Loading...
HomeMy WebLinkAboutSW8180209_Current Permit_20180215Energy, Mineral & Land Resources ENVIRONMENTAL QUALITY February 15, 2018 NC State Ports Authority Attn: Mark Blake, PE, Senior Director, Engineering & Maintenance 2202 Burnett Blvd. Wilmington, NC 28401 Subject: Stormwater Permit Exemption — Redevelopment Container Yard Expansion — Port of Wilmington Project Number SW8 180209 New Hanover County Dear Mr. Blake ROY COOPER Governor MICHAEL S. REGAN Secretary WILLIAM E. (T OB`r') VINSON, JR. Interim Director On February 13, 2018, the Wilmington Regional Office of the Division of Energy, Mineral and Land Resources (DEMLR) received a complete request to exempt the subject proposed redevelopment project from Stormwater Management Permit requirements. Staff review of the plans and supporting documentation has determined that the project proposes activities that are exempted from State Stormwater permitting requirements as set forth in the stormwater rules under Title 15A NCAC 2H.1000, as amended. Therefore, the director of the DEMLR is hereby providing confirmation that the subject project is exempted from State Stormwater permitting requirements under the following conditions: 1) The project must be constructed as shown on the plans submitted to this Office; 2) The total proposed built -upon area of 198,522 square feet does not exceed the existing built -upon area of 202,547 square feet; and, 3) The proposed stormwater control, a piped collection system and a grassed swale to redirect offsite runoff, provides equal protection of surface waters as the existing stormwater control, which is a piped collection system. Under Section .1003 (b) of the stormwater rules, the entire common plan of development must be permitted. Therefore, any future development or changes to the proposed development, including, but not limited to, the relocation of built -upon area and the construction of additional built -upon area, will require approval or a Stormwater Management permit application and permit issuance from the DEMLR prior to any construction. Construction of additional development or changes to the proposed development prior to receipt of the required approval or failure to maintain compliance with the exemption conditions, are violations of Title 15A NCAC 2H.1000, and may result in the initiation of appropriate enforcement action. Please keep in mind that this determination does not affect your legal obligation to obtain other permits and approvals, which may be required by Federal, State, or local government agencies, rule or law. If you have any question, or need additional information concerning this matter, please contact Christine Hall at 910-796-7215. Sincer ly, Y William E. ((TEfbVinson, Jr., PE, CPESC, GPM, Interim Director Division of Energy, Mineral and Land Resources GDS/canh: \\\Stormwater\Permits & Projects\2018\180209 Exemption\2018 02 permit 180209 cc: Amy McLane, PE; Talbert & Bright Wilmington Regional Office Stormwater File State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources Wilmington Regional. Office 1 127 Cardinal Drive Extension 1 Wilmington, NC 28405 UlA x 4 r')Pc