HomeMy WebLinkAboutNCC201932_NOT Closeout Documents_20210506North Carolina Department of Environmental Quality
Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094
(910) 433-3300
County: Cumberland Project: Blakefield Subdivision, Phase 6 - Lot 15 River basin: Cape Fear
Person financially responsible: Cates Building, Inc. - Christopher E Cates, Project N: CUNME-2020-134
President
Address: 639 Executive Place, Suite 400, Fayetteville, NC 28305
1. Project Location: Croft Drive, Cedar Creek
Pictures: No
2. Weather and soil conditions: Dry, workable soils
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes
5. Violations:
6. Is the site in compliance with the NPDES Permit? Yes
Describe:
Initial inspection: No
If no, check violations below:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): No one
Inspection report: Sent Report
9. Corrective action needed:
Title:
Date given/sent: October 20, 2020
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is in compliance with the SPCA and
released. Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities should be requested by the permittee via a Notice of Termination_
Please note that this correspondence must be uploaded as part of completing the Notice of
Termination process.
Reported by: Melissa Joyner Others present:
Date of inspection: October 15, 2020 Time arriving on site: 4:30 PM Time leaving site: 4:40 PM
cc: