Loading...
HomeMy WebLinkAbout20210940 Ver 1_B-5621_Sampson Bridge 248_Courtesy Application_signed_20210511 STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ROY COOPER J. ERIC BOYETTE GOVERNOR SECRETARY Mailing Address: NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 5501 BARBADOS BOULEVARD CASTLE HAYNE, NC 28429-5647 Telephone: 910-341-2000 Fax: 910-675-0143 Customer Service: 1-877-368-4968 Website: ncdot.gov Location: 5501 BARBADOS BOULEVARD CASTLE HAYNE, NC 28429-5647 May 11, 2021 Brad Shaver, NCDOT Coordinator Robert Patterson Wilmington Regulatory Field Office NC Department of Environmental Quality US Army Corps of Engineers Division of Water Resources 69 Darlington Avenue 217 West Jones Street Wilmington, NC 28403 Raleigh, NC 27603 Subject: Courtesy Notification for Section 404 Nationwide Permits 3 and Section 401 General Certifications 4132 for proposed replacement of Bridge No. 248 over Six Runs Creek on SR 1904 (Pine Ridge Road) in Sampson County; Federal Aid No. BRZ-1904(001); WBS No. 45576.1.1; TIP B-5621. Dear Mr. Shaver and Mr. Patterson: The North Carolina Department of Transportation (NCDOT) is proposing to replace Bridge No. 248 over Six Runs Creek on SR 1904 (Pine Ridge Rd.) in Sampson County. The existing 10 span - 146 ft. bridge will be replaced with three span - 165 ft. bridge. A preliminary jurisdictional determination (PJD) was acquired on this project on April 27, 2016 and the project was assigned Action Id No. SAW-2016-00624. An onsite preapplication meeting was held on April 14, 2021. Impacts associated with the bridge include 0.035 acres of fill and 0.048 acres of mechanized clearing for approach fill and erosion control. There is also 0.006 acres of excavation (beneficial excavation) for tying the excavated causeway to the natural adjacent wetland elevation. Coffer dams around the interior bents is also proposed which results in 0.03 acres of temporary surface water impacts. Traffic will use an offsite detour during the construction of this project. The attached permit drawings provide more details on the proposed impacts. Utilities There are no impacts for utility relocations on this project. Four County EMC is leaning their power poles to get the clearance needed to construct the bridge, Spectrum is only adjusting their HH to miss the guardrail and Star is abandoning their lines. There is a water line in the project footprint but there is no conflict. The attached utility plans provide more details on the proposed impacts. Regulatory Approvals Section 404 Permit: NCDOT is proposing to construct this project under the conditions of Nationwide 3. Based on the current design and impacts, notification requirements are not applicable for this project and written approval from the USACE is not required. NCDOT will abide by all conditions listed in NW 3, and will include a copy of the certifications in the permit package and/or contract. Section 401 Permit: The associated 401 General Certification 4132 will also apply to this project. Notification thresholds or circumstances for these certifications are not applicable to this project therefore written concurrence from the Division of Water Resources (DWR) is not required. NCDOT will abide by all conditions listed in GC 4132, and will include a copy of the certifications in the permit package and/or contract. If you have any questions or need additional information, please feel free to contact me. Sincerely, Mason Herndon NCDOT Division 3 Environmental Program Supervisor ec: Kristi Lynn Carpenter, Division of Water Resources Enclosures Be averRd Wade D a u g hteryR d MoltonvilleRdB r e w erRdFaisonHW Y AuctioneerRd Turkey HW Y LakeAr t esi aRdH u d s o n RdP a n h andleRdPineRidgeRdK e e n e r RdMatthisRdBeulahC hu rchR d King Rd I40 HWYJuniousLucasRdThompsonAveDaveBrightRdVicinity Map Sampson 248 Sampson County, North Carolina B-5621 Path: P:\GeoGra\Projects\2018\063\03\GIS\Vicinity.mxd Date: 3/5/2019 2:22:54 PM E ER18063.03 $SU 2019 EF/KT 1Figure: Project: Date: Drwn/Chkd: 010.5 Miles Project Study Area Disclaimer: The information depicted on this figure is for informational purposes only and was not prepared for, and is not suitable for legal or engineering purposes. Source: ESRI World Street Map base layer; Project Study Area approximated by ESI. *Location and extent is approximate. Cape Fear River Basin DaveBrightRdBeaver Rd SixRunsChurchRdPope RdLakeAr t esi aRdGard eniaLnPine Ri d ge R d Beu la h Church R dProject Study Area Map Sampson 248 Sampson County, North Carolina B-5621 Path: P:\GeoGra\Projects\2018\063\03\GIS\Topo.mxd Date: 3/5/2019 2:18:57 PM E ER18063.03 $SU2019 EF/KT 2Figure: Project: Date: Drwn/Chkd: 0 2,0001,000 Feet Project Study Area Disclaimer: The information depicted on this figure is for informational purposes only and was not prepared for, and is not suitable for legal or engineering purposes. Source: ESRI US Topo Maps Baselayer; 2011 National Geographic Society/ESRI, i-cubed seamless USGS quadrangles (Faison, NC); Project Study Area approximated by ESI. *Location and extent is approximate. Cape Fear River Basin Pine Rid g e R d UVWA UVWA UVWA UVWA Six Runs Creek NC Center for Geographic Information & Analysis Jurisdictional Features Map Sampson 248 Sampson County, North Carolina B-5621 Path: P:\GeoGra\Projects\2018\063\03\GIS\JD_Features.mxd Date: 3/5/2019 2:26:19 PM E ER18063.03 $SU 2019 EF/KT 3Figure: Project: Date: Drwn/Chkd: 010050 Feet Project Study Area Delineated Wetland Delineated Stream Disclaimer: The information depicted on this figure is for informational purposes only and was not prepared for, and is not suitable for legal or engineering purposes. Source: Latest High-Resolution NC Statewide Orthoimagery, NC OneMap Server; Project Study Area approximated by ESI. *Location and extent is approximate. Cape Fear River Basin         (Version 2.08; Released April 2018)45576.1.1TIP No.:B-5621County(ies):Sampson Page 1 of 1TIP Number:Date:Phone:Phone:Email:Email:County(ies):CAMA County?YesDesign/Future:Year:2025Existing:Year:Aquatic T&E Species?NoComments:YesN/ANoWetlands within Project Limits?Swamp Waters (Sw) NoneSupplemental Classification: Swamp with rural residential and agriculture outside of swamp limitsSix Runs Creek18-62-2-(.3)b0.40.13Project DescriptionProposed ProjectCape FearRiver Basin(s): City/Town:0.8Typical Cross Section Description: Surrounding Land Use: General Project Narrative:(Description of Minimization of Water Quality Impacts)Notmherndon@ncdot.govAddress:2/24/2021SampsonClintonMason HerndonCastle Hayne, NC 28429WBS Element:Bridge ReplacementWBS Element:HNTB North Carolina, P.C. / James A. Byrd, PENCDOT Contact:910-341-2036Suite 200Raleigh, NC 27609Contractor / Designer:919-424-0437343 E. Six Forks RoadNorth Carolina Department of TransportationHighway Stormwater Program STORMWATER MANAGEMENT PLAN FOR NCDOT PROJECTSProject Type:5501 Barbados BlvdAddress:General Project InformationB-562145576.1.1Impairments:Other Stream Classification: Primary Classification: Project Built-Upon Area (ac.)State project B-5621 involves the replacement of Sampson County Bridge # 810248 on SR 1904 (Pine Ridge Rd.) over Six Runs Creek. The existing bridge consists of a mutlispan arrangement of 1 @ 18' - 6", 1 @ 18' - 2", 1 @ 18' - 3", 1 @ 18' -1", 2 @ 18' -2", 1 @ 18' -4". 2 @18'3", 1 @18'6" with a reinforced concrete deck on timber piles with steel and timber crutch bents. The existing bridge is to be replaced with a four span 24" cored slab with 1 @ 50' - 0", 1 @ 60'-0", 2 @55'-0" span arrangement at the same location. The proposed bridge does not contain deck drains, all storm water from the bridge and approaches will be collected by a storm drainage systems and discharged into a Class "B" rip-rap pad at outlets in each of the four quadrants. There are no proposed ditches on this project. Furthermore, fill slopes have been minimized with rock plating to the east of the structure to avoid fill in the wetlands to the maximum extent practical. N/ABuffer Rules in Effect:None11002 - 11' asphalt paved lanes with 2' paved shoulders, 6' grass shoulders. Roadway in .025 normal crown over length of project. Waterbody Information2013NCDWR Stream Index No.:NRTR Stream ID:Annual Avg Daily Traffic (veh/hr/day):Existing SiteProject Length (lin. miles or feet): ac.Surface Water Body (1): Class CNCDWR Surface Water Classification for Water Bodyac.2 - 11' asphalt paved lanes with varying grass shoulders. Wetlands are present along all four quadrents of the project.2200jabyrd@hntb.comProject Includes Bridge Spanning Water Body? Deck Drains Discharge Over Buffer? Dissipator Pads Provided in Buffer?N/ADeck Drains Discharge Over Water Body?(If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative)(If yes, provide justification in the General Project Narrative) WETLAND AND SURFACE WATER IMPACTS PERMIT SHEET 1 OF 5 PERMIT DRAWING D T V = = = = = = % % MPH ADT ADT % * FUNC CLASS = DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED K 0 0 0 PROFILE (HORIZONTAL) PROJECT LENGTH RIGHT OF WAY DATE: LETTING DATE: STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO. TOTAL SHEETS N.C. SHEET 1 DESIGN DATA SIGNATURE: SIGNATURE: P.E. P.E. 2018 STANDARD SPECIFICATIONS PROJECT ENGINEER GRAPHIC SCALES PLANS PROFILE (VERTICAL) HYDRAULICS ENGINEER ENGINEER ROADWAY DESIGN LOCATION: TYPE OF WORK:09/08/99DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA 0 00 4/30/2021...\B-5621_HYD_PRM_TSH.dgnHNTBCONTRACT:TIP PROJECT:ARTMEN N ASO H DEPT O F TRA SPORTTIONTATEOFNRTCAR O LI NASee Sheet 1A For Index of Sheets OFFSITE DETOURVICINITY MAP NCDOT CONTACT PREPARED IN THE OFFICE OF: NC License No: C-1554 Raleigh, North Carolina 27609 343 E. Six Forks Road, Suite 200 HNTB NORTH CAROLINA, P.C. FOR NCDOT DIVISION 3 4 ON SR 1904 GRADING, DRAINAGE, PAVING AND STRUCTURE B-5621 B-5621 50 25 50 100 50 25 50 100 10 5 10 20 2013 1100 2025 2200 -L- POT STA. 21+50.00 BEGIN BRIDGE -L- POT STA. 25+44.31 END BRIDGE -L- POT STA. 28+50.00 BEGIN PROJECT B-5621 END PROJECT B-5621 60 10 60 6 * TTST =2%DUAL 4% ROY H. TELLIER, PE SUB-REGIONAL TIER 45576.1.1 PE TOTAL LENGTH OF PROJECT B-5621 LENGTH OF STRUCTURE PROJECT B-5621 LENGTH OF ROADWAY PROJECT B-5621 = = = SAMPSON COUNTY REPLACE BRIDGE NO. 248 OVER SIX RUNS CREEK MINOR COLLECTOR -L- POT STA. 23+21.69 TO SR-1916 POPE RD.TO SR-1740 LAKE ARTESIA RD. 0.133 MILES 0.042 MILES 0.091 MILES LIMITS PROJECT OCTOBER 14, 2021 DEREK PIELECH, PE BRZ-1904(001) -L- BRZ-1904(001) 45576.2.1 R/W & UTIL APRIL 30, 2021APPROVED ROW PLANSMoltonville 1920 1922 1919 1919 1919 1919 1970 1903 1904 1904 1904 1752 1916 1916 1917 1918 1918 1912 1914 1913 1913 1964 1906 1952 1952 1952 1909 1909 1740 1740 SixRunsChurchRd.Cu rtis I ve yRd. Springvale Rd.Molt onv ille Beaver Rd.Po pe Rd.Rd.SummerhillRd.Cabin Mus e u mCa bin Mu s e u mRd.Beul ahChurc h Rd.Rd.Artesi aPine Pine Ridge Rd.MatthisRd.Warsaw Rd. Old Warsaw Rd. 24Turkey HWY 403 403 Turkey pop. 271 24 1919 22' BST SR-1904 PINE RIDGE RD.SIX RUNS CREEK20 -L-25 -L-NAD 83 NA 2011NC GRID SR-1904 PINE RIDGE RD. 22' BST22' BST CCONC CONC2 3EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W JEFF HAIRR AND B. SCOTT KING VICKY LUCAS, JAMES TIMOTHY HAIRR, LILLIE BARBER CHAPMAN, ET AL JAMES EDWARD STARLING, JR. CAROL CARTRETTE BORDEAUX & PELMON JART HUDSON, JR. WILBERT EARL JACKSON, JR.GIS PROPERY LINEGIS PROPERTY LINETO SR-1916 POPE RD.TO SR-1740 LAKE ARTESIA RD.SR-1904 PINE RIDGE RD.S 05°13'00" W766.27'4 ", SAMPSON CO. PUBLIC WORKS T4 ", SAMPSON CO. PUBLIC WORKS TSIX RUNS CREEKH H H H SIX RUNS CREEKSHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER 4 R/W SHEET NO.8/17/995/3/2021...\B-5621_HYD_PRM_PSH4.dgnHNTB80' 90' 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00 B-5621 RELATION TO PAVEMENT SKETCH OF BRIDGE IN 100' 120' 110' 70' 80' 90' 100' 120' 110' 70'SIX RUNS CREEKELEV. = 98.14' RR SPIKE IN 14" OAK -L- STA 23+38.63, 67.18' RT BM#1 ELEV. = 96.57' RR SPIKE IN 18" CYPRESS -L- STA 25+67.35, 93.73' RT BM#2 DESIGN DISCHARGE DESIGN FREQUENCY BASE DISCHARGE CFS YRS YRS BASE FREQUENCY OVERTOPPING ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE CFS CFS YRS FT FT FT DESIGN HW ELEVATION BASE HW ELEVATION BRIDGE HYDRAULIC DATA DATE OF SURVEY W.S. ELEVATION AT DATE OF SURVEY FT = 2800 = 25 = 98.8 = 4599 = 100 = 100.5 >5800 (+) >500 (+) = 102.77 = 04-15-2019 = 95.5 NC License No: C-1554 Raleigh, North Carolina 27609 343 E. Six Forks Road, Suite 200 HNTB NORTH CAROLINA, P.C.NAD 83/ NA 2011MATERIAL TO BE REMOVED30 -L-20 -L-25 -L--L--L- -L- POT STA 21+50.00 BEGIN PROJECT B-5621 -L- POT STA 28+50.00 END PROJECT B-5621 F F F F F F F F F F F F F F F F BL-5 BL-4 BM-1 BM-2 BL-6 3 4 1 2 ELEV. = 103.03-L- STA 21+50.00BEGIN GRADE -L-ELEV. = 103.68-L- STA 28+50.00END GRADE -L--L- STA 23+23+/-BEGIN BRIDGE-L- STA 25+43+/-END BRIDGEPI = 24+50.00 EL = 104.53' (+)0.5000%(-)0.4442% VC = 180' K = 191 PI = 27+25.00 EL = 103.30' (-)0.4442%(+)0.3000% VC = 180' K = 242 SURVEY 04-15-19 WS EL.= 95.5' W1 W2 W4 W3 WETLAND & STREAM IMPACTS E E IN WETLAND DENOTES EXCAVATION WETLAND DENOTES FILL INFF LEGEND SHEET 2 OF 5 PERMIT DRAWING ** * * *** ** * *CLEARING DENOTES MECHANIZED MECHANIZED CLEARING IN WETLANDS = <0.01 Ac / 380 SF FILL IN WETLANDS = <0.01 Ac / 26 SF MECHANIZED CLEARING IN WETLANDS = 0.01 Ac / 431 SF FILL IN WETLANDS = <0.01 Ac / 33 SF EXCAVATION IN WETLANDS = <0.01 Ac / 117 SF MECHANIZED CLEARING IN WETLANDS = 0.01 Ac / 416 SF FILL IN WETLANDS = <0.01 Ac / 25 SF EXCAVATION IN WETLANDS = <0.01 Ac / 157 SF TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY TEMPORARY IMPACTS IN SURFACE WATER = 43 LF MECHANIZED CLEARING IN WETLANDS = 0.02 Ac / 845 SF FILL IN WETLANDS = 0.03 Ac / 1425 SF WATER BY IMPERVIOUS DIKES TEMP. IMPACTS IN SURFACE LIMIT (TYP.) EXCAVATION LIMIT (TYP.) EXCAVATION 8081 8283848585858687878888888989898990909090909090919191 9191929292929292929393 93 9393939393 9393939393939494 94 9494 949494949494949494949 4 94 949495 959595 95959595959595 95 95 959595 95 95 95 95 959595959595959595959595 9 5 95959595 9595959595 9595 959595959595959596969696969 6 96 969696 9696969696969 6 96 96 969696 96 96 96 9696969696969696969696 96 9696 96969696969696969696969696 969797 979797 9797979797979797979797 97 97 9797 97 979 797979797 9797 97 979798989898 9898989898989898 9898 9 898989898 9898989898989 9 99999999999999 9 9 9999999999 99999 9999999 99999 9 9999999999100100100100 1 00 100 100 100100100100100100 100100100100100100100100100100100100 100 100100 100 100 100 100100 1001 0 0100100 10 0 100100101101 101 101101101 101101101101101101101101 101101 10110 1 101101 101101102102102102 102102102 102102102102 102 102 102102 102102102102 102102 102103103103103 103 103 103 103 103 104104 104 105 SR-1904 PINE RIDGE RD. 22' BST22' BST CCONC CONC2 3EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W JEFF HAIRR AND B. SCOTT KING VICKY LUCAS, JAMES TIMOTHY HAIRR, LILLIE BARBER CHAPMAN, ET AL JAMES EDWARD STARLING, JR. CAROL CARTRETTE BORDEAUX & PELMON JART HUDSON, JR. WILBERT EARL JACKSON, JR.GIS PROPERY LINEGIS PROPERTY LINETO SR-1916 POPE RD.TO SR-1740 LAKE ARTESIA RD.SR-1904 PINE RIDGE RD.S 05°13'00" W766.27'4 ", SAMPSON CO. PUBLIC WORKS T4 ", SAMPSON CO. PUBLIC WORKS TSIX RUNS CREEKH H H H SIX RUNS CREEKSHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER 4 R/W SHEET NO.8/17/995/3/2021...\B-5621_HYD_PRM_PSH4.dgnHNTB80' 90' 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00 B-5621 RELATION TO PAVEMENT SKETCH OF BRIDGE IN 100' 120' 110' 70' 80' 90' 100' 120' 110' 70'SIX RUNS CREEKELEV. = 98.14' RR SPIKE IN 14" OAK -L- STA 23+38.63, 67.18' RT BM#1 ELEV. = 96.57' RR SPIKE IN 18" CYPRESS -L- STA 25+67.35, 93.73' RT BM#2 DESIGN DISCHARGE DESIGN FREQUENCY BASE DISCHARGE CFS YRS YRS BASE FREQUENCY OVERTOPPING ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE CFS CFS YRS FT FT FT DESIGN HW ELEVATION BASE HW ELEVATION BRIDGE HYDRAULIC DATA DATE OF SURVEY W.S. ELEVATION AT DATE OF SURVEY FT = 2800 = 25 = 98.8 = 4599 = 100 = 100.5 >5800 (+) >500 (+) = 102.77 = 04-15-2019 = 95.5 NC License No: C-1554 Raleigh, North Carolina 27609 343 E. Six Forks Road, Suite 200 HNTB NORTH CAROLINA, P.C.NAD 83/ NA 2011MATERIAL TO BE REMOVED30 -L-20 -L-25 -L--L--L- -L- POT STA 21+50.00 BEGIN PROJECT B-5621 -L- POT STA 28+50.00 END PROJECT B-5621 F F F F F F F F F F F F F F F F BL-5 BL-4 BM-1 BM-2 BL-6 3 4 1 2 ELEV. = 103.03-L- STA 21+50.00BEGIN GRADE -L-ELEV. = 103.68-L- STA 28+50.00END GRADE -L--L- STA 23+23+/-BEGIN BRIDGE-L- STA 25+43+/-END BRIDGEPI = 24+50.00 EL = 104.53' (+)0.5000%(-)0.4442% VC = 180' K = 191 PI = 27+25.00 EL = 103.30' (-)0.4442%(+)0.3000% VC = 180' K = 242 SURVEY 04-15-19 WS EL.= 95.5' W1 W2 W4 W3 WETLAND & STREAM IMPACTS E E IN WETLAND DENOTES EXCAVATION WETLAND DENOTES FILL INFF LEGEND SHEET 3 OF 5 PERMIT DRAWING ** * * *** ** * *CLEARING DENOTES MECHANIZED MECHANIZED CLEARING IN WETLANDS = <0.01 Ac / 380 SF FILL IN WETLANDS = <0.01 Ac / 26 SF MECHANIZED CLEARING IN WETLANDS = 0.01 Ac / 431 SF FILL IN WETLANDS = <0.01 Ac / 33 SF EXCAVATION IN WETLANDS = <0.01 Ac / 117 SF MECHANIZED CLEARING IN WETLANDS = 0.01 Ac / 416 SF FILL IN WETLANDS = <0.01 Ac / 25 SF EXCAVATION IN WETLANDS = <0.01 Ac / 157 SF TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY TEMPORARY IMPACTS IN SURFACE WATER = 43 LF MECHANIZED CLEARING IN WETLANDS = 0.02 Ac / 845 SF FILL IN WETLANDS = 0.03 Ac / 1425 SF WATER BY IMPERVIOUS DIKES TEMP. IMPACTS IN SURFACE LIMIT (TYP.) EXCAVATION LIMIT (TYP.) EXCAVATION 00 00 1010 1010 2020 2020 3030 3030 4040 4040 5050 5050 6060 6060 7070 7070 8080 8080 9090 9090 100100 100100 110110 110110 120120 120120 130 130130 140140 140140 150150 150150 PROJ. REFERENCE NO.SHEET NO. SCALE 5 10 WETLAND CROSS SECTIONS 1"=20' HORIZONTAL 1"=20' VERTICAL -L- STA. 23+00 -L- STA. 25+503/29/202190 90 90 95 100 95 100 95 100 SHEET 4 OF 5 PERMIT DRAWING -L- STA. 27+00 B-5621 102.91 EX R/WEX R/WWLB WLB 0.0250.025 103.36103.36103.78 VAR.VAR. 102.67 EX R/WEX R/WJSWLB WLB 2:12:1 0.0250.025 104.08 103.03EX R/WEX R/WWLB WLB 3:1 0.0250.025 103.50 VAR. ELEV = 97.0 ROCK EMBANKMENT TO Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts StreamNo. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)1 L Sta. 22+90 to Sta. 28+26 24" Cored Slab Bridge 0.035 0.006 0.048 0.030 43 TOTALS*:0.035 0.006 0.048 0.030 0 43 0*Rounded totals are sum of actual impactsNOTES: Permanent Fill in Wetlands: 1509 SF Excavation in Wetlands: 274 SF Mechanized Clearing in Wetlands: 2072 SF Temporary impacts in surface water: 1290 SFRevised 2018 Feb SHEET 5OF 5 WETLAND AND SURFACE WATER IMPACTS SUMMARYWETLAND IMPACTSSURFACE WATER IMPACTSSampsonB-562145576.1.1NC DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS4/30/2021 B-5621 UO-2 DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION 5/7/2021\\wse03.local\WSE\Projects\NC\_CaryOldServer\Engineer\JOBS\0696\026\13800 B-5621 Sampson BR-248\Utilities\Coordination\UbO\B5621_UBO_PSH2.dgn10:05:00 AM5/14/99SHEET NO.PROJECT REFERENCE NO. UTILITIES BY OTHERS THIS SHEET. FOR PROPOSED UTILITY WORK SHOWN ON PAYMENT WILL BE MADE TO THE CONTRACTOR SHEET WILL BE DONE BY OTHERS. NO ALL PROPOSED UTILITY WORK SHOWN ON THIS THIS SHEET CORRESPONDS TO RDY-04 30 -L-20 -L-25 -L--L--L- -L- POT STA 21+50.00 BEGIN PROJECT B-5621 -L- POT STA 28+50.00 END PROJECT B-56213 4 1 2 F F F F F F F F F F F F F F F F SR-1904 PINE RIDGE RD. 22’ BST22’ BST C CONC CONC 123460.00’60.00’EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W JEFF HAIRR AND B. SCOTT KING VICKY LUCAS, JAMES TIMOTHY HAIRR, DB 1887 PG 473 DB 1712 PG 946 DB 1385 PG 737 DB 1756 PG 461 DB 1772 PG 440 LILLIE BARBER CHAPMAN, ET AL JAMES EDWARD STARLING, JR. CAROL CARTRETTE BORDEAUX & PELMON JART HUDSON, JR. WILBERT EARL JACKSON, JR.GIS PROPERY LINEGI S PROPERTY LI NETO SR-1916 POPE RD.TO SR-1740 LAKE ARTESIA RD.SR-1904 PINE RIDGE RD.S 0513’00" W766.27’4 ", SAMPSON CO. PUBLIC WORKS Time Warner Cable Time Warner Cable TSTAR TELEPHONE(2) STAR TELEPHONE(2) 4 ", SAMPSON CO. PUBLIC WORKS Time Warner Cable Time Warner Cable 2" BLOW OFF ASSEMBLY TSTAR TELEPHONE(2) STAR TELEPHONE(2)SIX RUNS CREEKH H H H EST. 5 SYGF EST. 1 TONS CLASS ’B’ RIP-RAP EST. 5 SYGF EST. 1 TONS CLASS ’B’ RIP-RAP EST. 5 SYGF EST. 1 TONS CLASS ’B’ RIP-RAP EST. 5 SYGF EST. 1 TONS CLASS ’B’ RIP-RAP TB2GI TB2GI TB2GI TB2GI 401 402 406 405 407 404 403 (STRUCTURES PAY ITEM) CLASS ’II’ RIP-RAP (STRUCTURES PAY ITEM) CLASS ’II’ RIP-RAP LIMIT (TYP.) EXCAVATION LIMIT (TYP.) EXCAVATION 15" w/ ELBOWS 15" w/ ELBOWS 15" w/ ELBOWS 408 ELBOWS 15" w/ FOUR COUNTY EMC AERIAL OF THE ROAD. 34’ OF CLEARANCE FROM THE CENTERLINE TO INCREASE SEPARATION TO APPROXIMATELY EMC CONTRACTOR PRIOR TO CONSTRUCTION NOTE: POLES WILL BE "LEANED" BY FOUR COUNTY AERIAL LINE ABANDONED STARVISION POLES AND ABANDONED STARVISION COAX HAND HOLE EXISTING SPECTRUM HAND HOLE EXISTING SPECTRUM AS NEEDED HAND HOLE NEW SPECTRUM NAD 83/ 2011