Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW3210301_Design Calculations (Stormwater - Phase 3)_20210511
Iq STORMWATER MANAGEMENT REPORT FOR: CRESSWIND WESLEY CHAPEL - PHASE 03 WESLEY CHAPEL, NC PREPARED FOR: KH WESLEY CHAPEL, LLC APRIL 1, 2021 THOMAS & HUTTON ENGINEERING - co No F-0871 0 O %IIIIII1111 �O Prepared by: THOMAS Sc HUTTON STORMWATER MANAGEMENT REPORT Cresswind Wesley Chapel - Phase 03 Project: Cresswind Wesley Chapel - Phase 03 T&H Job Number: J-27842.0003 Location: Potter Road Wesley Chapel, NC 28173 Date Prepared: April 1, 2021 Owner: KH Wesley Chapel, LLC Owner Address: 8913 Silver Springs Court Drive Charlotte, NC 28215 Engineer: Thomas & Hutton Engineer Address: 1020 Euclid Avenue Charlotte, NC 28203 Phone: 980-201-5505 H THOMAS & HUTTON Page 1 TABLE OF CONTENTS Section 1 - Summary of Results....................................................................................................... Page 3 Section 2 - Project Narrative........................................................................................................... Page 4 Section3 - Purpose........................................................................................................................... Page 4 Section 4 - Regulatory Summary.................................................................................................... Page 5 Section5- Methodology.................................................................................................................Page 5 Section6- Hydrology.......................................................................................................................Page 6 Section 7- Runoff Calculations......................................................................................................Page 6 Section 8- Existing Conditions........................................................................................................Page 8 Section 9 - Post Development Conditions.....................................................................................Page 8 APPENDICES ProjectMapping...................................................................................................................... Appendix A Aerial Location Map.......................................................................................................... Exhibit A FEMAMap........................................................................................................................... Exhibit B WetlandsMap.................................................................................................................... Exhibit D SoilsMap.............................................................................................................................. Exhibit E Pre Development Drainage Map...........................................................................................Appendix B Pre Development Conditions Drainage Calculations......................................................... Appendix C Post Development Drainage Map........................................................................................ Appendix D Post Development Conditions Drainage Calculations........................................................Appendix E Water Quality Calculations...................................................................................................... Appendix F H THOMAS & HUTTON Page 2 SECTION 1 - SUMMARY OF RESULTS Table 1 - Pre Development Runoff Rates TABLE 1 Summary of Results - Existing Conditions Storm Event Outfall 01 cfs 2-year 41 10-Year 88 25-Year 114 50-Year 138 Table 2 - Post Development Runoff Rates TABLE 1 Summary of Results - Proposed Conditions Storm Event Outfall 01 cfs 2-year 33 10-Year 78 25-Year 112 50-Year 148 SECTION 2 - PROJECT NARRATIVE H THOMAS & HUTTON Page 3 Cresswind is a residential subdivision within Wesley Chapel, North Carolina. Phase 3 consists of approximately 157 single family detached units, with a portion draining to the exisiting pond in Phase 2 and the remaining draining to the proposed pond in Phase 3. The site is located in Union County along Potter Road, north of Newtown Road and south of Weddington Road. The majority of the site is currently wooded with an understory of brush. Pre -development run- off is discharged into an existing wetland system and FEMA Floodplain. The pre -development drainage basins have been delineated and are illustrated on the Pre -Development Drainage Exhibit found at the end of this report. For the purpose of this report we will compare the predevelopment runoff rates to the post development runoff rates as shown in the summary at the beginning of this report. The pre - development basin SUB-01 will be routed through one wet detention ponds during post development conditions and outfall into the existing wetlands and floodplain. The post -development sub -basins were delineated and are illustrated on the Post -Development Drainage Exhibit found at the end of this report. All design information for ponds and associated drainage pipes and structures can be found in the appendices of this report. The soils on this site consist of type B, C and D hydrologic soil groups which are shown on the attached NRCS soils map within Appendix A. SECTION 3 - PURPOSE The purposes of this report are: 1. To delineate all pre -development basins that are within this project and determine which drainage basins will be affected by the proposed development. 2. To develop a stormwater model that will: a. Be in compliance with the NCDEQ stormwater regulations. b. Simulate the pre- and post -development conditions for the project. c. Predict water elevations for all proposed ponds. d. Demonstrate that all culverts are of adequate size for drainage under post - development conditions. e. Provide design flows (under future build out conditions) for the major drainage structures that can be used to properly size improvements, if needed. 3. To document that the stormwater management measures and equipment installed on site will be adequate for all existing and proposed development on the site. Two drainage models are included in this report; • Pre -Development: examines the drainage basin prior to any development within the site. • Post -Development: examines the drainage basin after site improvements have been installed. The model may need to be revised and updated as the site plan evolves. H THOMAS & HUTTON Page 4 SECTION 4 - REGULATORY SUMMARY NCDEQ - Stormwater The North Carolina Department of Environmental Quality (NCDEQ) is responsible for administering the storm water management program. Development or re -development activities are required to apply for and receive a stormwater permit from NCDEQ. These permits address water quality and quantity. NCDEQ regulations require that peak post -development discharge rates from the basin shall be at or below pre -development rates for the 10 and 25-year storms events. The regulations also specify the 1-inch volume drawdown shall be released over a time of 48 to 120 hours to minimize hydrologic impacts to the receiving channel. See attached Exhibit E for post -development peak flow control calculations, and Exhibit F for water quality calculations. The stormwater treatment shall be designed to achieve average annual 857o Total Suspended Solids (TSS) removal and must apply to the volume of post -development runoff resulting from the one -inch rainfall. See attached Exhibit E for post -development peak flow control calculations, and Exhibit F for water quality and channel protection calculations. SECTION 5 - METHODOLOGY The pre- and post -development conditions of the site were analyzed using the Storm and Sanitary Analysis (SSA) program developed by Autodesk. The program is used to model rainfall and stormwater runoff and to perform hydraulic routing through the storm drainage system (including existing and proposed storage/detention features such as wetlands, ponds, and lakes). SSA is an advanced, powerful, and comprehensive modeling package for analyzing and designing drainage systems, stormwater sewers, and sanitary sewers. The software can simultaneously model complex hydrology, hydraulics, and water quality. The SSA program is built on the highly tested and widely utilized SWMM methodologies. For this application of the SSA program, the hydrology was simulated using the NRCS (SCS) TR-55 methodology. The hydraulics was simulated utilizing hydrodynamic routing. Hydrodynamic routing solves the complete St. Venant equations throughout the drainage network and includes modeling of backwater effects, flow reversal, surcharging, looped connections, pressure flow, tidal outfalls, and interconnected ponds. The SSA program graphical user interface (GUI) allows for the input of hydrologic data for each drainage sub -basin. See the appendices for input variables including runoff curve number, rainfall distribution pattern, hydrograph peaking factor, area of each drainage sub -basin, and time of concentration. The SSA program generates runoff hydrographs for each sub -basin based on these user -specified variables. Hydrographs are generated by SSA using the NRCS Unit Hydrograph (TR-55) Method. The model's hydraulic input data consists of a system of nodes and links. Nodes represent locations where flows enter or exit the system, pipe or channel characteristics change, or where stage/storage/time relationships are provided. Links represent traditional types of hydraulic conveyance such as pipes, channels, control structures, weirs, etc. The sizes, inverts, lengths, and H THOMAS & HUTTON Page 5 Manning "n" values for all pipes connecting the ponds or lakes are input into the model. In addition to pipe information, all pond, lake, and detention area stage -area information and the respective control structure information is input into the model. The node and link conditions are analyzed within the model for a given storm, and flow conditions are determined. Hydrographs for each drainage area are merged within the SSA program, and the hydrologic results are then combined with the hydraulic information to model the hydraulic interactions of the entire drainage system. The results include pond area and discharge rates and stage/storage information during the storm events. The storm drainage infrastructure onsite was modelled using the Storm Sewers program developed by Autodesk. This program utilizes the model rainfall and stormwater runoff through the storm drainage infrastructure to provide hydraulic grade line calculations and profiles for analyzing the proposed storm drain network. SECTION 6 - HYDROLOGY ■ SCS TR-55 Method was used. ■ The rainfall intensity used for each storm event was obtained from rainfall data publicly available for Union County, NC. The following design storms are used in the model simulations: - 2-year, 6-hour Design Storm = 3.50 inches - 10-year, 6-hour Design Storm = 5.20 inches - 25-year, 6-hour Design Storm = 6.10 inches - 50-year, 6-hour Design Storm = 6.90 inches - 100-year, 6-hour Design Storm= 7.50 inches ■ SCS Type II Statistical Rainfall Distribution was used. This distribution pattern is determined by the Soil Conservation Service comparing regional rain -gage data. ■ Soils present on site consist of the following: - Badin channery silty clay loam, 2 to 8 percent slopes (BdB2) - HSG C - Chewacla silt loam, 0 to 2 percent slopes (ChA) - HSG B/D - Goldstone-Badin complex (GsC), 8 to 15 percent slopes - HSG C - Tarrus gravelly silty clay loam, 2 to 8 percent slopes (TbB2) - HSG B SECTION 7 - RUNOFF CALCULATIONS Peak flow rates for the watersheds were calculated by the SSA Program for each design storm. The pre- and post -development drainage basins are shown in appendicies that follow this report. Curve Numbers Curve numbers were generated according to procedures set forth in SCS Technical Release 55. The composite curve numbers for each drainage basin were calculated using soils information from the Soil Survey of Union County, NC provided by The United H THOMAS & HUTTON Page 6 States Department of Agriculture Soil Conservation Service. Curve numbers were weighted based on the land use and soil group within each basin. Time of Concentration Times of concentration were calculated according to procedures set forth in SCS technical Release (TR) 55. The travel times (Tt) for overland flow, shallow concentrated flow, and channel flow are added together for the drainage basin to get the time of concentration Tc. Basin information for the area of interest was collected for use in the SSA models. Basins were delineated using surveyed topographic information. Basins were drawn and the longest flow paths were found. The times of concentration were calculated based on the NRCS, three part travel time method documented in TR-55. The three equations used are summarized below: Sheet Flow: (hr) 0.00 7(n.L) a.s t1 — Pz 0.05 X S a.4 Shallow Concentrated Flow: (hr) L _ tz 3600 x V Channel Flow: (hr) L i3 3600 x V Time of Concentration: (hr) t, = t1 + tz + t3 Symbol Dimension Units n Manning's n -- L Length of flow ft P2 2 yr event rainfall in S Slope ft/ft Symbol Dimension Units L Length of flow ft V* Velocity ft/s *Based on TR-55 velocity -slope relationship Symbol Dimension Units L Length of flow ft V* Velocity ft/s *Assumed to be 2 ft/s Appendices C and E with time of concentration information are attached. Mr. THOMAS & HUTTON Page 7 SECTION 8 - EXISTING CONDITIONS The total acreage of the drainage basins analyzed in the stormwater calculations is approximately 55 acres. The existing conditions described in this narrative will refer to the pre - development condition of the site. The pre -development conditions for the site consists predominantly of woods with an understory of brush. Stormwater runoff on the site was delineated according to the existing drainage patterns found at the site and upon the field topographic survey completed within the site. The watershed delineation was conducted to provide a comparison for pre -development and post - development flows. Outfall "01 " discharges into an existing wetland (See Pre Development Drainage Map - Appendix B). SECTION 9 - POST - DEVELOPMENT CONDITIONS The post -development drainage basins are shown on the Post -Development conditions watershed map located in Appendix D of this report. The total post -development watershed area analyzed for this project is approximately 18 acres. This site maintains all pre -development discharge points in the post -development condition. Post -development peak flows are less than pre -development conditions for the 2-yr, 10-yr, and 25-yr storm events. See Appendices B through H for pre- and post -development SSA model input and results. See Summary of pre - development versus post -development results at the beginning of report. After development, the site will consist of approximately 76 single family lots in Phase 2 and 96 lots in a future phase, public roads, private driveways, and stormwater management features such as drainage swales and stormwater detention ponds. Stormwater runoff from site will be conveyed to a proposed wet detention pond. The detention pond will meet NCDEQ pre- and post -development flows and meet freeboard requirements for the ten (10) year, twenty-five (25) year, and fifty (50) year storm events. The proposed detention ponds were designed to meet criteria found in the NCDEQ BMP Design Manual. Additionally, the required freeboard has been provided beneath the emergency spillways and the pond embankments for the (50) year storm event. The following tables illustrate the maximum water surface elevation for the two (2) year, ten (10) year, twenty-five (25) year, and fifty (50) year storm events both ponds. H THOMAS & HUTTON Page 8 Table 3 - Wet Detention Pond 04 Bottom of Pond = 563.5 Crest of Emergency Spillway = 572.75 Top of Embankment = 573.00 Wet Detention Pond 04 Storm Event Max Elevation (f0 10-Year 572.49 25-Year 573.04 50-Year 573.27 H THOMAS & HUTTON Page 9 STORMWATER MANAGEMENT REPORT CRESSWIND WESLEY CHAPEL - PHASE 03 APPENDIX A PROJECT MAPPING 27842.0003 H THOMAS Sc HUTTON v u c � N N = l0 N L U O Q N m LL O 7 O � r No LL � T ro N c N u o ti � 2 M� w �/� w N O � U C V N L a N LV D O O LL W o c a U v H� a v o ° V o N O_ rl U7 a O LL = Q ■■■ 0 W Mai �w v u c N N = N N L U O Q N m LL O 7 LL a L Or i rl Ln o LL T ro N c N o ry � -0 00 [� ^ _I N O U O L2 T� 2 /V/\, p U p 7 N r N LV —D O L O LL F c c 0 W o c a U v H� a v o ° V o N O_ � N O N N rl U7 a O LL = Q ■■■ 0 -C, W N Mai li IL tm� IF A. 9�n N ♦-) ♦. -0 N H L— N f� J N m O _O H Z v 0 0 m k O O e p e cc Q 0 C N 0 e x N C LL i N _6 a) a) c N co L U m t t E co 3 C = 3 a> N J -6 = a) j LL °— ¢ m 0� co o ° a � x o m m o O E— °� ¢ a) m W a) v o 0 0 0 -0 a) Q 0 k N _6 2 LLL `O (6 C C o O J C W T LL l a) a) a) C 0 v o LLL �S V 0 V a) 3 _O N Co O Co a) 0 ci �a -O N N O C o O L > O (6 (6 m ° Q -6 O o L ° a5 C C, a)'i E LL N E LL 3 W Co > s 15 a) a) a) O C U ° Co — _O O 0 0' a) a) o 0 a) a) a) T O m a) C LL Co Q O T 'o Y C O a) LL C O C U Y 0 '� N V ~ °O N a) E ~ W O �¢m C co O LL L a) L N _ N m� o � m m �_ N as C dcmi 3� 3 as a) as 0 as 5 o as m w 0 a) w a = ° N 0 N , 2 2 d d d w d L N ° O N co E T O O "O a3 LL U Q J Q Q W Q U J U U a0 J U LL 2 N LL w O W u�a 0'w M: W L a w a a w U O Q Q Q p w C 7 LL r as LLI =0 r O fn 2 r LL O a) � a) (6 � E O O_ z 2� CL _ (6 N Ems° ao E co ° to co co ° 3 m Y �' E cowo a) Co w o N a� E v o ° ° E z ° Q Y m ° o ° w C 0 ate+ 0 w W _06 U a) O aT+ �. (6 > E a) - ° T C (6 y Q a) y Y 4 N d 4 (6 E a) o i E (6 0 > as Y m N v $Q v o c E m a Ev M (a Q 'wo °_ N-0 a) m -0 > (6 N L 0 -1 d i O E o -0 N c0 N o m O p- (a a1 co as -0 `m m aa)m 0o 0a) Co U oEo v M Z _6 O O O- O N E >i Y (6a) 0 (6 a)L w .Q J W C LL E 0p a) co N a)- C Q dLL E w .. O V C (6 N a�+y„ 0 0 i 4�� T V N OQN V oQas ° ❑❑®t0C r a as 3 c N:� 3 w °3NE°v 2 J c as v m > a E Z E to0a)CM� EECL N -0 pea) CL COT -° W Z ° O E N OQ � a) T L>" co Z _6 y O L a) (6 a) -O Q y N C as a o Q a © Co 0 0 E �° 0 ._ 0- 0 t a) ° `o �r E as E a) ° c m �� ax) t a)O Em ¢ twotc0i t�m�EaO to wo�E� -a co rasa rn ra)��� 0 0 0 0 0 0 0 LO 0 LO N W Z o OOZZLB£ ONZL8£ 000ZL8£ 0066L8£ 0096L8£ 00L6L8£ 0096L8£ 0096L8£ OOb6L8£ 00£6L8£ M „L4,6£ .08 M „Sb,Ob .08 OOZZL8£ ONZL8£ 000ZL8£ 0066L8£ 0096L8£ 00L6L8£ 0O6L8£ 0096L8£ OOb6L8£ 00UZK z z o m N V w M..L4,6£ .08 O O 8 N c N a a� 8 � U 'o U � o � U > 0 m o aL U CL o ^ m o Z g W Ln j X � ON 8 n g N > fA Lf) O. N •0 N +� > p p L L 7 N ziiijc C ZU 0 Z /W V W J a Q O U)y N m w U O � N N' O N N I O Q U O U O y (6 O U) 3 C a) D m E O Q 7 N 6 U) 6 U)Y U06 o O E O N N N a) 3 O O U) a U U N E (A -a O N y a)(`") a) a) p "�" "=" N tl) N O L-0 N Z O m N (6 c d N U)-5 m Q ON O N � O2 `� N E U W N a3 O N o � () (6 N O O U O N U) N Z C a) 2 0- Q � N i O U O a- O O E 0 U U N N >,.� o U o O 7 0 y Q E �' N y O 70= N m O- O Q N N E N N U 2 a) 7 w U O N U -p CL w, '6 a) U O N (6 -0 a) (0 to E tl) > a) N 0� N a) 3: N C 3 J> (6 O N Q E O U Q C (6 N Utl) = i N U) O -O = O � N Z E Q U a) Q o a) (6 N rn 0 O -0 'E >+ L N a) jp O) m -O (6 a3 wm E O 0 T 7 C y Q N In N (6 (6 7 ,U) C N o y (60 O 'O O Q -0a) g) U m m U .o Q m m s c (n E T E _ U N O C E O 7 O 0 O N N O 7 N O> N Q 7 0 CL O N N C O L O v°)i U)i O U y" N m a) U a) N E o y O 'EL a) c_) a) a) 09 O (0 O y-2 L 0 7 O LP(6 FL E U U U Q 6 Q mH o U U U NH Oo.E to N (4 y N C N L m °- o U L 0 o 0 to a N 0 N L m o m a y w m `O m U U o Z in O Q R R C 0 7 0 ■ ■ 0 LL }{ R 4 R5 R F m o a o O w y 0) `O y a O > w H 'a) a° o a 0 m 0 U 0 c Q v rn Q m U o Z 0) Q 16 Q v) .j 0 0 a y m -0 0 0 0 o a. o 0 a m m U U o z 0) Q a m m S ❑ ❑ o 0 s U) N U UO � U 7 N (6 O N U Q Q O U m 0 m Z Hydrologic Soil Group —Union County, North Carolina Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 2mx85 Badin channery silty C 52.7 65.2% clay loam, 2 to 8 percent slopes, moderately eroded 2mx8q Tarrus gravelly silty clay B 3.1 3.9% loam, 2 to 8 percent slopes, moderately eroded 3wOp Chewacla silt loam, 0 to B/D 14.3 17.7% 2 percent slopes, frequently flooded 3w12 Goldston-Badin D 10.7 13.2% complex, 8 to 15 percent slopes Totals for Area of Interest 80.9 100.0% USDA Natural Resources Web Soil Survey 2/17/2021 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group —Union County, North Carolina Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.- None Specified Tie -break Rule: Higher USDA Natural Resources Web Soil Survey 2/17/2021 Conservation Service National Cooperative Soil Survey Page 4 of 4 STORMWATER MANAGEMENT REPORT CRESSWIND WESLEY CHAPEL - PHASE 03 APPENDIX B PRE -DEVELOPMENT DRAINAGE MAP 27842.0003 H THOMAS Sc HUTTON cV w U oz w 6 fdF _ OLT Q r Q oQ F= d U Y i STORMWATER MANAGEMENT REPORT CRESSWIND WESLEY CHAPEL - PHASE 03 APPENDIX C PRE -DEVELOPMENT CONDITIONS DRAINAGE CALCULATIONS 27842.0003 H THOMAS Sc HUTTON 277842.0003 CRESSWIND WESLEY CHAPEL - PHASE 03 PRE -DEVELOPMENT BASINS MODEL Pre -Development 002 - Year Project Description Page 1 File Name .................................................... 27842.0003 - PRE.SPF Project Options Flow Units ................................................... CFS Elevation Type ............................................ Elevation Hydrology Method ....................................... SCS TR-55 Time of Concentration (TOC) Method ......... SCS TR-55 Link Routing Method ................................... Hydrodynamic Enable Overflow Ponding at Nodes ............ YES Skip Steady State Analysis Time Periods ... NO Analysis Options Start Analysis On ........................................ Dec 03, 2020 00:00:00 End Analysis On .......................................... Dec 04, 2020 00:00:00 Start Reporting On ...................................... Dec 03, 2020 00:00:00 Antecedent Dry Days .................................. 0 days Runoff (Dry Weather) Time Step ................ 0 01:00:00 days hh:mm:ss Runoff (Wet Weather) Time Step ............... 0 00:05:00 days hh:mm:ss Reporting Time Step ................................... 0 00:05:00 days hh:mm:ss Routing Time Step ...................................... 15 seconds Number of Elements Qty RainGages ................................................. 1 Subbasins.................................................... 1 Nodes........................................................... 1 Junctions ............................................ 0 Outfalls............................................... 1 Flow Diversions .................................. 0 Inlets................................................... 0 Storage Nodes ................................... 0 Links............................................................. 0 Channels ............................................ 0 Pipes................................................... 0 Pumps................................................ 0 Orifices............................................... 0 Weirs.................................................. 0 Outlets................................................ 0 Pollutants.................................................... 0 LandUses ................................................... 0 Rainfall Details SN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 1 Time Series TS-002 Intensity inches North Carolina Union 2 3.50 SCS Type III 24-hr Pre -Development 002 - Year Page 2 Subbasin Summary SN Subbasin Area Peak Rate Weighted Total Total Total Peak Time of ID Factor Curve Rainfall Runoff Runoff Runoff Concentration Number Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 Sub-44 55.11 0.00 73.26 3.50 1.20 65.86 41.21 0 00:31:57 Pre -Development 002 - Year Page 3 Node Summary SN Element Element Invert Ground/Rim Initial Surcharge Ponded Peak Max HGL Max Min Time of Total Total Time ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Flooded Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (ft) (ft) (ft) (ft) (ft2) (cfs) (ft) (ft) (ft) (days hh:mm) (ac-in) (min) 1 Out-21 Outfall 0.00 0.00 0.00 Pre -Development 002 - Year Subbasin Hydrology Page 4 Subbasin : Sub-44 Input Data Area(ac)........................................................................ 55.11 Peak Rate Factor........................................................... 0.00 Weighted Curve Number ............................................... 73.26 RainGage ID................................................................. Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number Pasture, grassland, or range, Good 16.05 D 80.00 Pasture, grassland, or range, Good 28.53 C 74.00 Pasture, grassland, or range, Good 10.53 B 61.00 Composite Area & Weighted CN 55.11 73.26 Time of Concentration TOC Method : SCS TR-55 Sheet Flow Equation Tc = (0.007 ' ((n ' Lf)A0.8)) / ((PA0.5) ' (SfA0.4)) Where Tc = Time of Concentration (hr) n = Manning's roughness Lf = Flow Length (ft) P = 2 yr, 24 hr Rainfall (inches) Sf = Slope (ft/ft) Shallow Concentrated Flow Equation V = 16.1345' (SfA0.5) (unpaved surface) V = 20.3282' (SfA0.5) (paved surface) V = 15.0' (SfA0.5) (grassed waterway surface) V = 10.0' (SfA0.5) (nearly bare & untilled surface) V = 9.0' (SfA0.5) (cultivated straight rows surface) V = 7.0' (SfA0.5) (short grass pasture surface) V = 5.0' (SfA0.5) (woodland surface) V = 2.5 ' (SfA0.5) (forest w/heavy litter surface) Tc = (Lf / V) / (3600 sec/hr) Where Tc = Time of Concentration (hr) Lf = Flow Length (ft) V = Velocity (ft/sec) Sf = Slope (ft/ft) Channel Flow Equation V = (1.49' (RA(2/3))' (SfA0.5)) / n R =Aq/Wp Tc = (Lf / V) / (3600 sec/hr) Where Tc = Time of Concentration (hr) Lf = Flow Length (ft) R = Hydraulic Radius (ft) Aq = Flow Area (ft2) Wp = Wetted Perimeter (ft) V = Velocity (ft/sec) Sf = Slope (ft/ft) n = Manning's roughness Pre -Development 002 - Year Page 5 Flowpath Flowpath Flowpath Sheet Flow Computations A B C Manning's Roughness : .4 0.00 0.00 Flow Length (ft) : 100 0.00 0.00 Slope (%) : 4 0.00 0.00 2 yr, 24 hr Rainfall (in) : 3.50 0.00 0.00 Velocity (ft/sec) : 0.11 0.00 0.00 Computed Flow Time (min) : 15.56 0.00 0.00 Flowpath Flowpath Flowpath Shallow Concentrated Flow Computations A B C Flow Length (ft) : 2460 0.00 0.00 Slope (%) : 2.4 0.00 0.00 Surface Type: Unpaved Unpaved Unpaved Velocity (ft/sec) : 2.50 0.00 0.00 Computed Flow Time (min) : 16.40 0.00 0.00 Total TOC (min) ..................31.96 Subbasin Runoff Results Total Rainfall (in)............................................................ 3.50 Total Runoff (in)............................................................. 1.20 Peak Runoff (cfs)........................................................... 41.21 Weighted Curve Number ............................................... 73.26 Time of Concentration (days hh:mm:ss) ........................ 0 00:31:58 Pre -Development 002 - Year Page 6 Subbasin : Sub-44 3 2.9 2.8 2.7 2.6 2.5 2.4 2.3 2.2 2.1 2 1.9 1.8 1.7 1.6 co 1.5 E 1.4 � 1.3 1.2 1.1 1 0.9 0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.1 44 42 40 30 36 34 32 30 28 26 N V �Q 0 22 20 CY 10 16 14 12 10 8 6 4 2 Rainfall Intensity Graph 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time [hrs] Runoff Hydrograph 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time [hrs] Pre -Development 010 - Year Project Description Page 1 File Name .................................................... 27842.0003 - PRE.SPF Project Options Flow Units ................................................... CFS Elevation Type ............................................ Elevation Hydrology Method ....................................... SCS TR-55 Time of Concentration (TOC) Method ......... SCS TR-55 Link Routing Method ................................... Hydrodynamic Enable Overflow Ponding at Nodes ............ YES Skip Steady State Analysis Time Periods ... NO Analysis Options Start Analysis On ........................................ Dec 03, 2020 00:00:00 End Analysis On .......................................... Dec 04, 2020 00:00:00 Start Reporting On ...................................... Dec 03, 2020 00:00:00 Antecedent Dry Days .................................. 0 days Runoff (Dry Weather) Time Step ................ 0 01:00:00 days hh:mm:ss Runoff (Wet Weather) Time Step ............... 0 00:05:00 days hh:mm:ss Reporting Time Step ................................... 0 00:05:00 days hh:mm:ss Routing Time Step ...................................... 15 seconds Number of Elements Qty RainGages ................................................. 1 Subbasins.................................................... 1 Nodes........................................................... 1 Junctions ............................................ 0 Outfalls............................................... 1 Flow Diversions .................................. 0 Inlets................................................... 0 Storage Nodes ................................... 0 Links............................................................. 0 Channels ............................................ 0 Pipes................................................... 0 Pumps................................................ 0 Orifices............................................... 0 Weirs.................................................. 0 Outlets................................................ 0 Pollutants.................................................... 0 LandUses ................................................... 0 Rainfall Details SN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 1 Time Series TS-010 Intensity inches North Carolina Union 10 5.20 SCS Type III 24-hr Pre -Development 010 - Year Page 2 Subbasin Summary SN Subbasin Area Peak Rate Weighted Total Total Total Peak Time of ID Factor Curve Rainfall Runoff Runoff Runoff Concentration Number Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 Sub-44 55.11 0.00 73.26 5.20 2.46 135.63 88.28 0 00:31:57 Pre -Development 010 - Year Page 3 Node Summary SN Element Element Invert Ground/Rim Initial Surcharge Ponded Peak Max HGL Max Min Time of Total Total Time ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Flooded Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (ft) (ft) (ft) (ft) (ft') (cfs) (ft) (ft) (ft) (days hh:mm) (ac-in) (min) 1 Out-21 Outfall 0.00 0.00 0.00 Pre -Development 010 - Year Subbasin Hydrology Page 4 Subbasin : Sub-44 Input Data Area(ac)........................................................................ 55.11 Peak Rate Factor........................................................... 0.00 Weighted Curve Number ............................................... 73.26 RainGage ID................................................................. Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number Pasture, grassland, or range, Good 16.05 D 80.00 Pasture, grassland, or range, Good 28.53 C 74.00 Pasture, grassland, or range, Good 10.53 B 61.00 Composite Area & Weighted CN 55.11 73.26 Time of Concentration TOC Method : SCS TR-55 Sheet Flow Equation Tc = (0.007 ' ((n ' Lf)A0.8)) / ((PA0.5) ' (SfA0.4)) Where Tc = Time of Concentration (hr) n = Manning's roughness Lf = Flow Length (ft) P = 2 yr, 24 hr Rainfall (inches) Sf = Slope (ft/ft) Shallow Concentrated Flow Equation V = 16.1345' (SfA0.5) (unpaved surface) V = 20.3282' (SfA0.5) (paved surface) V = 15.0' (SfA0.5) (grassed waterway surface) V = 10.0' (SfA0.5) (nearly bare & untilled surface) V = 9.0' (SfA0.5) (cultivated straight rows surface) V = 7.0' (SfA0.5) (short grass pasture surface) V = 5.0' (SfA0.5) (woodland surface) V = 2.5 ' (SfA0.5) (forest w/heavy litter surface) Tc = (Lf / V) / (3600 sec/hr) Where Tc = Time of Concentration (hr) Lf = Flow Length (ft) V = Velocity (ft/sec) Sf = Slope (ft/ft) Channel Flow Equation V = (1.49' (RA(2/3))' (SfA0.5)) / n R =Aq/Wp Tc = (Lf / V) / (3600 sec/hr) Where Tc = Time of Concentration (hr) Lf = Flow Length (ft) R = Hydraulic Radius (ft) Aq = Flow Area (ft2) Wp = Wetted Perimeter (ft) V = Velocity (ft/sec) Sf = Slope (ft/ft) n = Manning's roughness Pre -Development 010 - Year Page 5 Flowpath Flowpath Flowpath Sheet Flow Computations A B C Manning's Roughness : .4 0.00 0.00 Flow Length (ft) : 100 0.00 0.00 Slope (%) : 4 0.00 0.00 2 yr, 24 hr Rainfall (in) : 3.50 0.00 0.00 Velocity (ft/sec) : 0.11 0.00 0.00 Computed Flow Time (min) : 15.56 0.00 0.00 Flowpath Flowpath Flowpath Shallow Concentrated Flow Computations A B C Flow Length (ft) : 2460 0.00 0.00 Slope (%) : 2.4 0.00 0.00 Surface Type: Unpaved Unpaved Unpaved Velocity (ft/sec) : 2.50 0.00 0.00 Computed Flow Time (min) : 16.40 0.00 0.00 Total TOC (min) ..................31.96 Subbasin Runoff Results Total Rainfall (in)............................................................ 5.20 Total Runoff (in)............................................................. 2.46 Peak Runoff (cfs)........................................................... 88.28 Weighted Curve Number ............................................... 73.26 Time of Concentration (days hh:mm:ss) ........................ 0 00:31:58 Pre -Development 010 - Year Page 6 Subbasin : Sub-44 4.4 4.2 4 3.8 3.6 3.4 3.2 3 2.8 2.6 2.4 2.2 2 1.8 1.6 1.4 1.2 1 0.8 0.6 0.4 0.2 95 90 85 80 75 70 65 60 65 60 0 45 40 35 30 25 20 15 10 5 Rainfall Intensity Graph 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time [hrs] Runoff Hydrograph 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time [hrs] Pre -Development 025 - Year Project Description Page 1 File Name .................................................... 27842.0003 - PRE.SPF Project Options Flow Units ................................................... CFS Elevation Type ............................................ Elevation Hydrology Method ....................................... SCS TR-55 Time of Concentration (TOC) Method ......... SCS TR-55 Link Routing Method ................................... Hydrodynamic Enable Overflow Ponding at Nodes ............ YES Skip Steady State Analysis Time Periods ... NO Analysis Options Start Analysis On ........................................ Dec 03, 2020 00:00:00 End Analysis On .......................................... Dec 04, 2020 00:00:00 Start Reporting On ...................................... Dec 03, 2020 00:00:00 Antecedent Dry Days .................................. 0 days Runoff (Dry Weather) Time Step ................ 0 01:00:00 days hh:mm:ss Runoff (Wet Weather) Time Step ............... 0 00:05:00 days hh:mm:ss Reporting Time Step ................................... 0 00:05:00 days hh:mm:ss Routing Time Step ...................................... 15 seconds Number of Elements Qty RainGages ................................................. 1 Subbasins.................................................... 1 Nodes........................................................... 1 Junctions ............................................ 0 Outfalls............................................... 1 Flow Diversions .................................. 0 Inlets................................................... 0 Storage Nodes ................................... 0 Links............................................................. 0 Channels ............................................ 0 Pipes................................................... 0 Pumps................................................ 0 Orifices............................................... 0 Weirs.................................................. 0 Outlets................................................ 0 Pollutants.................................................... 0 LandUses ................................................... 0 Rainfall Details SN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 1 Time Series TS-025 Intensity inches North Carolina Union 25 6.10 SCS Type III 24-hr Pre -Development 025 - Year Page 2 Subbasin Summary SN Subbasin Area Peak Rate Weighted Total Total Total Peak Time of ID Factor Curve Rainfall Runoff Runoff Runoff Concentration Number Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 Sub-44 55.11 0.00 73.26 6.10 3.20 176.19 115.31 0 00:31:57 Pre -Development 025 - Year Page 3 Node Summary SN Element Element Invert Ground/Rim Initial Surcharge Ponded Peak Max HGL Max Min Time of Total Total Time ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Flooded Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (ft) (ft) (ft) (ft) (ft2) (cfs) (ft) (ft) (ft) (days hh:mm) (ac-in) (min) 1 Out-21 Outfall 0.00 0.00 0.00 Pre -Development 025 - Year Subbasin Hydrology Page 4 Subbasin : Sub-44 Input Data Area(ac)........................................................................ 55.11 Peak Rate Factor........................................................... 0.00 Weighted Curve Number ............................................... 73.26 RainGage ID................................................................. Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number Pasture, grassland, or range, Good 16.05 D 80.00 Pasture, grassland, or range, Good 28.53 C 74.00 Pasture, grassland, or range, Good 10.53 B 61.00 Composite Area & Weighted CN 55.11 73.26 Time of Concentration TOC Method : SCS TR-55 Sheet Flow Equation Tc = (0.007 ' ((n ' Lf)A0.8)) / ((PA0.5) ' (SfA0.4)) Where Tc = Time of Concentration (hr) n = Manning's roughness Lf = Flow Length (ft) P = 2 yr, 24 hr Rainfall (inches) Sf = Slope (ft/ft) Shallow Concentrated Flow Equation V = 16.1345' (SfA0.5) (unpaved surface) V = 20.3282' (SfA0.5) (paved surface) V = 15.0' (SfA0.5) (grassed waterway surface) V = 10.0' (SfA0.5) (nearly bare & untilled surface) V = 9.0' (SfA0.5) (cultivated straight rows surface) V = 7.0' (SfA0.5) (short grass pasture surface) V = 5.0' (SfA0.5) (woodland surface) V = 2.5 ' (SfA0.5) (forest w/heavy litter surface) Tc = (Lf / V) / (3600 sec/hr) Where Tc = Time of Concentration (hr) Lf = Flow Length (ft) V = Velocity (ft/sec) Sf = Slope (ft/ft) Channel Flow Equation V = (1.49' (RA(2/3))' (SfA0.5)) / n R =Aq/Wp Tc = (Lf / V) / (3600 sec/hr) Where Tc = Time of Concentration (hr) Lf = Flow Length (ft) R = Hydraulic Radius (ft) Aq = Flow Area (ft2) Wp = Wetted Perimeter (ft) V = Velocity (ft/sec) Sf = Slope (ft/ft) n = Manning's roughness Pre -Development 025 - Year Page 5 Flowpath Flowpath Flowpath Sheet Flow Computations A B C Manning's Roughness : .4 0.00 0.00 Flow Length (ft) : 100 0.00 0.00 Slope (%) : 4 0.00 0.00 2 yr, 24 hr Rainfall (in) : 3.50 0.00 0.00 Velocity (ft/sec) : 0.11 0.00 0.00 Computed Flow Time (min) : 15.56 0.00 0.00 Flowpath Flowpath Flowpath Shallow Concentrated Flow Computations A B C Flow Length (ft) : 2460 0.00 0.00 Slope (%) : 2.4 0.00 0.00 Surface Type: Unpaved Unpaved Unpaved Velocity (ft/sec) : 2.50 0.00 0.00 Computed Flow Time (min) : 16.40 0.00 0.00 Total TOC (min) ..................31.96 Subbasin Runoff Results Total Rainfall (in)............................................................ 6.10 Total Runoff (in)............................................................. 3.20 Peak Runoff (cfs)........................................................... 115.31 Weighted Curve Number ............................................... 73.26 Time of Concentration (days hh:mm:ss) ........................ 0 00:31:58 Pre -Development 025 - Year Page 6 Subbasin : Sub-44 5.2 5 4.8 4.6 4.4 4.2 4 3.8 3.6 3.4 3.2 3 E 2.8 2.6 'E 2.4 2.2 2 1.8 1.6 1.4 1.2 1 0.8 0.6 0.4 0.2 120 115 110 105 100 95 90 85 80 75 70 65 0 60 65 60 45 40 35 30 25 20 15 10 5 Rainfall Intensity Graph 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time [hrs] Runoff Hydrograph 0 1 2 3 4 5 8 J 8 9 10 11 12 13 14 15 18 I 18 19 20 21 22 23 Time [hrs] Pre -Development 050 - Year Project Description Page 1 File Name .................................................... 27842.0003 - PRE.SPF Project Options Flow Units ................................................... CFS Elevation Type ............................................ Elevation Hydrology Method ....................................... SCS TR-55 Time of Concentration (TOC) Method ......... SCS TR-55 Link Routing Method ................................... Hydrodynamic Enable Overflow Ponding at Nodes ............ YES Skip Steady State Analysis Time Periods ... NO Analysis Options Start Analysis On ........................................ Dec 03, 2020 00:00:00 End Analysis On .......................................... Dec 04, 2020 00:00:00 Start Reporting On ...................................... Dec 03, 2020 00:00:00 Antecedent Dry Days .................................. 0 days Runoff (Dry Weather) Time Step ................ 0 01:00:00 days hh:mm:ss Runoff (Wet Weather) Time Step ............... 0 00:05:00 days hh:mm:ss Reporting Time Step ................................... 0 00:05:00 days hh:mm:ss Routing Time Step ...................................... 15 seconds Number of Elements Qty RainGages ................................................. 1 Subbasins.................................................... 1 Nodes........................................................... 1 Junctions ............................................ 0 Outfalls............................................... 1 Flow Diversions .................................. 0 Inlets................................................... 0 Storage Nodes ................................... 0 Links............................................................. 0 Channels ............................................ 0 Pipes................................................... 0 Pumps................................................ 0 Orifices............................................... 0 Weirs.................................................. 0 Outlets................................................ 0 Pollutants.................................................... 0 LandUses ................................................... 0 Rainfall Details SN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 1 Time Series TS-050 Intensity inches North Carolina Union 50 6.90 SCS Type III 24-hr Pre -Development 050 - Year Page 2 Subbasin Summary SN Subbasin Area Peak Rate Weighted Total Total Total Peak Time of ID Factor Curve Rainfall Runoff Runoff Runoff Concentration Number Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 Sub-44 55.11 0.00 73.26 6.90 3.88 213.66 139.90 0 00:31:57 Pre -Development 050 - Year Page 3 Node Summary SN Element Element Invert Ground/Rim Initial Surcharge Ponded Peak Max HGL Max Min Time of Total Total Time ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Flooded Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (ft) (ft) (ft) (ft) (ft') (cfs) (ft) (ft) (ft) (days hh:mm) (ac-in) (min) 1 Out-21 Outfall 0.00 0.00 0.00 Pre -Development 050 - Year Subbasin Hydrology Page 4 Subbasin : Sub-44 Input Data Area(ac)........................................................................ 55.11 Peak Rate Factor........................................................... 0.00 Weighted Curve Number ............................................... 73.26 RainGage ID................................................................. Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number Pasture, grassland, or range, Good 16.05 D 80.00 Pasture, grassland, or range, Good 28.53 C 74.00 Pasture, grassland, or range, Good 10.53 B 61.00 Composite Area & Weighted CN 55.11 73.26 Time of Concentration TOC Method : SCS TR-55 Sheet Flow Equation Tc = (0.007 ' ((n ' Lf)A0.8)) / ((PA0.5) ' (SfA0.4)) Where Tc = Time of Concentration (hr) n = Manning's roughness Lf = Flow Length (ft) P = 2 yr, 24 hr Rainfall (inches) Sf = Slope (ft/ft) Shallow Concentrated Flow Equation V = 16.1345' (SfA0.5) (unpaved surface) V = 20.3282' (SfA0.5) (paved surface) V = 15.0' (SfA0.5) (grassed waterway surface) V = 10.0' (SfA0.5) (nearly bare & untilled surface) V = 9.0' (SfA0.5) (cultivated straight rows surface) V = 7.0' (SfA0.5) (short grass pasture surface) V = 5.0' (SfA0.5) (woodland surface) V = 2.5 ' (SfA0.5) (forest w/heavy litter surface) Tc = (Lf / V) / (3600 sec/hr) Where Tc = Time of Concentration (hr) Lf = Flow Length (ft) V = Velocity (ft/sec) Sf = Slope (ft/ft) Channel Flow Equation V = (1.49' (RA(2/3))' (SfA0.5)) / n R =Aq/Wp Tc = (Lf / V) / (3600 sec/hr) Where Tc = Time of Concentration (hr) Lf = Flow Length (ft) R = Hydraulic Radius (ft) Aq = Flow Area (ft2) Wp = Wetted Perimeter (ft) V = Velocity (ft/sec) Sf = Slope (ft/ft) n = Manning's roughness Pre -Development 050 - Year Page 5 Flowpath Flowpath Flowpath Sheet Flow Computations A B C Manning's Roughness : .4 0.00 0.00 Flow Length (ft) : 100 0.00 0.00 Slope (%) : 4 0.00 0.00 2 yr, 24 hr Rainfall (in) : 3.50 0.00 0.00 Velocity (ft/sec) : 0.11 0.00 0.00 Computed Flow Time (min) : 15.56 0.00 0.00 Flowpath Flowpath Flowpath Shallow Concentrated Flow Computations A B C Flow Length (ft) : 2460 0.00 0.00 Slope (%) : 2.4 0.00 0.00 Surface Type: Unpaved Unpaved Unpaved Velocity (ft/sec) : 2.50 0.00 0.00 Computed Flow Time (min) : 16.40 0.00 0.00 Total TOC (min) ..................31.96 Subbasin Runoff Results Total Rainfall (in)............................................................ 6.90 Total Runoff (in)............................................................. 3.88 Peak Runoff (cfs)........................................................... 139.90 Weighted Curve Number ............................................... 73.26 Time of Concentration (days hh:mm:ss) ........................ 0 00:31:58 Pre -Development 050 - Year Page 6 Subbasin : Sub-44 6 5.8 5.6 5.4 5.2 5 4.0 4.6 4.4 4.2 4 3.8 3.6 3.4 3.2 �. 3 2.8 2.6 2.4 2.2 2 1.8 1.6 1.4 1.2 1 0.8 0.6 0.4 0.2 145 140 135 130 125 120 115 110 105 100 95 90 _ 85 N 80 T5 o TO 65 fy 60 55 50 45 40 35 3n 25 20 15 10 5 Rainfall Intensity Graph 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time [hrs] Runoff Hydrograph 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time [hrs] STORMWATER MANAGEMENT REPORT CRESSWIND WESLEY CHAPEL - PHASE 03 APPENDIX D POST -DEVELOPMENT DRAINAGE MAP m: . oZlZsk3 A THOMAS Sc HUTTON llm—mmom Y� Yr30 , ch U w as w 6 0 .0 F= d U Y I i STORMWATER MANAGEMENT REPORT CRESSWIND WESLEY CHAPEL - PHASE 03 APPENDIX E POST -DEVELOPMENT CONDITIONS DRAINAGE CALCULATIONS A THOMAS Sc HUTTON 277842.0003 CRESSWIND WESLEY CHAPEL - PHASE 03 POST -DEVELOPMENT BASINS MODEL Post -Development 002 - Year Project Description Page 1 File Name .................................................... 27842.003 - POST.SPF Project Options Flow Units ................................................... CFS Elevation Type ............................................ Elevation Hydrology Method ....................................... SCS TR-55 Time of Concentration (TOC) Method ......... SCS TR-55 Link Routing Method ................................... Hydrodynamic Enable Overflow Ponding at Nodes ............ YES Skip Steady State Analysis Time Periods ... NO Analysis Options Start Analysis On ........................................ Dec 03, 2020 00:00:00 End Analysis On .......................................... Dec 04, 2020 00:00:00 Start Reporting On ...................................... Dec 03, 2020 00:00:00 Antecedent Dry Days .................................. 0 days Runoff (Dry Weather) Time Step ................ 0 01:00:00 days hh:mm:ss Runoff (Wet Weather) Time Step ............... 0 00:05:00 days hh:mm:ss Reporting Time Step ................................... 0 00:05:00 days hh:mm:ss Routing Time Step ...................................... 15 seconds Number of Elements Qty RainGages ................................................. 1 Subbasins.................................................... 2 Nodes........................................................... 4 Junctions ............................................ 1 Outfalls............................................... 2 Flow Diversions .................................. 0 Inlets................................................... 0 Storage Nodes ................................... 1 Links............................................................. 5 Channels ............................................ 0 Pipes................................................... 1 Pumps................................................ 0 Orifices............................................... 2 Weirs.................................................. 2 Outlets................................................ 0 Pollutants.................................................... 0 LandUses ................................................... 0 Rainfall Details SN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 1 Time Series TS-002 Intensity inches North Carolina Union 2 3.50 SCS Type III 24-hr Post -Development 002 - Year Page 2 Subbasin Summary SN Subbasin Area Peak Rate Weighted Total Total Total Peak Time of ID Factor Curve Rainfall Runoff Runoff Runoff Concentration Number Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 Sub-47 37.02 0.00 73.00 3.50 1.18 43.68 27.29 0 003200 2 Sub-48 19.86 0.00 86.19 3.50 2.11 41.98 43.45 0 00:05:00 Post -Development 002 - Year Page 3 Node Summary SN Element Element Invert Ground/Rim Initial Surcharge Ponded Peak Max HGL Max Min Time of Total Total Time ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Flooded Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (ft) (ft) (ft) (ft) (ft2) (cfs) (ft) (ft) (ft) (days hh:mm) (ac-in) (min) 1 CONTROL -STRUCTURE Junction 568.00 573.00 0.00 0.00 1.00 6.45 569.27 0.00 7.23 0 0000 0.00 0.00 2 Emergency-Outffall Outfall 560.00 0.00 560.00 3 Out-02 Outfall 560.00 32.87 560.00 4 Pond-04 Storage Node 564.50 573.50 568.00 1.00 42.76 571.02 0.00 0.00 N r N 00 C ry O L O N N NS E m N O o a 0 0 F--z a 2 C O LL Z C N E ° o � w� C N E O E 4% C E N E 3 o in W a Y zn J O M O 000co O 00 00 O M O 0000 0000 CO CO O CO O O O O Lo Lo Lo Lo 0000 Lo Lo Lo Lo V V V V Lo Lo Lo Lo L° L° L° L° W W W Ir 01 ry D D H H H O O - O S S S ry O � T O O C O d d N d' zz Nz O 00 E O O O W O v v v v 0 0 0 0 a a a a O O O O a aaa Post -Development 002 - Year Page 5 Subbasin Hydrology Subbasin : Sub-47 Input Data Area(ac)........................................................................ 37.02 Peak Rate Factor........................................................... 0.00 Weighted Curve Number ............................................... 73.00 RainGage ID................................................................. Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number 37.02 73.00 Composite Area & Weighted CN 37.02 73.00 Time of Concentration TOC Method : SCS TR-55 Sheet Flow Equation Tc = (0.007 ' ((n ' Lf)A0.8)) / ((PAO.5) ' (SfA0.4)) Where Tc = Time of Concentration (hr) n = Manning's roughness Lf = Flow Length (ft) P = 2 yr, 24 hr Rainfall (inches) Sf = Slope (ft/ft) Shallow Concentrated Flow Equation V = 16.1345' (SfA0.5) (unpaved surface) V = 20.3282' (SfA0.5) (paved surface) V = 15.0' (SfA0.5) (grassed waterway surface) V = 10.0' (SfA0.5) (nearly bare & untilled surface) V = 9.0' (SfA0.5) (cultivated straight rows surface) V = 7.0' (SfA0.5) (short grass pasture surface) V = 5.0' (SfA0.5) (woodland surface) V = 2.5 ' (SfA0.5) (forest w/heavy litter surface) Tc = (Lf / V) / (3600 sec/hr) Where: Tc = Time of Concentration (hr) Lf = Flow Length (ft) V = Velocity (ft/sec) Sf = Slope (ft/ft) Channel Flow Equation V = (1.49' (RA(2/3))(SfA0.5)) / n R =Aq/Wp Tc = (Lf / V) / (3600 sec/hr) Where Tc = Time of Concentration (hr) Lf = Flow Length (ft) R = Hydraulic Radius (ft) Aq = Flow Area (ft2) Wp = Wetted Perimeter (ft) V = Velocity (ft/sec) Sf = Slope (ft/ft) n = Manning's roughness User -Defined TOC override (minutes): 32 Subbasin Runoff Results Total Rainfall (in)............................................................ 3.50 Total Runoff (in)............................................................. 1.18 Peak Runoff (cfs)........................................................... 27.29 Weighted Curve Number ............................................... 73.00 Time of Concentration (days hh:mm:ss) ........................ 0003200 Post -Development 002 - Year Page 6 Subbasin : Sub-47 3 2.9 2.8 2.7 2.6 2.5 2.4 2.3 2.2 2.1 2 1.9 1.8 1.7 1.6 1.5 0 1.4 1.3 1.2 1.1 1 0.9 0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.1 29 28 27 26 25 24 23 22 21 20 19 18 _ 17 16 15 0 14 13 12 11 10 9 8 7 6 5 4 3 2 1 Rainfall Intensity Graph 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time (hrs) Runoff Hydrograph 0 1 2 3 4 6 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time (hrs) Post -Development 002 - Year Subbasin : Sub-48 Page 7 Input Data Area(ac)........................................................................ 19.86 Peak Rate Factor........................................................... 0.00 Weighted Curve Number ............................................... 86.19 RainGage ID................................................................. Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number > 75 % grass cover, Good 6.34 B 61.00 Paved parking & roofs 8.38 A 98.00 Paved parking & roofs 2.09 A 98.00 Paved roads with curbs & sewers 0.71 C 98.00 Paved roads with curbs & sewers 2.06 C 98.00 Paved roads with curbs & sewers 0.28 C 98.00 Composite Area & Weighted CN 19.86 86.19 Time of Concentration User -Defined TOC override (minutes): 5 Subbasin Runoff Results Total Rainfall (in)............................................................ 3.50 Total Runoff (in)............................................................. 2.11 Peak Runoff (cfs)........................................................... 43.45 Weighted Curve Number ............................................... 86.19 Time of Concentration (days hh:mm:ss) ........................ 0000500 Post -Development 002 - Year Page 8 Subbasin : Sub-48 3.1 3 2.9 2.8 2.7 2.6 2.5 2.4 2.3 2.2 2.1 2 1.9 1.8 1.7 1.6 1.5 1.4 1.3 1.2 1.1 1 0.9 0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.1 46 44 42 40 38 36 34 32 30 28 n 26 -- 24 0 22 20 18 16 14 12 10 8 6 4 2 Rainfall Intensity Graph 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time (hrs) Runoff Hydrograph 0 1 2 3 4 6 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time (hrs) Post -Development 002 - Year Page 9 Pipe Input SN Element Length Inlet Inlet Outlet Outlet Total Average Pipe ID Invert Invert Invert Invert Drop Slope Shape Pipe Pipe Manning's Entrance Exit/Bend Additional Initial Flap No. of Diameter or Width Roughness Losses Losses Losses Flow Gate Barrels Elevation Offset Elevation Offset Height (ft) (ft) (ft) (ft) (ft) (ft) N (in) (in) (cfs) 1 Outlet -Pipe 95.00 568.00 8.00 567.00 -1.00 1.00 1.0500 CIRCULAR 36.000 36.000 0.0150 0.5000 0.5000 0.0000 0.00 No 1 Post -Development 002 - Year Page 10 Pipe Results SN Element Peak Time of Design Flow Peak Flow/ Peak Flow Travel Peak Flow Peak Flow Total Time Froude Reported ID Flow Peak Flow Capacity Design Flow Velocity Time Depth Depth/ Surcharged Number Condition Occurrence Ratio Total Depth Ratio (cfs) (days hh:mm) (cfs) (ft/sec) (min) (ft) (min) 1 Outlet -Pipe 6.45 0 12:44 1.88 3.44 3.00 0.53 1.03 0.34 0.00 > CAPACITY Post -Development 002 - Year Page 11 Storage Nodes Storage Node : Pond-04 Input Data Invert Elevation (ft).................................................................... 564.50 Max (Rim) Elevation (ft)............................................................ 573.50 Max (Rim) Offset (ft).................................................................. 9.00 Initial Water Elevation (ft).......................................................... 568.00 Initial Water Depth (ft)............................................................... 3.50 Ponded Area (ft2)....................................................................... 1.00 Evaporation Loss....................................................................... 0.00 Outflow Weirs Outflow Orifices SN Element Weir Flap Crest Crest Length Weir Total Discharge ID Type Gate Elevation Offset Height Coefficient (ft) (ft) (ft) (ft) 1 Spillway-04 Trapezoidal No 572.75 8.25 20.00 1.00 3.33 2 Weir-04 Rectangular No 570.00 5.50 2.00 3.00 3.33 SN Element Orifice Orifice Flap Circular Rectangular Rectangular Orifice Orifice ID Type Shape Gate Orifice Orifice Orifice Invert Coefficient Diameter Height Width Elevation (in) (in) (in) (ft) 1 CS -RIM Bottom Rectangular No 60.00 60.00 573.00 0.63 2 WQ-Orifice-04 Side CIRCULAR No 3.00 568.00 0.61 Output Summary Results Peak Inflow (cfs)........................................................................ 42.76 Peak Lateral Inflow (cfs)............................................................ 42.76 Peak Outflow (cfs)..................................................................... 6.45 Peak Exfiltration Flow Rate (cfm).............................................. 0.00 Max HGL Elevation Attained (ft)................................................ 571.02 Max HGL Depth Attained (ft)..................................................... 6.52 Average HGL Elevation Attained (ft)......................................... 569.37 Average HGL Depth Attained (ft).............................................. 4.87 Time of Max HGL Occurrence (days hh:mm) ............................ 0 1244 Total Exfiltration Volume (1000-ft')........................................... 0.000 Total Flooded Volume (ac-in).................................................... 0 Total Time Flooded (min).......................................................... 0 Total Retention Time (sec) ........................................................ 0.00 Post -Development 010 - Year Project Description Page 1 File Name .................................................... 27842.003 - POST.SPF Project Options Flow Units ................................................... CFS Elevation Type ............................................ Elevation Hydrology Method ....................................... SCS TR-55 Time of Concentration (TOC) Method ......... SCS TR-55 Link Routing Method ................................... Hydrodynamic Enable Overflow Ponding at Nodes ............ YES Skip Steady State Analysis Time Periods ... NO Analysis Options Start Analysis On ........................................ Dec 03, 2020 00:00:00 End Analysis On .......................................... Dec 04, 2020 00:00:00 Start Reporting On ...................................... Dec 03, 2020 00:00:00 Antecedent Dry Days .................................. 0 days Runoff (Dry Weather) Time Step ................ 0 01:00:00 days hh:mm:ss Runoff (Wet Weather) Time Step ............... 0 00:05:00 days hh:mm:ss Reporting Time Step ................................... 0 00:05:00 days hh:mm:ss Routing Time Step ...................................... 15 seconds Number of Elements Qty RainGages ................................................. 1 Subbasins.................................................... 2 Nodes........................................................... 4 Junctions ............................................ 1 Outfalls............................................... 2 Flow Diversions .................................. 0 Inlets................................................... 0 Storage Nodes ................................... 1 Links............................................................. 5 Channels ............................................ 0 Pipes................................................... 1 Pumps................................................ 0 Orifices............................................... 2 Weirs.................................................. 2 Outlets................................................ 0 Pollutants.................................................... 0 LandUses ................................................... 0 Rainfall Details SN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 1 Time Series TS-010 Intensity inches North Carolina Union 10 5.20 SCS Type III 24-hr Post -Development 010 - Year Page 2 Subbasin Summary SN Subbasin Area Peak Rate Weighted Total Total Total Peak Time of ID Factor Curve Rainfall Runoff Runoff Runoff Concentration Number Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 Sub-47 37.02 0.00 73.00 5.20 2.44 90.25 58.71 0 003200 2 Sub-48 19.86 0.00 86.19 5.20 3.67 72.95 73.51 0 00:05:00 Post -Development 010 - Year Page 3 Node Summary SN Element Element Invert Ground/Rim Initial Surcharge Ponded Peak Max HGL Max Min Time of Total Total Time ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Flooded Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (ft) (ft) (ft) (ft) (ft') (cfs) (ft) (ft) (ft) (days hh:mm) (ac-in) (min) 1 CONTROL -STRUCTURE Junction 568.00 573.00 0.00 0.00 1.00 19.83 570.22 0.00 6.28 0 0000 0.00 0.00 2 Emergency-Outffall Outfall 560.00 0.00 560.00 3 Out-02 Outfall 560.00 78.07 560.00 4 Pond-04 Storage Node 564.50 573.50 568.00 1.00 72.73 572.49 0.00 0.00 Y 0 � O a L� C ry O L O N N NS E m N O o a 0 0 F--z a 2 C O LL Z C N E ° o � w� C N E O E 4% C E N E 3 o in W a Y zn J O (O O co O M O V 0000) O 00 00 O M O 0000 0000 CO CO O CO O O O O Lo Lo Lo Lo 0000 Lo Lo Lo Lo V V V V Lo Lo Lo Lo L° L° L° L° W W W Ir 01 ry D D H H H O O - O S S S ry O � T O O C O d d N d' zz Nz O 00 E O O O W O v v v v 0 0 0 0 a a a a O O O O a aaa Post -Development 010 - Year Page 5 Subbasin Hydrology Subbasin : Sub-47 Input Data Area(ac)........................................................................ 37.02 Peak Rate Factor........................................................... 0.00 Weighted Curve Number ............................................... 73.00 RainGage ID................................................................. Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number 37.02 73.00 Composite Area & Weighted CN 37.02 73.00 Time of Concentration TOC Method : SCS TR-55 Sheet Flow Equation Tc = (0.007 ' ((n ' Lf)A0.8)) / ((PAO.5) ' (SfA0.4)) Where Tc = Time of Concentration (hr) n = Manning's roughness Lf = Flow Length (ft) P = 2 yr, 24 hr Rainfall (inches) Sf = Slope (ft/ft) Shallow Concentrated Flow Equation V = 16.1345' (SfA0.5) (unpaved surface) V = 20.3282' (SfA0.5) (paved surface) V = 15.0' (SfA0.5) (grassed waterway surface) V = 10.0' (SfA0.5) (nearly bare & untilled surface) V = 9.0' (SfA0.5) (cultivated straight rows surface) V = 7.0' (SfA0.5) (short grass pasture surface) V = 5.0' (SfA0.5) (woodland surface) V = 2.5 ' (SfA0.5) (forest w/heavy litter surface) Tc = (Lf / V) / (3600 sec/hr) Where: Tc = Time of Concentration (hr) Lf = Flow Length (ft) V = Velocity (ft/sec) Sf = Slope (ft/ft) Channel Flow Equation V = (1.49' (RA(2/3))(SfA0.5)) / n R =Aq/Wp Tc = (Lf / V) / (3600 sec/hr) Where Tc = Time of Concentration (hr) Lf = Flow Length (ft) R = Hydraulic Radius (ft) Aq = Flow Area (ft2) Wp = Wetted Perimeter (ft) V = Velocity (ft/sec) Sf = Slope (ft/ft) n = Manning's roughness User -Defined TOC override (minutes): 32 Subbasin Runoff Results Total Rainfall (in)............................................................ 5.20 Total Runoff (in)............................................................. 2.44 Peak Runoff (cfs)........................................................... 58.71 Weighted Curve Number ............................................... 73.00 Time of Concentration (days hh:mm:ss) ........................ 0003200 Post -Development 010 - Year Page 6 Subbasin : Sub-47 4.4 4.2 4 3.8 3.6 3.4 3.2 3 2.8 2.6 2.4 2.2 2 1.8 1.6 1.4 1.2 1 0.8 0.6 0.4 0.2 Rainfall Intensity Graph 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time (hrs) Runoff Hydrograph 62 60 58 56 54 52 50 48 46 44 42 40 38 36 34 32 0 30 � 28 26 24 22--- 20--- 18- 16- 0 1 2 3 4 6 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time (hrs) Post -Development 010 - Year Subbasin : Sub-48 Page 7 Input Data Area(ac)........................................................................ 19.86 Peak Rate Factor........................................................... 0.00 Weighted Curve Number ............................................... 86.19 RainGage ID................................................................. Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number > 75 % grass cover, Good 6.34 B 61.00 Paved parking & roofs 8.38 A 98.00 Paved parking & roofs 2.09 A 98.00 Paved roads with curbs & sewers 0.71 C 98.00 Paved roads with curbs & sewers 2.06 C 98.00 Paved roads with curbs & sewers 0.28 C 98.00 Composite Area & Weighted CN 19.86 86.19 Time of Concentration User -Defined TOC override (minutes): 5 Subbasin Runoff Results Total Rainfall (in)............................................................ 5.20 Total Runoff (in)............................................................. 3.67 Peak Runoff (cfs)........................................................... 73.51 Weighted Curve Number ............................................... 86.19 Time of Concentration (days hh:mm:ss) ........................ 0000500 Post -Development 010 - Year Page 8 Subbasin : Sub-48 4.6 4.4 4.2 4 3.8 3.6 3.4 3.2 3 2.8 2.6 2.4 2 2.2 M 2 0 1.8 1.6 1.4 1.2 1 0.8 0.6 0.4 0.2 80 75 70 65 60 55 50 n 45 40 0 35 30 25 20 15 10 5 Rainfall Intensity Graph 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time (hrs) Runoff Hydrograph 0 1 2 3 4 6 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time (hrs) Post -Development 010 - Year Page 9 Pipe Input SN Element Length Inlet Inlet Outlet Outlet Total Average Pipe ID Invert Invert Invert Invert Drop Slope Shape Pipe Pipe Manning's Entrance Exit/Bend Additional Initial Flap No. of Diameter or Width Roughness Losses Losses Losses Flow Gate Barrels Elevation Offset Elevation Offset Height (ft) (ft) (ft) (ft) (ft) (ft) N (in) (in) (cfs) 1 Outlet -Pipe 95.00 568.00 8.00 567.00 -1.00 1.00 1.0500 CIRCULAR 36.000 36.000 0.0150 0.5000 0.5000 0.0000 0.00 No 1 Post -Development 010 - Year Page 10 Pipe Results SN Element Peak Time of Design Flow Peak Flow/ Peak Flow Travel Peak Flow Peak Flow Total Time Froude Reported ID Flow Peak Flow Capacity Design Flow Velocity Time Depth Depth/ Surcharged Number Condition Occurrence Ratio Total Depth Ratio (cfs) (days hh:mm) (cfs) (ft/sec) (min) (ft) (min) 1 Outlet -Pipe 19.83 0 12:32 1.88 10.57 4.41 0.36 1.82 0.61 0.00 > CAPACITY Post -Development 010 - Year Page 11 Storage Nodes Storage Node : Pond-04 Input Data Invert Elevation (ft).................................................................... 564.50 Max (Rim) Elevation (ft)............................................................ 573.50 Max (Rim) Offset (ft).................................................................. 9.00 Initial Water Elevation (ft).......................................................... 568.00 Initial Water Depth (ft)............................................................... 3.50 Ponded Area (ft2)....................................................................... 1.00 Evaporation Loss....................................................................... 0.00 Outflow Weirs Outflow Orifices SN Element Weir Flap Crest Crest Length Weir Total Discharge ID Type Gate Elevation Offset Height Coefficient (ft) (ft) (ft) (ft) 1 Spillway-04 Trapezoidal No 572.75 8.25 20.00 1.00 3.33 2 Weir-04 Rectangular No 570.00 5.50 2.00 3.00 3.33 SN Element Orifice Orifice Flap Circular Rectangular Rectangular Orifice Orifice ID Type Shape Gate Orifice Orifice Orifice Invert Coefficient Diameter Height Width Elevation (in) (in) (in) (ft) 1 CS -RIM Bottom Rectangular No 60.00 60.00 573.00 0.63 2 WQ-Orifice-04 Side CIRCULAR No 3.00 568.00 0.61 Output Summary Results Peak Inflow (cfs)........................................................................ 72.73 Peak Lateral Inflow (cfs)............................................................ 72.73 Peak Outflow (cfs)..................................................................... 19.83 Peak Exfiltration Flow Rate (cfm).............................................. 0.00 Max HGL Elevation Attained (ft)................................................ 572.49 Max HGL Depth Attained (ft)..................................................... 7.99 Average HGL Elevation Attained (ft)......................................... 569.79 Average HGL Depth Attained (ft).............................................. 5.29 Time of Max HGL Occurrence (days hh:mm) ............................ 0 1232 Total Exfiltration Volume (1000-ft')........................................... 0.000 Total Flooded Volume (ac-in).................................................... 0 Total Time Flooded (min).......................................................... 0 Total Retention Time (sec) ........................................................ 0.00 Post -Development 025 - Year Project Description Page 1 File Name .................................................... 27842.003 - POST.SPF Project Options Flow Units ................................................... CFS Elevation Type ............................................ Elevation Hydrology Method ....................................... SCS TR-55 Time of Concentration (TOC) Method ......... SCS TR-55 Link Routing Method ................................... Hydrodynamic Enable Overflow Ponding at Nodes ............ YES Skip Steady State Analysis Time Periods ... NO Analysis Options Start Analysis On ........................................ Dec 03, 2020 00:00:00 End Analysis On .......................................... Dec 04, 2020 00:00:00 Start Reporting On ...................................... Dec 03, 2020 00:00:00 Antecedent Dry Days .................................. 0 days Runoff (Dry Weather) Time Step ................ 0 01:00:00 days hh:mm:ss Runoff (Wet Weather) Time Step ............... 0 00:05:00 days hh:mm:ss Reporting Time Step ................................... 0 00:05:00 days hh:mm:ss Routing Time Step ...................................... 15 seconds Number of Elements Qty RainGages ................................................. 1 Subbasins.................................................... 2 Nodes........................................................... 4 Junctions ............................................ 1 Outfalls............................................... 2 Flow Diversions .................................. 0 Inlets................................................... 0 Storage Nodes ................................... 1 Links............................................................. 5 Channels ............................................ 0 Pipes................................................... 1 Pumps................................................ 0 Orifices............................................... 2 Weirs.................................................. 2 Outlets................................................ 0 Pollutants.................................................... 0 LandUses ................................................... 0 Rainfall Details SN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 1 Time Series TS-025 Intensity inches North Carolina Union 25 6.10 SCS Type III 24-hr Post -Development 025 - Year Page 2 Subbasin Summary SN Subbasin Area Peak Rate Weighted Total Total Total Peak Time of ID Factor Curve Rainfall Runoff Runoff Runoff Concentration Number Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 Sub-47 37.02 0.00 73.00 6.10 3.17 117.43 76.85 0 003200 2 Sub-48 19.86 0.00 86.19 6.10 4.53 89.87 89.43 0 00:05:00 Post -Development 025 - Year Page 3 Node Summary SN Element Element Invert Ground/Rim Initial Surcharge Ponded Peak Max HGL Max Min Time of Total Total Time ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Flooded Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (ft) (ft) (ft) (ft) (ft2) (cfs) (ft) (ft) (ft) (days hh:mm) (ac-in) (min) 1 CONTROL -STRUCTURE Junction 568.00 573.00 0.00 0.00 1.00 25.57 570.56 0.00 5.94 0 0000 0.00 0.00 2 Emergency-Outffall Outfall 560.00 10.71 560.00 3 Out-02 Outfall 560.00 101.24 560.00 4 Pond-04 Storage Node 564.50 573.50 568.00 1.00 88.66 573.04 0.00 0.00 Y 0 � O a L� C ry O L O N N NS E m N O o a 0 0 F--z a 2 C O LL Z C N E ° o � w� C N E O E 4% C E N E 3 o in W a Y zn J W � .0 O M O 0 0 o v N O 00 00 O M O 0000 0000 CO CO O CO O O O O Lo Lo Lo Lo 0000 Lo Lo Lo Lo V V V V Lo Lo Lo Lo L° L° L° L° W W W Ir 01 ry D D H H H O O - O S S S ry O � T O O C O d d N d' zz Nz O 00 E O O O W O v v v v 0 0 0 0 a a a a O O O O a aaa Post -Development 025 - Year Page 5 Subbasin Hydrology Subbasin : Sub-47 Input Data Area(ac)........................................................................ 37.02 Peak Rate Factor........................................................... 0.00 Weighted Curve Number ............................................... 73.00 RainGage ID................................................................. Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number 37.02 73.00 Composite Area & Weighted CN 37.02 73.00 Time of Concentration TOC Method : SCS TR-55 Sheet Flow Equation Tc = (0.007 ' ((n ' Lf)A0.8)) / ((PAO.5) ' (SfA0.4)) Where Tc = Time of Concentration (hr) n = Manning's roughness Lf = Flow Length (ft) P = 2 yr, 24 hr Rainfall (inches) Sf = Slope (ft/ft) Shallow Concentrated Flow Equation V = 16.1345' (SfA0.5) (unpaved surface) V = 20.3282' (SfA0.5) (paved surface) V = 15.0' (SfA0.5) (grassed waterway surface) V = 10.0' (SfA0.5) (nearly bare & untilled surface) V = 9.0' (SfA0.5) (cultivated straight rows surface) V = 7.0' (SfA0.5) (short grass pasture surface) V = 5.0' (SfA0.5) (woodland surface) V = 2.5 ' (SfA0.5) (forest w/heavy litter surface) Tc = (Lf / V) / (3600 sec/hr) Where: Tc = Time of Concentration (hr) Lf = Flow Length (ft) V = Velocity (ft/sec) Sf = Slope (ft/ft) Channel Flow Equation V = (1.49' (RA(2/3))(SfA0.5)) / n R =Aq/Wp Tc = (Lf / V) / (3600 sec/hr) Where Tc = Time of Concentration (hr) Lf = Flow Length (ft) R = Hydraulic Radius (ft) Aq = Flow Area (ft2) Wp = Wetted Perimeter (ft) V = Velocity (ft/sec) Sf = Slope (ft/ft) n = Manning's roughness User -Defined TOC override (minutes): 32 Subbasin Runoff Results Total Rainfall (in)............................................................ 6.10 Total Runoff (in)............................................................. 3.17 Peak Runoff (cfs)........................................................... 76.85 Weighted Curve Number ............................................... 73.00 Time of Concentration (days hh:mm:ss) ........................ 0003200 Post -Development 025 - Year Page 6 Subbasin : Sub-47 5.2 5 4.8 4.6 4.4 4.2 4 3.8 3.6 3.4 3.2 3 E 2.8 2.6 'E 2.4 2.2 2 1.8 1.6 1.4 1.2 1 0.8 0.6 0.4 0.2 85 80 75 70 65 60 55 50 45 40 o✓ 35 30 25 20 15 10 5 Rainfall Intensity Graph 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time (hrs) Runoff Hydrograph 0 1 2 3 4 6 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time (hrs) Post -Development 025 - Year Subbasin : Sub-48 Page 7 Input Data Area(ac)........................................................................ 19.86 Peak Rate Factor........................................................... 0.00 Weighted Curve Number ............................................... 86.19 RainGage ID................................................................. Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number > 75 % grass cover, Good 6.34 B 61.00 Paved parking & roofs 8.38 A 98.00 Paved parking & roofs 2.09 A 98.00 Paved roads with curbs & sewers 0.71 C 98.00 Paved roads with curbs & sewers 2.06 C 98.00 Paved roads with curbs & sewers 0.28 C 98.00 Composite Area & Weighted CN 19.86 86.19 Time of Concentration User -Defined TOC override (minutes): 5 Subbasin Runoff Results Total Rainfall (in)............................................................ 6.10 Total Runoff (in)............................................................. 4.53 Peak Runoff (cfs)........................................................... 89.43 Weighted Curve Number ............................................... 86.19 Time of Concentration (days hh:mm:ss) ........................ 0000500 Post -Development 025 - Year Page 8 Subbasin : Sub-48 5.4 5.2 5 4.8 4.6 4.4 4.2 4 3.8 3.6 3.4 3.2 3 28 m 2.6 F, 2.4 2.2 2 1.8 1.6 1.4 1.2 1 0.8 0.6 0.4 0.2 95 90 85 80 75 70 65 60 55 50 0 45 40 35 30 25 20 15 10 5 Rainfall Intensity Graph 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time (hrs) Runoff Hydrograph 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time (hrs) Post -Development 025 - Year Page 9 Pipe Input SN Element Length Inlet Inlet Outlet Outlet Total Average Pipe ID Invert Invert Invert Invert Drop Slope Shape Pipe Pipe Manning's Entrance Exit/Bend Additional Initial Flap No. of Diameter or Width Roughness Losses Losses Losses Flow Gate Barrels Elevation Offset Elevation Offset Height (ft) (ft) (ft) (ft) (ft) (ft) N (in) (in) (cfs) 1 Outlet -Pipe 95.00 568.00 8.00 567.00 -1.00 1.00 1.0500 CIRCULAR 36.000 36.000 0.0150 0.5000 0.5000 0.0000 0.00 No 1 Post -Development 025 - Year Page 10 Pipe Results SN Element Peak Time of Design Flow Peak Flow/ Peak Flow Travel Peak Flow Peak Flow Total Time Froude Reported ID Flow Peak Flow Capacity Design Flow Velocity Time Depth Depth/ Surcharged Number Condition Occurrence Ratio Total Depth Ratio (cfs) (days hh:mm) (cfs) (ft/sec) (min) (ft) (min) 1 Outlet -Pipe 25.57 0 12:25 1.88 13.63 4.85 0.33 2.09 0.70 0.00 > CAPACITY Post -Development 025 - Year Page 11 Storage Nodes Storage Node : Pond-04 Input Data Invert Elevation (ft).................................................................... 564.50 Max (Rim) Elevation (ft)............................................................ 573.50 Max (Rim) Offset (ft).................................................................. 9.00 Initial Water Elevation (ft).......................................................... 568.00 Initial Water Depth (ft)............................................................... 3.50 Ponded Area (ft2)....................................................................... 1.00 Evaporation Loss....................................................................... 0.00 Outflow Weirs Outflow Orifices SN Element Weir Flap Crest Crest Length Weir Total Discharge ID Type Gate Elevation Offset Height Coefficient (ft) (ft) (ft) (ft) 1 Spillway-04 Trapezoidal No 572.75 8.25 20.00 1.00 3.33 2 Weir-04 Rectangular No 570.00 5.50 2.00 3.00 3.33 SN Element Orifice Orifice Flap Circular Rectangular Rectangular Orifice Orifice ID Type Shape Gate Orifice Orifice Orifice Invert Coefficient Diameter Height Width Elevation (in) (in) (in) (ft) 1 CS -RIM Bottom Rectangular No 60.00 60.00 573.00 0.63 2 WQ-Orifice-04 Side CIRCULAR No 3.00 568.00 0.61 Output Summary Results Peak Inflow (cfs)........................................................................ 88.66 Peak Lateral Inflow (cfs)............................................................ 88.66 Peak Outflow (cfs)..................................................................... 36.28 Peak Exfiltration Flow Rate (cfm).............................................. 0.00 Max HGL Elevation Attained (ft)................................................ 573.04 Max HGL Depth Attained (ft)..................................................... 8.54 Average HGL Elevation Attained (ft)......................................... 569.98 Average HGL Depth Attained (ft).............................................. 5.48 Time of Max HGL Occurrence (days hh:mm) ............................ 0 1225 Total Exfiltration Volume (1000-ft')........................................... 0.000 Total Flooded Volume (ac-in).................................................... 0 Total Time Flooded (min).......................................................... 0 Total Retention Time (sec) ........................................................ 0.00 Post -Development 050 - Year Project Description Page 1 File Name .................................................... 27842.003 - POST.SPF Project Options Flow Units ................................................... CFS Elevation Type ............................................ Elevation Hydrology Method ....................................... SCS TR-55 Time of Concentration (TOC) Method ......... SCS TR-55 Link Routing Method ................................... Hydrodynamic Enable Overflow Ponding at Nodes ............ YES Skip Steady State Analysis Time Periods ... NO Analysis Options Start Analysis On ........................................ Dec 03, 2020 00:00:00 End Analysis On .......................................... Dec 04, 2020 00:00:00 Start Reporting On ...................................... Dec 03, 2020 00:00:00 Antecedent Dry Days .................................. 0 days Runoff (Dry Weather) Time Step ................ 0 01:00:00 days hh:mm:ss Runoff (Wet Weather) Time Step ............... 0 00:05:00 days hh:mm:ss Reporting Time Step ................................... 0 00:05:00 days hh:mm:ss Routing Time Step ...................................... 15 seconds Number of Elements Qty RainGages ................................................. 1 Subbasins.................................................... 2 Nodes........................................................... 4 Junctions ............................................ 1 Outfalls............................................... 2 Flow Diversions .................................. 0 Inlets................................................... 0 Storage Nodes ................................... 1 Links............................................................. 5 Channels ............................................ 0 Pipes................................................... 1 Pumps................................................ 0 Orifices............................................... 2 Weirs.................................................. 2 Outlets................................................ 0 Pollutants.................................................... 0 LandUses ................................................... 0 Rainfall Details SN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 1 Time Series TS-050 Intensity inches North Carolina Union 50 6.90 SCS Type III 24-hr Post -Development 050 - Year Page 2 Subbasin Summary SN Subbasin Area Peak Rate Weighted Total Total Total Peak Time of ID Factor Curve Rainfall Runoff Runoff Runoff Concentration Number Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 Sub-47 37.02 0.00 73.00 6.90 3.85 142.49 93.34 0 003200 2 Sub-48 19.86 0.00 86.19 6.90 5.29 105.08 103.58 0 00:05:00 Post -Development 050 - Year Page 3 Node Summary SN Element Element Invert Ground/Rim Initial Surcharge Ponded Peak Max HGL Max Min Time of Total Total Time ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Flooded Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (ft) (ft) (ft) (ft) (ft') (cfs) (ft) (ft) (ft) (days hh:mm) (ac-in) (min) 1 CONTROL -STRUCTURE Junction 568.00 573.00 0.00 0.00 1.00 35.86 571.15 0.00 5.35 0 0000 0.00 0.00 2 Emergency-Outffall Outfall 560.00 25.19 560.00 3 Out-02 Outfall 560.00 123.29 560.00 4 Pond-04 Storage Node 564.50 573.50 568.00 1.00 102.77 573.27 0.00 0.00 N r 0 O Y 0 � O a L� C ry O L O N N NS E m N O o a 0 0 F--z a 2 C O LL Z C N E ° o � w� C N E O E 4) C E N E 3 U o in W a Y zn J O) O O N M M of o Lo CO N N O 00 00 O M O 0000 0000 CO CO O CO O O O O Lo Lo Lo Lo 0000 Lo Lo Lo Lo V V V V Lo Lo Lo Lo L° L° L° L° W W W Ir 01 ry D D H H H O O - O S S S ry O � T O O C O d d N d' zz Nz O 00 E O O O W O v v v v 0 0 0 0 a a a a O O O O a aaa Post -Development 050 - Year Page 5 Subbasin Hydrology Subbasin : Sub-47 Input Data Area(ac)........................................................................ 37.02 Peak Rate Factor........................................................... 0.00 Weighted Curve Number ............................................... 73.00 RainGage ID................................................................. Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number 37.02 73.00 Composite Area & Weighted CN 37.02 73.00 Time of Concentration TOC Method : SCS TR-55 Sheet Flow Equation Tc = (0.007 ' ((n ' Lf)A0.8)) / ((PAO.5) ' (SfA0.4)) Where Tc = Time of Concentration (hr) n = Manning's roughness Lf = Flow Length (ft) P = 2 yr, 24 hr Rainfall (inches) Sf = Slope (ft/ft) Shallow Concentrated Flow Equation V = 16.1345' (SfA0.5) (unpaved surface) V = 20.3282' (SfA0.5) (paved surface) V = 15.0' (SfA0.5) (grassed waterway surface) V = 10.0' (SfA0.5) (nearly bare & untilled surface) V = 9.0' (SfA0.5) (cultivated straight rows surface) V = 7.0' (SfA0.5) (short grass pasture surface) V = 5.0' (SfA0.5) (woodland surface) V = 2.5 ' (SfA0.5) (forest w/heavy litter surface) Tc = (Lf / V) / (3600 sec/hr) Where: Tc = Time of Concentration (hr) Lf = Flow Length (ft) V = Velocity (ft/sec) Sf = Slope (ft/ft) Channel Flow Equation V = (1.49' (RA(2/3))(SfA0.5)) / n R =Aq/Wp Tc = (Lf / V) / (3600 sec/hr) Where Tc = Time of Concentration (hr) Lf = Flow Length (ft) R = Hydraulic Radius (ft) Aq = Flow Area (ft2) Wp = Wetted Perimeter (ft) V = Velocity (ft/sec) Sf = Slope (ft/ft) n = Manning's roughness User -Defined TOC override (minutes): 32 Subbasin Runoff Results Total Rainfall (in)............................................................ 6.90 Total Runoff (in)............................................................. 3.85 Peak Runoff (cfs)........................................................... 93.34 Weighted Curve Number ............................................... 73.00 Time of Concentration (days hh:mm:ss) ........................ 0003200 Post -Development 050 - Year Page 6 Subbasin : Sub-47 6 5.8 5.6 5.4 5.2 5 4.8 4.6 4.4 4.2 4 3.8 3.6 3.4 3.2 3 2.8 nm 2.6 2.4 2.2 2 1.8 1.6 1.4 1.2 1 0.8 0.6 0.4 0.2 100 95 90 85 80 75 70 65 60 55 50 0 45 O✓ 40 35 30 25 20 15 10 5 Rainfall Intensity Graph 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time (hrs) Runoff Hydrograph 0 1 2 3 4 6 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time (hrs) Post -Development 050 - Year Subbasin : Sub-48 Page 7 Input Data Area(ac)........................................................................ 19.86 Peak Rate Factor........................................................... 0.00 Weighted Curve Number ............................................... 86.19 RainGage ID................................................................. Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number > 75 % grass cover, Good 6.34 B 61.00 Paved parking & roofs 8.38 A 98.00 Paved parking & roofs 2.09 A 98.00 Paved roads with curbs & sewers 0.71 C 98.00 Paved roads with curbs & sewers 2.06 C 98.00 Paved roads with curbs & sewers 0.28 C 98.00 Composite Area & Weighted CN 19.86 86.19 Time of Concentration User -Defined TOC override (minutes): 5 Subbasin Runoff Results Total Rainfall (in)............................................................ 6.90 Total Runoff (in)............................................................. 5.29 Peak Runoff (cfs)........................................................... 103.58 Weighted Curve Number ............................................... 86.19 Time of Concentration (days hh:mm:ss) ........................ 0000500 Post -Development 050 - Year Page 8 Subbasin : Sub-48 6.2 6 5.8 5.6 5.4 5.2 5 4.8 4.6 4.4 4.2 4 3.8 3.6 3.4 3.2 3 2.8 2.6 2.4 2.2 2 1.8 1.6 1.4 1.2 1 0.8 0.6 0.4 0.2 110 105 100 95 90 85 80 75 70 65 � 60 0 55 50 o✓ 45 40 35 30 25 20 15 10 5 Rainfall Intensity Graph 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time (hrs) Runoff Hydrograph 11 1 2 3 4 5 6 J 8 9 1U 11 12 13 14 15 18 I 18 19 2U 21 22 23 Time (hrs) Post -Development 050 - Year Page 9 Pipe Input SN Element Length Inlet Inlet Outlet Outlet Total Average Pipe ID Invert Invert Invert Invert Drop Slope Shape Pipe Pipe Manning's Entrance Exit/Bend Additional Initial Flap No. of Diameter or Width Roughness Losses Losses Losses Flow Gate Barrels Elevation Offset Elevation Offset Height (ft) (ft) (ft) (ft) (ft) (ft) N (in) (in) (cfs) 1 Outlet -Pipe 95.00 568.00 8.00 567.00 -1.00 1.00 1.0500 CIRCULAR 36.000 36.000 0.0150 0.5000 0.5000 0.0000 0.00 No 1 Post -Development 050 - Year Page 10 Pipe Results SN Element Peak Time of Design Flow Peak Flow/ Peak Flow Travel Peak Flow Peak Flow Total Time Froude Reported ID Flow Peak Flow Capacity Design Flow Velocity Time Depth Depth/ Surcharged Number Condition Occurrence Ratio Total Depth Ratio (cfs) (days hh:mm) (cfs) (ft/sec) (min) (ft) (min) 1 Outlet -Pipe 35.86 0 12:18 1.88 19.12 5.75 0.28 2.46 0.82 0.00 > CAPACITY Post -Development 050 - Year Page 11 Storage Nodes Storage Node : Pond-04 Input Data Invert Elevation (ft).................................................................... 564.50 Max (Rim) Elevation (ft)............................................................ 573.50 Max (Rim) Offset (ft).................................................................. 9.00 Initial Water Elevation (ft).......................................................... 568.00 Initial Water Depth (ft)............................................................... 3.50 Ponded Area (ft2)....................................................................... 1.00 Evaporation Loss....................................................................... 0.00 Outflow Weirs Outflow Orifices SN Element Weir Flap Crest Crest Length Weir Total Discharge ID Type Gate Elevation Offset Height Coefficient (ft) (ft) (ft) (ft) 1 Spillway-04 Trapezoidal No 572.75 8.25 20.00 1.00 3.33 2 Weir-04 Rectangular No 570.00 5.50 2.00 3.00 3.33 SN Element Orifice Orifice Flap Circular Rectangular Rectangular Orifice Orifice ID Type Shape Gate Orifice Orifice Orifice Invert Coefficient Diameter Height Width Elevation (in) (in) (in) (ft) 1 CS -RIM Bottom Rectangular No 60.00 60.00 573.00 0.63 2 WQ-Orifice-04 Side CIRCULAR No 3.00 568.00 0.61 Output Summary Results Peak Inflow (cfs)........................................................................ 102.77 Peak Lateral Inflow (cfs)............................................................ 102.77 Peak Outflow (cfs)..................................................................... 61.05 Peak Exfiltration Flow Rate (cfm).............................................. 0.00 Max HGL Elevation Attained (ft)................................................ 573.27 Max HGL Depth Attained (ft)..................................................... 8.77 Average HGL Elevation Attained (ft)......................................... 570.11 Average HGL Depth Attained (ft).............................................. 5.61 Time of Max HGL Occurrence (days hh:mm) ............................ 0 12:17 Total Exfiltration Volume (1000-ft')........................................... 0.000 Total Flooded Volume (ac-in).................................................... 0 Total Time Flooded (min).......................................................... 0 Total Retention Time (sec) ........................................................ 0.00 25-YR CAPACITY H EC-22 Energy Grade Line Computations Struct. Q EGLo HGLo Total Pipe EGLi HGLi Ea EGLa Surface Elev. ID (cfs) (ft) (ft) Loss (ft) (ft) (ft) (ft) (ft) (ft) 1 (41) 1 576.78 576.78 581.17 583.01 1 579.37 1 (39) 5.81 579.32 578.77 580.62 2.1 581.75 586.56 1 (38) 2.81 581.78 581.70 582.54 1.0 583.01 593.64 3 570.22 570.22 568.66 1 48.3 570.45 570.22 0.14 570.59 570.36 5.9 570.72 584.43 12 37.9 570.81 570.57 0.21 571.02 570.781 5.3 571.141 584.99 13 32.7 571.21 571.03 0.03 571.24 571.06 5.4 571.40 585.35 1 (15) 7.0 574.59 574.09 0.35 574.95 574.44 2.0 575.23 578.65 1 (13) 3.11 575.27 575.17 0.36 575.63 575.54 1.7 575.72 579.80 14 25.91 571.48 571.27 0.19 571.67 571.46 5.1 571.74 582.76 31 1.1 571.74 571.73 0.01 571.75 571.74 5.0 571.77 582.76 14 20.1 571.79 571.66 0.13 571.92 571.791 4.6 571.95 579.82 15 18.8 572.04 571.81 0.44 572.47 572.25 4.4 572.61 576.04 18 7.2 572.64 572.56 0.16 572.81 572.72 3.6 572.83 580.44 19 7.1 575.10 574.46 575.37 574.74 2.0 575.86 582.00 19 6.5 575.95 575.74 0.18 576.12 575.91 2.0 576.26 581.65 21 5.3 576.38 576.08 0.81 577.19 576.90 1.9 577.421 580.25 22 3.6 577.48 577.34 0.11 577.59 577.451 1.8 577.67 580.30 38 7.0 572.71 572.47 0.67 573.37 573.13 3.5 573.49 574.73 38 1.3 573.49 573.48 0.02 573.51 573.50 2.8 573.52 577.96 17 3.6 572.67 572.53 0.09 572.76 572.62 3.9 572.85 576.04 35 1.21 574.95 574.80 0.14 575.09 574.94 0.7 575.23 579.82 34 5.0 571.79 571.66 0.06 571.85 571.73 5.0 571.921 581.11 32 4.9 572.02 571.77 0.57 572.59 572.351 4.9 572.85 579.16 32 2.5 572.87 572.81 0.04 572.91 572.85 4.8 572.99 579.16 27 4.1 578.64 578.35 579.44 579.15 1.0 579.44 587.95 28 4.0 579.50 579.34 579.84 579.55 1.2 580.01 587.09 29 3.91 580.05 579.95 0.50 580.55 580.27 1.5 580.79 585.98 30 1.4 580.80 580.78 0.01 580.81 580.80 1.41 580.83 585.98 2 10.3 570.72 570.71 0.01 570.74 570.72 5.1 570.74 581.91 3 9.7 570.75 570.72 0.03 570.78 570.75 4.0 570.79 578.90 4 8.8 570.80 570.78 0.03 570.83 570.80 3.0 570.84 575.81 6 6.0 570.85 570.83 0.03 570.88 570.86 1.9 570.89 576.78 7 5.3 570.90 570.87 571.03 570.62 1.1 571.03 577.39 8 4.8 571.64 571.23 572.26 571.85 1.1 572.26 579.07 9 4.1 572.29 572.21 573.39 573.02 1.0 573.39 579.77 10 3.3 573.44 573.33 574.12 573.77 1.1 574.20 578.82 11 1.1 574.20 574.19 575.04 574.85 0.5 575.04 580.88 39 574.38 574.38 1 1 571.30 124 23.5 574.47 574.38 0.09 574.57 574.47 6.3 574.64 582.99 125 16.6 574.65 574.61 0.01 574.66 574.62 6.0 574.67 582.93 130 14.9 574.70 574.63 0.04 574.74 574.67 4.9 574.78 579.55 43 10.4 574.79 574.76 0.02 574.81 574.78 3.7 574.84 580.79 44 6.4 574.85 574.82 0.04 574.89 574.86 1.4 575.33 582.60 143 3.21 575.81 575.43 577.63 577.251 0.9 577.631 584.50 50 2.1 576.59 576.42 0.66 577.25 577.09 1.0 577.46 585.17 49 5.9 575.24 574.92 575.92 575.60 1.0 575.92 584.36 47 2.3 575.93 575.91 576.55 576.36 0.7 576.55 586.43 147 0.9 576.56 576.55 0.12 576.68 576.58 0.8 576.77 586.45 153 1.8 576.64 576.46 0.17 576.80 576.62 1.0 577.06 584.64 159 11.91 574.39 574.38 574.40 574.381 7.0 574.401 580.64 52 9.2 574.41 574.40 574.41 574.40 5.4 574.41 581.37 53 5.9 574.42 574.41 0.01 574.43 574.42 3.0 574.44 584.83 165 3.4 574.44 574.43 574.44 574.44 1.1 574.44 591.33 55 0.5 574.44 574.44 575.41 575.25 0.3 575.41 597.27 56 0.2 575.41 575.41 576.39 576.29 0.2 576.39 599.58 177 1 0.11 576.39 576.39 576.8 .801 0.2 576.871 599.58 107 1 2.01 584.37 584.19 0.161 584.53 584.351 1.01 584.771 591.33 iq THOMAS s HUTTON Z:127842127842.00031 Engineering I Calculations and Reportsl Storm Waterl HEC-22127842.0003 - HEC-22 Reporting.xlsm H EC-22 Energy Grade Line Computations Struct. ID Q (cfs) EGLo (ft) HGLo (ft) Total Pipe Loss (ft) EGU (ft) HGU (ft) Ea (ft) EGLa (ft) Surface Elev. (ft) 105 1.5 576.541 576.38 0.16 576.70 576.54 0.9 576.941 584.84 103 2.0 575.34 575.16 0.16 575.50 575.32 1.0 575.71 581.38 159 1.0 574.57 574.44 0.16 574.73 574.60 0.7 574.88 580.64 109 573.04 573.04 569.23 112 67.6 573.32 573.041 0.11 573.43 573.151 8.4 573.66 589.42 114 1 67.41 573.77 573.49 0.18 573.96 573.68 8.2 574.20 588.84 134 1.6 581.03 580.55 584.83 584.35 0.8 584.83 587.04 115 66.4 574.37 573.94 0.32 574.69 574.26 8.3 575.05 589.64 137 1.1 579.61 579.21 582.21 581.81 0.7 582.21 590.83 138 0.5 582.21 582.20 582.67 582.44 0.4 582.67 590.84 115 64.6 575.22 574.81 0.21 575.43 575.02 8.4 575.67 588.64 118 31.81 575.71 575.61 0.11 575.82 575.72 7.4 575.86 586.44 119 27.0 575.90 575.78 0.08 575.99 575.87 7.0 576.03 585.34 121 21.3 576.06 575.99 0.04 576.11 576.03 6.6 576.14 584.46 69 15.3 576.20 576.05 0.16 576.36 576.21 6.0 576.44 583.34 126 10.3 576.46 576.40 0.11 576.58 576.51 4.9 576.61 581.75 127 8.8 576.65 576.53 0.22 576.88 576.76 4.1 576.97 580.64 128 0.71 576.97 576.97 576.97 576.97 2.5 576.97 582.38 133 0.2 576.97 576.97 576.97 576.97 2.3 576.97 582.38 186 4.9 577.39 577.11 0.18 577.57 577.29 1.6 577.78 580.64 182 4.0 576.45 576.42 0.01 576.46 576.43 4.7 576.47 583.34 1 (237) 3.7 576.47 576.45 0.04 576.52 576.49 3.4 576.53 583.08 1 (237) 0.6 576.53 576.53 576.53 576.531 2.8 576.53 581.12 1 (237) 2.51 576.53 576.52 0.02 576.55 576.54 2.3 576.56 579.83 105 1.01 576.56 576.56 576.56 576.56 1.8 576.56 581.39 108 6.6 576.15 576.12 0.041 576.19 576.16 5.9 576.21 583.93 109 6.7 576.22 576.19 0.03 576.26 576.23 5.4 576.27 582.31 110 6.0 576.29 576.23 0.16 576.45 576.40 4.4 576.48 579.98 111 4.5 576.49 576.46 0.09 576.58 576.55 3.4 576.59 577.72 112 2.5 576.60 576.57 0.07 576.67 576.64 2.9 576.69 579.77 113 1 1.61 576.70 576.67 0.13 576.82 576.80 2.0 576.85 581.81 176 6.0 576.06 576.00 0.03 576.08 576.02 6.7 576.12 585.34 174 5.4 576.18 576.03 0.09 576.27 576.13 6.6 576.37 584.42 174 5.2 576.42 576.28 0.22 576.64 576.51 6.0 576.71 583.34 178 1.1 576.71 576.70 0.01 576.72 576.71 1.3 576.74 583.33 100 3.4 576.76 576.64 0.56 577.32 577.20 4.8 577.43 580.93 100 1.61 577.44 577.41 0.02 577.46 577.44 4.4 577.48 581.29 171 4.3 575.93 575.74 0.16 576.09 575.90 1.6 576.19 586.43 172 3.6 576.24 576.11 578.95 578.34 1.2 578.95 581.32 144 34.4 575.99 575.19 577.04 575.63 3.1 577.23 588.64 144 32.2 577.36 577.04 0.06 577.42 577.101 3.2 577.59 588.48 142 31.8 577.72 577.41 0.06 577.78 577.47 3.4 578.05 588.48 140 30.51 578.29 577.69 0.98 579.27 578.67 3.9 580.36 590.65 146 14.5 580.41 580.28 0.20 580.61 580.48 2.7 580.73 588.50 82 13.3 580.77 580.66 0.03 580.80 580.69 2.4 580.86 588.50 84 13.2 580.97 580.70 0.09 581.07 580.79 2.4 581.23 589.05 155 11.8 581.32 581.10 0.08 581.40 581.18 2.4 581.59 589.05 156 10.6 581.66 581.48 0.21 581.87 581.69 1.9 582.05 590.15 87 9.81 582.25 581.77 0.79 583.03 582.56 2.3 583.37 591.12 88 6.3 583.45 583.25 584.50 583.90 1.7 584.74 593.38 160 3.6 584.77 584.71 585.62 585.17 1.1 585.62 595.10 163 0.8 585.62 585.62 586.58 586.37 0.5 586.58 596.81 91 0.4 586.58 586.57 586.69 586.56 0.4 586.69 596.79 168 1.4 585.63 585.61 585.63 585.36 0.8 585.63 595.07 167 1.41 586.39 586.22 0.14 586.53 586.36 0.9 586.74 593.36 92 1.9 583.38 583.35 0.02 583.41 583.37 2.1 583.46 591.12 16.6 580.53 580.10 0.21 580.74 580.31 3.8 580.98 590.4 E(2 16.4 581.15 580.72 0.41 581.56 581.14 3.1 581.77 588.31 11.8 581.86 581.63 584.55 583.24 2.2 584.551 590.26 F4 THOMAS s HUTTON Z:127842127842.00031 Engineering I Calculations and Reportsl Storm Waterl HEC-22127842.0003 - HEC-22 Reporting.xlsm H EC-22 Energy Grade Line Computations Struct. ID Q (cfs) EGLo (ft) HGLo (ft) Total Pipe Loss (ft) EGU (ft) HGU (ft) Ea (ft) EGLa (ft) Surface Elev. (ft) 1 (248) 9.0 584.61 584.481 1 587.191 586.061 1.91 587.191 591.96 1 (247) 1 6.11 587.26 587.081 1 589.771 588.821 1.61 589.771 593.68 1 (245) 1 3.21 589.81 589.701 1 592.161 591.471 1.21 592.161 595.39 F4 THOMAS s HUTTON Z:127842127842.00031 Engineering I Calculations and Reportsl Storm Waterl HEC-22127842.0003 - HEC-22 Reporting.xlsm H EC-22 Storm Drain Computations Structure ID Length (ft) Drainage Area (ac) Runoff Coeff "C" I Tc (min) Rain "I" (in/hr) Runoff "Q" (cfs) Known Q (cfs) I Total Q (cfs) I Pipe Dia. (in) I Velocity Design I (ft/s) Invert Elevation Slope From To U/S I D/S 1 (39) 1 (41) 186 0.67 0.551 6 8.13 5.8 5.8 15 6.0 579.70 577.85 1.00% 8.25 2.8 2.8 15 5.5 582.00 579.70 1.25% 7.331 48.3 48.3 481 8.0 564.85 564.24 0.50% 1 (38) 1 (39) 184 0.61 0.55 5 1 3 122 0.44 0.55 9 12 1 146 0.32 0.55 8 7.67 37.9 37.9 42 7.5 565.87 565.14 0.50% 13 12 33 0.09 0.55 8 7.69 32.7 32.7 42 7.2 566.04 565.87 0.50% 1 (15) 113 1 68 0.88 0.551 6 8.10 7.0 7.0 15 5.7 573.19 572.84 0.52% 1 (13) 1 (15) 161 0.67 0.55 5 8.25 3.1 3.1 15 4.0 574.00 573.19 0.50% 14 13 127 0.07 0.55 7 7.76 25.9 25.9 36 6.8 566.67 566.04 0.50% 31 14 24 0.24 0.55 51 8.25 1.1 1.11 15 3.1 566.79 566.67 0.50% 15 14 145 0.10 0.55 7 7.84 20.1 20.1 36 6.4 567.40 566.67 0.50% 17 15 207 0.30 0.55 6 7.98 18.8 18.8 30 5.8 568.24 567.40 0.41% 18 17 158 0.03 0.55 6 8.11 7.2 7.2 24 4.9 569.221 568.44 0.50% 19 18 28 0.14 0.55 6 8.12 7.1 7.1 18 6.4 573.84 573.56 1.00% 20 19 46 0.27 0.55 5 8.15 6.5 6.5 181 6.3 574.30 573.84 1.00% 21 20 120 0.37 0.55 51 8.23 5.3 1 5.3 15 5.9 575.50 574.30 1.00% 22 21 35 0.79 0.55 5 8.25 3.6 3.6 15 5.4 575.85 575.50 1.00% 38 17 152 1.27 0.55 6 8.07 7.0 7.0 18 6.4 569.96 568.44 1.00% 37 38 155 0.28 0.55 5 8.25 1.3 1.3 18 3.2 570.73 569.96 0.50% 36 17 28 0.80 0.55 5 8.25 3.6 3.6 15 4.3 568.96 568.81 0.55% 35 15 28 0.26 0.55 5 8.25 1.2 1.2 151 3.1 574.50 574.36 0.50% 34 14 29 0.03 0.55 5 8.17 5.0 5.0 18 5.9 566.961 566.67 1.00% 32 34 101 0.53 0.55 5 8.23 4.9 4.9 15 5.8 567.96 566.96 1.00% 33 32 28 0.54 0.55 5 8.25 2.5 2.5 15 4.9 568.24 567.96 1.00% 27 12 160 0.04 0.55 6 8.08 4.1 4.1 24 4.3 578.46 577.66 0.50% 28 27 62 0.03 0.55 6 8.13 4.0 4.0 18 4.3 578.77 578.46 0.50% 29 28 1 100 0.55 0.55 5 8.22 3.9 3.9 18 4.2 579.27 578.77 0.50% 30 29 28 0.30 0.55 5 8.25 1.41 1.4 15 3.1 579.391 579.27 0.43% 2 1 111 0.19 0.55 9 7.40 10.3 10.3 42 6.1 565.68 564.86 0.74% 3 2 148 0.25 0.55 8 7.49 9.7 9.7 36 6.1 566.79 565.68 0.74% 4 3 147 0.67 0.55 8 7.59 8.8 8.8 36 5.9 567.88 566.79 0.74% 6 4 149 0.18 0.55 7 7.69 6.0 6.0 30 5.4 568.99 567.88 0.74% 7 6 1 131 0.13 0.55 7 7.79 5.3 1 5.3 301 5.2 569.97 568.99 0.74% 8 7 83 0.17 0.55 7 7.85 4.8 4.8 24 5.1 571.18 570.56 0.74% 9 8 164 0.18 0.55 6 7.98 4.1 4.1 24 4.9 572.40 571.18 0.74% 10 9 100 0.51 0.55 6 8.06 3.3 3.3 18 4.7 573.14 572.40 0.74% 11 10 182 0.24 0.55 5 8.25 1.1 1.1 18 3.5 574.50 573.14 0.74% 124 39 1 173 0.27 0.55 7 7.89 23.5 1 23.5 421 8.5 568.37 566.64 1.00% 125 124 29 0.38 0.55 7 7.91 16.6 16.6 42 7.7 568.66 568.37 1.00% 130 125 78 0.60 0.55 6 7.94 14.9 14.9 36 8.9 569.88 568.66 1.56% 43 130 102 0.92 0.55 6 8.00 10.4 10.4 36 6.1 571.12 570.38 0.73% 44 43 184 0.72 0.55 6 8.12 6.4 6.4 30 6.1 573.96 572.12 1.00% 143 44 182 0.69 0.55 51 8.25 3.2 3.2 30 5.0 576.77 574.96 1.00% 50 130 176 0.46 0.55 5 8.25 2.1 2.1 18 3.3 576.50 575.84 0.38% 49 124 136 0.41 0.55 6 8.00 5.9 5.9 36 4.5 574.89 574.21 0.50% 47 49 198 0.32 0.55 5 8.21 2.3 2.3 30 3.5 575.88 574.89 0.50% 147 47 28 0.19 0.55 5 8.25 0.9 0.9 30 2.5 576.00 575.88 0.43% 153 49 36 0.40 0.55 5 8.25 1.8 1.8 15 3.4 576.06 575.89 0.46% 159 39 48 0.42 0.55 71 7.72 11.9 11.9 48 8.0 567.371 566.64 1.50% 52 159 107 0.34 0.55 7 7.78 9.2 1 9.2 481 7.4 568.98 567.37 1.50% 53 52 163 0.26 0.55 7 7.87 5.9 5.9 36 6.7 571.43 568.98 1.50% 165 53 130 0.22 0.55 6 7.96 3.4 3.4 36 5.7 573.37 571.43 1.50% 55 165 113 0.06 0.55 6 8.08 0.5 0.5 30 3.3 575.07 573.37 1.50% 56 55 73 0.03 0.55 5 8.19 0.2 0.2 30 2.6 576.17 575.07 1.50% 177 56 36 0.03 0.55 51 8.25 0.1 0.1 24 2.2 576.71 576.17 1.50% 107 165 361 0.441 0.55 5 8.25 2.01 1 2.0 15 3.4 583.75 583.59 0.44% 105 53 36 0.33 0.55 5 8.25 1.51 1 1.5 15 3.2 576.03 575.87 0.44% 103 52 36 0.43 0.55 5 8.25 2.0 2.0 15 3.4 574.73 574.57 0.44% 101 159 36 0.231 0.55 5 8.25 1.01 1 1.0 15 2.9 574.181 574.02 0.44% Pi THOMAS & HUTTON Z:127842127842.00031 Engineering I Calculations and Reportsl Storm Waterl HEC-22127842.0003 - HEC-22 Reporting.xlsm H EC-22 Storm Drain Computations Structure ID Length (ft) Drainage Area (ac) Runoff Coeff "C" Tc (min) Rain "I" (in/hr) Runoff "Q" (cfs) Known Q (cfs) Total Q (cfs) Pipe Dia. (in) Velocity Design (ft/s) Invert Elevation Slope From To U/S I D/S 112 109 89 0.24 0.55 11 6.89 67.6 67.6 54 8.7 565.25 564.81 0.50% 114 112 156 0.08 0.55 11 6.95 67.4 67.4 54 8.7 566.03 565.25 0.50% 134 114 190 0.34 0.55 5 8.25 1.6 1.6 15 5.6 584.00 580.20 2.00% 115 114 150 0.30 0.55 10 7.02 66.4 66.4 48 8.6 566.78 566.03 0.50% 137 1115 1 130 0.15 0.55 5 8.221 1.1 1.1 15 5.1 581.51 578.92 2.00% 138 137 36 0.10 0.55 5 8.25 0.5 0.51 15 3.9 582.25 581.51 2.03% 118 115 106 0.26 0.55 10 7.07 64.6 64.6 48 8.6 567.31 566.78 0.50% 119 118 234 0.32 0.55 10 7.19 31.8 31.8 48 7.2 568.48 567.31 0.50% 121 119 116 0.10 0.55 9 7.25 27.0 27.0 42 6.9 569.06 568.48 0.50% 69 121 94 0.08 0.55 9 7.31 21.3 21.3 42 6.5 569.53 569.06 0.50% 126 69 119 0.27 0.55 7 7.72 15.3 15.3 30 7.0 570.42 569.53 0.75% 127 126 175 0.38 0.55 7 7.83 10.3 10.3 30 6.3 571.73 570.42 0.75% 128 127 150 0.77 0.55 6 7.92 8.8 8.8 24 6.1 572.86 571.73 0.75% 131 128 213 0.12 0.55 5 8.19 0.7 0.7 24 3.0 574.46 572.86 0.75% 133 131 36 0.04 0.55 5 8.25 0.2 0.2 15 2.1 574.73 574.46 0.75% 186 128 36 1.06 0.55 5 8.25 4.9 4.9 15 4.2 576.17 575.99 0.50% 182 126 1 36 0.091 0.55 7 7.83 4.0 4.0 24 5.2 571.79 571.47 0.87% 1 (237) 182 155 0.13 0.55 6 7.95 3.7 3.7 24 5.1 573.15 571.79 0.87% 104 1 (237) 64 0.14 0.55 5 8.25 0.6 0.6 18 3.1 573.71 573.15 0.87% 105 1 (237) 159 0.35 0.55 6 8.11 2.5 2.5 24 3.7 574.21 573.42 0.50% 106 105 107 0.21 0.55 5 8.25 1.0 1.0 24 2.8 574.75 574.21 0.50% 108 69 149 0.00 0.55 9 7.43 6.6 6.6 30 4.8 570.28 569.53 0.50% 109 108 1 129 0.211 0.55 8 7.53 6.7 1 6.7 30 4.81 570.92 570.28 0.50% 110 109 231 0.37 0.55 7 7.71 6.0 6.0 24 4.7 572.08 570.92 0.50% 111 110 225 0.47 0.55 7 7.91 4.5 4.5 24 4.4 573.20 572.08 0.50% 112 111 122 0.21 0.55 6 8.03 2.5 2.5 18 3.8 573.81 573.20 0.50% 113 112 204 0.35 0.55 5 8.25 1.6 1.6 15 3.4 574.83 573.81 0.50% 176 121 36 0.14 0.55 6 8.00 6.0 6.0 241 6.1 569.44 569.08 1.00% 174 176 36 0.04 0.55 6 8.02 5.4 5.4 18 6.0 569.80 569.44 1.00% 178 174 89 0.18 0.55 61 8.08 5.2 5.2 18 5.9 570.69 569.80 1.00% 102 178 28 0.24 0.55 5 8.25 1.1 1.1 15 3.0 575.49 575.35 0.50% 100 178 198 0.41 0.55 5 8.22 3.4 3.4 15 5.3 572.67 570.69 1.00% 181 100 41 0.34 0.55 5 8.25 1.6 1.6 15 4.3 573.081 572.67 1.00% 171 119 36 0.18 0.55 6 8.13 4.3 4.3 151 6.6 574.63 574.09 1.50% 172 171 208 0.78 0.55 5 8.25 3.6 3.6 15 6.3 577.75 574.63 1.50% 144 118 36 0.54 0.55 81 7.52 34.4 34.4 36 9.5 574.10 573.74 1.00% 142 144 28 0.12 0.55 8 7.53 32.2 32.2 36 9.4 574.38 574.10 1.00% 140 142 28 0.36 0.55 8 7.55 31.8 31.8 36 9.3 574.66 574.38 1.00% 146 140 177 0.06 0.55 8 7.62 30.5 30.5 30 9.2 576.431 574.66 1.00% 150 146 161 0.28 0.55 7 7.70 14.5 14.5 301 7.6 578.04 576.43 1.00% 82 150 28 0.02 0.55 7 7.71 13.3 13.3 30 8.6 578.46 578.04 1.50% 84 82 28 0.33 0.55 71 7.72 13.2 13.2 24 8.7 578.87 578.46 1.50% 155 84 28 0.30 0.55 7 7.74 11.8 11.8 24 7.9 579.22 578.87 1.25% 156 155 95 0.21 0.55 7 7.79 10.6 10.6 24 7.1 580.18 579.22 1.00% 87 156 91 0.42 0.55 7 7.84 9.8 9.8 18 6.8 581.08 580.18 1.00% 88 87 198 0.31 0.55 6 7.96 6.3 6.3 181 6.2 583.07 581.08 1.00% 160 88 1 150 0.31 0.55 6 8.06 3.6 3.6 18 5.4 584.57 583.07 1.00% 163 160 150 0.10 0.55 51 8.22 0.8 0.8 15 3.6 586.07 584.57 1.00% 91 163 28 0.09 0.55 5 8.25 0.4 0.4 15 2.91 586.35 586.07 1.00% 168 160 28 0.31 0.55 5 8.25 1.4 1.4 15 4.2 584.85 584.57 1.00% 167 88 28 0.31 0.55 5 8.25 1.4 1.4 15 3.3 585.88 585.74 0.50% 92 87 28 0.41 0.55 5 8.25 1.9 1.9 15 4.6 581.36 581.08 1.00% 1 (290) 146 1 39 0.05 0.55 6 7.92 16.6 16.6 24 10.0 577.16 576.43 1.88% 1 (266) 1 (290) 79 1.06 0.55 61 7.95 16.4 1 16.4 24 10.0 578.64 577.16 1.88% 1 (252) 1 (266) 199 0.66 0.55 6 8.03 11.8 11.8 24 9.2 582.38 578.64 1.88% 1 (248) 1 (252) 157 0.65 0.55 6 8.10 9.0 9.0 24 8.5 585.32 582.38 1.88% 1 (247) 1 (248) 150 0.65 0.55 5 8.17 6.1 6.1 18 7.8 588.13 585.32 1.88% 1 (245) 1 (247) 150 0.71 0.55 5 8.251 3.2 3.2 15 6.7 590.951 588.13 1.88% F4 THOMAS & HUTTON Z:127842127842.00031 Engineering I Calculations and Reportsl Storm Waterl HEC-22127842.0003 - HEC-22 Reporting.xlsm 4 IN/HR INLET SPREAD cu cr- N >- N a., U U W Q _ fB U cu L Y GJ 1' i N N 7 C i Q V A i m a m h W c-I O O c-I N 1� Ol N to m V W rl c-I m c-I c-I m N c-I ti Vl O c-I n m N N N Cl 1l cy O c-I ti O O m 30 ti N O ti O O O O O O O O O O O O O ti CL 0 v v mLL m c-I V Uf Cl N lq m m lq N N U1 N lq V m W Ol Lq N -i N Ol N c-I c-I 1� N lD lD N m c-I 1� lD O. O O O m O rV 0 0 0 0 ti 0 0 0 0 rV O O ti 0 0 ti 0 0 ti ti 0 0 0 ti 0 0 0 0 0 0 O N O N V w C r a 04 3 O _ V � v1 v1 O O �n O �n v1 O O �n v1 O O �n v1 v1 v1 v1 O C v1 m Ln m ti c-i Ln m c-i Ln m Ln m ti c-i Ln m Ln m ti c-i Ln m Ln m Ln m Ln m Ln m OQ 3 V O J 0 N s W oW oW oW oW oW tq tq oW oW oW oW oW oW oW oW oW oW tq tq tq tD tq tq tq tq tq tq tq tq tq tq tq tD tD tD oW +� m m N m N m N m N m N m N m N m N m N m N m N m N m N m N m N m N m N m N m N m N m N m N m N m N m N m N m N m N m N m N m N m N m N m N m N m N oq W W W W W Lq Lq W W W W W W W W W W O O v1 O Lq Lq O O Lr1 Lr1 O O Lr1 Lr1 Lr1 Lr1 Lr1 O W fop 00C m N m N m N m N m N m N vi m vi m m N m N m N m N m N m N m N m N m N m N ti 1l ti n Ln m ti n vi m Ln m ti n ti n vi m Ln m ti n ti n vi m vi m vi m vi m Ln m ti n m N J v CL C C C C C C C C C C C C C C C C C C C C H N N N N N N O_ O_ N N N N N N N N N N O - O - O - O - O - O - O - O - O - O - O - O - O - O - O - O - O - O - (LiO O — - S S S s s s s s s s s S m m m m m m££ m m m m m m m m m m m C7 V' V' V' V' V' U U V' V' V' V' V' V' V' V' V' V' U U U U U U U U U U U U U U U U U U V' O m W N O Cl N W 1l� lq W 1l� -i -i U1 Cl lq Ol N V n O Lq Ol O W N -i Cl m m O V m c-I ti O N c-I c-I N Z1,c-I O c-I O O O O ti c-I ti Vl N m c-I N lf1 c-I c-I N m c-I m c-I N c-I N h O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O N N O O O O O O O O O O N N N N N N N N N N N N N N N N N N O t m . N 1� lq -i -i m m m N N m lD V m N -i -i -i c-I -i N -i -i -i c-I -i -i -i -i -i -i -i U1 . +' N O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O 0 lq lq V Ln O) N 1, O Ln lD V V Ln V lD m c-I W Ol lD N c-I N Cl N lD N m -1 lD N 3 ti N O m ti N O O ti O ti O O O O N ti ti ti O O ti O O ti ti O O O ti O O O O O O ti o V LL N ti v1 O �n N ti 1� n ti ti ti ti O O 9 3 N ti O ti O O ti 0 0 O O O O O O i O C v a m v v v v v v v v v v v v v v v v v v v v 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 �3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 V Vf N N m m m m m m N N m m m m m m m m m m N N N N N N N N N N N N N N N N N N m m m m m m m o o m m m m m m m m m m o 0 0 0 0 0 0 0 0 0 0 0 0 0Lx 0 0 0 o m 0 0$ o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 V Vf V n O �--� O N N N c-I O N N O �--� O N N O O �--� O V N O O N c-I O O N N N c-I V O �--� (p O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O ti O ti 0 0 0 0 ti 0 0 ti O ti 0 0 ti ti O ti 0 0 ti ti 0 0 ti ti 0 0 0 0 0 ti O _ CL 3 J i C h y C J C o v V C v Y V Vl lD Cl Ul O N n O U1 c-I V V In V Lq QD V OW OO lD N -i N W N -i -i lD Lq ti ti O cV ti rV O O ti O ti 0 0 0 0 ti 0 0 ti 0 0 ti 0 0 ti ti 0 0 0 ti 0 0 0 0 0 0 ti Q w V i a3+ m �m m lD C. O N f1 O W 1� c-I c-I m Ol W � m N N m mNNNmmmm cNm c-I FI cu cr- N >- N a., U U W Q fB U cu L Y GJ 1' i N N 7 C i Q V T i co LM m Ol v1 O m V r� Ol v1 r�0 m v1 v o m r�0 Ol v1 m O lD W 0 V m W r�c-I V v1 Ol c-I Ol lD N n N W N Zil c-I c-I c-I -zl- c-I c-I c-I c-I v1 v1 c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I lD c-I c-I c-I N OW N c-I C l N -i N O O O -i N -i -i N m N v1 c-I m ti O O O O O O O O O O O O O O O ti O O O O O O O O O O N v v mLL W W N W 1l� N W lD n -i -i -i v1 lD n m r� W r C l N c-I O N lD V c-I O m N m lD m N v1 1l� Gl O. O m cV 0 0 0 0 0 0 0 0 0 0 0 0 0 ti 0 0 0 0 O O ti 0 0 0 0 ti 0 0 0 0 0 0 0 0 ti O N V w i+ C 0 04 v1 v1 v. v. v. v. v. v. v. v. v. v. v. v. v. v. v1 v1 v1 v1 v1 v1 v1 v1 v1 v1 O � C � v1 v1 v1 v1 v1 v1 v1 v1 v1 v1 v1 v1 v1 v1 v1 v1 v1 v1 v1 v1 v1 v1 v1 v1 v1 v1 c-I ^ 3 o s +� — W W W tD tD W tD tD tD lD lD lD lD lD lD lD lD lD tD tD tD W tq W W W W W W lD lD lD lD lD lD lD lD lD +� f0 � � m N m N m N m N m N m N m N m N m N m N m N m N m N m N m N m N m N m N m N m N m N m N m N m N m N m N m N m N m N m N m N m N m N m N m N m N m N m N t W W W v1 v1 W v1 v1 v1 v1 v1 v1 v1 v1 v1 v1 v1 v1 v1 v1 v1 W v. . . . . . . v. v. v1 v1 v1 v1 v1 v1 O moos m N m N m N vi m vi m m N vi m vi m vi m vi m vi m vi m vi m vi m vi m vi m vi m vi m vi m vi m vi m m N vi m m N m N m N m N m N m N vi m vi m vi m vi m vi m vi m vi m vi m ti J v CL C C C C C C C C C C C C C C C C C C C C C C C C C C C H N N N O - O - N O - O - O - O - O - O - O - O - O - O - O - O - O - O - O - N O_ N N N N N N O - O - O - O - O O O O O ci aj aj in in in in in in in in in in — m m m m£ m m m m m m E O O O O O O O O O O O O O O O O O O O O O O O O O O O V' V' V' U U V' lulu U U U U U U U U U U U U U V' U V' V' V' V' V' VU U U U U U U U U 1� r�v1 -i v1 W -i r� W O m m lD oq V Gl r� m 1l� C l -i W W C l W V -i tq C l m O 1l� -i Gl r� Gl O Gl m N c-I to v1 O �o In In V c-I c-I c-I N m V v1 m v1 m V O O O O O m m m m m N V �o m N h O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O is+ O O O N N O N N N N N N N N N N N N N N N O N O O O O O O N N N N N N N N N t v1 . 1� v1 N N m N N N -i -i -i -i -i -i -i N -i N -i -i m c-I m m Lq � N m -i -i -i N -i -i -i N N . +-' N O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O 0 tq W N O W O O 1, Ol V c-I c-I c-I v1 lD W m 1l O 1l O v1 -i O v1 1l W N O m N m 1l N tq Cl Cl 'FaN 3 N m N ti O ti ti 0 0 0 0 o o o 0 0 ti O ti O ti O O ti O ti 0 0 ti 0 0 0 0 0 0 0 0 ti o V LL N O W 9 3 N m ti ti O O O O O O O O O O O O O O O O O O O O i C u a m � v v v v v v v v v v v v v v v v v v v v v v v v v v v 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o o l3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 V h +^ m m m o o m o 0 0 0 0 0 0 0 0 0 0 0 0 0 o m o m m m m m m o 0 0 0 0 0 0 0 0 o2 000000000000000000000 00000000000000000 V Ln ti 0 0 ti ti Ol c-I c-I c-I c-I N N, m a rV O O ti V m ti ti O ti ti ti ti O ti ti ti ti ti ti ti ti 0 (p O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O ti ti 0 0 0 0 0 0 6 6 0 0 0 0 0 ti ti O o o O O ti 0 0 0 0 ti 0 0 0 0 0 0 0 0 ti _ CL 7 J i C {n y CO h v C J C C u C v Y V lD -i In C l lD O C l n C l V -i -i -i v1 lD OW Gl v1 O r� O In c-I W v1 r� W N v1 m N m lD N N lD C l n ti cV ti 0 0 ti 0 0 0 0 0 0 0 0 0 0 0 0 ti O ti O O O O ti 0 0 0 0 0 0 0 0 0 0 0 ti Q w V i a3+ 3 o In v m a r, In rn m In 0 v m In In N v v N ,� 00 00 ,� In In m m N N v1 1, lD v1 lD m N v1 0 O O O O m 0 0 1� m ti ti m m m c-I N Ol N N N c-I c c In c-I c-I c-I In In c In v1 c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I lD c-I c-I c-I FI cu cr- N >- N a., U U W Q fB U cu L Y GJ 1' i N N 7 CL V A i W a N vt D �o m O W O to v1 I, N c-I c-I O Ol O W W to c-I V N N N h Ib c-I n c-I Z1, c-I Ib c-I n c-I Z1, c-I to c-I to c-I Ib W n W v1 c-I N W v1 c-I N pl to c-I c-I c-I c-I c-I c-I c-I c-I c-I O c-I Z1, W O N O N O O m cy cy ti O ti O O ti ti N N O ti ti ti a m tD N O N O N ti c-i N c-i 0 m to N . O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O c-i O c-i . N G3p w v v mLL N m Cl lq n W W W m lq n lD V N IT V N O W V W �q -i v1 Il N lq v1 Il O O. N O O O O O O O O O O O O O O O O O O O O O O c-i O O O O O O O O O O O O O O O N V w i+ C � 3 aj 04 O v1 v. v. v. v. v. v. v. v. v. v. v. v. v. v. v. v. v. v. v. v. v. v. v1 v1 v1 v1 C m c-I v1 v1 v1 v1 v1 v1 v1 v1 v1 v1 v1 v1 v1 v1 v1 v1 v1 v1 v1 v1 v1 v1 v1 v1 v1 v1 v1 a pq I� m m m m m m m m m m m m m m m m m m m m m m m m m m m 3 s tD tD tD tD tD tD tD tD tD tD tD tD tD tD tD tD tD tD tD tD tD W W W W W W tD tD tD tD tD tD tD W W W W W N N N N N N N N N N N N N N N N N N N N N N N m N m N m N m N m N � O v1 v1 v1 v1 v1 v1 v1 v1 v1 v1 v1 v1 v1 v1 v1 v1 v1 v1 v1 v1 W W W W W W v1 v1 v1 v1 v1 v1 v1 W W W W W vi vi vi vi vi vi vi vi vi vi vi vi vi vi vi vi vi vi vi vi m m m m m m vi m vi vi vi vi vi m m m m mmoos J v CL C C C C C C C C C C C C C C C C C C C C C C C C C C C C O O O O O O O O O O O O - O- O- 4i0 O- 4i0 O- 4i0 0 - 0 - 0 - 0 - 0 0 0 0 0 O N N N N N f-0 f0 f0 f0 f0 f0 f0 f-0 f-0 f0 f-0 f-0 f-0 f-0 — - - 161616 FFF mmmmm O O O O O O O O O O O O O O O O O O O O O O O Ulu UUUUU U VV VVVVV 'o -i W Cl v1 m N tq n v1 m tq W O N -i v1 W tq O m O -i W I: N IT N O W Il -i W v1 v1 I� m m Lq Ib m _ I, N m to V v1 N Z1, N t N N v1 v1 to m v1 N v1 v1 Ln c-I O O O �o m v1 Ln c-I V v1 O N h O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O N N N N N N N N N N N N N N N N N N N N N O O O O O O N N N N N N N O O O O O t N . -i -i N -i N -i -i -i -i -i-i c-I c-I N N c-I N c-I N -i I: m m -iN c-I N N c-I c-I N N v1 lD +-' N O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O 0 N : N v1 Oq lq Ib -i lq N N I- 00 c-I W O m Il� Ib n Ib v1 Cl -i v1 O c-I : O I� -i v1 oq m lD v1 't -i N 3 rV O O c o o o o o o o o o o O 0 0 0 0 0 0 0 0 O 0 0 0 0 0 o V LL N O tiO0C l N OOlDiG C O O O O O O O O O O O O O O O O O O O O O O 1111 a m v v v v v v v v v v v v v v v v v v v v v v v v v v v v 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o o �3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 V h N +^ o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 m m m m m m O 0 0 0 0 0 0 m m m m m o2 000000000000000000000000000000000000000 V Vf �. O c-I c-I c-I c-I c-I O N c-I N c-I c-I c-I c-I c-I O c-I N c-I c-I c-I c-I N O c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I (p O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O 0 0 0 0 0 c-i 0 0 0 0 0 0 0 0 c-i 0 0 0 0 0 0 o c-i o o 0 0 0 0 0 0 0 0 0 0 0 0 0 CL 7 J i C h y CO h v C J C c C u C v Y V I: N m N v1 W m W -i lD N N n n IT n n -i v1 I� n W v1 c-I W v1 O Ol Ol I� cy v1 v1 v1 rV O O c 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 c-i 0 0 0 0 0 0 0 0 0 0 0 Q w V i m v v v n N O O m O In lD n W m N c-I O W W O vl V Ol N N N N N W W 1, O 00 W v1 cy) lD lD Ib n v1 00 N v1 lD lD c-I c-I c-I c-I 0 O O N 1, O N 1, r, n cy c-I c-I c-I c-I c-I c-I c-I c-I c-I c-I Ol W W c-I W W Ol FI cu cr- N >- N a., U U W Q _ fB U cu L Y GJ 1' i N N 3 m a Q V mi L LM N c-I N O N O O N� V v CO LL CL a O O N V w i+ C c N s t v 3 W00 CL _ V O Oq C c no 3 V1 m V O. J O N s OW lq m m v s + O� m `r. Ln m c N m J v d CL N O is y E — v m C7 U m _ N O N h O O as O O t OO N + N O O 0 3 N V O F - C v LL N G C w N N i 1 m LL Q \ 0 V Vf N v + O CL$ m m O m m O V Vf �. O ti (p O O r ti O _ 3 CL J i C h y CO VI v C J C C u C v Y � N O Q w V i V lD O 7 lD Ol LM ti ti FI STORMWATER MANAGEMENT REPORT CRESSWIND WESLEY CHAPEL - PHASE 03 APPENDIX F WATER QUALITY CALCULATIONS ►me9 • ollis i3 A THOMAS Sc HUTTON IA r_ @ Q s M 0 ca 3 U U 0 r4 0 n N R* 0 Z to O -wtad `^ -0 •3 O Z T a W tw m +, H w L �O a LA U LL a W 0 Q W Q � 6L O H Z W O C U J O J rl W O a ° m Z W O U O LL ,tt O 1-1 Ln O CIA � w O N Itt n m Q N c-1 .4 N zc-1 Ln m 1-, N N N c-I Q 0 z Ln N c-i --i Ln M --1 N l0 M 61 M 1, r-I n c-I N N M M Itt Ln l0 1" k.0 k.0 k.0 k.0 k.0 Ln LnLnLnLn LL LL u w 0 > Q m W w O LL a O H 00 O CW G J O J O O a F- z W z a W a 0 z W > H Q LL cI M m l0 O N zz l0 O M Ln u N -tt Ln U C7 > H Q LL N J j c I a N N N l0 N L.D O V z > � Ln l0 . r-I r-I r-I U z z W LL Q Ln M M M M p[ r I O M 00 rj O M Ln l0 w r-I z O U > W J W Ln Ln Ln Ln �t Ln l0 I- L.D O LD LD LD LD ,n Ln Ln Ln Ln z O U LL D u i'k w J O > J O O a H z W z CQ G W M a Q o0 0 Q LL ri 00 00 Co rl O � 00 ri CF)m 00 O � rn � u r�m LD rn N� O > V -I tU t9 ^ in F-: Q LL c-I c-I 00 N N J Q Ln M M n 00 N O V \ LD M� Ln n O > z ri Sri ri of r-I ri c-I N N N M c-I U Z Z W p LL z � a W Q W Q 00 Ln 00 M M O m p[ m O l0 m l0 O 00 N N M M-tt l0 m r-I O ... N -ze l0 00 O N Lri N N N N M M M Z O tU LU W J W ot 00 q O ri N M D 03 l0 n n n n M O ul ul ul un ul un H rrrl Z O U r1 w J O W Z O N Q Z 3 Z O M Q O M 5 W H — D,th. Node - Pond-04 (27842 0003 --ER QUALITY 2021-04-0211 28.24) 35 Time (hY5) Cresswind Wesley Chapel - Phase 02 Job: J-27842.0002 T z KH Wesley Chapel, LLC Date: 2/18/21 HP Thomas & Hutton Engineering Co. Revised: ~FEaµ Anti -Flotation Design Considerations By: MSK ANTI -FLOTATION DESIGN CONSIDERATIONS FOR: Wet Pond 02 CONTROL STUCTURE ELEVATIONS Top Structure Elevation: 570.20 Bottom Structure Elevation: 561.00 CONTROL STRUCTURE FLOTATION Buoyant Force Calculate submerged volume: Vs = (As x H,$) Where: VS = Submerged volume (cf) L,s = Length of control structure (ft) = 6.00 ft W,s = Width of Control structure (ft) = 6.00 ft A,s- Cross -sectional area of control structure (ft) = 36.00 ft H,s = Height of control structure (ft) = 9.20 ft Solve equation for Vs: Vs = (A,s x H,$) = 331.20 cf Calculate buoyant force: Fb = Vs x 7w.W, Where: Fb = buoyant force (lbf) y,,,, = Specific weight of water = 62.40 lbf/cf Fb = 20,667 lbf Z:\27842\27842.0002\Engineering\Calculations and Reports\Storm Water\Anti Flotation\27842.0002 - Wet Pond 03 - Anti Flotation Design Calculations.xlsx Pagel of 3 Cresswind Wesley Chapel - Phase 02 Job: J-27842.0002 T z KH Wesley Chapel, LLC Date: 2/18/21 HP Thomas & Hutton Engineering Co. Revised: ~FEaµ Anti -Flotation Design Considerations By: MSK Downward Force Calculate Downward Force of Control Structure Fdcs = (• cs - Vw& - Vorj&c) X Yconcrete Where: WteS = Weight of control structure (lbs) Yconcrete = Specific weight of concrete = 140.00 lbf/cf Acs = Cross -sectional area of control structure (ft) = 36.00 ft Hcs = Height of control structure (ft) = 9.20 ft Tcs = Wall thickness of control structure (ft) = 0.50 It Vcs = Volume of control structure (cf) = 101.20 cf Wu,eu = Width of weir (ft) = 4.00 ft Hu,eu = Height of weir opening (ft) = 3.40 ft Au,eu = Area of weir opening(ft) = 13.60 sf Vu,e;r = Volume of weir = 6.80 cf DIAorifice = Diameter of orifice opening (in) = 5.00 in Aorifice = Area of orifice opening (sf) = 0.136 sf Vorifice = Volume of orifice opening (sf) = 0.068 cf FdeS = 13,206 lbf Size Anti -Flotation Footing to Resist Bouyant Force FdeS + Fdft > Fb Fdft = (Lb X Wb X Db) X Yconcrete Where: FdeS = downward force of control structure (lbf) = 13206 lbf Fb = buoyant force (lbf) = 20667 lbf Yconcrete = Specific weight of concrete = 77.60 lbf/cf Lb = Length of Concrete Block = 12.00 ft Wb = Width of Concrete Block = 12.00 ft Db = Depth of Concrete Block = 12.00 in Fdft = downward force of anti -flotation footing (lbf) = 11174 lbf Z:\27842\27842.0002\Engineering\Calculations and Reports\Storm Water\Anti Flotation\27842.0002 - Wet Pond 03 - Anti Flotation Design Calculations.xlsx Page 2 of 3 Cresswind Wesley Chapel - Phase 02 KH Wesley Chapel, LLC Thomas & Hutton Engineering Co. Job: J-27842.0002 Date: 2/18/21 Revised: Anti -Flotation Design Considerations By: MSK Fd, + Fdtt = 24381 lbf > Fb = 20667 lbf _ Factor of Safety Confirm anti -flotation block is sized for minimum factor of safety (F,) of 1.10. Fs = (Fdcs + Fdrt)/Fb 1.18 > 1.10 - Z:\27842\27842.0002\Engineering\Calculations and Reports\Storm Water\Anti Flotation\27842.0002 - Wet Pond 03 - Anti Flotation Design Calculations.xlsx Page 3 of 3