Loading...
HomeMy WebLinkAbout20210735 Ver 1_Pre-Filing Meeting Request_20210410DWR Pre -Filing Meeting Request Form ID#* Regional Office* Reviewer List* 20210735 Version * 1 Mooresville Regional Office - (704) 663-1699 Alan Johnson Pre -Filing Meeting Request submitted 4/10/2021 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Owner Address: Janice Estep info@cbcstoneandrecycling.com Bowen Shoreline Pete Bowen Iredell Street Address 307 Windemere Isle Rd. Address Line 2 aty State / Rovince / Region Statesville NC Fbstal / Zip Code Country 28677 United States Is this a transportation project?* r Yes (' No Type(s) of approval sought from the DWR: r 401 Water Quality Certification - I— 401 Water Quality Certification - Regular Express I— Individual Permit I— Modification fJ Shoreline Stabilization Does this project have an existing project ID#?* r Yes (' No Do you know the name of the staff member you would like to request a meeting with? Alan Johnson Please give a brief project description below and include location information. * Shape and slope shoreline, install matting and install VA Fieldstone boulder rip rap for new shoreline stabilization. Remove only small trees on immediate shoreline to properly stabilize. Install TN Crab Orchard steps. Project by barge. Please give a couple of dates you are available for a meeting. 4/12/2021 4/13/2021 4/14/2021 4/15/2021 4/16/2021 Please attach the documentation you would like to have the meeting about. Bowen Shoreline. pdf pdf only 1.79MB By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 4/10/2021