Loading...
HomeMy WebLinkAboutSW3210301_Soils Report (SHWT)_20210511/'c CELEBRATING 15 YEARS SUMMIT ENGINEERING, LABORATORY & TESTING, P.C. May 17, 2019 Mr. Travis Manning Kolter Homes, LLC 8913 Silver Springs Court Charlotte, North Carolina 28215 Email: Tm anning(&,,kolter. com Subject: Estimated Seasonal High Water Table (ESHWT) Determinations Cresswind Potter Road Union County, North Carolina SUMMIT Project No. 2409.02 Dear Mr. Manning: SUMMIT Engineering, Laboratory and Testing, P. C. (SUMMIT) is pleased to submit this letter summarizing our observations of the soil test borings as related to Estimated Seasonal High Water Table Elevation (ESHWT) determinations. This report contains a brief description of the project information provided to us, general site and subsurface conditions revealed during this study. PURPOSE OF STUDY The primary purpose of this study was to obtain information regarding the subsurface conditions near the proposed detention ponds, assess the engineering characteristics of the subsurface materials, and determination of the estimated seasonal high water table mark (if evident). This report contains the following items: ENGINEERING • LABORATORY • TESTING 3575 Centre Circle Drive I Fort Mill, South Carolina 29715 1 (704) 504 - 1717 1 (704) 504 - 1125 (Fax) WWW. SU M M IT-COM PAN I ES. COM Summary of ESHWT Determination SUMMIT Project No. 2409.02 Cresswind May 17, 2019 • Photographic Logs, Site Vicinity Map and Boring Location Plan, • Summary of Test Boring Observations, visual soil classifications and descriptions, • A general review of the subsurface soils and estimated seasonal high water table depth from existing ground surface (if evident), • Groundwater level measurements. EXPLORATION PROCEDURES SUMMIT visited the site on May 8, 2019 and perform soil test borings (identified as Borings B- 2, B-13 through B-18) in the proposed detention ponds. The approximate locations of the borings are shown on Figure 2 — "Boring Location Plan" provided in Appendix 2. The client (Kolter Homes, LLC) provided SUMMIT a plan that indicated the approximate location of the proposed detention ponds. The boring locations were not surveyed prior to this study and should be considered approximate. The soil test borings were performed using an ATV -mounted CME 550X drill rig, and extended to an approximate depth of 16 feet below the existing ground surface. Hollow -stem, continuous flight auger drilling techniques were used to advance the boring into the ground. Standard Penetration Tests (SPT) were performed within the mechanical boring at designated intervals in general accordance with ASTM D 1586. When properly evaluated, the SPT results can be used as an index for estimating soil strength and density. In conjunction with the penetration testing, representative soil samples were obtained from each test location and returned to our laboratory for visual classification and potential laboratory testing. The soil samples collected were visually examined and classified in general accordance with ASTM D-2488. The Munsell Soil Color Charts (2009 Revision) were used to identify the hue, value, and chroma of soil samples. Water level measurements were attempted at the termination of drilling. The classification symbols are depicted on the "Boring Log" provided in Appendix 3. 2 Summary of ESHWT Determination SUMMIT Project No. 2409.02 Cresswind May 17, 2019 GENERALIZED SUBSURFACE STRATIGRAPHY General subsurface conditions observed during our geotechnical study are described herein. For more detailed soil descriptions and stratifications at a particular test location, the respective "Boring Log" provided in Appendix 3 should be reviewed. The horizontal stratification lines designating the interface between various strata represent approximate boundaries. Transitions between different strata in the field may be gradual in both the horizontal and vertical directions. Beginning from the ground surface, a layer of topsoil (surficial organic soils) was observed with approximate thicknesses ranging from 3 to 5 inches. Beneath the topsoil layer, residual (undisturbed) soils were encountered that consisted of elastic silts and sandy silts. A stratum of partially weathered rock (PWR) conditions were encountered in Boring B-13 between the approximate depths of 6 to 10 feet. Auger refusal conditions were not encountered in any of the borings. GROUNDWATER LEVEL MEASUREMENTS At the time of drilling and after waiting more than 24 hours, groundwater was not observed in the borings. It should also be noted that groundwater levels tend to fluctuate with seasonal and climatic variations, as well as with some types of construction operations. Therefore, water may be encountered during construction at depths not indicated in the borings performed for this exploration. ESTIMATED SEASONAL HIGH WATER TABLE ESHWT is defined as the shallowest depth to a wet soil layer as a result of "true" or "permanent" groundwater at any time during the year. The ESHWT is typically identified with a change in the color of the soil layer due to water staining (typically, gray redoximorphic depletions and mottling). Spots or blotches of different color or shades of color interspersed with a dominant color in soil, commonly referred to as mottling. Mottling is a historic indication for the presence of ground water caused by intermittent periods of saturation and drying, and may be indicative of 3 Summary of ESHWT Determination Cresswind SUMMIT Project No. 2409.02 May 17, 2019 poor aeration and impeded drainage. Mottling is a "general indication of groundwater" flow through this layer, but it is not known whether the groundwater flow was recent. CONCLUSIONS Based on our observations, Estimated Seasonal High Water Table (ESHWT) indicators (water stained soils) indicators were not evident in soils sampled in the borings. However, even though groundwater and ESHWT indicators were not observed in Boring B-13, perched water conditions can develop during wet weather above low permeable stratum such as the partially weathered rock (PWR) stratum encountered in the boring. Perched water conditions differ from the "true" or "permanent' water table. A perched water table is water standing above an unsaturated zone and is often influenced by soil conditions, and occurrence of less permeable soils. Where the ESHWT is defined as the shallowest depth to a wet soil layer as a result of "true" or "permanent" groundwater at any time during the year. The BMP designer should take into consideration that perched water conditions may exist above the low permeable PWR stratum. The following table summarizes the results of the borings and our observations. Summary Table of the Boring Results and Our Observations GW Depth Partially Boring ESHWT GW Depth After Weathered Test Depth Depth ATD 24 Hours Rock Approx. Location (Feet)' Feet' (Feet)' (Feet)' Depth, (Feet)' B -2 16 NE NE NE NE B-13 16 NE NE NE 6 to 10 B-19 16 NE NE NE NE 1 Depths from existing ground surface. NE — Not Encountered in Boring. 4 Summary of ESHWT Determination Cresswind SUMMIT Project No. 2409.02 May 17, 2019 The analyses and recommendations submitted in this report were based, in part, on data obtained from this study. If the above -described project conditions are incorrect or changed after the issuing of this report, or subsurface conditions encountered during construction are different from those reported, SUNIlMT should be notified and these recommendations should be re-evaluated based on the changed conditions to make appropriate revisions. We have prepared this report according to generally accepted geotechnical engineering practices. No warranty, express or implied, is made as to the professional advice included in this report. CLOSING SUNMT appreciates the opportunity to provide our professional services for you on this project. If you have any questions concerning the information in this proposal or if we may be of further service, please contact us at 704.504.1717. Sincerely, SUNUMT Todd A. Costner, E.I. Senior Professional LIST OF APPENDICES 1 2 9 `CA RQ��i� f = f' SUMMIT ~ z Engineering, Laboratory & W mTesting, P.C. C-4361 Photographic Log Figure No. 1 —Site Location Map Figure No. 2 — Test Boring Location Plan Boring Logs 5 �%A CARP .Al_ 23055 '•a,'�1' C. CO010 5/17/19 Kerry C. Cooper, P.E. Senior Geotechnical Engineer Summary of ESHWT Determination Cresswind SUMMIT Project No. 2409.02 May 17, 2019 //.Jam SUMMIT ENGINEERING. LAI)ORATQRY • TESTING APPENDIX I Photographic Log Summary of ESHWT Determination SUMMIT Project No. 2409.02 Cresswind May 17, 2019 Boring B-2 Samples (Approximate Depth = 0 to 10 feet below existing ground surface) Boring B-2 Samples (Approximate Depth =10 to 16 feet below existing ground surface) Summary of ESHWT Determination SUMMIT Project No. 2409.02 Cresswind May 17, 2019 Boring B-13 Samples (Approximate Depth = 0 to 10 feet below existing ground surface) Boring B-13 Samples (Approximate Depth =10 to 16 feet below existing ground surface) Summary of ESHWT Determination SUMMIT Project No. 2409.02 Cresswind May 17, 2019 Boring B-18 Samples (Approximate Depth = 0 to 10 feet below existing ground surface) Boring B-18 Samples (Approximate Depth =10 to 16 feet below existing ground surface) Summary of ESHWT Determination Cresswind SUMMIT Project No. 2409.02 May 17, 2019 SUMMIT ENGINEERING * LABORATORY . TESTING APPENDIX 2 Figures 10 I Custom & Sewing O = ; 3 a ►� c�3 O, Pa ��erx 2cz� P 1162 Waxhaw Gifts Q 0 0 sa 6 'ern a p L m c Figure 1 Site Vicinity Map SCALE: NTS a a New Life Baptist 4 d Y 0 a Propane Coolers Q Oak Grove Baptist Church 11 22 Cresswind Potter Road Union County, North Carolina SUMMIT Project No.: 2409.02 SUMMI`C 3575 Centre Circle Fort Mill, South Carolina 29715 (803) 504-1717 ojectrea 1� Al 1 =dS 4W 1 �� •, WitV °�• AD" B-13 o, � . f PWR 6' to 10, o A ESHWT — NE .o� o> n `�,�� • -dK FIT i_ o O O"4� C, ,0 O 67 O; r •: �i • � • Bp 71 •� O mum ESHWT — NE l o -7t!� ••'�'� /�,•�►� �`'�` J�- I -l�lr q B 2 � �, il •�� ESHWTNE Boring locations were not •�• - -__- -- --" - - 1. , 7 7 surveyed and should be �� - ---�—�----------------�+r- 1-_ considered approximate Figure 2 Boring Location Plan Cresswind Approx. Soil Test Boring Potter Road Location Union County, North Carolina SUMMIT 3575 Centre Circle Fort Mill, South Carolina 29715 (803) 504-1717 SCALE: NTS SUMMIT Project No.: 2409.02 Summary of ESHWT Determination Cresswind SUMMIT Project No. 2409.02 May 17, 2019 //.Jam SUMMIT ENGINEERING. LAI)ORATQRY • TESTING APPENDIX 3 Boring Logs 11 SUMMIT Engineering, Laboratory & Testing, P.C. KEY TO SYMBOLS 3575 Centre Circle / - Fort Mill, South Carolina 29715 SUMMIT 704.504.1717 ,„EEa,„„,aao„.ro„ .T- „.,,„.. summitcompanies.com CLIENT Kolter Homes, LLC PROJECT NAME Cresswind PROJECT NUMBER 2409.20 PROJECT LOCATION Union County, North Carolina LITHOLOGIC SYMBOLS SAMPLER SYMBOLS (Unified Soil Classification System) Standard Penetration Test F-1 BLANK ® CH: USCS High Plasticity Clay ® CL: USCS Low Plasticity Clay FILL: Fill (made ground) ® MH: USCS Elastic Silt MLS: USCS Sandy Silt TOPSOIL: Topsoil WELL CONSTRUCTION SYMBOLS PWR: Partially Weathered Rock ABBREVIATIONS LL -LIQUID LIMIT (%) TV -TORVANE PI -PLASTIC INDEX (%) PID - PHOTOIONIZATION DETECTOR W - MOISTURE CONTENT (%) UC -UNCONFINED COMPRESSION DID - DRY DENSITY (PCF) ppm -PARTS PER MILLION NP -NON PLASTIC Water Level at Time -200 - PERCENT PASSING NO. 200 SIEVE Drilling, or as Shown PP - POCKET PENETROMETER (TSF) Water Level at End of 1 Drilling, or as Shown Water Level After 24 - Hours, or as Shown SUMMIT Engineering, Laboratory & Testing, P.C. BORING NUMBER B-02 Centre Circle 11AM1k Fort Mill, South Carolina 29715 PAGE 1 OF 1 Fort SUMMIT 704.504.1717 summitcompanies.com CLIENT Kolter Homes, LLC PROJECT NAME Cresswind PROJECT NUMBER 2409.20 PROJECT LOCATION Union County, North Carolina DATE STARTED 5/8/19 COMPLETED GROUND ELEVATION HOLE SIZE 6 inches DRILLING CONTRACTOR SUMMIT GROUND WATERICAVE-IN: DRILLING METHOD Hollow Stem Auger AT TIME OF DRILLING --- GW NE ATD LOGGED BY J Parrish CHECKED BY T. Costner AT END OF DRILLING --- GW > 24 Hrs NE NOTES Refer to Figure 2 "Boring Location Plan" for Approx. Boring Location AFTER DRILLING --- p U ❑= (7 Q 0-0 > Q J (D w MATERIAL DESCRIPTION Lu �w J ED a Z U o G✓0 > O O U LU U) w ��� O? Q m O> UZ A SPT N VALUE A 0 20 40 60 80 100 PL Mc LL 0 20 40 60 80 100 ❑ FINES CONTENT (%) ❑ 0 20 40 60 80 100 Approx. 5' of Topsoil (MH) RESIDUUM: _ ....:..._._.........:. ..... Firm Moist Red Elastic SILT SPT 2-3-5-9 1 (8) 2.5 — — — — — — — — — — — — — — — — — — — — — — — — — — — — (MH) Stiff Red Elastic SILT SPT .... ... ;........ ;........ ;........ ;... ..... 5-6-8-9 2 (14) (ML) Stiff Red and Reddish Yellow Slightly Clayey Slightly Sandy SILT 5.0 SPT 3 3-8-7-9 (15) — — — — — — — — — — — — — — — — — — — — — — — — — — — — (ML) Very Stiff Red and Yellow Slightly Clayey Slightly Sandy .......;.... .... ;........ ;............ ..... SILT........................................... SPT 3-6-15-13 :........ :........ 4 (21) ...............:........ 7.5 — — — — — — — — — — — — — — — — — — — — — — — — — — — — (ML) Hard Light Gray and Red Slightly Clayey Sandy SILT ............ ....:........ :........ :........ SPT 5-15-21-29 5 (36) :........:........:........ 10.0 SPT 14-20-24-40 6 (44) z.s — — — — — — — — — — — — — — — — — — — — — — — — — — — — (ML) Very Stiff Light Gray, Red and Black Slightly Clayey Sandy SILT with Clay Seams and Rock Fragments SPT 8-10-13-21 7 (23) ........: — — — — — — — — — — — — — — — — — — — — — — — — — — — — (ML) Hard Light Gray, Red and Black Slightly Clayey Sandy SILT ........................................... with Clay Seams and Rock Fragments 15.0 SPT 8 5-14-28-30 (42) LLL Bottom of Boring at 16 feet bgs, Boring Terminated SUMMIT Engineering, Laboratory & Testing, P.C. BORING NUMBER B-13 Centre Circle 11AM1k Fort Mill, South Carolina 29715 PAGE 1 OF 1 Fort SUMMIT 704.504.1717 summitcompanies.com CLIENT Kolter Homes, LLC PROJECT NAME Cresswind PROJECT NUMBER 2409.20 PROJECT LOCATION Union County, North Carolina DATE STARTED 5/8/19 COMPLETED GROUND ELEVATION HOLE SIZE 6 inches DRILLING CONTRACTOR SUMMIT GROUND WATERICAVE-IN: DRILLING METHOD Hollow Stem Auger AT TIME OF DRILLING --- GW NE ATD LOGGED BY J Parrish CHECKED BY T. Costner AT END OF DRILLING --- NOTES Refer to Figure 2 "Boring Location Plan" for Approx. Boring Location AFTER DRILLING --- Lu o A SPT N VALUE A p U U) w 0 20 40 60 80 100 ❑= c7 Q 0-0 MATERIAL DESCRIPTION �w J ED G✓0 > O ��� O? Q PL Mc LL > Q J � a O U m O> 0 20 40 60 80 100 ❑ FINES CONTENT (%) ❑ w Z U LU U Z 0 20 40 60 80 100 Approx. 3" of Topsoil (ML) RESIDUUM: ........ ....:..._._.........:. ..... Stiff Light Olive Brown, Light Gray and Black Slightly Clayey SPT 5-6-7-10 Slightly Sandy SILT 1 (13 — — — — — — — — — — — — — — — — — — — — — — — — — — — — (ML) Hard Yellowish Red and Yellowish Slightly Clayey Sandy ....... ;........ ;........ ;........ z.s SILT SPT 3-19-24-19 2 (43) 5.0 SPT 8-19-19-28 3 (38) ... - ..................................:........ (ML) Partially Weathered Rock (PWR) when sampled becomes ._•;:_: Yellowish Red and Yellowish Slightly Clayey Sandy SILT with SPT 6-22-50 Rock Fragments 4 (50/5") 7.5 ---------------------------- (ML) Partially Weathered Rock (PWR) when sampled becomes ........:........:........ Olive Brown Slightly Clayey Sand SILT with Rock Fragments 9 Y Y Y Y 9 SPT 1531 50 _ .......... :.......... ..... 5 (50/4") J. 10.0 .......... ................ :........ :........ (ML) Very Hard Pale Yellow and Light Gray Slightly Clayey Slightly Sandy SILT ........ :...... ...................... ..... SPT 23-30-44-50 6 (74) — — — — — — — — — — — — — — — — — — — — — — — — — — — — (ML) Hard Pale Yellow, Light Gray and Black Slightly Clayey ........ ;........ :...... . ;....... z.s Sandy SILT SPT 20-16-26-37 7 (42) .......... — — — — — — — — — — — — — — — — — — — — — — — — — — — — (ML) Very Hard Pale Yellow, Light Gray and Black Slightly Clayey ............................................ Sandy SILT 15.0 SPT 8 5-18-44-50 (62) Bottom of Boring at 16 feet bgs, Boring Terminated SUMMIT Engineering, Laboratory & Testing, P.C. BORING NUMBER B-18 Centre Circle 11AM1k Fort Mill, South Carolina 29715 PAGE 1 OF 1 Fort SUMMIT 704.504.1717 summitcompanies.com CLIENT Kolter Homes, LLC PROJECT NAME Cresswind PROJECT NUMBER 2409.20 PROJECT LOCATION Union County, North Carolina DATE STARTED 5/8/19 COMPLETED GROUND ELEVATION HOLE SIZE 6 inches DRILLING CONTRACTOR SUMMIT GROUND WATERICAVE-IN: DRILLING METHOD Hollow Stem Auger AT TIME OF DRILLING --- GW NE ATD LOGGED BY J Parrish CHECKED BY T. Costner AT END OF DRILLING --- GW > 24 Hrs NE NOTES Refer to Figure 2 "Boring Location Plan" for Approx. Boring Location AFTER DRILLING --- Lu o A SPT N VALUE A p U } w 0 20 40 60 80 100 PL MC LL _ Q a O MATERIAL DESCRIPTION �w J ED > p Z Q > ry J a O� of U m O> 0 20 40 60 80 100 El FINES CONTENT (%) (D w �Z < LU UZ 0 20 40 60 80 100 Approx. 5' of Topsoil (MH) RESIDUUM: _ ....:..._._.........:. ..... Firm Moist Reddish Brown Elastic SILT SPT 2-2-4-6 1 (6) — — — — — — — — — — — — — — — — — — — — — — — — — — — — (MH) Stiff Red Elastic SILT ... .... ;........ ;........ ;........ ;........ 2.5 SPT 3-5-7-9 2 (12) ........................................... (ML) Hard Brownish Yellow, Dark Red and Black Slightly Clayey Slightly Sandy SILT ........ ........ :........ ........ ........ 5.0 SPT 3 5-11-22-28 (33) . — — — — — — — — — — — — — — — — — — — — — — — — — — — — (ML) Very Hard Gray, Red and Black Slightly Sandy SILT ........ ;........ ;.......;........ ;........ SPT 8-26-46-50 4 (72) ........... 7.5 (ML) Hard Gray, Red and Black Slightly Sandy SILT with Rock Fragments _ ....;......_:......... ..... SPT 12-18-25-31 5 (43) ......:........:........ 10.0 — — — — — — — — — — — — — — — — — — — — — — — — — — — — (ML) Very Stiff Gray, Red and Black Slightly Sandy SILT with ............... ...........:................. Rock Fragments ........ :...... ..:........:........:... ..... SPT 12-10-18-20 6 (28) 12.5 SPT 3-11-12-7 7 (23) 15.0 SPT 8 7-11-13-35 (24) Bottom of Boring at 16 feet bgs, Boring Terminated