HomeMy WebLinkAboutSW5210202_SuppEZ-2020-Version-2.1.3_20210510SUPPLEMENT-EZ COVER PAGE
FCJRMS I..CJADFD
PROJECT INFORMATION���������������������������������������������������������������������������������������������������������������
1
Project Name
Franklin County E911
2
Project Area (ac)
28.16
3
Coastal Wetland Area (ac)
4
Surface Water Area
5
Is this project High or Low Density?
High
6 Does this project use an off -site SCM?
no
COMPLIANCE WITH 02H .1003(4�.......................................................................................................
7
Width of vegetated setbacks provided (feet)
50
8
Y@ the vegetated setback remain vegetated?
Yes
9
If BUA is proposed in the setback, does it meet NCAC 02H.1003(4)(c-d)?
No
10 Is streambank stabilization proposed on this project?
no
NUMBER AND TYPE OF SCMs...........................................................................................................
11
Infiltration System
12
Bioretention Cell
13
Wet Pond..
1
14
Stormwater Wetland
15
Permeable Pavement
.... .... .... .... .... .... ....
.... .... .... .... .... ....
16
Sand Filter
17
Rainwater Harvesting (RWH)
18
Green Roof
19
Level Spreader -Filter Strip
20
Disconnected Impervious Surface (DIS)
21
Treatment Swale
22
Dry Pond ..
23
StormFilter .... .... .... .... .... .... ....
.... .... .... .... .... ....
24
Silva CeIL........
25
Bayfilter
26
Filterra
E R ! I.DIFD
DESIGNER CERTIFICATION
27
Name and Title:
Brandon McLamb, PE Project Manager
28
Organization:
Timmons Group
29
Street address:
5410 Trinity Road, Suite 102
30
City, State, Zip:
Raleigh, NC 27607
31
Phone number(s):
919-866-4935
32
Email:
brandon.mclamb@timmons.com
Certification Statement:
I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that
the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans,
specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here.
Seal
Signature of Designer
Date
DRAINAGE AREAS
............................................................................................................................................................................................................................................................................
1 Is this a high density project? Yes
2 If so, number of drainage areas/SCMs 1
3 Does this project have low density areas? No
4 If so, number of low density drainage areas 0
Is all/part of this project subject to previous rule
5 versions? No
Mai a I.. LD.F.D
DRAINAGE AREA INFORMATION���������������������
Ent°ire S°ite
1���������
4
T e of SCM
wetpond
5
Total drainage area (sq ft
1226463
64812
6
Onsite drainage area (sq ft
1226463
64812
7
Offsite drainage area (sq ft)
0
8
Total BUA in roject (sq ft
218344 sf
25934 sf
New BUA on subdivided lots (subject to
9
permitting) (sq ft) ....
New BUA not on subdivided lots (subject to
10
permitting) (sq
11
Offsite BUA (sq ft)
12
Breakdown of new BUA not on subdivided lots:
Parking„ (sq ft)
6237 sf
6237 sf
Sidewalk (sq ft)....
623 sf
623 sf
Roof (sq ft)
7694 sf
7694 sf
Roadway (sq ft)
9281 sf
9281 sf
Future (sq ft)
Other, please specify in the comment box
below (sq ft
New infiltrating permeable pavement on
13
subdivided lots (sq ft)
New infiltrating permeable pavement not on
14
subdivided lots s ft
Existing BUA that will remain (not subject to
15
permitting) (sq ft)
2099 sf
16
Existing BUA that is already permitted (sq ft)
10854 sf
17
Existing BUA that will be removed (sq ft)
234 sf
234 sf
18
I Percent BUA
18%
40%
19
Design storm (inches)
1.0 in
20
Design volume of SCM (cu ft)
2098 cf
21
Calculation method for design volume
...... ...... ...... ...... ...... ...... ...... ...... ......
.... ...... ...... ...... ...... ...... ...... ...... ....
Simple Method
ADDITIONAL�INFORMATION������....
�Please use this space to provide any additional information about the
22
drainage a rea(s)
WET POND
1
Drainage area number
1
2
Mmimum required treatment volumecu ft) ...... ...... ...... ...... ...... ....
2231 cf
GENERAL MDC FROM 02H�.1050�������������
3
Is the SCM sized to treat the SW from all surfaces at build -out?
Yes
4
Is the SCM located away from contaminated soils?
Yes
5
What are the side slopes of the SCM (H:V)?
3:1
6
Does the SCM have retaining walls, gabion walls or other
No
engineered side slopes?
7
Are the inlets, outlets, and receiving stream protected from erosion
Yes
10- ear storm)?
8
Is there an overflow or bypass for inflow volume in excess of the
Yes
design volume?
9
What is the method for dewatering the SCM for maintenance?
Drawdown Orifice
10
If applicable will the SCM be cleaned out after construction?
Yes
11
Does the maintenance access comp!coTp!y with General MDC 8 ?
Yes
12
Does the drainage easement comply with General MDC (9)?
Yes
13
If the SCM is on a single family lot, does (will?) the plat comply with
N/A
General MDC (10)?
14
Is there an O&M Agreement that complies with General MDC (11)?
Yes
15
Is there an O&M Plan that complies with General MDC (12) .
Yes
16
Does the SCM follow the device specific MDC?
Yes
17
NC licensed �rofessronal
Was the SCM desi Heil bar an �
Yes
WET POND
MDC FROM 02H .1053
18
Sizing method used
SA/DA
19
Has a stage/storage table been provided in the calculations?
Yes
20
Elevation of the excavated main pool depth (bottom of sediment
244.00
removal) (fmsl)
21
Elevation of the main pool bottom (top of sediment removal) (fmsl)
245.00
22
Elevation of the bottom of the vegetated shelf (fmsl)
250.50
23
Elevation of the permanent pool (fmsl)
251.00
24
Elevation of the top of the vegetated shelf (fmsl)
251.50
25
Elevation of the temporary pool (fmsl)
251.40
26
Surface area of the main permanent pool (square feet)
4109
27
Volume of the main permanent pool (cubic feet)
13374 cf
28
Average depth of the main pool (feet)
3.00 ft
29
Average depth equation used
Equation 3
30
If using equation 3, main pool perimeter (feet)
290.0 ft
31
If using equation 3, width of submerged veg. shelf (feet)
3.0 ft
32
Volume of the forebay (cubic feet)
2500 cf
33
Is this 15-20% of the volume in the main pool?
Yes
34
Clean -out depth for forebay (inches)
60 in
35
Design volume of SCM (cu ft)
12531 cf
36
Is the outlet an orifice or a weir?
Orifice
37
If orifice, orifice diameter (inches)
1 in
38
If weir, weir height (inches)
39
If weir, weir length (inches)
40
Drawdown time for the temporary pool (days)
2.9
41
Are the inlet(s) and outlet located in a manner that avoids short-
Yes
circuiting?
42
Are berms or baffles provided to improve the flow path?
No
43
Depth of forebay at entrance (inches)
72 in
44
Depth of forebay at exit (inches)
72 in
45
Does water flow out of the forebay in a non -erosive manner?
Yes
46
Width of the vegetated shelf (feet)
6 ft
47
Slope of vegetated shelf (H:V)
6:1
48
Does the orifice drawdown from below the top surface of the
Yes
permanent pool?
49
Does the pond minimize impacts to the receiving channel from the 1-
Yes
yr, 24-hr storm?
50
Are fountains proposed? (If Y, please provide documentation that
No
MDC(9) is met.)
51
Is a trash rack or other device provided to protect the outlet system?
Yes
52
Are the dam and embankment planted in non -clumping turf grass?
Yes
53
Species of turf that will be used on the dam and embankment
tall fescue
54Hasa�lantinc�lan�been�rovidedforthe�ve�etated�shelf?��������
Yes
ADDITIONAL
INFORMATION
55
Please use this s aCe to rovde an additional ................................................t
p p Y
the wet pond(s):
Wet Pond 1 11:44 AM 5/10/2021