HomeMy WebLinkAbout20181502 Ver 3_PreFiling 30-Day Clock Reached Email_20210510Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Monday, May 10, 2021 12:00 AM
To: aliisa@cws-inc.net
Cc: Johnson, Alan
Subject: Pre -Filing Time Clock has been reached for Cheyney 20181502 Ver 3
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Cheyney that you
submitted on 4/9/2021. The ID number for that project is 20181502, Version 3.
Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be
accepted.
When you submit your application please upload a copy of the attached document in this email.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as
responses are not monitored.
Internal Use only: Non Transportation
i
DWR Pre -Filing Meeting Request Form
ID#*
Regional Office*
Reviewer List*
20181502
Version*
3
Mooresville Regional Office - (704) 663-1699
Alan Johnson
Pre -Filing Meeting Request submitted 4/9/2021
Contact Name *
Contact Email Address*
Project Name*
Project Owner*
Project County*
Owner Address:
Aliisa Harjuniemi
aliisa@cws-inc.net
Cheyney
Mattamy Homes; POC: Brian Johnson
Mecklenburg
Street Address
2127 Ayrsley Town Blvd
Address Line 2
aty State / Province / Region
Charlotte NC
Fbstal / Zip Code Country
28273 USA
Is this a transportation project?* r Yes F No
Type(s) of approval sought from the DWR:
i7 401 Water Quality Certification - I— 401 Water Quality Certification -
Regular Express
I— Individual Permit fJ Modification
F Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Please list all existing project ID's associated with this projects.*
18-1502V2
Do you know the name of the staff member you would like to request a meeting with?
Alan Johnson
Please give a brief project description below and include location information. *
This project is currently being constructed for a single-family
subdivision. U.S. Army Corps of Engineers (USACE) has previously
issued a Nationwide Permit Nos. 29 and 27 Verification for this
project.
This Permit Modification Request will request authorization for one
more additional open trench sewerline crossing. This crossing was
originally designed to be constructed utilizing jack -and -bore methods;
however, due to the rock that was recently encountered at the other
stream crossings, it was determined that the jack -and -bore method
would not be feasible at this location. The total number of open cut
crossings will be five.
Please give a couple of dates you are available for a meeting.
Please attach the documentation you would like to have the meeting about.
Site Plan and Impacts2021.pdf 558.6KB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
rrTc� 10.e.vr.'
Submittal Date 4/9/2021