Loading...
HomeMy WebLinkAboutNC0035904_Lab Certification Inspection_20040730ATA NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Michael F. Easley, Governor William G. Ross, Jr., Secretary Alan W. Klimek, P.E., Director July 30, 2004 5218 Mr. Darrel Cockman McCain Correctional Hospital WWTP 855 Old NC Hwy. 211 Raeford, NC 28376- SUBJECT: Laboratory Certification Maintenance Inspection Dear Mr. Cockman: DEN II` -FR0 AUG 3 - 2004 DWQ Enclosed is a report for the inspection performed on July 22, 2004 by Mr. Norm Good. No deficiencies or lettered comments and/or recommendations are cited in this report, a response is not required. We appreciate the fine job you and your staff are doing. As a certification requirement, your laboratory must continue to carry out the requirements set forth in 15A NCAC 2H .0800. Copies of the checklists completed during the inspection may be requested from this office. Thank you for your cooperation during the inspection. If you wish to obtain an electronic copy of this report by email, or if you have questions or need additional information please contact us at 919-733-3908. Sincerely, 0teddaite-t_ James W. Meyer Laboratory Section Enclosure cc: Norm Good Fayetteville Regional Office Laboratory Section 1623 Mail Service Center, Raleigh, North Carolina 27699-1623 4405 Reddy Creek Road, Raleigh, North Carolina 27609 Phone: 919-733-3908 / FAX: 919-733-6241 / Internet: www,dwglab.org An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper North Carolina Naturally On Site Inspection Report LABORATORY NAME: McCain Correctional Hospital WWTP ADDRESS: 855 Old Hwy. 211 Reaford, NC 28376 CERTIFICATE NO: 5218 DATE OF INSPECTION: July 22, 2004 TYPE OF INSPECTION: Field EVALUATOR: Norman L. Good LOCAL PERSON(S) CONTACTED: Darrel Cockman I. INTRODUCTION: This laboratory was inspected to verify its compliance with the requirements of 15A NCAC 2H .0800 for the analysis of environmental samples. II. GENERAL COMMENTS: The facilities and equipment are well maintained. All documentation was current and all applicable calibrations and quality control measures had been performed. No deficiencies were noted during this inspection. Report prepared by: Norman L. Good Date: July 27, 2004