HomeMy WebLinkAboutSW3210301_Supplement-EZ Form_20210511SUPPLEMENT-EZ COVER PAGE
FORMS LOADED
(PROJECT INFORMATION
1 jProject Name
2 1 Project Area ac
3 lCoastal Wetland Area
4 Surface Water Area ac
5 Is this project High or Low Density?
6 Does this protect use an off -site SCM?
Cresswind - Phase 3
63
0.56
High
No
COMPLIANCE WITH 02H .1003(4)
7
Width of vegetated setbacks rovided feet
30
8
Will the vegetated setback remain vegetated?
Yes
9
If BUA is proposed in the setback, does it meet NCAC 02H.1003 4 c-d ?
Yes
10
Is streambank stabilization proposed on this project?
No
NUMBER AND TYPE OF SCMs:
11
Infiltration S stem
0
12
Bioretention Cell
0
13
Wet Pond
1
14
Stormwater Wetland
0
15
Permeable Pavement
0
16
Sand Filter
0
17
Rainwater Harvesting RWH
0
18
Green Roof
0
19
Level Spreader -Filter Strip LS-FS
0
20
Disconnected Impervious Surface (DIS)
0
21
Treatment Swale
0
22
Dry Pond
0
23
StormFilter
0
24
Silva Cell
0
25
lBayfilter
0
26
1 Filterra
0
FORMS LOADED
DESIGNER CERTIFICATION
27
Name and Title:
Matthew S. Kiker
Tho
Or anization:
Thomas & Hutton
29
Street address:
1020 Euclid Avenue
30
City, State, Zip:
Charlotte, NC 28203
31
Phone numbers :
980-201-5507
32
Email:
kiker.m@tandh.com
Certification Statement:
I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision, that
the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete, and that the engineering plans,
specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here.
H C A R •�''�4
�•-.�p�LSSlgNq . q
USEAL
04948O
' • .......... • .•�
.•••.......• [i�9
THOMAS
E HUTTON
ENGINEERING
No F-OB71 '
Signature of Designer
Date
DRAINAGE AREAS
1
Is this a high density project?
Yes
2
If so, number of draina a areas/SCMs
1
3
Does this roiect have low densit areas?
No
4
F5
If so, number of low densitydrainage areas
0
Is all/part of this project subject to previous rule
versions?
No
FORMS LOADED
Entire Site
1
4
T pe of SCM
N/A
Wet Pond
5
Total drainage area (sq ft
865355
6
Onsite drainage area (sq ft
865355
7
Offsite drainage area (sq ft
0
8
Total BUA in project (sq ft
589657 sf
9permitting)
New BUA on subdivided lots (subject to
s ft
589657 sf
10permitting)
New BUA not on subdivided lots (subject to
s
-
11
Offsite BUA (sq ft
-
12
1 Breakdown of new BUA not on subdivided lots:
Parking (sq ft
91250 sf
Sidewalk (sq ft
31114 sf
Roof (sq ft
365000 sf
Roadway s ft
89979 sf
Future (sq ft
-
Other, please specify in the comment box
below (sq ft
13
New infiltrating permeable pavement on
subdivided lots (sq ft
14
New infiltrating permeable pavement not on
subdivided lots (sq ft
15permitting)
Existing BUA that will remain (not subject to
s ft
16
Existina BUA that is already permitted (sq ft
17
Existing BUA that will be removed (sq ft
18
Percent BUA
68 0
19
Design storm inches
1 in
20
Design volume of SCM cu ft
47842 cf
21
Calculation method for design volume
simple
ADDITIONAL INFORMATION
22
Please use this space to provide any additional information about the
drainage area(s):
WET POND
area number
ERAL MDC FROM 02H .1050
3
Is the SCM sized to treat the SW from all surfaces at build -out?
Yes
4
Is the SCM located away from contaminated soils?
Yes
5
What are the side slopes of the SCM (H:V)?
:1
6
Does the SCM have retaining walls, gabion walls or other
engineered side slopes?
No
7
Are the inlets, outlets, and receiving stream protected from erosion
10- ear storm)?
Yes
8
Is there an overflow or bypass for inflow volume in excess of the
desi n volume?
Yes
9
What is the method for dewatering the SCM for maintenance?
Drawdown Orifice
10
If a Iicable, will the SCM be cleaned out after construction?
Yes
11
Does the maintenance access comply with General MDC 8 ?
Yes
12
Does the drainage easement comply with General MDC (9)?
Yes
13
If the SCM is on a single family lot, does (will?) the plat comply with
General MDC 10 ?
No
14
Is there an O&M Agreement that complies with General MDC (11)?
Yes
151
Is there an O&M Plan that complies with General MDC (12)?
Yes
161
Does the SCM follow the device specific MDC?
Yes
17
Was the SCM designed by an NC licensedprofessional?
Yes
WET POND
MDC FROM 02H .1053
18
Sizing method used
SA/DA
19
Has a stage/storage table been provided in the calculations?
Yes
20
Elevation of the excavated main pool depth (bottom of sediment
removal) (fmsl
564.00
21
Elevation of the main pool bottom (top of sediment removal) (fmsl)
564.50
221
Elevation of the bottom of the vegetated shelf (fmsl)
567.50
23
Elevation of the permanent pool (fmsl)
568.00
24
Elevation of the top of the vegetated shelf (fmsl)
568.50
25
Elevation of the temporary pool (fmsl)
568.00
26
Surface area of the main permanent pool (square feet)
18273
27
Volume of the main permanent pool (cubic feet)
54465 cf
28
Average depth of the main pool (feet)
2.95 ft
29
Average depth equation used
Equation 3
30
If using equation 3, main pool perimeter (feet)
660.0 ft
31
If using equation 3, width of submerged veg. shelf (feet)
3.0 ft
32
Volume of the forebay (cubic feet)
9305 cf
33
Is this 15-20% of the volume in the main pool?
Yes
34
Clean -out depth for forebay (inches)
48 in
351
Design volume of SCM (cu ft)
47842 cf
36
Is the outlet an orifice or a weir?
Orifice
37
If orifice, orifice diameter (inches)
3 in
38
If weir, weir height (inches)
39
If weir, weir length (inches)
-
40
Drawdown time for the temporary pool (days)
3
41
Are the inlet(s) and outlet located in a manner that avoids short-
arcuitin ?
Yes
42
Are berms or baffles provided to improve the flow path?
No
43
Depth of forebay at entrance (inches)
66 in
44
Depth of forebay at exit (inches)
60 in
45
Does water flow out of the forebay in a non -erosive manner?
Yes
46
Width of the vegetated shelf (feet)
6 ft
47
Slope of vegetated shelf (H:V)
6:1
48
Does the orifice drawdown from below the top surface of the
ermanent pooI?
Yes
49
Does the pond minimize impacts to the receiving channel from the 1-
r, 24-hr storm?
Yes
50
Are fountains proposed? (If Y, please provide documentation that
MDC(9) is met.
No
51
Is a trash rack or other device provided to protect the outlet system?
Yes
52
Are the dam and embankment planted in non -clumping turf grass?
Yes
53
Species of turf that will be used on the dam and embankment
Bermuda
54
Hasa plantinq plan been provided for the vegetated shelf?
Yes
ADDITIONAL
INFORMATION
55
Please use this space to provide any additional information about
the wet pond(s):
Wet Pond 1 11:49 AM 4/2/2021