of the Division of Water Resources. by
August 15, 2016 to the above mentioned concerns.
Please refer to the enclosed inspection report for additional observations and comments: If you or your
staff have any questions, please call me at 910-433-3327.
cc:
Donovan Dennis, ORRC
Central _il-es•
FayettguiIi iiii
Sincerely,
Mark Brantley
Environmental Program Consultant
Division of Water Resources
Water Quality Regional Operations Section
United States Environmental.Protection Agency '
E PA Washington, D.c.20460 -
Water,Compliance Inspection Report
Form Approved.'
OMB No. 2040-0057 .•
Approval'expires'8-31-98 •
Section' A:` National Data System Coding (i.e:; PCS) •
Transaction Code NPDES yr/mo/day Inspection
1 i,, I 2 ILI 3 I NC0089176 • 111 121 16/06/21 I17
Type
18I I
I I I I •I .
Inspector Fac Type' • .
• 19I I 201
21I I I I I I I I- I...I:.I I ..l ,I, .I, I I. I ,I I -.III .I .-I 1- .I I. -I
I I 'I
I- I 1 1.16
Inspection Work Days Facility Self-MonitloringlEvaluation Rating �nB1 ' CIA
67.172 LJ .
I 70.,L_I 71ill
.I
Reserved" '
73I I i I74 751
I I I 1 I I. 180
Section'B Facility Data
Name and Location.of Facility Inspected (For Industrial Users discharging to POTW, also include
POTW name and NPDES permit Number)
Hoke County WWTP :.
Ellis Rd
Raeford NC 28376
Entry Time/Date
10:30AM 16/06/21
Permit Effective Date -•
13/02/01
..
Exit Time/Date
02:30PM.'..16/06/21
Permit -Expiration Date:
; ,.16/10/31
Names) of Onsite Representative(s)/Titles(s)/Phone and Faz-Number(s)
/. ..
//
Donovan Dennis/ORC/910-369-4186/
Other Facility -Data ,- r
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Letitia Edens,227 N Main St Raeford NC 28376/County
Manager/910-875-8751/9108757651 - - No
Section.C: Areas. Evaluated During Inspection (Check only those areas evaluated)
�• Permit Flow Measurement . ' .. �� .Operations -&:Maintenance. � Records/Reports -- ;. .
Self -Monitoring Program . Sludge Handling Disposal . :Facility:Site Review''; :, . -
Section:b: Siimniaryof-Finding/Cominents (Attach additional §heets of narrative and'checklists:as necessary),
(See attachment summary):,
Name(s) and Signature(s) of Inspector(s) • Agency/Office/Phone and Fax Numbers Date
Mark Brantley FRO WQ//910 433-3300 Ext:727/ "/ .. .
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers - , 7� I (i,, , Date
B in a S enso ;. �FRO WQ//910-433-3300 Ext.72E
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page# 1
31
NPDES
NC0089176
111 121
yr/mo/day
16/06/21
Inspection Type
I17 18I�J
(Cont.)
1
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Comments
•Facility was clean and neat in appearance at the time of the inspection.
•The ORC logbook and operators log was up to date. Please continue to make sure all maintenance
activities are recorded.
•Please remember that an annual report is required as stated in the facility's NPDES permit. This
report can be done either on a calendar year basis or a fiscal year basis.
Concerns
•Lime feed system. The Division recommends that spare parts be maintained onsite for the mixing
unit in the lime slurry tank. The concern is that if the mixer is not operational then the lime slurry will
form a solid and will not be able to be used in the WWTP.
•Alum feed. The concern is that the alum feed system is not properly sized for Total Phosphorus
removal at higher flows. It was explained during the inspection that the complete feed system (2 alum
feed pumps) was being used to dose one of the batch reactors to meet the NPDES Phosphorus limit.
The operations staff explained that if both batch reactors were online that they could not feed enough
alum for phosphorus removal which could result in NPDES permit violations.
•Bar Screen. On the day of the inspection the automatic bar screen was out of service. If you have not
already done so, please evaluate the system and repair as necessary.
•Alarms/SCADA. The Fayetteville Regional Office is concerned there is not enough telemetry at this
facility to alert staff of problems after hours. Failure of some of the automated systems at this facility
could result in a bypass or wastewater spill. If a large bypass occurs the Director of the Division of
Water Resources could require 24 hour staffing to prevent further bypasses.
•Actuator valves. The actuator valve on batch reactor #1 has failed and the County is working with the
manufacture to repair or replace the valve. Please have the manufacture evaluate the valve on reactor
#2 to see if it needs to be replace before it fails. Also, from a safety point of view please consider
relocating these valves so the operations will not have to lean out over the water to work on them.
•Blowers. The operations staff has expressed concern over the blowers (batch reactors and digesters
blowers) shutting down during the hot weather periods due to the overheating of the motor oil. The
Fayetteville Regional Office understands the County is working with the engineering firm and the blower
manufacture to correct the overheating problem.
oUV. The air scrubber in the UV bath was not operational. Operations staff was having to clean the UV
bulbs by hand"which is a labor intensive process.
•Filters. Operations staff stated that filters had to be manually backwashed during the decant cycle
because the flow was too.low for the filters to backwash automatically.
•Effluent sampler. The effluent sampler is currently not flow proportional. The facility is working with
the instrumentation company to solve the problem.
Page# 2
Permit: NC0089176
Inspection Date: 06/21/2016
Owner - Facility: Hoke County WVVTP
Inspection Type: Compliance Evaluation -
Operations & Maintenance
Is the plant generallyclean with acceptable housekeeping?
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment:
Permit
(If the.present permit expires in 6 months or less). Has the permittee submitted a new
application? •
Is the facility asdescribed in the permit?
# Are there any special conditions for the permit?
Is access to the plant site restricted to the general public?
Is the inspector granted access to all areas for inspection?
CoMMent:
Record Keeping
Are records kept and maintained as required by the permit?
Is all required information readily 'available, complete and current?
Are all records maintained for 3 years (lab. reg. required 5 years)?
Are analytical resulte•consistent With data reported on DMRs?
Is the chain -of -custody complete?
Dates, times and location of sampling
• Name of individual performing the sampling
Results of analysis and calibration
' •Dates of analysis-,
Name of person performing analyses
Transported:COCs
Are DMRs complete: -,do they include all permit parameters?
Has the facility, submitted its annual compliance report to users and DWQ?
(If the facility is =or >, 6 MGD permitted flow) Do they operate 24/7 with a certified operator
on each shift? Is the ORC visitation log available and current?
Is the ORC certified at grade equal to or higher than the facility classificatidn?
Is the beakUp-oPerator certified at one grade less or greater than the facility classification?
Is a copy of the current NPDES permit available on.site?
Yet NO NA NE
• 0 0 D
Yes NO NA NE
7.- • .171 121 0
•
-El 1;1
El El • 0
• 0 '0 0
, o 0
, •,
Yes No NA NE
• El
iiodo
• 0 .E1 El
,El 0 0
•
•
0!
••ILP,D
0 0'
"•:
1;1 P•D.
Page# 3
Permit: NC0089176
Inspection Date: 06/21/2016
Owner - Facility: Hoke County \AAArrp
Inspection Type: Compliance5valuation
Record Keeping
Facility has copy of previous year's Annual Report on file for review?
Comment:
Aerobic Digester
Is the capacity adequate?
Is the mixing, adequate?
Is the site free of excessive foaming in the tank?
# Is the odor acceptable?
# Is tankage available for properly waste sludge?
Comment:
Solids Handling -Equipment
Is the equipment operational?
Is the chemical feed equipment operational?
. - .
. . ,
Is storage adequate?
• • •
Is the site free of high level of solids in filtrate from filter presses or vacuum filters?,
Is the site free of sludge buildup on belts and/or rollers of filter press?
Is the site free of excessive moisture in belt filter press sludge cake?
The facility has an approved sludge management plan?
Comment: The belt Dress was not in operation at the time of the inspection.
Bar Screens
Type of bar screen
a.Manual
b.Mechanical
Are the bars adequately screening debris?
Is the screen free of excessive debris?
Is disposal of screening in compliance?
Is the unit in good condition?
Comment:
Yes No NA NE
- _
In 0 •
Yes No NA NE
11 El 0 El
• 0 0 El
111 0 0 0
11 El 0 El
11 0 0 0
• Yes No NA NE -
El CI DI 11
O El El •
O El 0 111
O 0 El II
O El •
El•0 0 II
Yes NO4NA 'NE
Grit Removal Yes No NA NE
Type of grit removal
Page# 4
Permit: NC0089176 Owner - Facility: Hoke County WVVTP
Inspection Date: 06/21/2016 ' '
Inspection Type: Complianoe Evaluation
Grit Removal' -
a.Manuar,
b.Mechanical
Is the grit free of excessive organic matter?
•
Is the grit free dfiexcassive odor?
# Is disposal of grit in compliance?
•
ComMent:
Yet .No' NA NE
'El El 0
0 0
Cl CI El
Sequencing Batch Reactors 'Yes No NA NE
Type of -Operation:
Is the reactor effluentfree of solids? 121 -
Does minimum:fill time correspond to the peak hour'flow rate of the'faeility? ' DAD i0
Is aeration and•Mixing cycled on and off during fill? II '0 0 cr
The operator understands and can explain the process? • II E]
Comment: This is a constant fill process:
Nutrient Removal
# Is total nitrogen removal required?
# Is totalphosphorous removal required?
Type r. '
*Is Chemical feed required to sustain process?
Is nutrient -removal process operating properly?
•
Conitnent:
Filtration (High Rate Tertiary)
Type of operation: -
Is the filter media present?
Is the filter surface free of. clogging?
Is the filter freaOf growth?
Is the air scour operafional?
Is the scouring acceptable'?
Is the clear well free cif excessive solids and filter media?
Comment:
„ .
Yes. No NA NE -
'Upflow
• -,1=1 0-
111 0 0 0 -
1111 1:1
•
. .
11' 0 0
D D
Page# 5
Permit: NC0089176
Inspection Date: 06/21/2016
Owner - Facility: Hoke County'MNTP
Inspection Type: Compliance Evaluation
.Disinfection - UV
Are extra UV bulbs available on site?
Are UV bulbs dean?
Is UV intensity adequate?
Is transmittance at or above designed level?
Is there a backup system on site?
Is effluent clear and free of solids?
Comment: There is no backup system for disinfection on site.
Standby Power
Is automatically activated standby power available?
Is the generator tested by interrupting primary power source?
Is the generator tested under load?
Was generator, tested & operational during the inspection?
Do the generator(s) have adequate capacity to operate the entire wastewater site?,
Is there an emergency agreement with a fuel vendor for extended run on back-up power?
Is the generatorfuel level monitored?
Comment:
Yes No NA NE
❑ '❑ ■-❑
II ❑ ❑ ❑
,111.:.0 ❑ ❑
▪ Cl ❑ ❑
❑ II ❑ ❑
11 ❑ ❑ ❑
Yes No NA NE,
11 D.D.D.
▪ ❑ ❑ ❑
❑ ❑•1
1 ❑ ❑ ❑.
❑ 0 ❑
1 °❑ ❑
Influent Sampling Yes No NA NE
# Is composite sampling flow proportional? ❑ •❑ ,I 0
Is sample collected above side streams? • - • 0 0 . ❑
Is proper volume collected? • 0 ❑ ❑
Is the tubing clean? 11000
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees �._: _❑-_ 0
Celsius)?
Is sampling,perforrned according to the permit? 1 ❑ 0 0
Comment:'
Effluent Sampling Yes No NA NE
Is composite sampling flow proportional? 0 0 ❑ 0
Is sample collected below all treatment units? • ❑ ❑ 0
Is proper volume collected? • 0 0 0
Is the tubing clean? • 0 0 ❑
Page# 6
Permit: NC0089176
Inspection Date: 06/21/2016
Owner - Facility: Hoke County W WTP •
Inspection Type: Compliance Evaluation
Effluent Sampling
# Is proper temperature set for sample storage (kept at Tess than or equal to 6.0 degrees
Celsius)?
Is the facility sampling performed as required by the permit (frequency, sampling type
representative)?
Yes No NA NE
❑ ❑ ❑
III ❑ ❑ ❑
Comment: Facility staff is working with the instrumentation company to set up the effluent sampler for
flow proportional sampling. Currently the sampler is not receiving the 4.20 ma signal from
flow measurement device.
Upstream / Downstream Sampling
Is the facility sampling performed as required by the permit (frequency, sampling type, and
sampling location)?
Comment:
Yes No NA NE
ill El El El
Page# 7