HomeMy WebLinkAbout20210928 Ver 1_ePCN Application_20210505DWR
Division of Water Resources
Initial Review
Pre -Construction Notification (PCN) Form
April 4, 2021 Ver 4
Has this project met the requirements for acceptance in to the review process?*
6 Yes
✓ No
Is this project a public transportation project?*
CYes r No
Change cnly 1 needed.
BIMS # Assigned* Version#*
20210928 1
Is a payment required for this project?*
6 No payment required
✓ Fee received
✓ Fee needed - send electronic notification
Select Project Reviewer*
Holley Snider:eads\hasnider
Information for Initial Review
la. Name of project:
COURTESY COPY Sutton Plant-Delco 230kV Line - Replace Structures 113 and 114
la. Who is the Primary Contact?*
Josh Witherspoon
lb. Primary Contact Email:*
Reviewing Office *
Wilmington Regional Office - (910) 796-7215
lc. Primary Contact Phone:*
josh.witherspoon@duke-energy.com (919)546-2177
Date Submitted
5/5/2021
Nearest Body of Water
Cape Fear River
Basin
Cape Fear
Water Classification
C; Sw
Site Coordinates
Latitude:
34.279717
A. Processing Information
Longitude:
-77.988927
County (or Counties) where the project is located:
New Hanover
Brunswick
Is this a NCDMS Project
✓ Yes f No
Is this project a public transportation project?*
✓ Yes ( No
Pre -Filing Meeting Information
Is this a courtesy copy notification? *
✓ Yes r No
ID# Version
Pre -fling Meeting or Request Date
Attach documentation of Pre -Filing Meeting Request here:
Click the upload button or drag and drop files here to attach document
Fle type rust be FCF
la. Type(s) of approval sought from the Corps:
r Section 404 Permit (wetlands, streams and waters, Clean Water Act)
f7 Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
1b. What type(s) of permit(s) do you wish to seek authorization?
(7 Nationwide Permit (NWP)
r Regional General Permit (RGP)
r Standard (IP)
lc. Has the NWP or GP number been verified by the Corps?
s Yes r No
Nationwide Permit (NWP) Number: 12 - Utility Lines
NWP Numbers (for multiple NWPS):
NWP 57 (not available in drop down list)
Id. Type(s) of approval sought from the DWR:
(7 401 Water Quality Certification - Regular
r Non-404 Jurisdictional General Permit
r Individual 401 Water Quality Certification
le. Is this notification solely for the record because written approval is not required?
For the record only for DWR 401 Certification:
For the record only for Corps Permit:
1f. Is this an after -the -fact permit application?*
✓ Yes ( No
r 401 Water Quality Certification - Express
r Riparian Buffer Authorization
lg. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
✓ Yes r No
lg. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
✓ Yes rNo
Acceptance Letter Attachment
1h. Is the project located in any of NC's twenty coastal counties?
f: Yes r No
1i. Is the project located within a NC DCM Area of Environmental Concern (AEC)?
6 Yes
r No r Unknown
1j. Is the project located in a designated trout watershed?
✓ Yes allo
• Yes r No
✓ Yesr No
B. Applicant Information
Id. Who is applying for the permit?
fJ Owner r Applicant (other than owner)
le. Is there an Agent/Consultant for this project?*
✓ Yes r No
2. Owner Information
2a. Name(s) on recorded deed:
Duke Energy Progress Transmission Line Easement Holder
2b. Deed book and page no.:
2c. Contact Person:
Duke Energy Progress
2d. Address
Street Address
410 South Wilmington Street
Address Line 2
Oty State / Province / Region
Raleigh NC
Fostal / Zip code Country
27601 Wake
2e. Telephone Number: 2f. Fax Number:
(919)546-2177
2g. Email Address:*
josh.Wtherspoon@duke-energy.com
C. Project Information and Prior Project History
1. Project Information
1b. Subdivision name:
(if appropriate)
lc. Nearest municipality/ town:
Wilmington, NC
2. Project Identification
2a. Property Identification Number:
R04000.001.007.000
2c. Project Address
Street Address
Address Line 2
at),
Fbstal / Zip code
3. Surface Waters
3a. Name of the nearest body of water to proposed project:*
Cape Fear River
3b. Water Resources Classification of nearest receiving water:*
C; Sw
3c. What river basin(s) is your project located in?*
Cape Fear
2b. Property size:
152.35
State / Province / Region
Country
3d. Please provide the 12-digit HUC in which the project is located.
030300050501
4. Project Description and History
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:*
The site includes the existing Sutton Plant-Delco 230kV Transmission Line right of way. General land use in the project vicinity incudes the maintained line right of way, Duke Energy
Sutton Steam Plant, the Cape Fear River, and undeveloped forested lands and marsh.
4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?*
r Yes r No r Unknown
4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR)
4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR)
4f. List the total estimated acreage of all existing wetlands on the property:
Approximately 3.5 acres within the transmission line right of way.
4g. List the total estimated linear feet of all existing streams on the property:
Approximately 125 linear feet of the Cape Fear River within the right of way.
4h. Explain the purpose of the proposed project:*
Structures 113 & 114 are on opposing sides of the Cape Fear River just outside the Sutton SE Plant. These structures would be difficult to access with traditional line construction
equipment if a storm event was to compromise the structures. Additionally, site inspections of the existing wood poles have shown them to be in a deteriorating state. Accordingly,
replacement of Structures 113 & 114 is necessitated.
4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:*
Existing wood H-frame Structures 113 & 114 will be removed and replaced with steel I+frame structures on helical pile foundations. All structure replacement work will be completed
utilizing barges to transport materials, equipment and personnel from the Cape Fear River. All work within wetland areas will be conducted from composite mat works pads around the
structures as well as composite mat access to the structures. All project work will take place within the existing right-of-way.
All down guys and anchors for Structures 113 & 114 will be removed. All existing wood piling foundations will be cut off at the ground line.
The replacement of Structures 113 and 114 will result in the lowest sage of the transmission line will be raised 0.61 feet above the mean water elevation. The existing lowest sag
elevation is 77.20 feet above the mean water elevation of the Cape Fear River. The new lowest sag elevation will be 77.81 feet above mean water elevation.
4j. Please upload project drawings for the proposed project.
PCN Cover Letter and Supporting Documentation.pdf 4.84MB
5. Jurisdictional Determinations
5a. Have the wetlands or streams been delineated on the property or proposed impact areas?*
6 Yes f No
Comments:
5b. If the Corps made a jurisdictional determination, what type of determination was made?*
C' Preliminary r Approved 6 Not Verified C' Unknown r WA
Corps AID Number:
5c. If 5a is yes, who delineated the jurisdictional areas?
Name (if known):
Agency/Consultant Company:
Other:
5d1. Jurisdictional determination upload
6. Future Project Plans
Wood Environment and Infrastructure Solutions, Inc. (Wood)
6a. Is this a phased project?*
✓ Yes f No
r Unknown
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity?
D. Proposed Impacts Inventory
1. Impacts Summary
la. Where are the impacts associated with your project? (check all that apply):
r Wetlands r Streams -tributaries
r Open Waters r Pond Construction
E. Impact Justification and Mitigation
1. Avoidance and Minimization
r Buffers
la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:
All structure replacement work will be completed utilizing barges to transport materials, equipment and personnel from the Cape Fear River. All work
within wetland areas will be conducted from composite mat works pads around the structures as well as composite mat access to the structures. All
project work will take place within the existing right-of-way.
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:
An erosion control plan will be obtained from NCDEQ for this project.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
✓ Yes f• Na
2b. If this project DOES NOT require Compensatory Mitigation, explain why:
This project will not impact Waters of the US or Waters of the State.
F. Stormwater Management and Diffuse Flow Plan (required by DWR) L)
1. Diffuse Flow Plan
la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules?
✓ Yes f No
If no, explain why:
This project is within the Cape Fear River Basin. This project will not produce run-off.
2. Stormwater Management Plan
2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?*
✓ Yes G No
2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)?
✓ Yes r No
Comments:
G. Supplementary Information
1. Environmental Documentation
la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?*
✓ Yes 6 No
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or
Riparian Buffer Rules (15A NCAC 2B .0200)?*
✓ Yes r: No
3. Cumulative Impacts (DWR Requirement)
3a. Will this project result in additional development, which could impact nearby downstream water quality?*
✓ Yes 6- No
3b. If you answered "no," provide a short narrative description.
This project includes the replacement of existing transmission line structures and will not result in additional development.
4. Sewage Disposal (DWR Requirement)
4a. Is sewage disposal required by DWR for this project?*
✓ Yes r No N/A
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or habitat?*
6 Yes rNo
5b. Have you checked with the USFWS concerning Endangered Species Act impacts?*
✓ Yes ( No
5d. Is another Federal agency involved?*
✓ Yes
5e. Is this a DOT project located within Division's 1-8?
✓ Yes 6 No
G No r Unknown
5f. Will you cut any trees in order to conduct the work in waters of the U.S.?
✓ Yes G No
5g. Does this project involve bridge maintenance or removal?
✓ Yes r No
5h. Does this project involve the construction/installation of a wind turbine(s)?*
✓ Yes G No
5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.?
✓ Yes r' No
5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
The proposed work will have no impact to endangered species or designated habitat. The will be no in -stream work.
Consultation Documentation Upload
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat?*
( Yes r No
Are there submerged aquatic vegetation (SAV) around the project vicinity?*
✓ Yes ( No
r Unknown
6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?*
NOAA Habitat Conservation Essential Fish Habitat Mapper accessed 4/29/2021.
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?*
✓ Yes f• No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?*
The proposed work all have no impact to cultural resources. All work will be on existing lines and structures within the existing transmission line right of
way.
7c. Historic or Prehistoric Information Upload
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain?*
✓ Yes rNo
8b. If yes, explain how project meets FEMArequirements:
The project consists of one for one replacement with the old structures being removed and new structures being installed. Floodplain development
permits will be obtained from New Hanover and Brunswick Counties.
8c. What source(s) did you use to make the floodplain determination?*
North Carolina Flood Risk Information System: https://fris.nc.gov/fris/Index Accessed on 4/29/2021.
Miscellaneous
Comments
Miscellaneous attachments not previously requested.
Signature
*
I7 By checking the box and signing below, I certify that:
• The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief; and
• The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time.
• I have given true, accurate, and complete information on this form;
• I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
• I intend to electronically sign and submit the PCN form.
Full Name:
Josh Witherspoon
Signature
Date
5/5/2021
DUKE
ENERGY®
PROGRESf.
Apr. 29, 2021
Brad Shaver
US Army Corps of Engineers
69 Darlington Avenue
Wilmington, NC 28403
Subject: Duke Energy Progress, Sutton Plant-Delco 230kV Line
Replace Structures 113 and 114
New Hanover and Brunswick Counties, NC
Pre -Construction Notification Form NWP 57 — Section 10
Duke Energy Progress Project Number: F140917B
Dear Mr. Shaver:
Josh Witherspoon
410 S. Wilmington Street
Raleigh, NC 27601
Mailing Address:
NC 5 / P.O. Box 1551
Raleigh, NC 27602
919.546.2177
Duke Energy Progress (DEP) plans to replace two old wooden H-frame structures on the Sutton
Plant — Delco 230kV Transmission Line in Wilmington, North Carolina.
Purpose/Need
Structures 113 & 114 are on opposing sides of the Cape Fear River just outside the Sutton SE
Plant. These structures would be difficult to access with traditional line construction equipment if
a storm event was to compromise the structures. Additionally, site inspections of the existing wood
poles have shown them to be in a deteriorating state. Accordingly, replacement of Structures 113
& 114 is necessitated.
Project Scope
Existing wood H-frame Structures 113 & 114 will be removed and replaced with steel H-frame
structures on helical pile foundations. All structure replacement work will be completed utilizing
barges to transport materials, equipment and personnel from the Cape Fear River. All work within
wetland areas will be conducted from composite mat works pads around the structures as well as
composite mat access to the structures. All project work will take place within the existing right-
of-way.
All down guys and anchors for Structures 113 & 114 will be removed. All existing wood piling
foundations will be cut off at the ground line.
The replacement of Structures 113 and 114 will result in the lowest sage of the
transmission line will be raised 0.61 feet above the mean water elevation. The existing lowest
sag elevation is 77.20 feet above the mean water elevation of the Cape Fear River. The new
lowest sag elevation will be 77.81 feet above mean water elevation.
No channel closures area anticipated for the duration of the project. The construction contractor
will be in compliance with all US Coast Guard requirements related to activities while operating
on the Cape Fear River. No in -water construction activities are required for this project beyond
the use of a barge to transport materials, equipment and personnel.
The anticipated project schedule is from 5/2/2022 through 7/1/2022.
Environmental Concerns
Jurisdictional Areas
No impacts to jurisdictional areas will occur as of result of the proposed work, since all work will
in wetland areas be conducted from composite mat work pads as well as composite mat access
to the structures.
CAMA Buffers
There are no permanent impacts to CAMA buffers. All work occurs within the existing ROW. All
heavy equipment within the CAMA buffer will be on composite matting to avoid ground
disturbance. DEP has received a Certification of Exemption From Requiring a CAMA Permit from
the N.C. Division of Coastal Management.
Protected Species
No impacts to protected species will occur as a result of the proposed work.
Cultural Resources
No impacts to cultural resources will occur as a result of the proposed work.
Erosion Control Plan
An erosion control plan will be required for the proposed work. DEP is currently developing an
erosion control plan to be submitted to NCDEQ.
Floodplain Permits
Floodplain permits will be from New Hanover and Brunswick Counties for the proposed work.
Stormwater Permits
No stormwater permits will be required for the proposed work.
We have enclosed the following in the application packet:
1. Pre -Construction Notification
2. Project Location Maps
3. Engineered Drawings
4. Proposed Construction Schedule
Should you or others of the USACE, Wilmington Regulatory Office staff wish to visit this project,
please contact Mr. Josh Witherspoon with Transmission Siting, Permitting and Engagement at
919-546-2177 or email josh.witherspoon@duke-energy.com.
Sincerely,
Pad 2thrkirova
Josh Witherspoon
Sr Transmission Permitting Specialist
Siting, Permitting and Engagement
CERTIFICATION OF EXEMPTION
FROM REQUIRING A CAMA PERMIT
as authorized by the Slate of North Carolina.
Department of Environmental Qualify and the Coastal Resources Commission in an area of
environmental corleem pursuant to 15 NCAC Subchapter iK •' 1c3or NCGS 113A-103 (5) (b) (5)
[ 3.547
Applicant NamebL1�Lwi c CIL+fYQ55 to W++4�+�Sp�al� phone Numberci1� �' a ��
Address Lid 1 . IN , v1 II ie' s-i
City Q�� 1 -t state 1(-- Zip 0.-4a ,
ProJectLocation u' LYP1C I- - b l S-L '� Stec, WI
!- (C,vun�1, State Rvad, Water Body, etc. j �
Type and Dimensions of Project `-s ('ICU-' >rti ` Cy �11 S It ' Y� ►� 1'�
vt t4u vAYQV •
The proposed project to be located and constructed as
described above is hereby certified as exempt from the
CAMA permit requirements This exemption to CAMA
permit requirements does not alleviate the necessity of
your obtaining any other State. Federal, or Local
authonzation
This certification of exemption from requinng a CAMA permit
is valid for 120 days from the date of issuance Following
expiration. a re-examination of the project and pooled site may
be necessary to continue Ibis certification
AEC(5): C tA,1 I E 5
SCALE
1 • I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I
I 1 1 1 1 1 1 1 l 1 1 1 1 1 1 1 1 I 1 1 1 1 ! 1 1 1 1 1
r 1 1 1 1 �`1 ` ` L 1 I��] jT 1I 1 ���.j{11�,, try— 1}j • I . �r( ` 1 1 I 1
r 1 1 4 gi�TL� 1 rtiii-}—TL— s\ F�I1—�1 ] Y__ lvt1s k • ■n i� ch oh 1 1
r--r--r--r- rr--t r----Tf—�r�--{r--r--t—(�-4y--rl.--�r-1—r—r--r--r--1
titi
t.
▪ --r--r-- c __, c _ __t— ,_ter— . , . — --%=`t �_ _ rr-..f--.vc r�` �-r--1r--r--;
1 1 1 I 1 I 1 1 1 1 1 1 1 t 1 I I I 1 1 1 1 ! 1 I 1 r
1 1 1 1 14`I� !', 1 r 1 1 1 1 t 1 1 1 1 1 1 1 1 e t : 1 1
r--r--r--r--r �'r r--r--r--r--r--�--r--T--r--T--r-�r--r--r--T--r--r--r--r--r--r`-�
1 1 1 I r t I 1 1 I 1 1 1 t i t 1 I e ! I I 1 t 1 1 I I e
1 1 1 1 1 1 ! e t ! 1 1 1 L 1 L ! 1 I 1 1 1 1 1 1 1 r 1 1
r--r--r--r--r--r--r r--rl--r--T--r--r--T--r--T--r—r--r--r- T--r--r--r—�-r--r--r--1
1 r , i 1, 1— _. L1 ,.(�� y 1 �,{ 1 :WW1
4 AAV— �j 1 j/�y 1 ` r 1 I t 1
I 1 I I �..11 j,a rd r1L r'11 Fes• IY • F i� 1 la, t r 1•i'h�11 W r 1 1 1
r—'-r—` r r— —r -r—T r--T—T--r--r--r— — —r--r— T--T r--r--r--r--r--1
1 I I 1 A y t 1 I ,�..��,y ,�I j 1 I L I 1 1 i I 1 I 1 I 1
r e ! 1 clu \d (1� �"1:-- t it A 11tlrl __,'t 1 1 1 i 1 1 1 r 1 1
r--r--r--r--r r--r —r `r T"—r T--1—"r--r--r-- r-1 r--r--r--r—r--r--r--r--r"-1
r 1 I I ! 1 i 1 t I I I 1 r I 1 1 1 1 1 1 1 I ! 1 1 1 i i
t---4-4--1--1--{---#------1-`---1-`1----`---_---+------`f--T--4--€----+----`r-----j
1 i 1 1 1 I I I 1 1 1 1 1 1 4, 1 I ! L 1 1 .. .. 1 I r
--L--1 --j --1--E --f --1- --L_- 1-4--1-- 1--F --1--j --1--� - .---1--f--1--1----L--L-`j --L--
e 1 ! t t 1 1 1 1 I I 1 1 1 1 1 1 1 1 I 1 1 I I 1 1 1 1 1
L—_L—_L__L--l—_L__L—_L_—L--1--L--1--J--L_-1--L--1__L—J_—_1__1__1--1__L__L--L--L—_L__J
Mot! 1 1 ! 1 1 1 ! t 1 1 i I 1 1 t i 1 i r i 1 1
1 t I 1 1 1 1 1 1 1 1 1 1 1 + 1 1 1 1 1 I 1 1 I 1 e 1 1 e
1 1 1 1 1 1 1 1 1 1 1 1 1 1 i 1 1 1 1 1 1 1 1 I1 1
1 1 I I ! 1 I I 1 1 r l 1 ! 1 1 1 1 1 l i I i 1 1 ! i 1 1
1 I 1 I ! 1 1 1 I 1 1 1 1 1 1 1 1 1 1 I 1 1 1 1 1 1 t 1 !
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 I 1 1 1 1 1 1 1 1 1 1 I 1 1 ! 1 1 1 1 1 I 1 !
1 1 1 I 1 1 1 1 1 1 I I I 1 ! 1 1 1 1 ! 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 ! e I 1 1 1 1 1 1 1 l 1 1
1 1 1 1 ! e I t 1 t 1 1 1 I 1 1 ! 1 1 1 1 1 1 1 1 1 1 1 1
i 1 t 1 ! 1 I 1 1 I 1 1
1 i 1 1 1 1 1 e 11 till!
1 I 1 I I I I 1 1 1 1 1 t I I 1 I t 1 1 I I e e 1 e I 1
L ........ L--i--.--L--L--L--i--L--i--J—i......
_—i--6.��--_i__a__J __1__V __1__V __�__L__•
Any person who proceeds with a development without the con-
sent of a CAMA official under mistaken assumption that the
development is exempted. wilt be in violation of the CAMA if there
is a subsequent determination that a permit was required for the
development
The applicant certifies by signing this exemption that the
applicant will abide by the conditions of this exemption.
V✓ L
�• plicant's signature
B42-
CAMA Official's signature
Issuing date
Expiration Date
Project Location Maps
14c
ar'
Sutton Plant - Delco
230kV (OL119)
❑Id Mill AdNENavassa
irre W O O D B U R N
U+aFavw,„,-..evfireR6
eivill
I 1
14E1
Project Location
•
Sutton SE Plant
f Rives
02,Ce LIVE OAK
Battleship
Eagle Island
RIVERFRONT
orth Carolina 9
7a
LI4INGTON PCSi'LOUISIANA PACIFIC CORP 115KY
194
Hightsville
,s1
�tkti�e4 C L A
NORTHSIDE
THE
PROMENADE
Grace SI.
HISTORIC
DISTRICT
v:
GLE ISLAND 115KP-
14
74
NDON
RK
SEDGEFIELD
ro
Wilmington
International
Airport
CREEKWOOD
NORTH
SMITHS CREEK
INDUSTRIAL PARK
PRINCESS PLACE
ppAtT
a
WILLIAMS
mafket St
CAROLINA PLACE
WILM
ILIAINGTON NINTH AND ORANGE 234KY
ARDMORE
•
GREENWOOD
PrincE
BEAUMON
BL
FOREST HIL
lHnl FCnI F iu:.
e,9n11 r .,..la
Figure 1: General Location Map
Address: 899 Sutton Steam Plant Rd, Wilmington NC 28401
Lat/Long: 34.279560, -77.990173
Str 113
Repl w/ steel HFR
on helical pile FDN
Figure 2: Structure Location Map
(Not to Scale)
Str 114
Repl w/ steel HFR
on helical pile FDN
Plan and Profile Details
PROGRESS.
>-
0
c(
w
z
w
w
0
0
AUTHORIZATION
z
w
H
0
H
c(
0
c(
0
w
0
z
H
w
V)
H
c(
w
0
0
w
V)
c(
0
BE REPRODUCED, TRANSMITTED, DISCLOSED
0
0
z
PROGRESS, AS SUCH IS
>-
0
w
z
w
w
0
0
z
Q
z
0
0
z
H
c(
0
BRUNSWICK COUNTY
STR. 112
FRAME SIR.
STR, 112
- .-
NOTES°
1. STRUCTURE LOCATIONS, STRUCTURE ELEVATIONS, & EDGE OF WATER (EOW) ARE BASED ON
LIDAR SURVEY COMPLETED NOVEIVBER 2011.
2. PROPOSED STRUCTURE 113 & 114 STRUCTURE LOCATIONS AND ELEVATIONS ARE BASED ON
DUCE ENERGY PROJECT l*F140917B01 DESIGN. SCHEDULED IN—SERVICE DATE SPRING 2022.
3. MEAN WATER ELEVATION IS BASED ON USGS NATIONAL MAP GIS.
4. WIRE INFORMATION°
A. CONDUCTOR° 3-1272 MCIV
B. OHGWo 2-7410 AW
45/7 ACSR
CROSSI\2 CAI FEAR RIV=R
STR 112 - STR 115
=ROFIF= VI=W
STR, 113
--
CROSSI\G CA FEAR RIV-R
STR 112 - STR 115
=LA\ VFW
NEW HANOVER COUNTY
STR. 115
V)
STEEL 3-POLE
CE SUTTON PLANT — DELCO 230
STR, 115
--
N81° 21' 37"E
<V UINE
CROSSI\G
ROJ
CA FEAR RIV
=CT LOCATIO\
GEOGRAPHIC STRUCTURE LOCATIONS
STR. NO.
LONG.
LAT.
STR. 113
77°
59'
29.191"W
34°
16' 45.834"N
STR. 114
77°
59'
20.527"W
34°
16' 46.852"N
LEGEND
•
SINGLE CIRCUIT 230KV TRANSMISSION LINE
PROPOSED TRANSMISSION STRUCTURE
NO. DATE
SCALE
DRAWN BY
REVISION
BY APP.
HORIZo 200.0'
VERTh 40.0'
SDC
SCALE RATIO°
CHECKED BY
N/A
DEF
DATE
APPROVED
03/19/2021
BY JG
DUKE
�' ENERGY®
PROGRESS
S_TTD\ 2L_A\
CA
B\SWIC
V
F
IT
C
EA
T - DELCO 230
0_110
3 3IV 3
EW HA\0V
3OSSI\G 3
<V L_I\E
C3OSSI
CO_
\
G
G
TI
IS, \C
V)
I-1
SECTION
DRAWING NO.
SHEET NO.
STR. 112 TO ST9. 115
CT-79519
2 OF 2
C
C
ALL CONDUCTORS SHOWN AT 60° FINAL -E ) AND MAXIMUM OPERATING
TEMPERATURE ()PER TABLE THIS SHEET, OHGW/OPGW SHOWN AT
60° FINAL. REFER TO LINE DATA SHEET FOR DESIGN TENSIONS,
SIDE PROFILES SHOWN 15' FROM \
RIGHT SIDE PROFILE (
LEFT SIDE PROFILE 4 )
VERTICAL DATUM° NAVD 88 (WITH GEIOD09)
HORIZONTAL DATUM NAD 83 / NSRS 2007
P&P CENTERLINE IS BASED ON STRUCTURE LOCATIONS°
FOR LEGAL CENTERLINE, SEE ROW/EASEMENT DOCUMENTS.
LOCATIONS OF UNDERGROUND UTILITIES ARE
APPROXIMATE AND SHOULD BE FIELD VERIFIED
z_
0
STR
3
STR
116
HORIZ LA VERT LA
Conductor and As -Built Tension Information
Span From Str.
Span To Str.
Wire Type
60°F Initial Tension
(Ibs) Based on LiDAR
Survey (See Note 1)
Ruling
Span (ft)
Max.
Operating
Temp (°F)
Str.90
Str.115
3-1272 MCM 45/7 ACSR
10161
700
200
Str.90
Str.96
7#10 AW
2262
700
Str.90
Str.96
7#10AW
2006
700
Str.96
Str.97
7#10 AW
1483
700
Str.96
Str.97
7#10 AW
917
700
Str.97
Str.115
7#10 AW
2602
700
Str.97
Str.115
7#10 AW
2375
700
NOTE 1. The ruling span tensions above were determined from the as -built PLS-Model using the ruling span method. The ruling span
tensions above are approximate and should not be used for design purposes. For design, refer to the as -built PLS-Model. The PLS-Model will
include tensions determined using the finite element method.
Station Comparison
PI- Str. #
PLS & Gen. 2 P&P
Stationing (ft)
Gen. 1 P&P Stationing (ft)
Configuration
Phasing
Str.3
1710.622
163705
Horiz.
C B A
Str.13
8671.979
136745.62 or 156735.18
Str.40
27467.143
28791.17
Str.53
35990.604
37315.74
Str.90
62175.792
62962.5
Str.116
80156.497
80947.64
Vertical
C B A
*Shown this Sheet *Refer to old P&P
GENERAL NOTES:
1. This drawing reflects the updated stationing and survey details obtained by the Li DAR survey flights performed in 2010-2012. Please refer
to original plan & profile drawings TD-11418 for property owner information, previous survey and stationing, easement documentation and
other details that may or may not be duplicated on this sheet.
2. Phasing is provided based on original plan & profile drawings. All substation phasing is read left to right looking out of the substation
terminal. Intermediate phasing detatils are the result of a change in conductor configuration. Phasing provided for a vertical or delta
conductor configuration reads from top to bottom phase. Phasing provided for a horizontal conductor configuration reads from left to right
looking line ahead according to the PLS Stationing.
2-3/8" GUYS
20' OFFSET
SEE VIEW
AT RIGHT
1-3/8" GUYS
IN LINE
SEE VIEW
AT RIGH
0
300
200
100
0.10
0
-100
2-3/8" GUYS
20' OFFSET
SEE VIEW
AT RIGHT
1-3/8" GUY
IN LINE
SEE VIEW
T RIGHT
4-65 CL-A PILES
2-55 CL-A PILES
HARDWARE PER T3-6B
Cv)
04
I- I-
(I)CI)
00000
Lc) W W \ W
co 1 CCWJ1\Q 1
�WI-CD i WHO
NLiCLU0CLNJON
11,04
0
ti STR 109
I
SUSPE\SIO\ STR 113 & 11
1 1 1
766.53
000
10'
- 750+00
10'
00
10/03/2013
INITIAL RELEASE
REV
FILE NO.
DATE
REVISION
DRAWN
CHECKED
APPROVED
rr
Cv)
LC)
I- I-
U) Cn
STR 110
o'
O
o'
Ul
CC 02
W I 00
W X
CC z
u- C o
W
N O CL
- 755+00
W W\CD r„
w J1\Q 1
I--- CD i WI-�
CnccNJCi
760,44
t 760+00
STR 111
CC
m J
Q
11 LIT
�z
m CD
J N ui h_
--0t--------------
-J
_•••...._
ONO
-J
797,34
-------------
CD
0
+
Ln
(NI
O
I- I-
(I)CI)
o'
CEm
W
CL X
CC z
'[O
I H- W
N O CL
co
v
m
o-
LLI
NE'O
CD CD
O
W
▪ o
O n 7 CD O
W
CC N =
W W 0 [0
CL >O h-Cn Q
lE
(Jo m co z H-
Z >-
O - LC)
mO~)_
Cn W co
Q I-CC
6
m CO cn CO #
W W \ O „
W JI,Q 1
I- O i W H
U0CLNJON
s)
975.12
roject Location
Replace Strs 113-114
w/ steel H-frames on
_helical pile foundations
0
v
0
0
PI 769+03.74
CD CD CD
o ti
® I I I I I I
STR 112
co
CO
co
CCQ
I- I-
(J) CI)
co
O
Cn
cCO
[0 X
W
cc C,
10
O WLLJ
N a W
00 U0
Q
X 0L
m0OCC
J -0
CV m
W CC
mw
COQ
lE !,-„,2
CV=�Q
O
CI) Q W Cn W
}Ho W
0<ir Cf I- CI)
0 YEAR FLOC)
oo
CAPE
704,26
D ELEV
=EAR F
}
0
0
10.0'
IVER
PER US
CV
co
CO
CCQ
I- I-
(J) O
ACE.
m
(n
o' Q
LLI
CI_O CL
CC on
Cc
W
co co En
W=
co O
CL
lE CD Cn
C V = Q
O
CO Q W Cn
- moo W
s
CI)
11,42,44`e
CAN
AL
859.58
on
w
z w
0
w
0
o-
BRUNSWICK COUNTY NEW HANOVER COUNTY
0
0
0
CO
r`
•
•
•
SEE TA-11547 FOR
X-ING PERMIT DWG v
0
�wCD .s_ Cr
STR 114 +� i +CO
'�'`-
SO
S
LJ
0
300
200
100
0
-100
HIGHEST STR.
LOWEST STR.
ONE LINE NO.
4/sRGY®
PROGRESS
200.0 FT. HORIZ. SCALE
40.0 FT. I VERT. SCALE
TITLE
SUTTON PLANT-DELCO
230KV LINE
PLAN AND PROFILE
SIZE
DRAWING
CT-61119
SHEET 20 OF 21