April.22, 2021
LETTER OF APPROVAL
A & G Residential, LLC
Jamie Godwin, Member Manager
916 Arsenal Avenue, Suite B
Fayetteville, NC 28305
RE: Project Name: Sierra Village At Overhills, Phase One, Section 1 - Lot 50
Acres Approved: 0.28
Project ID: HARNE-2021-113
County Harnett, City: Anderson Creek
Address South Dakota. Court
River Basin: Cape Fear
Stream .Classification: Other
Submitted by: Dennis Gilbert
Date Received by LQS: March 31, 2021
Plan Type: Residential
Dear Mr. Godwin:
This office has reviewed the subject erosion and sedimentation control plan: We find
the plan to be acceptable and herebyissue this Letter. of Approval. The enclosed'
Certificate of Approval must be posted at the job site. This plan shall expire three (3)
years following the date of approval, if no land disturbing activity has been
undertaken:, as is required by Title 15A NCAC 4B..0129.
As of April 1, 2019, all new construction activities are .required to complete and
submit an electronic Notice of Intent (NOI) form requesting a Certificate of
Coverage (COC) under the NCG010000 Construction Stormwater General Permit.
This form MUST be submitted and COC issued prior to the commencement. of any
land disturbing activity on the above -named project. The NOI form may be accessed
at deq.nc.gov/NCG0 1. Please direct questions about the NOI. form.to Annette Lucas
at Annette. lucasnnederingov or Paul Clark at Paul.clark(c�r�,nc_denr.gov. After you
submit a complete and correct NOI Form, a COC will be emailed to you within
three business days. Initially, DEMLR will not charge a fee for coverage under the
NCG01 permit. However, on or after. June 1, 2019, a $100 fee will be charged
annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in
Raleigh.
North G-irollha.Department of EnvironmehtalQuality I Division (if'Energy, Wieral and Land Izesourees
....� Fayetteyitle ke.& (Office 1 225 Green Street,SufCe 7141 Fayetteville, Alortb Carolftia 28301
Ara m r maw. r✓ 910,4 ;3300
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation
be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01-permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of
periodic inspection to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented,
requiring protection of existing natural resources and adjoining properties. If,
following the commencement of this project, the erosion and sedimentation control
plan is inadequate to meet the requirements of the Sedimentation Pollution Control
Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may
require revisions to the plan and implementation of the revisions to insure
compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with
Federal and State water quality laws, regulations, and rules. In addition, local city or
county ordinances or rules may also apply to this land -disturbing activity. This
approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the
informationprovided in the Financial Responsibility Form, which you provided.
You are requested to file an amended form if there is any change in the
information included on the form. This permit allows for a land -disturbance, as -
called for on the application plan, not to exceed the approved acres. Exceeding
the acreage will be a violation of this permit and would require a revised plan and
additional application fee. Any addition in impervious surface, over that already
noted on the approved plan, would also require a revised plan to verify the
appropriateness of the erosion control measures and the stormwater retention
measures. (GS 113A-54.1(b)). In addition, it would be helpful if you notify this
office of the proposed starting date for this project. Please notify us if you plan to
have a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
C.h4 sa�-
Chris Baker
Assistant Regional Engineer
DEMLR - Fayetteville Regional Office
Enclosures: Certificate of Approval
cc: Dennis Gilbert, Moorman, Kizer & Reitzel, Inc. — electronic copy
Landon Chandler, Harnett County Inspections Office electronic copy