HomeMy WebLinkAboutNC0035904_Lab Certification Inspection_20070802Michael Tt:. Easley, Govenior
William G: Ross Jr., Secretary
North Carolina Department of Envirotiinent and Natural Resources
August 2, 2007
5218
MR. DARREL COCKMAN
McCAIN CORRECTIONAL HOSPITAL WWTP
SANDHILLS REGIONAL MAINTENANCE
180 SANDHILLS DRIVE P.O. BOX 1870
RAEFORD; -NC 28376
SUBJECT: Laboratory Certification Maintenance Inspection
Dear" Mr. Cockman:
Coleen;iI. Sullins; Director
Division of Water Quality
DEN FRO
A 4:11 i 2097
Enclosed is a report for the inspection performed.on, July 19, 2007. Where findings) are
cited in this report, a response is required. Within thirty days ,of receipt, please supply this
office with a written item for item description of how these finding(s) were corrected. If the
finding(s) cited .in the - enclosed • report are not corrected, ' enforcement 'actions may be
recommended. For certification maintenance, your laboratory must continue to carry out the
requirements set forth 'in 15A NCAC 2H-.0800.
Copies of .the: checklists: completed during the inspection, may, be requested fromthis
office. Thank.you for your cooperation during the inspection. If you wish to obtain, an electronic.
copy of- this report by email,: or if you have questions or need additionalinformation please •
contact us at 919-733-3908.
Sincerely,
Gary Francies-
Unit Supervisor
Enclosure
Cc: Fayetteville Regional office
No On
•
-North "Carolina Division of Water" Quality 1623 Mail Scrvice Center - Raleigh, NC 27699-1623_ • Phone (919) 733-3908 Customer Service
Internet miww.dwglab,org Location: 4405 Reedy Creek Rd Raleigh, NC 27607 Fax (919) 733-6241 `1-877-623-6748
An Equal OpportunitylANrmativeAction Employer -- 50°% Recycledl1M Post Consumer Paper
LABORATORY- NAME:
NPDES PERMIT #:
ADDRESS:
CERTIFICATE #:
DATE:OF .INSPECTION:
TYPE OF INSPECTION:
AUDITOR(S):
LOCAL PERSON(S) CONTACTED:
I. '' INTRODUCTION: -
On -Site Inspection Report
McCain Correctional Hospital WWTP
NC 0035904 .
Sandhills Regional Maintenance
180 Sandhill Dr. P.O. Box 1870
Raeford NC, 28376
5218
July 19,.2007
Field Maintenance
Gary Francies
Darrel Cockman
This -laboratory was,inspected'to verify its compliance with, the requirements of 15A NCAC 2H .0800 for
the analysis of environmental samples.
GENERAL COMMENTS:. -
The staff is congratulated for doing .a good job of maintaining the Field=Testing. Certification program.
' The facility' has all the equipment necessary to perform the analyses. All of the following comments are
new requirements or policies that have been implemented since the last inspection.
III. FINDINGS, REQUIREMENTS, COMMENTS AND RECOMMENDATIONS:
Documentation
A. Finding: The time the pH; and D.O. meters are: calibrated,: needs to be documented. This is
considered pertinent information.
Requirement: Data pertinent to each analysis must be maintained for, five years:. Certified data
must consist of- date collected, time. collected, samples site,. sample collector; and sample
analysis time. The field bench: sheets must provide a space for the signature of the analyst, and..
-proper units of measure for all analyses., Ref:.15A NCAC 2H :0805 (g)
LH - Standard Methods,'18th Edition, 4500 = H+ B.
B. ,Finding: The laboratory needs, to verify the Automatic Temperature Compensator(ATC)'of. the -
pH meter annually (every twelve months).
'Requirement: The following must be performed on an 'annual (12 month) basi:-
Automatic Temperature Compensator Check-(ATC) for pH meter, performed every 12 months
Page-:2
1: Take a buffer solution and cool to below 10°C and read the temperature. Analyze the buffer
solution- at that temperature. Document the temperature and the measured pH value
Obtained on the log sheet.
2. Raise the temperature of the buffer solution to approximately 25°C Document._the •
- temperature and the measured pH value on the log sheet.
3. 'Raise the temperature of the buffer solution to approximately 35°C. Document the
temperature and the measured pH value on the log sheet. •
4. Repeat with additional temperature adjustments .and pH readings as. necessary to ensure the
temperature usually measured for samples has been bracketed. As the temperature
increases .ordecreases,- the value of the buffer must be within ± Q;1-S.U. of the truevalue of
the buffer.
Ref: North.Carolina Wastewater/Groundwater Laboratory Certification (NC WW/GW LC) Policy
Statement February 2006
C. Finding: The temperature at which pH is measured is not documented.
- Requirement: Document the temperature at which- the pH sample(s) are analyzed. Ref: EPA
150.1-4.4; Standard Methods 18'h Edition Method 4500H B.1 b.
IV. PAPER TRAIL INVESTIGATION:
A review;of data was conducted. This consisted of comparing field testing records and, contract lab
reports to Discharge Monitoring Reports (DMRs) submitted to this Division. Data were- reviewed for
January, March, andr May 2007. No errors were noted:- Itappears the facility is doing' a good job of.
accurately, transcribing data. ,
CONCLUSIONS:
Correcting the above -cited findings will help this lab to produce quality data and meet certification'
requirements: Please respond to all lettered findings.
Report prepared by: Gary Francies Date: August .1, 2007
Report reviewed -by: Dana Satterwhite Date: August:1, 2007
August 24, 2007
Mr. Gary Francies, Unit Supervisor
MSC 1623,
Raleigh NC 27699-1623
Q
Re: Certificate # 5218—Field Maintenance Inspection of 7/19/07 — Findings
Mr. Francies:
The following actions have been taken per your recommendations:
Findings A and C
Daily benchsheets have been ' revised to include spaces for calibration times and
temps.
Finding B
Annual check of the ATC on the pH meter has been done and documented in the
daily benchsheets. Results were satisfactory.
I may be contacted at (910) 944-2939.
Darrel C. Cockman. ORC
McCain WWTP
Cc: Fayetteville_. Regional Office
DCC/emm