HomeMy WebLinkAbout20210696 Ver 1_Buffer Impact Map_20210505Se gment of Ea st Pr ong Slocum Creek iscurrently cu lvert ed. The culverts will beremoved a nd the stream crossing will be change d to a b ridged crossing.
Sanitary sewer line to be relocated (buried)
Water line to be relocated (aerial)
The area outside of the tree line contains an ex isting roadwayon a n earthe n berm with maintained roadside s houlders, a maint aine d powerline corridor, a sanitary sew er line, and a water line . Buffer areas outside of the tree line do notcontain w ood y vegetation and are regularly maintained.
W o o d H a v e n R o a d
Pr oposed Bridge
East
Prong Sl
ocum Cr
eekNEUS E RIVER RIPARIAN BUFFER SUMMA RY
Are as Within Proposed Pr oject Limits th at are sub ject -Zone 1: 5 ,061 square feet / 0.12 acr eZone 2: 2 ,900 square feet / 0.07 acr e
Are as withi n Pr oposed Project Li mits th at are e xem ptdue to their existing and ongoing uses -Zone 1: 3 ,693 square feet / 0.08 acr eZone 2: 4 ,886 square feet / 0.12 acr e
M a in ta in e d A r e a / N o n -fo r e s te d
M a in ta in e d A re a / N o n -fo re s te d
M a in ta in e d A r e a / N o n -fo re s te d
W o o d H a v e n R o a d
F o re s te d
F o r e s te d
F o r e s te d
F o r e s te d
M a in ta in e d A r e a / N o n -fo r e s te d
Wood Haven D rive Bridge ReplacementCity of Havelock, Craven County, N C
NEUSE RIVER B UFFER IM PACT M AP.0 50 10025Feet
1 inch equals 50 feet
Proposed Limits of Dist urbance
Pump Around System
Coffer Dam
Tree Line
Neuse River Riparian Buffer
East Prong Slocum Creek
Buf fer Imp acts (applicab ility)
Zone 1 (subject )
Zone 2 (subject )
Zone 1 (exempt )
Zone 2 (exempt )Zone 1Zone 1Zone 2Zone 1Zone 2Zone 2Zone 2Zone 1Z o n e 2
Z o n e 1
Z o n e 1