Loading...
HomeMy WebLinkAboutSW3210301_Soils Report (Geotechnical)_20210511CELEBRATING 15 YEARS SUMMIT ENGINEERING, LABORATORY & TESTING, P.C. REPORT OF GEOTECHNICAL SUBSURFACE EXPLORATION CRESSWIND POTTER ROAD UNION COUNTY, NORTH CAROLINA SUMMIT PROJECT NO. 2409.02 Prepared For: Mr. Travis Manning Kolter Homes, LLC 8913 Silver Springs Court Charlotte, North Carolina 28215 Email: Tmanninggkolter.com Prepared By: SUMMIT Engineering, Laboratory & Testing, P. C. (SUMMIT) 3575 Centre Circle Drive Fort Mill, South Carolina 29715 May 17, 2019 ENGINEERING • LABORATORY • TESTING 3575 Centre Circle Drive I Fort Mill, South Carolina 29715 1 (704) 504 - 1717 1 (704) 504 - 1125 (Fax) WWW. SU M M IT-COMPAN I ES. COM CELEBRATING 15 YEARS SUMMIT ENGINEERING, LABORATORY & TESTING, P.C. May 17, 2019 Mr. Travis Manning Kolter Homes, LLC 8913 Silver Springs Court Charlotte, North Carolina 28215 Email: Tmanninggkolter.com Subject: Report of Geotechnical Subsurface Exploration Cresswind Potter Road Union County, North Carolina SUNIlMT Project No. 2409.02 Dear Mr. Manning: SUMMIT Engineering, Laboratory & Testing, P. C. (SUNIlMT) has completed a geotechnical subsurface exploration for the Cresswind site located off of Potter Road in Union County, North Carolina. These geotechnical services were performed in general accordance with our Proposal No. P2019-504-G, dated April 14, 2019. This report contains a brief description of the project information provided to us, general site and subsurface conditions revealed during our geotechnical subsurface exploration and our general recommendations regarding foundation design and construction. SUNIlMT appreciates the opportunity to be of service to you on this project. If you have any questions concerning the information presented herein or if we can be of further assistance, please feel free to call us at (704) 504-1717. Sincerely yours, SUNIlMT Engineering, Laboratory & Testing, P. C =�4 SUMMIT�� i Engineering, `•_ Laboratory & LLj m Testing, P.G. gr y C-4361 j\A CAI a;U 23055 i I-• Nc«E '•F. A p ;'.. Todd A. Costner, E.I. Kerry C. Cooper, P.E. 5/17/19 Senior Professional Senior Geotechnical Engineer Report of Geotechnical Subsurface Exploration SUMMIT Project No. 2409.02 Cresswind May 17, 2019 TABLE OF CONTENTS SECTION Page EXECUTIVE SUMMARY........................................................................................................... ill 1.0 INTRODUCTION.............................................................................................................. I I.I. Site and Project Description.................................................................................... 1 1.2. Purpose of Subsurface Exploration......................................................................... 1 2.0 EXPLORATION PROCEDURES...................................................................................... 3 2.1. Field Exploration.................................................................................................... 3 3.0 AREA GEOLOGY AND SUBSURFACE CONDITIONS ............................................... 4 3.1. Physiography and Area Geology............................................................................ 4 3.2. Generalized Subsurface Stratigraphy...................................................................... 4 3.2.1. Surface Materials........................................................................................ 5 3.2.2. Alluvial Soils.............................................................................................. 5 3.2.3. Existing Fill Soils....................................................................................... 6 3.2.4. Residual Soils............................................................................................. 6 3.2.5. Partially Weathered Rock and Auger Refusal ............................................ 7 3.2.6. Groundwater Level Measurements............................................................ 7 4.0 EVALUATIONS AND RECOMMENDATIONS............................................................. 9 4.1. General....................................................................................................................9 4.2. Shallow Foundation Recommendations................................................................. 9 4.3. Retaining Wall Recommendations....................................................................... 10 4.4. Low to Moderate Plasticity Moisture Sensitive Soils(MH)................................. 11 4.5. High Plasticity Moisture Sensitive Soils (CH) ..................................................... 12 4.6. Wet Weather Conditions....................................................................................... 13 4.7. Floor Slabs............................................................................................................ 14 4.8. Pavements Subgrade Preparation.......................................................................... 14 4.9. Cut and Fill Slopes................................................................................................ 15 5.0 CONSTRUCTION CONSIDERATIONS........................................................................ 16 5.1. Abandoned Utilities/Structures............................................................................. 16 5.2. Site Preparation..................................................................................................... 16 5.3. Difficult Excavation.............................................................................................. 17 5.4. Temporary Excavation Stability........................................................................... 19 5.5. Structural Fill........................................................................................................ 19 5.6. Suitability of Excavated Soils for Re-Use............................................................ 21 5.7. Engineering Services During Construction.......................................................... 21 6.0 RELIANCE AND QUALIFICATIONS OF REPORT .................................................... 23 APPENDIX 1 - Figures SiteVicinity Map................................................................................................................. I BoringLocation Plan...........................................................................................................2 APPENDIX 2 - Boring Logs Report of Geotechnical Subsurface Exploration SUMMIT Project No. 2409.02 Cresswind May 17, 2019 EXECUTIVE SUMMARY SUMMIT has completed a geotechnical subsurface exploration for the Cresswind project. The purpose of this exploration was to obtain general information regarding the subsurface conditions and to provide geotechnical recommendations regarding foundation support of the proposed construction. The exploration consisted of twenty (20) soil test borings (identified as B-1 through B-20). The approximate test locations are shown on the Figure 2 provided in Appendix 1. The following geotechnical engineering information was obtained as a result of the soil test borings: Surface Materials — Surficial organic (topsoil) soils were observed at the existing ground surface of the borings with thicknesses ranging from approximately 2 to 6 inches. Existing Fill Soils — An approximate 6- to 8-inch layer of existing fill (disturbed) soils were encountered beneath the surface materials in all of the borings except for Borings B-2, B-13 and B-18. These existing fill soils were encountered in borings that were located in fields formerly utilized for agricultural purposes; therefore, these fill soils are considered cultivated soils. When sampled, the existing fill soils generally consisted of elastic silts (MH) and sandy silts (ML). • Residual Soils - Residual (undisturbed) soils were encountered below the surface materials and/or existing fill soils and extended to either the maximum termination depth or partially weathered rock (PWR). These residual soils generally consisted of fat clays (CH), lean clays (CL), elastic silts (MH), and sandy silts (ML) with varying amount of rock fragments. The Standard Penetration Resistances (SPT N-values) in the residual soils ranged from 4 to greater than 50 blows per foot (bpf). Partially Weathered Rock (PWR) and Auger Refusal — Partially weathered rock (PWR) conditions were encountered in Borings B-11, B-12, B-13, B-15, B-16 and B-20 at approximate depths ranging from 5.5 to 12 feet below the existing ground surface. Auger refusal conditions were not encountered in the borings. • Groundwater Levels -At the time of drilling, groundwater was observed in Borings B-14 and B-15 at approximate depths of 10 and 9 feet below the existing ground surface respectively. After waiting more than 24 hours, water was not observed in Borings B-2, B-13 and B-18, and water was observed in Boring B- 9 at a depth of 9.6 feet below the existing ground surface. Foundation Support - Based on the results of our borings, the proposed structures can be adequately supported on shallow foundations systems provided site preparation and compacted fill recommendation procedures outlined in this report are implemented concerning unsuitable soils such as existing "cultivated" fill soils, fat clays, and soils with N-values less than 7 bpf. An allowable net bearing pressure of up to 2,500 pounds per square foot (psf) can be used for design of the foundations bearing on approved undisturbed residual soils, or on structural fill compacted to at least 95 percent of its Standard Proctor maximum dry density. • Special Construction Considerations: Special considerations are warranted concerning existing "cultivated" fill soils, fat clays, and soils with SPT N-values less than 7 bpf. iii Report of Geotechnical Subsurface Exploration Cresswind SUMMIT Project No. 2409.02 May 17, 2019 Dependent on final grades, the contractor can anticipate that some undercutting and/or foundation extension may be necessary through these unsuitable soils if encountered during grading and construction. Should these soils be encountered during the grading and construction activities, these soils should be evaluated in the field by a Geotechnical Engineer - of -Record and/or his designee prior to remediation. Additional testing such as test pit excavations and/or hand auger borings may be required in order to further evaluate these soil conditions, depths and locations. o Existing "Cultivated" Fill Soils: At the time of this report, no relevant information (documentations) regarding previous grading activities, prior materials testing, and/or geotechnical engineering services was provided for our review. All of the borings except for Borings B-2, B-13 and B-18 encountered undocumented fill soils (fill soils not monitored and tested during placement) and undocumented fill poses risks associated with undetected deleterious materials within the fill soils and/or deleterious material at the interface between the fill soils and residual soils. Also, based on historical aerial photographs and our site observations, agricultural fields were present on the site. Except for Borings B-2, B-13 and B-14, all of the borings were performed in the agricultural fields and encountered a 6- to 8-inch layer of existing fill soil that are considered to be cultivated fill soils. Cultivated fill soil is a layer that was plowed and disturbed for agricultural purposes. Cultivated fill soils are not suitable for building and pavement support and are not suitable to be re -used as structural fill material due to the organics mixed in the soil. However, if approved by the Geotechnical Engineer of Record, the organic stained soils may be suitable as structural quality fill material if the organic content in the soil is less than 5% and/or blended with non -organic soils to reduce the organic content. o Fat Clams High plasticity and moisture sensitive (fat clays) soils were encountered beneath the existing fill soils in Borings B-14 and B-15 to an approximate depth of 3 feet below the existing ground surface. Highly plastic soils can undergo significant changes in volume (shrink/swell behavior) with changes in moisture conditions. These soils typically provide poor subgrade support for pavements and foundations. o Soils with SPT N-values less than 7 bpf: Soils that exhibited SPT N-values less than 7 bpf are considered not suitable to support the proposed construction. These soil conditions were generally encountered in the upper 1.5 feet of the borings. Please note that the information provided in this executive summary is intended to be a brief overview of project information and recommendations from the geotechnical report. The information in the executive summary should not be used without first reading the geotechnical report and the recommendations described therein. iv Report of Geotechnical Services SUMMIT Project No. 2409.02 Cresswind May 17, 2019 1.0 INTRODUCTION I.I. Site and Project Description The Cresswind site is located off of Potter Road in Union County, North Carolina. A vicinity map showing the project's general location is provided as Figure 1. The subject property is approximately 162 acres comprised of Union County Tax Parcel ID Numbers 06027007 and 06009008. At the time of our field exploration, the subject site was undeveloped land that consisted of mostly agricultural fields and wooded areas. Also, Molly Branch creek was present along the southern portion line and the East Fork Twelve Mill Creek was present along the northwestern property line. The Client (Kolter Homes, LLC) provided SUMMIT a plan sheet titled "Concept Plan", prepared by Thomas & Hutton dated April 11, 2019 that indicated the configurations of the proposed construction planned for this project. Based on the provided information, we understand the project is planned to include 599 single family residential lots with associated, amenities, pavements, roadways, utilities and storm water management systems. At the time of report preparation, SUMMIT had not been provided structural details of the planned construction indicating proposed loads, foundation bearing elevations, or finished floor elevations. For this report, SUMMIT assumed the proposed structures will be supported on a shallow foundation system consisting of spread, strip, and/or combined footings and that wall loads will be on the order of 1 to 3 kips per foot. Also, grading plans were not available at the time of this report and we have assumed that maximum cut/fill depths will be on the order of 1 to 3 feet over the existing ground surface. 1.2. Purpose of Subsurface Exploration The purpose of this exploration was to obtain general geotechnical information regarding the subsurface conditions and to provide general preliminary recommendations regarding the geotechnical aspects of site preparation and foundation design. This report contains the following items: 1 Report of Geotechnical Subsurface Exploration Cresswind SUMMIT Project No. 2409.02 May 17, 2019 • General subsurface conditions, • Boring logs and an approximate "Boring Location Plan", • Suitable foundation types, • Allowable bearing pressures for design of shallow foundations, • Anticipated excavation difficulties during site grading and/or utility installation, • Remedial measures to correct unsatisfactory soil conditions during site development, as needed, • Drainage requirements around structures and under floor slabs, as needed, • Construction considerations, • Pavement subgrade support guidelines. Report of Geotechnical Subsurface Exploration SUMMIT Project No. 2409.02 Cresswind May 17, 2019 2.0 EXPLORATION PROCEDURES 2.1. Field Exploration SUMMIT visited the site on May 6, 7 and 8, 2019 and performed a geotechnical exploration that consisted of twenty (20) soil test borings (identified as B-1 through B-20). The approximate locations of the borings are shown on the Figure 2 - "Boring Location Plan" provided in Appendix 1. The borings were located by professionals from our office using the provided plan, recreation - grade handheld GPS, existing topography, and aerial maps as reference. Since the boring locations were not surveyed, the location of the borings should be considered approximate. The soil test borings were performed using an ATV -mounted CME 550X drill rig and extended to approximate depths of 13.9 to 16 feet below the existing ground surface. Hollow -stem, continuous flight auger drilling techniques were used to advance the borings into the ground. Standard Penetration Tests (SPT) were performed within the mechanical borings at designated intervals in general accordance with ASTM D 1586. The SPT "N" value represents the number of blows required to drive a split -barrel sampler 12 inches with a 140-pound hammer falling from a height of 30 inches. When properly evaluated, the SPT results can be used as an index for estimating soil strength and density. In conjunction with the penetration testing, representative soil samples were obtained from each test location and returned to our laboratory for visual classification in general accordance with ASTM D 2488. Water level measurements were attempted at the termination of drilling. The results of these tests are presented on the individual boring logs provided in Appendix 2 at the respective test depth. 3 Report of Geotechnical Subsurface Exploration SUMMIT Project No. 2409.02 Cresswind May 17, 2019 3.0 AREA GEOLOGY AND SUBSURFACE CONDITIONS 3.1. Physiography and Area Geology The subject property is located in Union County, North Carolina, which is located in the south central Piedmont Physiographic Province. The Piedmont Province generally consists of well- rounded hills and ridges which are dissected by a well -developed system of draws and streams. The Piedmont Province is predominantly underlain by metamorphic rock (formed by heat, pressure and/or chemical action) and igneous rock (formed directly from molten material) which were initially formed during the Precambrian and Paleozoic eras. The volcanic and sedimentary rocks deposited in the Piedmont Province during the Precambrian era were the host of the metamorphism and were generally changed to gneiss and schist. The more recent Paleozoic era had periods of igneous emplacement, with episodes of regional metamorphism resulting in the majority of the rock types seen today. The topographic relief found throughout the Piedmont Province has developed from differential weathering of theses igneous and metamorphic rock formations. Ridges developed along the more easily weathered and erodible rock. Because of the continued chemical and physical weathering, the rocks in the Piedmont Province are generally covered with a mantle of soil that has weathered in -place from the parent bedrock below. These soils have variable thicknesses and are referred to as residual soils, as they are the result of in -place weathering. Residual soils are typically fine- grained and have a higher clay content near the ground surface because of the advanced weathering. Similarly, residual soils typically become more coarse -grained with increasing depth because of decreased weathering. As weathering decreases with depth, residual soils generally retain the overall appearance, texture, gradation and foliations of their parent rock. 3.2. Generalized Subsurface Stratigraphy General subsurface conditions observed during our geotechnical exploration are described herein For more detailed soil descriptions and stratifications at a particular field test location, the respective "Boring Logs", provided in Appendix 2 should be reviewed. The horizontal 4 Report of Geotechnical Subsurface Exploration Cresswind SUMMIT Project No. 2409.02 May 17, 2019 stratification lines designating the interface between various strata represent approximate boundaries. Transitions between different strata in the field may be gradual in both the horizontal and vertical directions. Therefore, subsurface stratigraphy between test locations may vary. 3.2.1. Surface Materials Surficial organic (topsoil) soils were observed in all borings at the existing ground surface with thicknesses ranging from approximately 2 to 6 inches. The surficial organic soil depths provided in this report and on the individual "Boring Logs" are based on observations of field personnel and should be considered approximate. Please note that the transition from surficial organic soils to underlying materials may be gradual, and therefore the observation and measurement of the surficial organic soil depth is subjective. Actual surficial organic soil depths should be expected to vary and generally increases with the amount of vegetation present over the site. Surficial Organic Soil is typically a dark -colored soil material containing roots, fibrous matter, and/or other organic components, and is generally unsuitable for engineering purposes. SUMMIT has not performed any laboratory testing to determine the organic content or other horticultural properties of the observed surficial organic soils. Therefore, the phrase "surficial organic soil" is not intended to indicate suitability for landscaping and/or other purposes. 3.2.2. Alluvial Soils Alluvial (water -deposited) soils were not encountered in any of the borings performed during this exploration. Alluvial soils are typically encountered in or near drainage features, pond bottoms, creeks and in low-lying areas. Alluvial soils are generally loose and/or under -compacted and, as such, are typically unsuitable for supporting the proposed construction. Therefore, remediation may be required wherever alluvial soils are encountered during grading activities. If these soils are encountered during site grading activities, the extent of the alluvial soils should be evaluated in the field by the Geotechnical Engineer -of -Record or his qualified representative. Additional testing such as test pit 5 Report of Geotechnical Subsurface Exploration Cresswind SUMMIT Project No. 2409.02 May 17, 2019 excavations and/or hand auger borings may be required in order to further evaluate the alluvial soils. 3.2.3. Existing Fill Soils An approximate 6- to 8-inch layer of existing fill (disturbed) soils were encountered beneath the surface materials in all of the borings except for Borings B-2, B-13 and B-18. When sampled, the existing fill soils generally consisted of elastic silts (MH) and sandy silts (ML). Also, based on historical aerial photographs and our site observations, agricultural fields were present on the site. Except for Borings B-2, B-13 and B-14, all of the borings were performed in the agricultural fields and encountered a 6- to 8-inch layer of existing fill soil that are considered to be cultivated fill soils. Cultivated fill soil is a layer that was plowed and disturbed for agricultural purposes. Cultivated fill soils are not suitable for building and pavement support and are not suitable to be re -used as structural fill material due to the organics mixed in the soil. However, if approved by the Geotechnical Engineer of Record, the organic stained soils may be suitable as structural quality fill material if the organic content in the soil is less than 5% and/or blended with non -organic soils to reduce the organic content. If fill soils are encountered at other locations in the field during construction, the fill soils should be evaluated by the Geotechnical Engineer -of -Record, or his authorized representative, with respect to the criteria outlined in Section 5.0 — Constriction Considerations. 3.2.4. Residual Soils Residual (undisturbed) soils were encountered below the surface materials and/or existing fill soils and extended to either the maximum termination depth or partially weathered rock (PWR). These residual soils generally consisted of soft to very stiff fat clays (CH), firm to very stiff lean clays (CL), firm to very stiff elastic silts (MH), and firm to very hard sandy 6 Report of Geotechnical Subsurface Exploration Cresswind SUMMIT Project No. 2409.02 May 17, 2019 silts (ML) with varying amount of rock fragments. The Standard Penetration Resistances (SPT N-values) in the residual soils ranged from 4 to greater than 50 blows per foot (bpf). 3.2.5. Partially Weathered Rock and Auger Refusal Partially weathered rock (PWR) conditions were encountered in Borings B-11, B-12, B- 13, B-15, B-16 and B-20 at approximate depths ranging from 5.5 to 12 feet below the existing ground surface. PWR is defined as soil -like material exhibiting SPT N-values in excess of 100 bpf. When sampled, the PWR generally breaks down into sandy silts with rock fragments. Auger refusal conditions were not encountered in the borings. Auger refusal is defined as material that could not be penetrated by the drilling equipment used during our field exploration. The following table summarizes the approximate depths that PWR and auger refusal conditions were encountered in the borings performed for this exploration. Summary Table of Partially Weathered Rock and Auger Refusal Depths Boring No. Partially Weathered Rock Approx. Depth, (feet) Auger Refusal Approx. Depth, (feet) B-11 12 --- B-12 5.5 --- B-13 6 to 10 --- B-15 8 --- B-16 5.5 --- B-20 12 --- *Depths were measured from the ground surface existing at the time drilling was performed. -- " When PWR or auger refusal conditions were not encountered in the borings. 3.2.6. Groundwater Level Measurements At the time of drilling, groundwater was observed in Borings 13-14 and 13-15 at approximate depths of 10 and 9 feet below the existing ground surface respectively. After waiting more than 24 hours, water was not observed in Borings B-2, B-13 and B-18 and water was 7 Report of Geotechnical Subsurface Exploration Cresswind SUMMIT Project No. 2409.02 May 17, 2019 observed in Boring B- 9 at a depth of 9.6 feet below the existing ground surface. Please note moisture conditions of the soil samples were noted within some of the borings and moisture conditions within the soils may be an indication of the presence of groundwater. Also, moist to wet soil conditions can be an indication that some manipulation (scarifying and drying) of the soil may be required in order to obtain the specified compaction during grading operations. It should also be noted that groundwater levels tend to fluctuate with seasonal and climatic variations, as well as with some types of construction operations. Therefore, water may be encountered during construction at depths not indicated in the borings performed for this exploration. Report of Geotechnical Subsurface Exploration SUMMIT Project No. 2409.02 Cresswind May 17, 2019 4.0 EVALUATIONS AND RECOMMENDATIONS 4.1. General Our preliminary evaluation and recommendations are based on the project information outlined previously and on the data obtained from the field and laboratory testing program. If the structural loading, geometry, or proposed building locations are changed or significantly differ from those outlined, or if conditions are encountered during construction that differ from those encountered by the borings, SUMMIT requests the opportunity to review our recommendations based on the new information and make the necessary changes. Grading plan information with proposed foundation bearing elevations was not available for our review at the time of this report. Finish grade elevations of proposed construction in conjunction with the proposed foundation bearing elevation can have a significant effect on design and construction considerations. SUMMIT should be provided the opportunity to review the project grading plans prior to their finalization with respect to the recommendations contained in this report. 4.2. Shallow Foundation Recommendations Based on the results of the soil test borings, and our assumptions regarding site grading and assumed structural building loads, the proposed structures can be adequately supported on shallow foundation systems provided site preparation and compacted fill recommendation procedures outlined in this report are implemented concerning unsuitable soils such as existing "cultivated" fill soils, fat clays, and soils with N-values less than 7 bpf. An allowable net bearing pressure of up to 2,500 pounds per square foot (psf) can be used for design of the foundations bearing on approved undisturbed residual soils, or on approved structural fill compacted to at least 95 percent of its Standard Proctor maximum dry density. Please refer to section 5.0 of this report for more information. Provided the procedures and recommendations outlined in this report are implemented and using the assumed loads, we have estimated a total settlement of less than 1 inch for footing design 9 Report of Geotechnical Subsurface Exploration SUMMIT Project No. 2409.02 Cresswind May 17, 2019 pressures of 2,500 psf. To avoid punching type bearing capacity failure, we recommend wall foundation widths of 18 inches or more. Exterior foundations and foundations in unheated areas should be designed to bear at least 12 inches below finished grade for frost protection. To reduce the effects of seasonal moisture variations in the soils, for frost protection and for bearing capacity, it is recommended that all foundations be embedded at least 12 inches below the lowest adjacent grade. All footing excavations and undercutting remediation operations should be evaluated by the Geotechnical Engineer -of -Record or his qualified representative to confirm that suitable soils are present at and below the proposed bearing elevation and that the backfill operations are completed with the recommendations of this report. This evaluation may include hand -auger and DCP testing. If evaluation with DCP testing encounters lower penetration resistances than anticipated or unsuitable materials are observed beneath the footing excavations, these bearing soils should be corrected per the Geotechnical Engineer-of-Record's recommendations. 4.3. Retaining Wall Recommendations Design Parameters for backfill properties (i.e., friction angle, earth pressure coefficients) should use the values in the table below. These parameters are based on suitable soils with a minimum moist unit weight of 120 pcf. SUNIlMT should be retained to test the actual soils used for construction to verify these design assumptions. To reduce long term creep or deflections to the wall system, desirable wall backfill soils should be used. These include non -plastic, granular soils (sands and gravels). However, these soils may not be available on site. Soil Parameters for Wall Backfill Active Passive Coefficient Allowable Modulus of Earth Earth of Earth Bearing Friction Subgrade Pressure Pressure Pressure at Capacity Angle Reaction Coefficient Coefficient Rest Slide Back ill Type (psf) (deg) (pci) & Kp Ko Friction Residuum 2,500 280 200 0.361 2.77 0.531 0.4 Fill 2,500 240 150 0.421 2.37 0.593 0.4 10 Report of Geotechnical Subsurface Exploration SUMMIT Project No. 2409.02 Cresswind May 17, 2019 Soils classified as elastic silts (MH) and/or fat clays (CH) shall not be used for wall backfill or in the retained zone as shown in Table 1610.1 of the 2015 IBC. If on -site soils are used as backfill within the reinforced zone, the wall designer should address the need for wall drainage and the possibility of long-term, time -dependent movement or creep in their design. At the time of report preparation, we were not provided retaining wall plans or specifications. Therefore, we request the opportunity to review the wall plans and specifications once they are finalized. Also, we recommend an external stability analysis (including global stability) of the proposed wall(s) be conducted once the site layout and wall geometry is complete. 4.4. Low to Moderate Plasticity Moisture Sensitive Soils (MH) Low to moderate plasticity and moisture sensitive (elastic silts) soils were encountered in the majority of the borings performed for this exploration. These fine-grained soils are susceptible to moisture intrusion and can become soft when exposed to weather and/or water infiltration. Consequently, some undercutting and/or reworking (drying) of the near -surface soils may be required depending upon the site management practices and weather conditions present during construction. Should these materials be left in -place, special consideration should be given to providing positive drainage away from the structure and discharging roof drains a minimum of 5 feet from the foundations to reduce infiltration of surface water to the subgrade materials Note: Since Low to Moderate Plasticity and Moisture Sensitive Soils can become remolded (i.e., softened) under the weight of repeated construction traffic and changes in moisture conditions, these soils should be evaluated and closely monitored by the Geotechnical Engineer -of -Record or his qualified representative prior to and during fill placement. Additional testing and inspections of moisture sensitive soils may be warranted such as laboratory testing, field density (compaction) testing, hand auger borings with dynamic cone penetrometer (DCP) testing and/or test pit excavations. 11 Report of Geotechnical Subsurface Exploration Cresswind 4.5. High Plasticity Moisture Sensitive Soils (CH) SUMMIT Project No. 2409.02 May 17, 2019 High plasticity and moisture sensitive (fat clays) soils were encountered beneath the existing fill soils in Borings 13-14 and 13-15 to an approximate depth of 3 feet below the existing ground surface. Highly plastic soils can undergo significant changes in volume (shrink/swell behavior) with changes in moisture conditions. These soils typically provide poor subgrade support for pavements and foundations. The highly plastic materials encountered in the borings performed for this exploration are typically not considered suitable for building or pavement subgrade support. Depending on final subgrade elevations, we recommend the highly plastic soils be undercut from beneath foundations and pavements so that the foundation elements bear on 3 feet or more of engineered fill and pavements are supported on 11/z feet or more of engineered fill, creating a separation between the foundation elements/pavements and the underlying highly plastic soils. The presence of the high plasticity materials can adversely affect the performance of the foundation and pavement systems. Due to the presence of highly plastic soils at the project site, we recommend the following be implemented by the design team: 1. The high plasticity materials should be undercut from all structural and pavement areas. The undercut subgrades should be evaluated by a staff professional upon completion of undercut operations. Once the evaluation is completed and the subgrade appears suitable, structural fill should be placed to subgrade elevation. 2. Three (3) feet of separation should be provided between the high plasticity materials and foundations and one and one-half (11/2) feet of separation on pavement areas. The separation material should consist of approved structural fill materials 3. Lime stabilization techniques could be utilized in order to lower the plasticity of the referenced soils in -place and minimize any undercut. These techniques should extend to a depth of at least 3 feet below finished floor elevation of the building and at least 1.5 feet on pavement areas. It should be noted that the success of lime stabilization techniques is 12 Report of Geotechnical Subsurface Exploration SUMMIT Project No. 2409.02 Cresswind May 17, 2019 highly dependent upon the means and methods utilized by the contractor. 4. If the expansive soils are not undercut from beneath the structures or adequate separation is not provided, the building foundations could be designed to either penetrate the expansive soils or should be designed to resist the differential volume and prevent structural damage. Slab -on -grades should be designed as structural slabs for the expansive soils in accordance with WRI/CRSI Design of Slab -on -Ground Foundations or PTI Design and Construction of Post -Tensioned Slabs -on -Ground. 4.6. Wet Weather Conditions Contractors should be made aware of the moisture sensitivity of the near soils and potential compaction difficulties. If construction is undertaken during wet weather conditions, the surficial soils may become saturated, soft, and unworkable. The contractor can anticipate reworking and/or recompacting soils may be needed when excessive moisture conditions occur. Additionally, subgrade stabilization techniques, such as chemical (lime or lime -fly ash) treatment, may be needed to provide a more weather -resistant working surface during construction. Therefore, we recommend that consideration be given to construction during the dryer months. Surface runoff should be drained away from excavations and not allowed to pond. Concrete for foundations should be placed as soon as practical after the excavation is made. That is, the exposed foundation soils should not be allowed to become excessively dry or wet before placement of concrete. Bearing soils exposed to moisture variations may become highly disturbed resulting in the need for undercutting prior to placement of concrete. If excavations must remain open overnight, or if rainfall becomes imminent while the bearing soils are exposed, we recommend that a 2- to 4-inch-thick "mud -mat" of lean (2000 psi) concrete be placed on the bearing soils before work stops for the night. SUNIlMT recommends that special care be given to providing adequate drainage away from the building areas to reduce infiltration of surface water to the base course and subgrade materials. If these materials are allowed to become saturated during the life of the slab section, a strength 13 Report of Geotechnical Subsurface Exploration SUMMIT Project No. 2409.02 Cresswind May 17, 2019 reduction of the materials may result causing a reduced life of the section 4.7. Floor Slabs Slab -on -grade floor systems may be supported on approved residual soils, or newly compacted fill, provided the site preparation and fill placement procedures outlined in this report are implemented. Depending upon the amount of cuts and/or fills, unsuitable soils such as existing fill soils, cultivated soils, fat clays, and areas which deflect, rut or pump excessively during proof - rolling may require remediation as described in Section 5.2. We recommend floor slabs be isolated from other structural components to allow independent movement of the slab and the building foundation elements. Immediately prior to constructing a floor slab, the areas should be proof -rolled to detect any softened, loosened or disturbed areas that may have been exposed to wet weather or construction traffic. Areas that are found to be disturbed or indicate pumping action during the proof -rolling should be undercut and replaced with adequately compacted structural fill. This proof -rolling should be observed by the staff professional or a senior soils technician under his/her direction. Proof -rolling procedures are outlined in the "Site Preparation" section of this report. 4.8. Pavements Subgrade Preparation The pavement sections can be adequately supported on approved non -high plasticity residual soils, or newly compacted fill, provided the site preparation and fill placement procedures outlined in this report are implemented. Immediately prior to constructing the pavement section, we recommend that the areas be proofrolled to detect any softened, loosened or disturbed areas that may have been exposed to wet weather or construction traffic. Areas that are found to be disturbed or indicate instability during the proofrolling should be undercut and replaced with adequately compacted structural fill or repaired as recommended by the Geotechnical Engineer. This proofrolling should be observed by the staff professional or a senior soils technician under his/her direction. Proofrolling procedures are outlined in the "Site Preparation" section of this report. Due to prevalence of near surface moderate to high plasticity elastic silts and fat clays, remediation 14 Report of Geotechnical Subsurface Exploration Cresswind SUMMIT Project No. 2409.02 May 17, 2019 of pavement subgrade soils may be recommended (as determined by the Geotechnical Engineer during construction) including undercutting and replacement with additional NCDOT ABC stone. Alternatively, lime stabilization of pavement subgrade may be a more economical option and SUNIlMT can provide lime stabilization mix design services if requested. This may be more pronounced depending on the time of the year and seasonal conditions at the time of pavement construction. We recommend contingency for some remediation efforts for the subgrade soils be considered during the planning stage. 4.9. Cut and Fill Slopes Permanent project slopes should be designed with geometry of 3 horizontal to I vertical or flatter. The tops and bases of all slopes should be located 10 feet or more from structural limits and 5 feet or more from parking limits. Fill slopes should be properly compacted according to the recommendations provided in this report. In addition, fill slopes should be overbuilt and cut to finished grade during construction to achieve proper compaction on the slope face. All slopes should be seeded and maintained after construction and adhere to local, state and federal municipal standards, if applicable. 15 Report of Geotechnical Subsurface Exploration SUMMIT Project No. 2409.02 Cresswind May 17, 2019 5.0 CONSTRUCTION CONSIDERATIONS 5.1. Abandoned Utilities/Structures SUMMIT recommends that any existing utility lines and foundations be removed from within proposed building and pavement areas. The utility backfill and foundation material should be removed and the subgrade in the excavations should be evaluated by a geotechnical professional prior to fill placement. The subgrade evaluation should consist of visual observations, probing with a steel rod and/or performing hand auger borings with Dynamic Cone Penetrometer tests to evaluate their suitability of receiving structural fill. Once the excavations are evaluated and approved, they should be backfilled with adequately compacted structural fill. Excavation backfill under proposed new foundations should consist of properly compacted structural fill, crushed stone, flowable fill or lean concrete as approved by the Geotechnical Engineer -of -Record. 5.2. Site Preparation Based on the results of our borings, and dependent on final grades, the contractor can anticipate that some undercutting and/or foundation extension through as existing "cultivated" fill soils, fat clays and soils with N-values less than 7 bpf may be required prior to building construction and/or fill placement. If these soils are encountered during the grading activities, the extent of the undercut required should be determined in the field by the Geotechnical Engineer -of -Record and/or an experienced staff professional. Additional testing such as test pit excavations and/or hand auger borings may be required in order to further evaluate these soil conditions, depths and locations. Topsoil, organic laden/stained soils, and other unsuitable materials should be stripped/removed from the proposed construction limits. Stripping and clearing should extend 10 feet or more beyond the planned construction limits. Upon completion of the stripping operations, we recommend areas planned for support of foundations, floor slabs, parking areas and structural fill be proof -rolled with a loaded dump truck or similar pneumatic tired vehicle (minimum loaded of 20 tons) under the observations of a staff brofessional. After excavation of the site has 16 Report of Geotechnical Subsurface Exploration SUMMIT Project No. 2409.02 Cresswind May 17, 2019 been completed, the exposed subgrade in cut areas should also be proof -rolled. The proof -rolling procedures should consist of four complete passes of the exposed areas, with two of the passes being in a direction perpendicular to the proceeding ones. Any areas which deflect, rut or pump excessively during proof -rolling or fail to "tighten up" after successive passes should be undercut to suitable soils and replaced with compacted fill. The extent of any undercut required should be determined in the field by an experienced staff professional or engineer while monitoring construction activity. After the proof -rolling operation has been completed and approved, final site grading should proceed immediately. If construction progresses during wet weather, the proof -rolling operation should be repeated after any inclement weather event with at least one pass in each direction immediately prior to placing fill material or aggregate base course stone. If unstable conditions are experienced during this operation, then undercutting or reworking of the unstable soils may be required. 5.3. Difficult Excavation Based on the results of our soil test borings and dependent on final grades, it appears that the majority of general excavation for footings and utilities will be possible with conventional excavating techniques. We anticipate that the residual soils can be excavated using pans, scrapers, backhoes, and front end loaders. Depending on the location, excavations deeper than approximately 5.5 to 12 feet may require specialized equipment and procedures. Even though Partially Weathered Rock (PWR) conditions were encountered in six (6) of the borings and auger refusal conditions were not encountered in the borings performed for this exploration, the depth and thickness of partially weathered rock, boulders, and rock lenses or seams can vary dramatically in short distances and between the boring locations; therefore, soft/hard weathered rock, boulders or bedrock may be encountered during construction at locations or depths, between the boring locations, not encountered during this exploration. The table below may be used as a quick reference for rippability of in -place materials. 17 Report of Geotechnical Subsurface Exploration Cresswind SUMMIT Project No. 2409.02 May 17, 2019 Summary of Rippability Based on SPT N-Values N-Values as Shown Description of N-Values Anticipated Rippability on Boring Logs These materials may generally be excavated 60 < N-Value N-values less than 60 bpf with heavy-duty equipment such as a Caterpillar D-8 with a single -shank ripper N-values more than 60 bpf, These materials are considered marginally 60 < N-Value < 50/3" but less than 50 blows per 3 excavatable, even with heavy-duty inches of penetration equipment. N-values more than 50 blows Blasting and/or removal with impact 50/3" < N-Value per 3 inches of penetration hammers is typically required to excavate these materials. *Thus table is for general information only. Actual rippability is dependent upon many other factors as stated above. Care should be exercised during excavations for footings on rock to reduce disturbance to the foundation elevation. The bottom of each footing should be approximately level. When blasting is utilized for foundation excavation in rock, charges should be held above design grades. Actual grades for setting charges should be selected by the contractor and he should be responsible for any damage caused by the blasting. All loose rock should be carefully cleaned from the bottom of the excavation prior to pouring concrete. Footing excavations in which the rock subgrade has been loosened due to blasting should be deepened to an acceptable bearing elevation. In our professional opinion, a clear and appropriate definition of rock should be included in the project specifications to reduce the potential for misunderstandings. A sample definition of rock for excavation specifications is provided below: Rock is defined as any material that cannot be dislodged by a Caterpillar D-8 tractor, or equivalent, equipped with a hydraulically operated power ripper (or by a Cat 325 hydraulic backhoe, or equivalent) without the use ofdrilling and blasting. Boulders or masses of rock exceeding % cubic yard in volume shall also be considered rock excavation. This classification does not include materials such as loose rock, concrete, or other materials that can be removed by means other than drilling and blasting, but which for any reason, such as economic reasons, the Contractor chooses to remove by drilling and blasting. 18 Report of Geotechnical Subsurface Exploration SUMMIT Project No. 2409.02 Cresswind May 17, 2019 5.4. Temporary Excavation Stability Localized areas of soft or unsuitable soils not detected by our borings, or in unexplored areas, may be encountered once grading operations begin. Vertical cuts in these soils may be unstable and may present a significant hazard because they can fail without warning. Therefore, temporary construction slopes greater than 5 feet in height should not be steeper than two horizontal to one vertical (2H:IV), and excavated material should not be placed within 10 feet of the crest of any excavated slope. In addition, runoff water should be diverted away from the crest of the excavated slopes to prevent erosion and sloughing. Should excavations extend below final grades, shoring and bracing or flattening (laying back) of the slopes may be required to obtain a safe working environment. Excavation should be sloped or shored in accordance with local, state and federal regulations, including OSHA (29 CFR Part 1926) excavation trench safety standards. 5.5. Structural Fill Soil to be used as structural fill should be free of organic matter, roots or other deleterious materials. Structural fill should have a plasticity index (PI) less than 25 and a liquid limit (LL) less than 50 or as approved by the Geotechnical Engineer -of -Record. Compacted structural fill should consist of materials classified as either CL, ML, SC, SM, SP, SW, GC, GM, GP, or GW per ASTM D-2487 or as approved by the Geotechnical Engineer -of -Record. Off -site borrow soil should also meet these same classification requirements. Non -organic, low -plasticity on -site soils are expected to meet this criterion. However, successful reuse of the excavated, on -site soils as compacted structural fill will depend on the moisture content of the soils encountered during excavation. We anticipate that scarifying and drying of portions of the on -site soils will be required before the recommended compaction can be achieved. Drying of these soils will likely result in some delay. All structural fill soils should be placed within the proposed structural pad and extending at least 5 feet beyond the perimeter of the pad and foundation limits. All structural fill soils should be 19 Report of Geotechnical Subsurface Exploration SUMMIT Project No. 2409.02 Cresswind May 17, 2019 placed in thin (not greater than 8 inches) loose lifts and compacted to a minimum of 95 percent of the soil's Standard Proctor maximum dry density (ASTM D 698) at/or near optimum moisture content (±2%). The upper 2 feet of structural fill should be compacted to a minimum of 100 percent of the soil's Standard Proctor maximum dry density (ASTM D 698) at/or near optimum moisture content (±2%). Some manipulation of the moisture content (such as wetting, drying) may be required during the filling operation to obtain the required degree of compaction. The manipulation of the moisture content is highly dependent on weather conditions and site drainage conditions. Therefore, the grading contractor should be prepared to both dry and wet the fill materials to obtain the specified compaction during grading. Sufficient density tests should be performed to confirm the required compaction of the fill material. Structural Fills Greater than 10 feet Discussions: Soil undergoes both primary and secondary consolidation (compression of the soil). Primary consolidation can take place over a short-term during the mechanical compacting process. Secondary consolidation can take place over a long- term and can place after the compaction process is complete and the permanent loads are in place. The amount of secondary consolidation which can be expected increases with the depth of fill soils and structure loads. Therefore, in order to reduce secondary consolidation, we recommend when either mass fills or utility lines are more than 10 feet deep, the fill/backfill material below 10 feet should be compacted to at least 98 percent of standard Proctor maximum dry density (ASTM D 698) and within 2 percentage points of the material's optimum moisture content. The portion of the fill/backfill shallower than 10 feet should be compacted as outlined above. Another option is to monitor the settlement with settlement plates embedded at the proposed subgrade level. After the magnitude and rate of settlement are within acceptable levels, then foundation and slab -on grade construction may commence. Based on our previous experience and dependent on soil types at the site, we anticipate the time required to reduce settlements to an acceptable level may be on the order of 30 to 90 days. 20 Report of Geotechnical Subsurface Exploration SUMMIT Project No. 2409.02 Cresswind May 17, 2019 5.6. Suitability of Excavated Soils for Re -Use Except for the fat soils and the existing cultivated fill soils encountered during this exploration, the soils encountered in the borings should be suitable to be used as structural fill material provided the recommendations in this report are implemented. These soils may be utilized as non-structural fill and backfill at landscaped or non -pavement areas of the project. We recommend non-structural fill to be compacted to at least 92 percent of the soil's Standard Proctor Maximum Dry Density to reduce settlement of the fill soils particularly over utility trenches. However, if approved by the Geotechnical Engineer -of -Record, high plasticity soils encountered during general site grading can be mixed/blended and/or mixed with lower plasticity soils and used as structural fill. We recommend that mixed soils be used below the top five (5) feet at deeper fill locations and adequate drainage be provided away from structural and pavement areas. The top five (5) feet should consist of materials classified as either CL, ML, SC, SM, SP, SW, GC, GM, GP or GW per ASTM D-2487 or as approved by the Geotechnical Engineer -of -Record. All fill soils should be placed in thin (not greater than 8 inches) loose lifts and compacted to a minimum of 95 percent of the soil's Standard Proctor maximum dry density (ASTM D 698) at near optimum moisture content (±2%). Typically, cultivated fill soils are not suitable for building and pavement support and are not suitable to be re -used as structural fill material due to the organics mixed in the soil. However, if approved by the Geotechnical Engineer of Record, the organic stained soils may be suitable as structural quality fill material if the organic content in the soil is less than 5% and/or blended with non -organic soils to reduce the organic content. 5.7. Engineering Services During Construction As stated previously, the engineering recommendations provided in this report are based on the project information outlined above and the data obtained from field tests. However, unlike other engineering materials like steel and concrete, the extent and properties of geologic materials (soil) vary significantly. Regardless of the thoroughness of a geotechnical engineering exploration, there 21 Report of Geotechnical Subsurface Exploration SUMMIT Project No. 2409.02 Cresswind May 17, 2019 is always a possibility that conditions between borings will be different from those at the boring locations, that conditions are not as anticipated by the designers, or that the construction process has altered the subsurface conditions. This report does not reflect variations that may occur between the boring locations. Therefore, conditions on the site may vary between the discrete locations observed at the time of our subsurface exploration. The nature and extent of variations between the borings may not become evident until construction is underway. To account for this variability, professional observation, testing and monitoring of subsurface conditions during construction should be provided as an extension of our engineering services. These services will help in evaluating the Contractor's conformance with the plans and specifications. Because of our unique position to understand the intent of the geotechnical engineering recommendations, retaining us for these services will also allow us to provide consistent service through the project construction. Geotechnical engineering construction observations should be performed under the supervision of the Geotechnical Engineer -of -Record from our office who is familiar with the intent of the recommendations presented herein. This observation is recommended to evaluate whether the conditions anticipated in the design actually exist or whether the recommendations presented herein should be modified where necessary. Observation and testing of compacted structural fill and backfill should also be provided by our firm. 22 Report of Geotechnical Subsurface Exploration Cresswind SUMMIT Project No. 2409.02 May 17, 2019 6.0 RELIANCE AND QUALIFICATIONS OF REPORT This geotechnical subsurface exploration has been provided for the sole use of Kolter Homes, LLC. This geotechnical subsurface exploration should not be relied upon by other parties without the express written consent of SUNIlMT and Kolter Homes, LLC. The analyses and recommendations submitted in this report were based, in part, on data obtained from this exploration. If the above -described project conditions are incorrect or changed after the issuing of this report, or subsurface conditions encountered during construction are different from those reported, SUNIlMT should be notified and these recommendations should be re-evaluated based on the changed conditions to make appropriate revisions. We have prepared this report according to generally accepted geotechnical engineering practices. No warranty, express or implied, is made as to the professional advice included in this report. 23 Report of Geotechnical Subsurface Exploration Cresswind CELEBRATING 15 YEARS SUMMIT Project No. 2409.02 May 17, 2019 SUMMIT ENGINEERING, LABORATORY & TESTING, P.G. APPENDIX I — Figures I Custom & Sewing O = ; 3 a ►� c�3 O, Pa ��erx 2cz� P 1162 Waxhaw Gifts Q 0 0 sa 6 'ern a p L m c Figure 1 Site Vicinity Map SCALE: NTS a a New Life Baptist 4 d Y 0 a Propane Coolers Q Oak Grove Baptist Church 11 22 Cresswind Potter Road Union County, North Carolina SUMMIT Project No.: 2409.02 SUMMI`C 3575 Centre Circle Fort Mill, South Carolina 29715 (803) 504-1717 CH - Approx. Fat Clay Soil Depth PWR - Approx. Partially Weathered Rock Depth OJ@Ctl'ea ice' GWATD - Groundwater At Time Drilled ' GW>24Hrs- Groundwater after 24 Hours �4, r Y B-9 7 l l t o o <" •� ��- GW>24Hrs- 9.6' !I I(_ WR-5.5' B-10 o f\` B-8 \/ 60-1 i %F "°'B-14 I /�,vr u o, CH-0.7 to i ' o�GWATD-10'°� B-13 _ o `� °✓ .o PWR 6'to 10' ��o° 14 -B-15 0; CH-0.7 to 3' l r `� C moo' d Z o, o,o rrPWR-8' '41 1, * 'B-5 - GWATD 9 `bo<': o I B-19 XFIT ° -'. B-18 •J, ,• Y \R •�� •l"'r,� / //I B-16 l a I �� • P - p E WRS5 4• Boring locations were not surveyed and should be considered approximate \ - ------------------------- - - - - - - - Figure 2 Boring Location Plan Cresswind Approx. Soil Test Boring Potter Road Location Union County, North Carolina �SCALE:NTS n B-6 I i B-4 SUMMIT 3575 Centre Circle Fort Mill, South Carolina 29715 (803) 504-1717 SUMMIT Project No.: 2409.02 Report of Geotechnical Subsurface Exploration Cresswind CELEBRATING 15 YEARS SUMMIT Project No. 2409.02 May 17, 2019 SUMMIT ENGINEERING, LABORATORY & TESTING, P.G. APPENDIX 2 — Boring Logs SUMMIT Engineering, Laboratory & Testing, P.C. KEY TO SYMBOLS 3575 Centre Circle / - Fort Mill, South Carolina 29715 SUMMIT 704.504.1717 ,„EEa,„„,aao„.ro„ .T- „.,,„.. summitcompanies.com CLIENT Kolter Homes, LLC PROJECT NAME Cresswind PROJECT NUMBER 2409.20 PROJECT LOCATION Union County, North Carolina LITHOLOGIC SYMBOLS SAMPLER SYMBOLS (Unified Soil Classification System) Standard Penetration Test F-1 BLANK ® CH: USCS High Plasticity Clay ® CL: USCS Low Plasticity Clay FILL: Fill (made ground) ® MH: USCS Elastic Silt MLS: USCS Sandy Silt TOPSOIL: Topsoil WELL CONSTRUCTION SYMBOLS PWR: Partially Weathered Rock ABBREVIATIONS LL -LIQUID LIMIT (%) TV -TORVANE PI -PLASTIC INDEX (%) PID - PHOTOIONIZATION DETECTOR W - MOISTURE CONTENT (%) UC -UNCONFINED COMPRESSION DID - DRY DENSITY (PCF) ppm -PARTS PER MILLION NP -NON PLASTIC Water Level at Time -200 - PERCENT PASSING NO. 200 SIEVE Drilling, or as Shown PP - POCKET PENETROMETER (TSF) Water Level at End of 1 Drilling, or as Shown Water Level After 24 - Hours, or as Shown SUMMIT Engineering, Laboratory & Testing, P.C. BORING NUMBER B-01 Centre Circle 11AM1k Fort Mill, South Carolina 29715 PAGE 1 OF 1 Fort SUMMIT 704.504.1717 summitcompanies.com CLIENT Kolter Homes, LLC PROJECT NAME Cresswind PROJECT NUMBER 2409.20 PROJECT LOCATION Union County, North Carolina DATE STARTED 5/6/19 COMPLETED GROUND ELEVATION HOLE SIZE 6 inches DRILLING CONTRACTOR SUMMIT GROUND WATERICAVE-IN: DRILLING METHOD Hollow Stem Auger AT TIME OF DRILLING --- GW NE ATD / Caved in Depth (a12.7' bqs LOGGED BY J Parrish CHECKED BY T. Costner AT END OF DRILLING --- NOTES Refer to Figure 2 "Boring Location Plan" for Approx. Boring Location AFTER DRILLING --- p U _ Q a O Lu ry J w 0 MATERIAL DESCRIPTION Lu �Lu J ED a �Z < o } > O of U� Lu w p Z Q m O> UZ A SPT N VALUE A 0 20 40 60 80 100 PL MC LL 0 20 40 60 80 100 El FINES CONTENT (%) 0 20 40 60 80 100 Approx. 2" of Topsoil (MH) FILL: (Cultivated Fill Soil) SPT 4-3-4 Moist Dark Reddish Brown Elastic SILT 1 (7) (MH) RESIDUUM: Firm Moist Red and Yellow Elastic SILT -------------------- --------� .................:........ .. (MH) Stiff Moist Red and Yellow Elastic SILT SPT 3-4-5 2.5 2 (9) (ML) Stiff Moist Red and Yellow Slightly Clayey Slightly Sandy SILT........................................... SPT 4-5-7 ........ :. 3 (12) 5.0 " — — — — — — — — — — — — — — — — — — — — — — — — — — — — (ML) Stiff Moist Gray and Red Slightly Sandy SILT ........;........;........ SPT 3-4-5 4 (9) 7.5 " — — — — — — — — — — — — — — — — — — — — — — — — — — — — (ML) Firm Moist Gray and Light Olive Brown Slightly Clayey ....... :........:........ :........ :........ Slightly Sandy SILT _ .......... :......... ..... SPT 2-3-5 5 (8) 10.0 (ML) Very Stiff Moist Gray, Light Olive Brown and Red Slightly Clayey Slightly Sandy SILT z.s 12.7ft SPT 5-7-11 6 18 15.0 Bottom of Boring at 15 feet bgs, Boring Terminated SUMMIT Engineering, Laboratory & Testing, P.C. BORING NUMBER B-02 Centre Circle 11AM1k Fort Mill, South Carolina 29715 PAGE 1 OF 1 Fort SUMMIT 704.504.1717 summitcompanies.com CLIENT Kolter Homes, LLC PROJECT NAME Cresswind PROJECT NUMBER 2409.20 PROJECT LOCATION Union County, North Carolina DATE STARTED 5/8/19 COMPLETED GROUND ELEVATION HOLE SIZE 6 inches DRILLING CONTRACTOR SUMMIT GROUND WATERICAVE-IN: DRILLING METHOD Hollow Stem Auger AT TIME OF DRILLING --- GW NE ATD LOGGED BY J Parrish CHECKED BY T. Costner AT END OF DRILLING --- GW > 24 Hrs NE NOTES Refer to Figure 2 "Boring Location Plan" for Approx. Boring Location AFTER DRILLING --- p U _ Q a O > ry J (D w MATERIAL DESCRIPTION Lu �w J ED a �Z < o } > O� of U LU w p Z Q m O> UZ A SPT N VALUE A 0 20 40 60 80 100 PL MC LL 0 20 40 60 80 100 El FINES CONTENT (%) 0 20 40 60 80 100 Approx. 5' of Topsoil (MH) RESIDUUM: _ ....:..._._.........:. ..... Firm Moist Red Elastic SILT SPT 2-3-5-9 1 (8) 2.5 — — — — — — — — — — — — — — — — — — — — — — — — — — — — (MH) Stiff Red Elastic SILT SPT .... ... ;........ ;........ ;........ ;........ 5-6-8-9 2 (14) (ML) Stiff Red and Reddish Yellow Slightly Clayey Slightly Sandy SILT 5.0 SPT 3 3-8-7-9 (15) . — — — — — — — — — — — — — — — — — — — — — — — — — — — — (ML) Very Stiff Red and Yellow Slightly Clayey Slightly Sandy .......;.... .... ;...... ..;.......... ....... SILT........................................... SPT 3-6-15-13 4 (21) 7.5 — — — — — — — — — — — — — — — — — — — — — — — — — — — — (ML) Hard Light Gray and Red Slightly Clayey Sandy SILT ........:... ....:........:........:........ SPT 5-15-21-29 5 (36) :........:........:........ 10.0 SPT 14-20-24-40 6 (44) z.s ---------------------------- (ML) Very Stiff Light Gray, Red and Black Slightly Clayey Sandy SILT with Clay Seams and Rock Fragments ........ ;.......:........ ;........ ..... SPT 8-10-13-21 7 (23) ........: — — — — — — — — — — — — — — — — — — — — — — — — — — — — (ML) Hard Light Gray, Red and Black Slightly Clayey Sandy SILT ........................................... with Clay Seams and Rock Fragments 15.0 SPT 8 5-14-28-30 (42) Bottom of Boring at 16 feet bgs, Boring Terminated SUMMIT Engineering, Laboratory & Testing, P.C. BORING NUMBER B-03 Centre Circle 11AM1k Fort Mill, South Carolina 29715 PAGE 1 OF 1 Fort SUMMIT 704.504.1717 summitcompanies.com CLIENT Kolter Homes, LLC PROJECT NAME Cresswind PROJECT NUMBER 2409.20 PROJECT LOCATION Union County, North Carolina DATE STARTED 5/6/19 COMPLETED GROUND ELEVATION HOLE SIZE 6 inches DRILLING CONTRACTOR SUMMIT GROUND WATERICAVE-IN: DRILLING METHOD Hollow Stem Auger AT TIME OF DRILLING --- GW NE ATD / Caved in Depth (a12.6' bqs LOGGED BY J Parrish CHECKED BY T. Costner AT END OF DRILLING --- NOTES Refer to Figure 2 "Boring Location Plan" for Approx. Boring Location AFTER DRILLING --- p U _ Q a O Lu ry J w 0 MATERIAL DESCRIPTION Lu �Lu J ED a �Z < o } > O of U� Lu w p Z Q m O> UZ A SPT N VALUE A 0 20 40 60 80 100 PL MC LL 0 20 40 60 80 100 El FINES CONTENT (%) 0 20 40 60 80 100 Approx. 2" of Topsoil (ML) FILL: (Cultivated Fill Soil) SPT 2-4-5 Moist Dark Reddish Brown Slightly Sandy SILT 1 (9) (MH) RESIDUUM: Stiff Moist Red and Yellow Elastic SILT ................:........ .. (ML) Firm Moist Red and Yellow Slightly Clayey Slightly Sandy SILT SPT 2-3-4 z.s — — — — — — — — — — — — — — — — — — — — — — — — — — — — (ML) Stiff Moist Yellow, Red and Black Slightly Clayey Slightly 2 (7) .. ...... ...... ...... ..... .......................... ;........ :........ Sandy SILT SPT 4-6-8 3 (14) 5.0 " — — — — — — — — — — — — — — — — — — — — — — — — — — — — (ML) Stiff Moist Red, Olive Yellow and Black Slightly Clayey .......;........;........ ;........ ;........ Slightly Sandy SILT ..... ..:................................... SPT 4-5-7 4 (12) ............................................ 7.5 " — — — — — — — — — — — — — — — — — — — — — — — — — — — — (ML) Firm Moist Red, Olive Yellow and Black Slightly Clayey ........:........:........:........:........ Slightly Sandy SILT ... .... ._ .... ;...... _;........ ._..... SPT 3-3-4 5 (7) 10.0 (ML) Stiff Moist Olive Yellow and Light Gray Slightly Clayey Slightly Sandy SILT 12.6ft - z.s SPT 4-5-914 6 ( ) ...... ...... ................. ..... 15.0 Bottom of Boring at 15 feet bgs, Boring Terminated SUMMIT Engineering, Laboratory & Testing, P.C. BORING NUMBER B-04 Centre Circle 11AM1k Fort Mill, South Carolina 29715 PAGE 1 OF 1 Fort SUMMIT 704.504.1717 summitcompanies.com CLIENT Kolter Homes, LLC PROJECT NAME Cresswind PROJECT NUMBER 2409.20 PROJECT LOCATION Union County, North Carolina DATE STARTED 5/6/19 COMPLETED GROUND ELEVATION HOLE SIZE 6 inches DRILLING CONTRACTOR SUMMIT GROUND WATERICAVE-IN: DRILLING METHOD Hollow Stem Auger AT TIME OF DRILLING --- GW NE ATD / Caved in Depth (a12.9' bqs LOGGED BY J Parrish CHECKED BY T. Costner AT END OF DRILLING --- NOTES Refer to Figure 2 "Boring Location Plan" for Approx. Boring Location AFTER DRILLING --- p U _ Q a O Lu ry J w 0 MATERIAL DESCRIPTION Lu �Lu J ED a �Z < o } > O of U� Lu w p Z Q m O> UZ A SPT N VALUE A 0 20 40 60 80 100 PL MC LL 0 20 40 60 80 100 El FINES CONTENT (%) 0 20 40 60 80 100 Approx. 2" of Topsoil SPT 3-4-3 A. (ML) FILL: (Cultivated Fill Soil) Moist Dark Reddish Brown Slightly Sandy SILT 1 (7) (ML) RESIDUUM: Firm Moist Red and Yellow Slightly Clayey Slightly Sandy SILT ----------------------------� ............:........ .. (ML) Stiff Moist Red and Yellow Slightly Clayey Slightly Sandy SILT SPT 4-4-6 2.s — — — — — — — — — — — — — — — — — — — — — — — — — — — — (ML) Stiff Moist Red, Yellow and Black Slightly Clayey Slightly 2 (10) ........:........:........;........:........ Sandy SILT SPT 4-4-7 3 (11) 5.0 " — — — — — — — — — — — — — — — — — — — — — — — — — — — — (ML) Very Stiff Moist Yellow and Red Slightly Clayey Slightly .......;........;........ ;........ ;........ Sandy SILT SPT 4-5-11 4 (16) ............................................ 7.5 " — — — — — — — — — — — — — — — — — — — — — — — — — — — — (ML) Very Stiff Moist Reddish Yellow and Red Slightly Clayey ........ :........:........ :........ :........ Slightly Sandy SILT .......... .... ;...... _;........ ._..... SPT 5-7-14 5 (21) 10.0 — — — — — — — — — — — — — — — — — — — — — — — — — — — — (ML) Very Hard Yellow and Olive Brown Slightly Clayey Sandy SILT ........;....... .........;....... 12.s 12.9ft - SPT 9-18-34 6 52 15.0 Bottom of Boring at 15 feet bgs, Boring Terminated SUMMIT Engineering, Laboratory & Testing, P.C. BORING NUMBER B-05 Centre Circle 11AM1k Fort Mill, South Carolina 29715 PAGE 1 OF 1 Fort SUMMIT 704.504.1717 summitcompanies.com CLIENT Kolter Homes, LLC PROJECT NAME Cresswind PROJECT NUMBER 2409.20 PROJECT LOCATION Union County, North Carolina DATE STARTED 5/6/19 COMPLETED GROUND ELEVATION HOLE SIZE 6 inches DRILLING CONTRACTOR SUMMIT GROUND WATERICAVE-IN: DRILLING METHOD Hollow Stem Auger AT TIME OF DRILLING --- GW NE ATD / Caved in Depth (a8.6' bqs LOGGED BY J Parrish CHECKED BY T. Costner AT END OF DRILLING --- NOTES Refer to Figure 2 "Boring Location Plan" for Approx. Boring Location AFTER DRILLING --- p U _ Q a O Lu ry J w 0 MATERIAL DESCRIPTION Lu �Lu J ED a �Z < o } > O of U� Lu w p Z Q m O> UZ A SPT N VALUE A 0 20 40 60 80 100 PL MC LL 0 20 40 60 80 100 El FINES CONTENT (%) 0 20 40 60 80 100 Approx. 2" of Topsoil (ML) FILL: (Cultivated Fill Soil) SPT 4-4-5 Moist Light Brown Slightly Clayey Sandy SILT 1 (9) (MH) RESIDUUM: Stiff Moist Red Elastic SILT -------------------- --------� ................:........ .. (MH) Stiff Moist Red and Yellow Elastic SILT SPT 4-4-6 2.5 2 (10) (CL) Stiff Moist Gray and Yellow Lean CLAY SPT 3-5-5 3 (10) 5.0 (CL) Very Stiff Moist d R Gray aneddish Yellow Lean CLAY SPT 5-7-12 .......:........:........:........:........ 4 (19) ........ :........:........ :........ :........ 7.5 ........:......... .......:........:........ (ML) Very Hard White and Light Gray Slightly Clayey Slightly Sandy SILT with Clay Seams 8.6ft - .......... .. SPT 15-28-36.....:........ ........... 5 (64) 10.0 z.s — — — — — — — — — — — — — — — — — — — — — — — — — — — — (ML) Very Stiff Olive Brown and Light Brownish Gray Slightly Clayey Slightly Sandy SILT with Clay Seams ........;.......... ......:....... SPT 11-13-15 6 28 15.0 Bottom of Boring at 15 feet bgs, Boring Terminated SUMMIT Engineering, Laboratory & Testing, P.C. BORING NUMBER B-06 Centre Circle 11AM1k Fort Mill, South Carolina 29715 PAGE 1 OF 1 Fort SUMMIT 704.504.1717 summitcompanies.com CLIENT Kolter Homes, LLC PROJECT NAME Cresswind PROJECT NUMBER 2409.20 PROJECT LOCATION Union County, North Carolina DATE STARTED 5/8/19 COMPLETED GROUND ELEVATION HOLE SIZE 6 inches DRILLING CONTRACTOR SUMMIT GROUND WATERICAVE-IN: DRILLING METHOD Hollow Stem Auger AT TIME OF DRILLING --- GW NE ATD LOGGED BY J Parrish CHECKED BY T. Costner AT END OF DRILLING --- NOTES Refer to Figure 2 "Boring Location Plan" for Approx. Boring Location AFTER DRILLING --- p U _ Q a O Lu ry J w 0 MATERIAL DESCRIPTION Lu �Lu J ED a �Z < o } > O of U� Lu w p Z Q m O> UZ A SPT N VALUE A 0 20 40 60 80 100 PL MC LL 0 20 40 60 80 100 El FINES CONTENT (%) 0 20 40 60 80 100 Approx. 2" of Topsoil (MH) FILL: (Cultivated Fill Soil) SPT 2-3-4 Moist Dark Reddish Brown Elastic SILT 1 (7) .......................................... (MH) RESIDUUM: Firm Moist Red and Yellow Elastic SILT ........ .. (ML) Stiff Light Red, White and Black Slightly Sandy SILT SPT 4-6-8 z.s — — — — — — — — — — — — — — — — — — — — — — — — — — — — (ML) Stiff Brownish Red, Yellow and Black Slightly Sandy SILT 2 (14) ..... ..................... ;........ :........ SPT 4-5-9 3 (14) 5.0 " — — — — — — — — — — — — — — — — — — — — — — — — — — — — (ML) Very Stiff Red, White and Black Slightly Sandy SILT .......;........; ........ ;........ ;........ SPT 4-7-11 4 (18) ........................................... 7.5 ....... :........:........ :........ :........ SPT 4-8-10 5 (18) 10.0 — — — — — — — — — — — — — — — — — — — — — — — — — — — — (ML) Stiff Moist Red, White and Black Slightly Sandy SILT .......;........:........................ 1z.s SPT 5-6-8 6 14 15.0 Bottom of Boring at 15 feet bgs, Boring Terminated SUMMIT Engineering, Laboratory & Testing, P.C. BORING NUMBER B-07 Centre Circle 11AM1k Fort Mill, South Carolina 29715 PAGE 1 OF 1 Fort SUMMIT 704.504.1717 summitcompanies.com CLIENT Kolter Homes, LLC PROJECT NAME Cresswind PROJECT NUMBER 2409.20 PROJECT LOCATION Union County, North Carolina DATE STARTED 5/7/19 COMPLETED GROUND ELEVATION HOLE SIZE 6 inches DRILLING CONTRACTOR SUMMIT GROUND WATERICAVE-IN: DRILLING METHOD Hollow Stem Auger AT TIME OF DRILLING --- GW NE ATD / Caved in Depth (a12.7' bqs LOGGED BY J Parrish CHECKED BY T. Costner AT END OF DRILLING --- NOTES Refer to Figure 2 "Boring Location Plan" for Approx. Boring Location AFTER DRILLING --- p U _ Q a O Lu ry J w 0 MATERIAL DESCRIPTION Lu �Lu J ED a �Z < o } > O of U� Lu w p Z Q m O> UZ A SPT N VALUE A 0 20 40 60 80 100 PL MC LL 0 20 40 60 80 100 El FINES CONTENT (%) 0 20 40 60 80 100 Approx. 2" of Topsoil (ML) FILL: (Cultivated Fill Soil) SPT 2-4-5 Moist Dark Reddish Brown Slightly Clayey Sandy SILT 1 (9) (MH) RESIDUUM: Stiff Moist Red and Yellow Elastic SILT ........ .. (CL) Stiff Moist Yellow and Red Lean CLAY SPT 4-5-7 2.5 2 (12) (CL) Stiff Moist Gray, Brownish Yellow and Red Lean CLAY SPT 4-5-8 3 (13) ...............:........................ 5.0 — — — — — — — — — — — — — — — — — — — — — — — — — — — — (CL) Stiff Moist Gray, Yellowish Red and Black Lean CLAY ..... ...:.... ............. :........ :........ SPT5-5-7 ........:........:........:........:........ 4 (12) ........ :........:........ :........ :........ 7.5 ........:........:........:........:........ (ML) Very Stiff Moist Gray and Red Slightly Clayey Slightly Sandy SILT SPT 5-7-9 5 (16) 10.0 12.5 — — — — — — — — — — — — — — — — — — — — — — — — — — — — (ML) Very Hard Gray Slightly Sandy SILT ........ ;........:........ ;........ ..... 12.7ft SPT 5-19-38 6 57 15.0 Bottom of Boring at 15 feet bgs, Boring Terminated SUMMIT Engineering, Laboratory & Testing, P.C. BORING NUMBER B-08 Centre Circle 11AM1k Fort Mill, South Carolina 29715 PAGE 1 OF 1 Fort SUMMIT 704.504.1717 summitcompanies.com CLIENT Kolter Homes, LLC PROJECT NAME Cresswind PROJECT NUMBER 2409.20 PROJECT LOCATION Union County, North Carolina DATE STARTED 5/6/19 COMPLETED GROUND ELEVATION HOLE SIZE 6 inches DRILLING CONTRACTOR SUMMIT GROUND WATERICAVE-IN: DRILLING METHOD Hollow Stem Auger AT TIME OF DRILLING --- GW NE ATD / Caved in Depth (a13.7' bqs LOGGED BY J Parrish CHECKED BY T. Costner AT END OF DRILLING --- NOTES Refer to Figure 2 "Boring Location Plan" for Approx. Boring Location AFTER DRILLING --- p U _ Q a O Lu ry J w 0 MATERIAL DESCRIPTION Lu �Lu J ED a �Z < o } > O of U� Lu w p Z Q m O> UZ A SPT N VALUE A 0 20 40 60 80 100 PL MC LL 0 20 40 60 80 100 El FINES CONTENT (%) 0 20 40 60 80 100 Approx. 2" of Topsoil (MH) FILL: (Cultivated Fill Soil) SPT 3-4-4 Moist Yellowish Brown Slightly Clayey Sandy SILT 1 (8) (CL) RESIDUUM: Firm Moist Light Brown Lean CLAY ............:........ .. (ML) Stiff Red and Yellow Slightly Clayey Slightly Sandy SILT SPT 3-4-5 z.s 2 (9) ...... ...... ...... ..... SPT 4-5-7 3 (12) 5.0 (CL) Stiff Moist Gray and Red Lean CLAY SPT 4-4-6 4 (10) 7.5 SPT 3-4-5 5 (9) 10.0 1z.s (ML) Very Stiff Gray and Black Slightly Sandy SILT 13.7ft 10 - SPT 5-7-15 6 22 15.0 Bottom of Boring at 15 feet bgs, Boring Terminated SUMMIT Engineering, Laboratory & Testing, P.C. BORING NUMBER B-09 Centre Circle 11AM1k Fort Mill, South Carolina 29715 PAGE 1 OF 1 Fort SUMMIT 704.504.1717 summitcompanies.com CLIENT Kolter Homes, LLC PROJECT NAME Cresswind PROJECT NUMBER 2409.20 PROJECT LOCATION Union County, North Carolina DATE STARTED 5/6/19 COMPLETED GROUND ELEVATION HOLE SIZE 6 inches DRILLING CONTRACTOR SUMMIT GROUND WATERICAVE-IN: DRILLING METHOD Hollow Stem Auger AT TIME OF DRILLING --- GW NE ATD / Caved in Depth (a13.3' bqs LOGGED BY J Parrish CHECKED BY T. Costner 1 AT END OF DRILLING 9.60 ft GW > 24 Hours NOTES Refer to Figure 2 "Boring Location Plan" for Approx. Boring Location AFTER DRILLING --- p U _ Q a O Lu ry J w 0 MATERIAL DESCRIPTION Lu �Lu J ED a �Z < o } > O of U� Lu w p Z Q m O> UZ A SPT N VALUE A 0 20 40 60 80 100 PL MC LL 0 20 40 60 80 100 El FINES CONTENT (%) 0 20 40 60 80 100 Approx. 2" of Topsoil (MH) FILL: (Cultivated Fill Soil) SPT 2-5-6 Moist Dark Reddish Brown Elastic SILT 1 (11) (MH) RESIDUUM: Stiff Moist Red Elastic SILT ........ .. SPT 5-5-7 2.5 — — — — — — — — — — — — — — — — — — — — — — — — — — — — (MH) Very Stiff Red and Yellow Elastic SILT 2 (12) .......:........:........;........:........ SPT 5-9-13 3 (22) 5.0 (ML) Very Stiff Olive Brown and Gray Slightly Sandy SILT with a trace of Rock Fragments SPT 14-13-16 4 (29) ............................................ 7.5 SPT 5-9-10 5 (19) 9.6ft 10.0 — — — — — — — — — — — — — — — — — — — — — — — — — — — — (ML) Hard Olive Brown and Gray Sandy SILT with Rock Fragments ........ ;........:........ ;........ ..... _ ....;..._. :........:. ..... 12.5 13.3ft SPT 18-19-23 6 42 15.0 Bottom of Boring at 15 feet bgs, Boring Terminated SUMMIT Engineering, Laboratory & Testing, P.C. BORING NUMBER B-10 Centre Circle 11AM1k Fort Mill, South Carolina 29715 PAGE 1 OF 1 Fort SUMMIT 704.504.1717 summitcompanies.com CLIENT Kolter Homes, LLC PROJECT NAME Cresswind PROJECT NUMBER 2409.20 PROJECT LOCATION Union County, North Carolina DATE STARTED 5/7/19 COMPLETED GROUND ELEVATION HOLE SIZE 6 inches DRILLING CONTRACTOR SUMMIT GROUND WATERICAVE-IN: DRILLING METHOD Hollow Stem Auger AT TIME OF DRILLING --- GW NE ATD / Caved in Depth (a11.5' bqs LOGGED BY J Parrish CHECKED BY T. Costner AT END OF DRILLING --- NOTES Refer to Figure 2 "Boring Location Plan" for Approx. Boring Location AFTER DRILLING --- p U _ Q a O Lu ry J w 0 MATERIAL DESCRIPTION Lu �Lu J ED a �Z < o } > O of U� Lu w p Z Q m O> UZ A SPT N VALUE A 0 20 40 60 80 100 PL MC LL 0 20 40 60 80 100 El FINES CONTENT (%) 0 20 40 60 80 100 Approx. 2" of Topsoil (MH) FILL: (Cultivated Fill Soil) SPT 2-4-5 ......... Moist Brownish Red Slightly Clayey Sandy SILT 1 (g) .......................................... (MH) RESIDUUM: Stiff Moist Red Elastic SILT ............:........ .. (CL) Stiff Moist Red and Yellow Lean CLAY SPT 4-4-5 z.s 2 (9) ...... ...... ...... ..... (MH) Stiff Red, Yellow and Black Elastic SILT SPT 4-5-6 5.0 .......:........:........:........:........ SPT 4-6-7 4 (13) ........ :........:........ :........ :........ 7.5 ........:.......:.......................... (ML) Hard Olive Brown and Light Gray Sandy SILT with Rock Fragments .......... .... : ... _ . _ ......... ..... SPT 6-10-21 5 (31) 10.0 11.5ft - 1z.s SPT 21-21-17 6 (38) 15.0 Bottom of Boring at 15 feet bgs, Boring Terminated SUMMIT Engineering, Laboratory & Testing, P.C. BORING NUMBER B-11 Centre Circle 11AM1k Fort Mill, South Carolina 29715 PAGE 1 OF 1 Fort SUMMIT 704.504.1717 summitcompanies.com CLIENT Kolter Homes, LLC PROJECT NAME Cresswind PROJECT NUMBER 2409.20 PROJECT LOCATION Union County, North Carolina DATE STARTED 5/7/19 COMPLETED GROUND ELEVATION HOLE SIZE 6 inches DRILLING CONTRACTOR SUMMIT GROUND WATERICAVE-IN: DRILLING METHOD Hollow Stem Auger AT TIME OF DRILLING --- GW NE ATD / Caved in Depth (a13' bqs LOGGED BY J Parrish CHECKED BY T. Costner AT END OF DRILLING --- NOTES Refer to Figure 2 "Boring Location Plan" for Approx. Boring Location AFTER DRILLING --- p U _ Q a O Lu ry J w 0 MATERIAL DESCRIPTION Lu �Lu J ED a �Z < o } > O of U� Lu w p Z Q m O> UZ A SPT N VALUE A 0 20 40 60 80 100 PL MC LL 0 20 40 60 80 100 El FINES CONTENT (%) 0 20 40 60 80 100 Approx. 2" of Topsoil SPT 2-4-5 (MH) FILL: (Cultivated Fill Soil) Moist Dark Reddish Brown Slightly Clayey Sandy SILT with a 1 (9) trace of Rock Fragments (CL) RESIDUUM: ........:................ Stiff Moist Red and Yellow Lean CLAY SPT 8-10-16 (ML) Very Stiff Gray and Red Sandy SILT with a trace of Rock z.s Fragments 2 (26) — — — — — — — — — — — — — — — — — — — — — — — — — — — — (ML) Hard Gray and Olive Brown Sandy SILT with a trace of Rock ............. ... :........ ;........ :........ Fragments ........:.......:........:........:........ SPT 8-18-23 3 (41) 5.0 .................................... SPT 10-14-17 4 (31) 7.5 — — — — — — — — — — — — — — — — — — — — — — — — — — — — (ML) Stiff Olive Gray and Red Slightly Clayey Slightly Sandy SILT ........:.......:........ :........ :........ with Clay Seams _ ...... :......... ..... SPT 5-6-6 5 (12) 10.0 .. .... ;...... :..... ..:. ..... 12.5 ._•;:_: (ML) Partially Weathered Rock (PWR) when sampled becomes Olive Brown and Gray Sandy SILT with Rock Fragments 13ft >> SPT 6 31-50 (50/5") Bottom of Boring at 14.4 feet bgs, Boring Terminated 15.0 SUMMIT Engineering, Laboratory & Testing, P.C. BORING NUMBER B-12 Centre Circle 11AM1k Fort Mill, South Carolina 29715 PAGE 1 OF 1 Fort SUMMIT 704.504.1717 summitcompanies.com CLIENT Kolter Homes, LLC PROJECT NAME Cresswind PROJECT NUMBER 2409.20 PROJECT LOCATION Union County, North Carolina DATE STARTED 5/7/19 COMPLETED GROUND ELEVATION HOLE SIZE 6 inches DRILLING CONTRACTOR SUMMIT GROUND WATERICAVE-IN: DRILLING METHOD Hollow Stem Auger AT TIME OF DRILLING --- GW NE ATD / Caved in Depth (a12.5' bqs LOGGED BY J Parrish CHECKED BY T. Costner AT END OF DRILLING --- NOTES Refer to Figure 2 "Boring Location Plan" for Approx. Boring Location AFTER DRILLING --- p U _ Q a O Lu ry J w 0 MATERIAL DESCRIPTION Lu �Lu J ED a �Z < o } > O of U� Lu w p Z Q m O> UZ A SPT N VALUE A 0 20 40 60 80 100 PL MC LL 0 20 40 60 80 100 El FINES CONTENT (%) 0 20 40 60 80 100 Approx. 2" of Topsoil (MH) FILL: (Cultivated Fill Soil) A. SPT 3-5-6 ......... Moist Reddish Brown Slightly Clayey Sandy SILT 1 (11) (ML) RESIDUUM: Stiff Red Slightly Clayey Sandy SILT with a trace of Rock ................:........ .. Fragments -----------------------/ (ML) Very Stiff Dark Red and White Slightly Clayey Slightly SPT 3-8-20 z.s Sandy SILT with a trace of Rock Fragments 2 (28) (ML) Hard Red and Light Brown Sandy SILT with Rock Fragments ................. SPT 13-15-27 3 (42) 5.0 ::• ._•;:_: (ML) Partially Weathered Rock (PWR) when sampled becomes Dark Red, Gray and Black Slightly Clayey Sandy SILT with Rock Fragments :,- SPT 4 19-31-50 (50/5") ........:........:........:........:....�>. 7.5 „ — — — — — — — — — — — — — — — — — — — — — — — — — — — — (ML) Partially Weathered Rock (PWR) when sampled becomes Olive Brown, Gray and Black Slightly Clayey Sandy SILT with ........:........:........:........:........ __....,......_.................. Rock Fragments 27-50-50 (50/5") ........ : ........ : ........ ........ : .... >;. 10.0 12.5 12.5ft : ' SPT 6 32-50 50/3" Bottom of Boring at 14.3 feet bgs, Boring Terminated 15.0 SUMMIT Engineering, Laboratory & Testing, P.C. BORING NUMBER B-13 Centre Circle 11AM1k Fort Mill, South Carolina 29715 PAGE 1 OF 1 Fort SUMMIT 704.504.1717 summitcompanies.com CLIENT Kolter Homes, LLC PROJECT NAME Cresswind PROJECT NUMBER 2409.20 PROJECT LOCATION Union County, North Carolina DATE STARTED 5/8/19 COMPLETED GROUND ELEVATION HOLE SIZE 6 inches DRILLING CONTRACTOR SUMMIT GROUND WATERICAVE-IN: DRILLING METHOD Hollow Stem Auger AT TIME OF DRILLING --- GW NE ATD LOGGED BY J Parrish CHECKED BY T. Costner AT END OF DRILLING --- NOTES Refer to Figure 2 "Boring Location Plan" for Approx. Boring Location AFTER DRILLING --- Lu o A SPT N VALUE A p U } w 0 20 40 60 80 100 PL MC LL _ Q a O MATERIAL DESCRIPTION �w J ED > p Z Q > ry J 0 a O of U� m O> 0 20 40 60 80 100 El FINES CONTENT (%) w �Z < LU UZ 0 20 40 60 80 100 Approx. 3" of Topsoil (ML) RESIDUUM: _ ....:..._._.........:. ..... Stiff Light Olive Brown, Light Gray and Black Slightly Clayey SPT 5-6-7-10 Slightly Sandy SILT 1 (13 — — — — — — — — — — — — — — — — — — — — — — — — — — — — (ML) Hard Yellowish Red and Yellowish Slightly Clayey Sandy ....... ;........ ;........ ;........ 2.s SILT SPT 3-19-24-19 2 (43) 5.0 SPT 8-19-19-28 3 (38) ......... - ................ (ML) Partially Weathered Rock (PWR) when sampled becomes ._•;:_: Yellowish Red and Yellowish Slightly Clayey Sandy SILT with SPT 6-22-50 Rock Fragments 4 (50/5") 7.5 — — — — — — — — — — — — — — — — — — — — — — — — — — — — (ML) Partially Weathered Rock (PWR) when sampled becomes ........:........:........:........:........ Olive Brown Slightly Clayey Sand SILT with Rock Fragments 9 Y Y Y Y 9 SPT 1531 50 _ ....;..._._:.......... ..... iol 10.0 (ML) Very Hard Pale Yellow and Light Gray Slightly Clayey Slightly Sandy SILT ........ :........ :........ :................. SPT 23-30-44-50 6 (74) — — — — — — — — — — — — — — — — — — — — — — — — — — — — (ML) Hard Pale Yellow, Light Gray and Black Slightly Clayey .......;....... z.s Sandy SILT SPT 20-16-26-37 7 (42) — — — — — — — — — — — — — — — — — — — — — — — — — — — — (ML) Very Hard Pale Yellow, Light Gray and Black Slightly Clayey ............................................ Sandy SILT 15.0 SPT 8 5-18-44-50 (62) Bottom of Boring at 16 feet bgs, Boring Terminated SUMMIT Engineering, Laboratory & Testing, P.C. BORING NUMBER B-14 Centre Circle 11AM1k Fort Mill, South Carolina 29715 PAGE 1 OF 1 Fort SUMMIT 704.504.1717 summitcompanies.com CLIENT Kolter Homes, LLC PROJECT NAME Cresswind PROJECT NUMBER 2409.20 PROJECT LOCATION Union County, North Carolina DATE STARTED 5/8/19 COMPLETED GROUND ELEVATION HOLE SIZE 6 inches DRILLING CONTRACTOR SUMMIT GROUND WATERICAVE-IN: DRILLING METHOD Hollow Stem Auger a AT TIME OF DRILLING 10.00 ftGW ATD LOGGED BY J Parrish CHECKED BY T. Costner AT END OF DRILLING --- NOTES Refer to Figure 2 "Boring Location Plan" for Approx. Boring Location AFTER DRILLING --- p U _ Q a O Lu ry J w 0 MATERIAL DESCRIPTION Lu �Lu J ED a �Z < o } > O of U� Lu w p Z Q m O> UZ A SPT N VALUE A 0 20 40 60 80 100 PL MC LL 0 20 40 60 80 100 El FINES CONTENT (%) 0 20 40 60 80 100 Approx. 2" of Topsoil (MH) FILL: (Cultivated Fill Soil) SPT 4-7-9 Moist Dark Grayish Brown Slightly Clayey Sandy SILT 1 (16) (CH) RESIDUUM: Very Stiff Gray and Yellow Fat CLAY ----------------------------� ................:........ .. (CH) Firm Moist Gray and Brown Fat CLAY SPT 4-4-4 2.5 2 (8) (ML) Stiff Dark Olive Brown, Yellow and Black Slightly Clayey Sandy SILT SPT 3-5-6 3 (11) 5.0 " — — — — — — — — — — — — — — — — — — — — — — — — — — — — (ML) Very Hard Dark Olive Brown, Yellow and Black Sandy SILT ........;........ ........ ;........ ;........ SPT 16-28-40:........ ................ 4 (68) ........................................... 7.5 " — — — — — — — — — — — — — — — — — — — — — — — — — — — — (ML) Stiff Moist Dark Olive Brown, Olive Yellow and Black Sandy ........ :........:........ :........ :........ SILT SPT 6-7-7 ........... .. .... :........ :........ :........ 5 (14) 10.0 1Oft _ ........ :........:........ :........ :........ z.s — — — — — — — — — — — — — — — — — — — — — — — — — — — — (ML) Very Stiff Moist Dark Olive Brown, Olive Yellow and Black Sandy SILT ...... .;........:........ ;....... SPT 5-7-10 6 17 15.0 Bottom of Boring at 15 feet bgs, Boring Terminated SUMMIT Engineering, Laboratory & Testing, P.C. BORING NUMBER B-15 Centre Circle 11AM1k Fort Mill, South Carolina 29715 PAGE 1 OF 1 Fort SUMMIT 704.504.1717 summitcompanies.com CLIENT Kolter Homes, LLC PROJECT NAME Cresswind PROJECT NUMBER 2409.20 PROJECT LOCATION Union County, North Carolina DATE STARTED 5/7/19 COMPLETED GROUND ELEVATION HOLE SIZE 6 inches DRILLING CONTRACTOR SUMMIT GROUND WATERICAVE-IN: DRILLING METHOD Hollow Stem Auger a AT TIME OF DRILLING 9.00 ft GW ATD / Caved in Depth (a13' bqs LOGGED BY J Parrish CHECKED BY T. Costner AT END OF DRILLING --- NOTES Refer to Figure 2 "Boring Location Plan" for Approx. Boring Location AFTER DRILLING --- p U _ Q a O Lu ry J w 0 MATERIAL DESCRIPTION Lu �Lu J ED a �Z < o } > O of U� Lu w p Z Q m O> UZ A SPT N VALUE A 0 20 40 60 80 100 PL MC LL 0 20 40 60 80 100 El FINES CONTENT (%) 0 20 40 60 80 100 Approx. 2" of Topsoil (MH) FILL: (Cultivated Fill Soil) SPT 2-2-2 Moist Brownish Gray Slightly Clayey Sandy SILT 1 (4) (CH) RESIDUUM: Soft Moist Gray Fat CLAY — ---------------------------� ........................................ (CH) Firm Moist Gray Fat CLAY SPT 3-3-3 2.5 2 (6) (CL) Very Stiff Moist Gray and Black Lean CLAY SPT 3-6-10 3 (16) ........ :....... :........ ........ ........ 5.0 (ML) Very Hard Gray Sandy SILT with Rock Fragments SPT 26-36-44 ........ ........ ...... ..:..... ..:........ 4 (80) ........................................... 7.5 ._•;:_: .............:........:.... ... -: (ML) Partially Weathered Rock (PWR) when sampled becomes Gray and Black Sandy SILT with Rock Fragments 9ft - SPT 5 21-33-50 (50/5") >> 10.0 12.5 13ft SPT 6 25-27-50 (50/4") ........ ........: ...... 1e.0 Bottom of Boring at 14.8 feet bgs, Boring Terminated SUMMIT Engineering, Laboratory & Testing, P.C. BORING NUMBER B-16 Centre Circle 11AM1k Fort Mill, South Carolina 29715 PAGE 1 OF 1 Fort SUMMIT 704.504.1717 summitcompanies.com CLIENT Kolter Homes, LLC PROJECT NAME Cresswind PROJECT NUMBER 2409.20 PROJECT LOCATION Union County, North Carolina DATE STARTED 5/8/19 COMPLETED GROUND ELEVATION HOLE SIZE 6 inches DRILLING CONTRACTOR SUMMIT GROUND WATERICAVE-IN: DRILLING METHOD Hollow Stem Auger AT TIME OF DRILLING --- GW NE ATD LOGGED BY J Parrish CHECKED BY T. Costner AT END OF DRILLING --- NOTES Refer to Figure 2 "Boring Location Plan" for Approx. Boring Location AFTER DRILLING --- p U _ Q a O Lu ry J w 0 MATERIAL DESCRIPTION Lu �Lu J ED a �Z < o } > O of U� Lu w p Z Q m O> UZ A SPT N VALUE A 0 20 40 60 80 100 PL MC LL 0 20 40 60 80 100 El FINES CONTENT (%) 0 20 40 60 80 100 Approx. 2" of Topsoil (MH) FILL: (Cultivated Fill Soil) A. SPT 5-8-10 ......... Reddish Brown Slightly Clayey Sandy SILT with Rock Fragments 1 (18) (ML) RESIDUUM: Very Stiff Red Sandy SILT with Rock Fragments ----------------------------� ................:........ .. (ML) Very Stiff Dark Red and Black Slightly Clayey Slightly Sandy SILT SPT 9-6-10 2.5 2 (16) (ML) Hard Red, Yellow and Black Sandy SILT with Rock Fragments ........:........:........:........:........ SPT 18-18-31 ........ :........ :....... :........ :........ 3 (49) 5.0 ._•;:_: ..................:............. (ML) Partially Weathered Rock (PWR) when sampled becomes Red, Yellow and Black Sandy SILT with Rock Fragments SPT 10-50 » 7.5 ._•;:_: — — — — — — — — — — — — — — — — — — — — — — — — — — — — (ML) Partially Weathered Rock (PWR) when sampled becomes Gray, Yellow and Black Sandy SILT with Rock Fragments ........:........:........:........:........ >> SPT 5 50 50/5" 10.0 12.5 » SPT 6 50-50 (50/5" ) Bottom of Boring at 14.4 feet bgs, Boring Terminated 15.0 SUMMIT Engineering, Laboratory & Testing, P.C. BORING NUMBER B-17 Centre Circle 11AM1k Fort Mill, South Carolina 29715 PAGE 1 OF 1 Fort SUMMIT 704.504.1717 summitcompanies.com CLIENT Kolter Homes, LLC PROJECT NAME Cresswind PROJECT NUMBER 2409.20 PROJECT LOCATION Union County, North Carolina DATE STARTED 5/8/19 COMPLETED GROUND ELEVATION HOLE SIZE 6 inches DRILLING CONTRACTOR SUMMIT GROUND WATERICAVE-IN: DRILLING METHOD Hollow Stem Auger AT TIME OF DRILLING --- GW NE ATD / Caved in Depth (a13' bqs LOGGED BY J Parrish CHECKED BY T. Costner AT END OF DRILLING --- NOTES Refer to Figure 2 "Boring Location Plan" for Approx. Boring Location AFTER DRILLING --- p U _ Q a O Lu ry J w 0 MATERIAL DESCRIPTION Lu �Lu J ED a �Z < o } > O of U� Lu w p Z Q m O> UZ A SPT N VALUE A 0 20 40 60 80 100 PL MC LL 0 20 40 60 80 100 El FINES CONTENT (%) 0 20 40 60 80 100 Approx. 2" of Topsoil (MH) FILL: (Cultivated Fill Soil) SPT 3-4-4 Moist Brownish Red Slightly Clayey Sandy SILT 1 (8) (MH) RESIDUUM: Firm Moist Red Elastic SILT ----------------------------� ........ .. (MH) Stiff Red Elastic SILT SPT 3-6-8 2.5 2 (14) (ML) Very Hard Yellow, White and Red Sandy SILT with Rock Fragments ........... ........ ...... :........ :........ SPT 6-20-42 ........ :........:.......:........ :........ 3 (62) 5.0 " — — — — — — — — — — — — — — — — — — — — — — — — — — — — (ML) Very Hard Olive Brown and Black Sandy SILT with Rock ........;........;........ Fragments ........................................... SPT 33-23-29 4 (52) ........................................... 7.5 SPT 18-32-30 5 (62) 10.0 — — — — — — — — — — — — — — — — — — — — — — — — — — — — (ML) Very Stiff Yellow, Gray and Red Sandy SILT 13ft - ........;........ ........ ;........ :........ ........ :.__.... i...... _i........ ;._..... iz.s SPT 6 8-14 6 22 Bottom of Boring at 15 feet bgs, Boring Terminated SUMMIT Engineering, Laboratory & Testing, P.C. BORING NUMBER B-18 Centre Circle 11AM1k Fort Mill, South Carolina 29715 PAGE 1 OF 1 Fort SUMMIT 704.504.1717 summitcompanies.com CLIENT Kolter Homes, LLC PROJECT NAME Cresswind PROJECT NUMBER 2409.20 PROJECT LOCATION Union County, North Carolina DATE STARTED 5/8/19 COMPLETED GROUND ELEVATION HOLE SIZE 6 inches DRILLING CONTRACTOR SUMMIT GROUND WATERICAVE-IN: DRILLING METHOD Hollow Stem Auger AT TIME OF DRILLING --- GW NE ATD LOGGED BY J Parrish CHECKED BY T. Costner AT END OF DRILLING --- GW > 24 Hrs NE NOTES Refer to Figure 2 "Boring Location Plan" for Approx. Boring Location AFTER DRILLING --- Lu o A SPT N VALUE A p U } w 0 20 40 60 80 100 PL MC LL _ Q a O MATERIAL DESCRIPTION �w J ED > p Z Q > ry J a O� of U m O> 0 20 40 60 80 100 El FINES CONTENT (%) (D w �Z < LU UZ 0 20 40 60 80 100 Approx. 5' of Topsoil (MH) RESIDUUM: _ ....:..._._.........:. ..... Firm Moist Reddish Brown Elastic SILT SPT 2-2-4-6 1 (6) — — — — — — — — — — — — — — — — — — — — — — — — — — — — (MH) Stiff Red Elastic SILT ... .... ;........ ;........ ;........ ;........ 2.5 SPT 3-5-7-9 2 (12) ........................................... (ML) Hard Brownish Yellow, Dark Red and Black Slightly Clayey Slightly Sandy SILT ........ ........ :........ ........ ........ 5.0 SPT 3 5-11-22-28 (33) . — — — — — — — — — — — — — — — — — — — — — — — — — — — — (ML) Very Hard Gray, Red and Black Slightly Sandy SILT ........ ;........ ;.......;........ ;........ SPT 8-26-46-50 4 (72) ........... 7.5 (ML) Hard Gray, Red and Black Slightly Sandy SILT with Rock Fragments _ ....;......_:......... ..... SPT 12-18-25-31 5 (43) ......:........:........ 10.0 — — — — — — — — — — — — — — — — — — — — — — — — — — — — (ML) Very Stiff Gray, Red and Black Slightly Sandy SILT with ............... ...........:................. Rock Fragments ........ :...... ..:........:........:... ..... SPT 12-10-18-20 6 (28) 12.5 SPT 3-11-12-7 7 (23) 15.0 SPT 8 7-11-13-35 (24) Bottom of Boring at 16 feet bgs, Boring Terminated SUMMIT Engineering, Laboratory & Testing, P.C. BORING NUMBER B-19 Centre Circle 11AM1k Fort Mill, South Carolina 29715 PAGE 1 OF 1 Fort SUMMIT 704.504.1717 summitcompanies.com CLIENT Kolter Homes, LLC PROJECT NAME Cresswind PROJECT NUMBER 2409.20 PROJECT LOCATION Union County, North Carolina DATE STARTED 5/8/19 COMPLETED GROUND ELEVATION HOLE SIZE 6 inches DRILLING CONTRACTOR SUMMIT GROUND WATERICAVE-IN: DRILLING METHOD Hollow Stem Auger AT TIME OF DRILLING --- GW NE ATD / Caved in Depth (a12' bqs LOGGED BY J Parrish CHECKED BY T. Costner AT END OF DRILLING --- NOTES Refer to Figure 2 "Boring Location Plan" for Approx. Boring Location AFTER DRILLING --- p U _ Q a O Lu ry J w 0 MATERIAL DESCRIPTION Lu �w J ED a �Z < o } — > O of U� Lu w �� p Z Q m O> UZ A SPT N VALUE A 0 20 40 60 80 100 PL MC LL 0 20 40 60 80 100 El FINES CONTENT (%) 0 20 40 60 80 100 Approx. 3" of Topsoil (MH) FILL: (Cultivated Fill Soil) SPT 3-6-8 Moist Brownish Red Slightly Clayey Sandy SILT 1 (14) (MH) RESIDUUM: Stiff Moist Red Elastic SILT ----------------------------� ........ .. (CL) Very Stiff Red and Yellow Lean CLAY SPT 5-8-10 2.5 2 (18) (ML) Hard Red and Yellow Slightly Clayey Slightly Sandy SILT with Rock Fragments ........:........:........:........:........ SPT 10-14-26 ........ ....... ........ ........ :........ 3 (40) 5.0 " — — — — — — — — — — — — — — — — — — — — — — — — — — — — (ML) Very Hard Yellow and Light Olive Brown Slightly Clayey ........ ;........;........ ;........ ;........ Sandy SILT SPT 10-20-31 4 (51) ............................................ 7.5 " ---------------------------- (ML) Hard Yellow and Light Olive Brown Slightly Clayey Sandy .. .....:........:........ SILT SPT 14-19-23 5 (42) 10.0 1211 _ ........ :........ ........ :........ ........ 12.5 SPT 11-15-23 6 (38) ........ :........ ........ :........ :........ 15.0 Bottom of Boring at 15 feet bgs, Boring Terminated SUMMIT Engineering, Laboratory & Testing, P.C. BORING NUMBER B-20 /lAmillik Fort Centre Circle Fort Mill South Carolina 29715 PAGE 1 OF 1 SUMMIT 704.504.1717 summitcompanies.com CLIENT Kolter Homes, LLC PROJECT NAME Cresswind PROJECT NUMBER 2409.20 PROJECT LOCATION Union County, North Carolina DATE STARTED 5/7/19 COMPLETED GROUND ELEVATION HOLE SIZE 6 inches DRILLING CONTRACTOR SUMMIT GROUND WATERICAVE-IN: DRILLING METHOD Hollow Stem Auger AT TIME OF DRILLING --- GW NE ATD LOGGED BY J Parrish CHECKED BY T. Costner AT END OF DRILLING --- NOTES Refer to Figure 2 "Boring Location Plan" for Approx. Boring Location AFTER DRILLING --- Lu o A SPT N VALUE A p U } U w 0 20 40 60 80 100 PL nnc LL _ Q a O MATERIAL DESCRIPTION �Lu Lu ED > 0 p Z Q > Q J a O- m O> 0 20 40 60 80 100 w z U z < Lu ❑ FINES CONTENT (%) ❑ 0 20 40 60 80 100 € _ = 2.5 — Approx. 3" of Topsoil SPT 1 SPT 2 3-4-5 (g) ........' ........ .......:...... .. .. ........:........:........;........:....... ........;........;.. .....;........;...... ........:.......... (MH) FILL: (Cultivated Fill Soil) Moist Brownish Red Slightly Clayey Sandy SILT (ML) RESIDUUM: Firm Moist Red Slightly Sandy SILT ----------------------------� (ML) Hard Red Slightly Clayey Slightly Sandy SILT with a trace of Rock Fragments — — — — — — — — — — — — — — — — — — — — — — — — — — — — (ML) Very Hard Olive Brown and Yellow Slightly Clayey Slightly Sandy SILT with a trace of Rock Fragments — — — — — — — — — — — — — — — — — — — — — — — — — — — — (ML) Hard Olive Brown, Red and Yellow Slightly Clayey Slightly Sandy SILT with a trace of Rock Fragments 7-11-29 (40) _ = 5.0 SPT 3 25-25-29 (54) _ = 7.5 T. SPT 4 8-17-23 (40) SPT 5 8-20-24 (44) = 10.0 (ML) Partially Weathered Rock (PWR) when sampled becomes 12.5 Olive Brown Sandy SILT with Rock Fragments Bottom of Boring at 13.9 feet bgs, Boring Terminated 15.0 0 »A