Loading...
HomeMy WebLinkAbout20210926 Ver 1_Meeting Request Review_20210510 OtilV DWR Pre-Filing Meeting Request Form NORTH CAROLINA EnWircnmenred Quaffry ID#* 20210926 Version* 1 Regional Office* Central Office-(919)707-9000 Reviewer List* Rob Ridings Pre-Filing Meeting Request submitted 5/10/2021 ......................................................................................................................................................................................................................................................................................................................................................................................................................................................... Contact Name* Jason Dilday Contact Email Address* jldilday@ncdot.gov Project Name* U-5748(Intersection Upgrade for US401 at Ligon Mill and Mitchell Mill Roads Project Owner* NCDOT Project County* Wake Owner Address: Street Address 1000 Birch Ridge Drive Address Line 2 City State/Bovine/Region Raleigh NC Fbstal/Zip Code Country 27610 USA Is this a transportation project?* f: Yes r No Type(s) of approval sought from the DWR: I� 401 Water Quality Certification- I— 401 Water Quality Certification- Regular Express I— Individual Permit I— Modification I— Shoreline Stabilization Does this project have an existing project ID#?* c Yes No Do you know the name of the staff member you would like to request a meeting with? Rob Ridings Please give a brief project description below and include location information.* The improvement of the US 401 intersection at Ligon Mill and Mitchell Mill Roads. Please give a couple of dates you are available for a meeting. 5/19/2021 Please attach the documentation you would like to have the meeting about. pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. . I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. . I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an application. Signature puMi fiqia., Submittal Date 5/10/2021 Reviewer Meeting Request Decision .................. Is a meeting required or is there more info needed?* C Yes No If rmre information is needed,please add con I ents for the enail notification below.