Loading...
HomeMy WebLinkAbout20181502 Ver 3_PreFiling 30-Day Clock Reached Email_20210510Strickland, Bev From: laserfiche@ncdenr.gov Sent: Monday, May 10, 2021 12:00 AM To: aliisa@cws-inc.net Cc: Johnson, Alan Subject: Pre -Filing Time Clock has been reached for Cheyney 20181502 Ver 3 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Cheyney that you submitted on 4/9/2021. The ID number for that project is 20181502, Version 3. Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be accepted. When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. Internal Use only: Non Transportation i DWR Pre -Filing Meeting Request Form ID#* Regional Office* Reviewer List* 20181502 Version* 3 Mooresville Regional Office - (704) 663-1699 Alan Johnson Pre -Filing Meeting Request submitted 4/9/2021 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Owner Address: Aliisa Harjuniemi aliisa@cws-inc.net Cheyney Mattamy Homes; POC: Brian Johnson Mecklenburg Street Address 2127 Ayrsley Town Blvd Address Line 2 aty State / Province / Region Charlotte NC Fbstal / Zip Code Country 28273 USA Is this a transportation project?* r Yes F No Type(s) of approval sought from the DWR: i7 401 Water Quality Certification - I— 401 Water Quality Certification - Regular Express I— Individual Permit fJ Modification F Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Please list all existing project ID's associated with this projects.* 18-1502V2 Do you know the name of the staff member you would like to request a meeting with? Alan Johnson Please give a brief project description below and include location information. * This project is currently being constructed for a single-family subdivision. U.S. Army Corps of Engineers (USACE) has previously issued a Nationwide Permit Nos. 29 and 27 Verification for this project. This Permit Modification Request will request authorization for one more additional open trench sewerline crossing. This crossing was originally designed to be constructed utilizing jack -and -bore methods; however, due to the rock that was recently encountered at the other stream crossings, it was determined that the jack -and -bore method would not be feasible at this location. The total number of open cut crossings will be five. Please give a couple of dates you are available for a meeting. Please attach the documentation you would like to have the meeting about. Site Plan and Impacts2021.pdf 558.6KB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature rrTc� 10.e.vr.' Submittal Date 4/9/2021