HomeMy WebLinkAbout20210707 Ver 1_PreFiling 30-Day Clock Reached Email_20210508Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Saturday, May 8, 2021 12:01 AM
To: tgingerich@cecinc.com
Cc: Turlington, Chad
Subject: Pre -Filing Time Clock has been reached for Blewett Falls Dam Culvert Replacement -
20210707 Ver 1
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Blewett Falls Dam
Culvert Replacement that you submitted on 4/7/2021. The ID number for that project is 20210707, Version 1.
Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be
accepted.
When you submit your application please upload a copy of the attached document in this email.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as
responses are not monitored.
Internal Use only: Non Transportation
i
DWR Pre -Filing Meeting Request Form
ID#*
Regional Office*
Reviewer List*
20210707
Version *
1
Fayetteville Regional Office - (910) 433-3300
Chad Turlington
Pre -Filing Meeting Request submitted 4/7/2021
Contact Name *
Contact Email Address*
Project Name*
Project Owner*
Project County*
Owner Address:
Todd Gingerich
tgingerich@cecinc.com
Blewett Falls Dam Culvert Replacement
Duke Energy Progress Inc.
Anson
Street Address
400 S Tryon Street
Address Line 2
City State / Rovince / Region
Charlotte North Carolina
Fbstal / Zip Code Country
28201 USA
Is this a transportation project?* r Yes r No
Type(s) of approval sought from the DWR:
fJ 401 Water Quality Certification - I— 401 Water Quality Certification -
Regular Express
I— Individual Permit I— Modification
r Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes (' No
Do you know the name of the staff member you would like to request a meeting with?
No
Please give a brief project description below and include location information. *
Duke Energy is looking to replace an existing failing box culvert. The
existing culvert is adjacent to a fishing platform that is currently being
constructed downstream of the Blewett Falls Dam in Anson County.
The existing culvert will be replaced by a round concrete pipe. It will
include concrete end walls at each invert and minimum riprap outlet
protection at the downstream end. Minimum riprap protection will
prevent additional erosion of the downstream channel.
Please give a couple of dates you are available for a meeting.
Please attach the documentation you would like to have the meeting about.
4j - 151852BF06-CV01-CP02 Culvert
273.42KB
Replacement-3.pdf
4j - 151852BF06-CV01-CP02 Culvert
98.62KB
Replacement-4.pdf
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 4/7/2021