HomeMy WebLinkAboutWQ0015392_Regional Office Historical File Pre 2018 (2)prState of North Carolina.
Department of Environment
and Natural Resources
Division of Water Quality
Jaynes B. Hunt, Jr., Governor
Wayne McDevitt, Secretary
A. Preston Howard, Jr., P.E., Director
August 18, 1.998
Mr. Lloyd B. Beasley, Jr., City Manager
City of Conover
P O Box 549
Conover, NC 28613
City of Conover
Ira Cline Plantation
Sewer Extension
Catawba County
Dear Mr. Beasley:
In accordance with your application received May 26, 1998, we are forwarding herewith Permit
No. WQ0015392, dated August 18, 1998, to the City of Conover for the construction and operation of the
subject wastewater collection extension.
This permit shall be effective from the date of issuance until rescinded and shall be subject to the
conditions and limitations as specified therein. Please pay special attention to Permit Condition No. 13,
which states: "No flow shall be made tributary to the subject sewer system until an application for
individual permits for the collection system which will be made tributary to this system has been submitted
to and approved by the Division of Water Quality".
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the
right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of
this permit. This request must be in the form of a writter petition, conforming to Chapter 150B of the
North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer
27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding.
One set of approved plans and specifications is being forwarded, you. If you need additional
information concerning this matter, please contact Ed Buchan at (919) 7,3 083 extension 546.
Since
Preston Howard, Jar., P.E.
cc: Catawba County Health Department
Mooresville Regional Office, Water Quality lion
W. K. Dickson & Co., Inc.
P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone (919) 733-5083 FAX (919) 733-0719
An Equal Opportunity Affirmative Acton Employer 50% recycled/ 10% post -consumer paper
NORTH CAROLINA
ENVIRONMENTAL MANAGEMENT COMMISSION
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
RALEIGH
WASTEWATER COLLECTION PERMIT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as
amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
City of Conover
Catawba County
FOR THE
construction and operation of approximately 1,859 linear feet of 16 inch gravity sewer, and approximately
3,686 linear feet of 15 inch gravity sewer, to serve the Ira Cline Plantation, and the discharge of zero GPD
of collected domestic wastewater (flow to be allocated in future collection system permits) into the City of
Conover's existing sewerage system, pursuant to the application received May 26, 1998, and in
conformity with the project plan, specifications, and other supporting data subsequently filed and
approved by the Department of Environment and Natural Resources and considered a part of this perrnit.
This permit shall be effective from the date of issuance until rescinded and shall be subject to the
following specified conditions and limitations:
1. This permit shall become voidable unless the facilities are constructed in accordance with the
conditions of this permit, the approved plans and specifications, and other supporting data.
2. This permit is effective only with respect to the nature and volume of wastes described in the
application and other supporting data.
3. The facilities must be properly maintained and operated at all times.
4. The sewage and wastewater collected by this system shall be treated in the City of Conover's
Northeast Wastewater Treatment Facility prior to being discharged into the receiving stream.
5. This permit is not transferable. In the event there is a desire for the facilities to change ownership,
or there is a name change of the Permittee, a formal permit request must be submitted to the
Division of Water Quality (Division) accompanied by an application fee, documentation from the
parties involved, and other supporting materials as may be appropriate. The approval of this
request will be considered on its merits and may or may not be approved.
6. Construction of the sewers, pump station(s) and force main shall be scheduled so as not to
interrupt service by the existing utilities nor result in an overflow or bypass discharge of
wastewater to the surface waters of the State.
Upon completion of construction .and pia.or to operation of this permitted facility, a certification
must be received from a professional engineer certifying that the permitted facility has been
installed in accordance with this permit, the approved plans and specifications, and other
supporting materials. Mail the Certification to the Non -Discharge Permitting Unit, P.O. Box
29535, Raleigh, NC 27626-0535.
8. A copy of the approved plans and specifications shall be maintained on file by the Perrnittee for a
minimum of five years from the date of the completion of construction,
9. Failure to abide by the conditions and limitations contained in this permit may subject the Perrnittee
to an enforcement action by the Division, in accordance with North Carolina General Statute 143-
215.6A to 143-215.6C.
10. The issuance of this permit does not preclude the Permittee from complying with any and all
statutes, rules, regulations, or ordinances which may be imposed by other government agencies
(local, state, and federal) which have jurisdiction.
11. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance
conditions, the Permittee shall take immediate corrective action, including those as may be required
by this Division, such as the construction of additional or replacement wastewater collection
facilities.
12. Noncompliance Notification:
The Permittee shall report by telephone to the Mooresville Regional Office, telephone number
(704) 663-1699, as soon as possible, but in no case more than 24 hours or on the next working
day, following the occurrence or first knowledge of the occurrence of either of the following:
a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable
of adequate wastewater transport, such as mechanical or electrical failures of pumps, line
blockage or breakage, etc.; or
b. Any failure of a pumping station or sewer line resulting in a by-pass directly to receiving
waters without treatment of all or any portion of the influent to such station or facility.
Persons reporting such occurrences by telephone shall also file a written report in letter form within
five (5) days following first knowledge of the occurrence. This report must outline the actions
taken or proposed to be taken to ensure that the problem does not recur.
13. No flow shall be made tributary to the subject sewer system until an application for individual
permits for the collection system which will be made tributary to this system has been submitted to
and approved by the Division of Water Quality.
Permit issued this the 18th day of August, 1998
NORTHC1ROLiNA V
AGEMENT COMMISSION
A. Preston Howard, Jr., PE., Director
Division of Water Quality
By Authority of the Environmental Management Commission
Permit Number WQ0015392
2
PermitNo, 5 92
August 13, 199
Final
Pal
1, , as a duly registered Professional Engineer in the State of North
Carolina, haying been authorized. t observe p riodically, weekly, hill time) the consuuctiori of the
project, for the
Project Name
r
P rr itt e hereby state that, to the best of my abilities, due Bare and diligence was used in the observation
of the construction such that the construction was observed to be built within substantial compliance • d
intent of this permit, the approved plans d specifications, and other suppo g materials..
Signature Registration No.
Date