Loading...
HomeMy WebLinkAbout20141255 Ver 3_Wetlands JD SAW-2014-00415_20210510U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2014-00415 County: Onslow U.S.G.S. Quad: Kellum NOTIFICATION OF JURISDICTIONAL DETERMINATION Property Owner: Weyerhaeuser Real Estate Development Agent: Com max attn: Tailor Downey P.O. Box 12768 New Bern, NC 28561 (252) 633-4401 Land Management Grotto, Inc. attn: Christian Preziosi 3805 Wrightsville Ave., Suite 15 Wilmington. NC 28403 910)452-0001_ Property description: Size (acres) 594.7 Nearest Town Jacksonville Nearest Waterway Rocky Run & Horse Swamp River Basin White Oak USGS HUC 03030001 Coordinates 34.751458 N-77.297706W Location description: This tract is referenced as Tract 3 of the original 1.754.84-acre propert known as Onslow 22, which is located e parcel is located on the southeast side of Old Rocky Run Road (SR 14131. approximately 1.5 mi. north of its intersection with NC 24, adjacent to Horse Swamp and Rocky Run Creek, near Jacksonville. Onslow County, North Carolina. Tax iD: 032434. Indicate Which of the Following Apply: A. Preliminary Detertination _ Based on preliminary information, there may be wetlands on the above described property. We strongly suggest you have this property inspected to determine the extent of Department of the Army (DA) jurisdiction. To be considered final, a jurisdictional determination must be verified by the Corps. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process ( Reference 33 CFR Part 331). B. Approved Determination There are Navigable Waters of the United States within the above described property subject to the permit requirements of Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. X There are waters of the U.S. including wetlands on the above described property subject to the permit requirements of Section 404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. _ We strongly suggest you have the wetlands on your project area delineated. Due to the size of your property andlor our present workload, the Corps may not be able to accomplish this wetland delineation in a timely manner. For a more timely delineation, you may wish to obtain a consultant. To be considered final, any delineation must be verified by the Corps. X The waters of the U.S. including wetlands on your property have been delineated and the delineation has been verified by the Corps. We strongly suggest you have this delineation surveyed. Upon completion, this survey should be reviewed and verified by the Corps. Once verified, this survey will provide an accurate depiction of all areas subject to CWA jurisdiction on your property which, provided there is no change in the law or our published regulations, may be relied upon for a period not to exceed five years. The waters of the U.S. including wetlands have been delineated and surveyed and are accurately depicted on the plat signed by the Corps Regulatory Official identified below on _. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. There are no waters of the U.S., to include wetlands, present on the above described property which are subject to the permit requirements of Section 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. Page 1 of 2 X The property is located in one of the 20 Coastal Counties subject to regulation under the Coastal Area Management Act (CAMA). You should contact the Division of Coastal Management in Morehead City, NC, at (252) 808-2808 to determine their requirements. Placement of dredged or fill material within waters of the US and/or wetlands without a Department of the Army permit may constitute a violation of Section 301 of the Clean Water Act (33 USC § 1311). If you have any questions regarding this determination and/or the Corps regulatory program, please contact Mr. Mickey Sugg at (910) 251-4811 mickev.t.su.nn usace.armv.mil. C. Basis For Determination The site exhibits water bodies with ordinary high water, as well as abutting and adjacent wetlands as defined in the 1987 wetland delineation manual and the Atlantic and Gulf Coastal Plain Regional Supplement. The water bodies on the site include Rocky Run and several unnamed tributaries (UTs) and Horse Swamp and several UTs. all Relatively Permanent Waters - which drain into Northeast Creek, a Section 10 Navigable Waterway - and contiguous wetlands. D. Remarks Cross reference Action ID. 2009-00315 for the entire Onslow 22 property. This notification is a reverification of Tract 3 (Portion of Onslow 22) where Wilmington Corps Staff previously conducted several extensive field inspections. Wetlands THUS, FT300:308. GD1=8. RH1e25, Ts1=8, and SH1-32 were previously determined to be isolated wetlands and continue to be deemed isolated. These isolated wetlands still may be subject to regulation by the State of North Carolina and it is recommended that prior to any work in these wetland areas, you should contact Ms. Joanne Steenhuis with the North Carolina Division of Water Quality. 127 Cardinal Drive Extension, Wilmington, North Carolina 28403 or (910) 796-7306. E. Appeals Information (This information applies only to approved jurisdictional determinations as indicated in B. above) This correspondence constitutes an approved jurisdictional determination for the above described site. If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: U.S. Army Corps of Engineers South Atlantic Division Attn: Jason Steele, Review Officer, 60 Forsyth Street SW, Room 10M15 Atlanta, Georgia 30303-8801 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the District Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by 12 Mal' 2014. **It is not necessary to submit an RFA form to the District Office if you do not object to the determination in this correspondence.** Corps Regulatory Official: Mickey Sugg Date March 10, 2014 /.- Expiration Date March 10, 2019 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the attached customer Satisfaction Survey or visit http://www.perg.nwp.usace.anny.miI/survey.html to complete the survey online. Copy furnished: Joanne Steenhuis, NC DWR Christian Preziosi Page 2 of 2 NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND REQUEST FOR APPEAL Applicant: Taylor Downey, Weyerhaeuser Real Estate Development Company Attached is: File Number: SAW-2014- 00415 Date: March 10, 2014 See Section below INITIAL PROFFERED PERMIT (Standard Permit or Letter of permission) PROFFERED PERMIT (Standard Permit or Letter of permission) PERMIT DENIAL A B C APPROVED JURISDICTIONAL DETERMINATION D PRELIMINARY JURISDICTIONAL DETERMINATION E SECTION I - The following identifies your rights and options regarding an administrative appeal of the above decision. Additional information may be found at http://www.usace.army.mil/CECW/Pages/reg materials.aspx or Corps regulations at 33 CFR Part 331. A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section 11 of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD. + APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative record. POINT OF CONTACT FOR QUESTIONS OR INFORMATION: • if you have questions regarding this decision and/or the appeal process you may contact: District Engineer, Wilmington Regulatory Division, Attn: Mickey Sugg Wilmington Regulatory Field Office 69 Darlington Drive Wilmington, NC 28403 If you only have questions regarding the appeal process you may also contact: Jason Steele, Administrative Appeals Review Officer CESAD-PDO U.S. Army Corps of Engineers, South Atlantic Division 60 Forsyth Street, SW (Room 10M15) Atlanta, GA 30303-8801 Phone: (404) 562-5137 RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day notice of any site investigation, and will have the opportunity to participate in all site investigations. Date: Signature of appellant or agent. Telephone number: For appeals on Initial Proffered Permits send this form to: District Engineer, Wilmington Regulatory Division, Attn: Mickey Sugg, Project Manager, Wilmington Regulatory Field Office, 69 Darlington Avenue, Wilmington, North Carolina 28403 For Permit denials, Proffered Permits, and approved Jurisdictional Determinations send this form to: Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Jason Steele, Administrative Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 10M15, Atlanta, Georgia 30303-8801. Phone: (404) 562-5137