Loading...
HomeMy WebLinkAbout20210709 Ver 1_PreFiling 30-Day Clock Reached Email_20210508Strickland, Bev From: laserfiche@ncdenr.gov Sent: Saturday, May 8, 2021 12:01 AM To: james.mason@threeoaksengineering.com Cc: Homewood, Sue Subject: Pre -Filing Time Clock has been reached for Greensboro Arboretum Stream Restoration Project - 20210709 Ver 1 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Greensboro Arboretum Stream Restoration Project that you submitted on 4/7/2021. The ID number for that project is 20210709, Version 1. Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be accepted. When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. Internal Use only: Non Transportation i DWR Pre -Filing Meeting Request Form ID#* Regional Office* Reviewer List* 20210709 Version * 1 Winston-Salem Regional Office - (336) 776-9800 Sue Homewood Pre -Filing Meeting Request submitted 4/7/2021 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Owner Address: James Mason james.mason@threeoaksengineering.com Greensboro Arboretum Stream Restoration Project City of Greensboro Guilford Street Address 2602 S. Elm -Eugene St Address Line 2 City State / Rovince / Region Greensboro North Carolina Fbstal / Zip Code Country 27406 United States Is this a transportation project?* r Yes (' No Type(s) of approval sought from the DWR: fJ 401 Water Quality Certification - I— 401 Water Quality Certification - Regular Express I— Individual Permit I— Modification r Shoreline Stabilization Does this project have an existing project ID#?* r Yes (' No Do you know the name of the staff member you would like to request a meeting with? Please give a brief project description below and include location information. * The City of Greensboro, North Carolina (the "City"), Department of Water Resources, proposes the restoration of approximately 2,200 linear feet of North Buffalo Creek and adjacent riparian areas within the approximate existing location of the stream. This project will include restoration, stabilization, or enhancement of the stream, or a combination of these activities. The restoration will occur within the Greensboro Arboretum, located at 401 Ashland Drive in Greensboro. Please give a couple of dates you are available for a meeting. 4/16/2021 4/23/2021 Please attach the documentation you would like to have the meeting about. pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature ofaoteV Submittal Date 4/7/2021