HomeMy WebLinkAbout20210926 Ver 1_Meeting Request Review_20210510 OtilV
DWR Pre-Filing Meeting Request Form
NORTH CAROLINA
EnWircnmenred Quaffry
ID#* 20210926 Version* 1
Regional Office* Central Office-(919)707-9000
Reviewer List* Rob Ridings
Pre-Filing Meeting Request submitted 5/10/2021
.........................................................................................................................................................................................................................................................................................................................................................................................................................................................
Contact Name* Jason Dilday
Contact Email Address* jldilday@ncdot.gov
Project Name* U-5748(Intersection Upgrade for US401 at Ligon Mill and Mitchell Mill
Roads
Project Owner* NCDOT
Project County* Wake
Owner Address: Street Address
1000 Birch Ridge Drive
Address Line 2
City State/Bovine/Region
Raleigh NC
Fbstal/Zip Code Country
27610 USA
Is this a transportation project?* f: Yes r No
Type(s) of approval sought from the DWR:
I� 401 Water Quality Certification- I— 401 Water Quality Certification-
Regular Express
I— Individual Permit I— Modification
I— Shoreline Stabilization
Does this project have an existing project ID#?*
c Yes No
Do you know the name of the staff member you would like to request a meeting with?
Rob Ridings
Please give a brief project description below and include location information.*
The improvement of the US 401 intersection at Ligon Mill and Mitchell Mill
Roads.
Please give a couple of dates you are available for a meeting.
5/19/2021
Please attach the documentation you would like to have the meeting about.
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
. I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
. I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an
application.
Signature
puMi fiqia.,
Submittal Date 5/10/2021
Reviewer Meeting Request Decision
..................
Is a meeting required or is there more info needed?*
C Yes No
If rmre information is needed,please add con I ents for the enail notification below.