HomeMy WebLinkAbout20210344 Ver 1_Pre-Filing Meeting Information_20210511DWR Pre-Fil ing Meeting Req u est Form
ID#*Ve rsion *
Re gional Office *
Re v ie we r List *
Contact Name *
Contact Email Addre ss *
Proje ct Name *
Proje ct Owne r *
Proje ct County *
Owne r Addre ss:
Is this a transportation proje ct?*
Type (s) of approv al sought from the DWR:
Doe s this proje ct hav e an e xisting proje ct ID#?*
Do you know the name of the staff me mbe r you would like to re que st a me e ting with?
Ple ase giv e a brie f proje ct de scription be low.*
20210344 1
Winston-Salem Regional Office - (336) 776-9800
Dave Wanucha
Pre-Filing Me eting Reque st submitte d 2/13/2021
NCDOT - Kevin Hining, Div 11 DEO
kjhining@ncdot.gov
Ashe Bridge 122
NCDOT
Ashe
City
North Wilkesboro
State / Province / Region
NC
Postal / Zip Code
28659
Country
United States
Street Address
801 Statesville Road
Address Line 2
Yes No
401 Water Quality Certification -
Regular
401 Water Quality Certification -
Express
Individual Permit Modification
Shoreline Stabilization
Yes No
Dave Wanucha
Replacement of Ashe bridge 122. Located at the intersection of
Garvey Bridge Rd (SR1549) and East Weaver Ford Road (SR1550),
at coordinates 36.542688, -81.352118
Dave - No meeting needed unless you would like to meet. We are
finalizing the permit drawings (attached below), so I hope to have the
PCN completed soon.
Please give a couple of dates you are available for a meeting.
Ple ase attach the docume ntation you would like to hav e the me e ting about.
Signature
Submittal Date
2/22/2021
3/2/2021
040122 Preliminary Permit Drawings and
impact summary.pdf
4.99MB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
· This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
· I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
· I also understand that DWR is not required to respond or grant the meeting request.
Your project’s thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired, and you can submit an
application.
2/13/2021