Loading...
HomeMy WebLinkAbout20210922 Ver 1_Bridge 215_permit drawings_final_20210504(Version 2.08; Released April 2018)BP4.R002TIP No.:SF-500215County(ies):Johnston Page 1 of 1TIP Number:Date:Phone:Phone:Email:Email:County(ies):CAMA County?YesDesign/Future:Year:2025Existing:Year:Aquatic T&E Species?Comments:YesNoNoState project BP4.R002 involves the replacement of Johnston County Bridge #0215 on SR 2159 (Bay Valley Rd.) over UT to Little Buffalo Creek. The existing bridge consists of 1 @ 30'-6", 1@ 30'-0", 1 @ 31'-0",PPC cored slab with PPC caps and H-Piles. It is to be replaced with a 1 @ 105'-0" 39" box beam bridge at the same location.The proposed bridge does not contain deck drains. All storm water from the bridge and approaches will be collected by a concrete flume and discharged at the toe of slope into Class 'I' rip-rap in the northwest quadrant at a location outside the buffer. The roadside ditches in the southeast and southwest quadrants will not be impacted and will match the existing drainage patterns. Wetlands within Project Limits?NSWNoneSupplemental Classification: Rural, Residential, and AgricultureUT to Little Buffalo Creek25-57-170.40.142Project DescriptionProposed ProjectNeuseRiver Basin(s): City/Town:0.8Typical Cross Section Description: Surrounding Land Use: General Project Narrative:(Description of Minimization of Water Quality Impacts)Notccoggins@ncdot.govWilson, NC 27895Address:3/3/2021JohnstonKenlyChad CogginsPO Box 3165WBS Element:Bridge ReplacementWBS Element:HNTB North Carolina, P.C. / James Byrd, PENCDOT Contact:(252) 640-6427Suite 200Raleigh, NC 27609Contractor / Designer:(919) 424-0437343 E. Six Forks RoadNorth Carolina Department of TransportationHighway Stormwater Program STORMWATER MANAGEMENT PLAN FOR NCDOT PROJECTSProject Type:509 Ward Blvd. Address:General Project InformationSF-500215BP4.R002Impairments:Other Stream Classification: Primary Classification: Project Built-Upon Area (ac.)ac.NeuseBuffer Rules in Effect:None20132-11' asphalt paved lanes with 2' to 6' paved shoulders and 3' to 4' grass shoulders. Side slopes have front slopes of 3:1 or flatter.Waterbody Information380NCDWR Stream Index No.:NRTR Stream ID:Annual Avg Daily Traffic (veh/hr/day):Existing SiteProject Length (lin. miles or feet): ac.Surface Water Body (1): Class CNCDWR Surface Water Classification for Water Body2-10' paved lanes with grass shoulders. Roadside ditches exist in the southeast and southwest quadrants, but both ditches dissipate before discharging into the UT to Buffalo Creek.760jabyrd@hntb.comProject Includes Bridge Spanning Water Body? Deck Drains Discharge Over Buffer? Dissipator Pads Provided in Buffer?NoDeck Drains Discharge Over Water Body?(If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative)(If yes, provide justification in the General Project Narrative) WETLAND AND SURFACE WATER IMPACTS PERMIT SHEET 1 OF 9 PERMIT DRAWING D T V = = = = = = % % MPH ADT ADT % * FUNC CLASS = DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED K 0 0 0 PROFILE (HORIZONTAL) PROJECT LENGTH STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO. TOTAL SHEETS N.C. SHEET 1 DESIGN DATA SIGNATURE: SIGNATURE: P.E. P.E. GRAPHIC SCALES PLANS PROFILE (VERTICAL) HYDRAULICS ENGINEER ENGINEER ROADWAY DESIGN LOCATION: TYPE OF WORK:09/08/99DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA 0 00 3/29/2021...\BP4.R002_HYD_PRM_TSH.dgnHNTBCONTRACT:ARTMEN N ASO H DEPT O F TRA SPORTTIONTATEOFNRTCAR O LI NA2018 STANDARD SPECIFICATIONS RIGHT OF WAY DATE: LETTING DATE: Prepared in the Office of: NC License No: C-1554 Raleigh, North Carolina 27609 343 E. Six Forks Road, Suite 200 HNTB NORTH CAROLINA, P.C. PROJECT ENGINEER NCDOT CONTACT = = = VICINITY MAP BEGIN BRIDGE LOCAL SUB-REGIONAL TIER 50 100 50 100 10 20105 50 25 50 25 GRADING, DRAINAGE, PAVING AND STRUCTURE OFFSITE DETOUR See Sheet 1B for Symbology Sheet See Sheet 1A For Index of Sheets PE -L- POT STA 13+00.00 0.142 MILES 0.020 MILES 0.122 MILES 380 760 4 JOHNSTON COUNTY TIP PROJECT: REPLACE BRIDGE NO. 215 BRANCH OF BUFFALO CREEK 2013 2. THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES. 1. CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II. NOTES: 2025 6 ON SR 2159 (BAY VALLEY RD) END BRIDGE LI MITS PROJECT TO SR 2148 (BEULAHTOWN RD) TO SR 2163 (TEDDER RD )10 60 JANUARY 22, 2021 * TTST =1%DUAL 3% ROY H. TELLIER, PE--CHAD COGGINS -L- POT STA. 20+50.00COUNTYJOHNSTON COUNTYWI LSON55 BRANCH OF BUFFALO CREEK SR 2159 BAY VALLEY RD -L- JULY 13, 2021 RW/UTIL CONST. -L- POT STA 15+43.20 -L- POT STA 16+50.80 BP4.R002.1 BP4.R002.2 BP4.R002.3 BP4.R002BP4.R002 END PROJECT BP4.R002 BEGIN PROJECT BP4.R002 TOTAL LENGTH OF PROJECT BP4.R002 LENGTH OF STRUCTURE PROJECT BP4.R002 LENGTH OF ROADWAY PROJECT BP4.R002APPROVED R/W PLANS2148 2163 2162 2161 2160 2159 2110 2159 2159 2163 2110 2110 2161 2163 2143 Bunn Rd.SimmonsR d.Ba y Vall e yBayValle y Rd.Ba y Valley Rd. Fl o wer Hill And Glendale Rd. C oreRd.TedderRd.TedderRd.Rd.Rd.Rd.BaileyLittle Buffalo Creek Monica Ln.Da ve Dr. Elementary School Glendale-Kenly Rd.Bailey2148 2143 Beulahtown 222 222 2148 Boyette RevelRevellRd.Ramble 1104 1195 1195 BRANCH OF BUFFALO CREEK BRANCH OF BUFFALO CREEK NA 2 0 1 1NAD 8 3/NA 2011NAD 83/ 18" RCP 24 " RCP 24" RCP RAP RIP RAP RIP RAP RIP SR 2159 BAY VALLEY RD - 21' BST SR 2159 BAY VALLEY RD - 21' BST 72" CHL 3SBWGR TO BEULAHTOWN RD TO TEDDER RD GUY GUY GUY GUY GUY GUY EIP EIP EIP EIP AXLE RIPRAP BST DRIVEP B 7 2 P G 10 9 (CE NT E RE D ON P L) 2 0' J OI NT DRI VE WAY E AS E ME NT OVERGROWTH WOODED WOODED WOODED WOODED WOODED WOODED WOODED WOODED WOODED CONC DRIVECONC S/W BRANCH OF BUFFALO CREEK BRANCH OF BUFFALO CREEK EIP WIFE, POCONNA S CUDDINGTON MATTHEW L CUDDINGTON AND WIFE, LOUISE H CUDDINGTON RICHARD E CUDDINGTON AND GAIL A. RENFROW LORIE M ALVIS WIFE, LAUREN TOMFORD DARREN TOMFORD AND BETTY BROUGHTON JAMES C PEARCE WIFE, SHERRY E MUNDEN JOSEPH M MUNDEN AND COUNTY OF JOHNSTON BRIDGE 215 TREE L INE T LP EIP TPOST VAULT STATIONPUMP EIP EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R /WTHH Public Utility, 12 ", DIP Johnston County BRANCH OF BUFFALO CREEK RIPRAP SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO.8/17/993/29/2021...\BP4.R002_HYD_PRM_wet_PSH4.dgnHNTB-L- 120' 130' 150' 160' 170' 120' 130' 150' 160' 170' 11+0010+00 12+00 13+00 14+00 15+00 16+00 17+00 4 NC License No: C-1554 Raleigh, North Carolina 27609 343 E. Six Forks Road, Suite 200 HNTB NORTH CAROLINA, P.C. SKETCH OF BRIDGE IN RELATIONSHIP TO PAVEMENT -L- POC STA. 13+00.00 -L- POC STA. 20+50.00 18+00 19+00 20+00 21+00 140' 180' 190' -L- STA. 15+43.20 BEGIN BRIDGE -L- STA. 16+50.80 END BRIDGE -L- STA. 15+32.50 BEGIN APPROACH SLAB -L- STA. 16+61.50 END APPROACH SLAB 140' 180' 190' 22+00 BUFFALO CREEK BRANCH OF BP4.R002 END PROJECT BP4.R002 BEGIN PROJECT BP4.R002 MATERIAL TO BE REMOVED -L- POT Sta. 21+82.06 -L- PCC Sta. 13+05.32 -L- PT Sta. 19+84.53 -L- PC Sta. 10+00.00 15 -L-10 -L-20 -L-PI = 18+50.00 EL = 166.21' VC = 289' K = 79 ELEV. = 162.14 -L- STA 13+00.00 BEGIN GRADE ELEV. = 175.01 -L- STA 20+50.00 END GRADE ELEV.= 157.62' -L- STA BEFORE 10+00, 77.89 RT BM#1 RR SPIKE IN BASE OF 14" PINE V = 45 MPH (+)0.2400% (+)0.7400% (+)4.4000% (+)4.8200% (+)0.7400% ELEV.= 157.13 -L- STA 15+66.29, 61.37' LT BM#2 RR SPIKE IN BASE OF 23" PINE -L- STA 15+43.20 BEGIN BRIDGE -L- STA 16+50.80 END BRIDGE -L- -L- 1 2 4 3 F F F F F F F F F F AR GV GV BORE PIT BORE PIT BORE PIT BORE PIT AR GV GV LEGEND W1 WETLAND & STREAM IMPACTS -L- SHEET 2 OF 9 PERMIT DRAWING W2 MECHANIZE CLEARING IN WETLANDS = 0.001 Ac / 39 SF E E ** * * ** * ** * * HC HC EXCAVATION IN WETLANDS HAND CLEARING IN WETLANDS HAND CLEARING IN WETLANDS SCALE 1" = 40' HAND CLEARING IN WETLANDS IN WETLANDS MECHANIZED CLEARING HAND CLEARING IN WETLANDS = 0.009 Ac / 410 SF MECHANIZE CLEARING IN WETLANDS = 0.002 Ac / 81 SF EXCAVATION IN WETLANDS = <0.001 Ac / 1 SF MECHANIZED CLEARING IN WETLANDS HAND CLEARING IN WETLANDS IN WETLANDS DENOTES EXCAVATION CLEARING IN WETLANDS DENOTES MECHANIZED CLEARING IN WETLANDS DENOTES HAND NAD 8 3 NA 2 0 1 1NC GRI DRETAIN RETA IN RETAIN LIMIT (TYP.) EXCAVATION BRIDGE REMOVE EXIST. C C C ELEV. 156.0' TO SHOULDER CLASS "II" RIPRAP C EST. 5 SYGF EST. 2 TONS CLASS 'I' RIP-RAP -L- STA. 14+66.44 FLUME CONCRETE MODIFIED DESIGN DISCHARGE DESIGN FREQUENCY BASE DISCHARGE CFS YRS YRS BASE FREQUENCY OVERTOPPING ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE CFS CFS YRS FT FT FT DESIGN HW ELEVATION BASE HW ELEVATION BRIDGE HYDRAULIC DATA DATE OF SURVEY W.S. ELEVATION AT DATE OF SURVEY FT = 1020 = 25 = 155.2 = 3240 = 100 = 158.2 = >3240 (+) = >100 (+) = 161.51 = 06-06-19 = 151.09 145145146146147147147147148148148148149149149149149149149149149150150150150 150150 1501501501501501 5 0150 150150150150150150151151 151151151151 151 151151151 151 151152 1 5 2 1 521 5 2 152152152 152152 152152 152152152152 152152152 152 152152153153153153 153153153153 153153153 153 153 153153153153 153153 153153 153153153153 15315315315315 4 154154154 15415415415415 4154154 154154 154 154154154154 15415 4 154154154154155155 155155 155155155 155155155155155 155155155 155 155155155155155155155155155155 155 155 155 155 155 155 155155155 155155155 15515515515515515 5155155155155155 156156156 1 5 6 156 156 156156156156156156 156156 156 156156156156 1 5 6 156 156156156157 157157157157157 157157157157157157157157157 157 157158158158158 158158158 158158158 158158158 158 158159159159159 159159159159 159 159159 1591 6 0160160160 160160 160160160160160 1601 6 0 160 160 160 160 160 160160160160160161161161 161161 161 161 161161161 162162162 162162162 162162 162162 163163163 163163163164164 164 164165165165165 165165 16516 6166 16616716 7 1671681681681691691691701701701701701701711711711 7 1 17 2 172172172173173173173174174174174175175 175175175175175175175175 17617 6176176176 177 177177177177 177178178178178178178179 179179179 179179 180 18018018018018 0 1 8 0 180180180 180181181181181181181181181 181182182 1821821 8 2 1821 8 2182182183183183 183 18318318318318418418418 4184 1841841 8 5185185185185 185 185185185185185185 185185186 186186186186186186187187187187 187188188 188 188188189189189190 19018" RCP 24 " RCP 24" RCP RAP RIP RAP RIP RAP RIP SR 2159 BAY VALLEY RD - 21' BST SR 2159 BAY VALLEY RD - 21' BST 72" CHL 3SBWGR TO BEULAHTOWN RD TO TEDDER RD GUY GUY GUY GUY GUY GUY EIP EIP EIP EIP AXLE RIPRAP BST DRIVEP B 7 2 P G 10 9 (CE NT E RE D ON P L) 2 0' J OI NT DRI VE WAY E AS E ME NT OVERGROWTH WOODED WOODED WOODED WOODED WOODED WOODED WOODED WOODED WOODED CONC DRIVECONC S/W BRANCH OF BUFFALO CREEK BRANCH OF BUFFALO CREEK EIP WIFE, POCONNA S CUDDINGTON MATTHEW L CUDDINGTON AND WIFE, LOUISE H CUDDINGTON RICHARD E CUDDINGTON AND GAIL A. RENFROW LORIE M ALVIS WIFE, LAUREN TOMFORD DARREN TOMFORD AND BETTY BROUGHTON JAMES C PEARCE WIFE, SHERRY E MUNDEN JOSEPH M MUNDEN AND COUNTY OF JOHNSTON BRIDGE 215 TREE L INE T LP EIP TPOST VAULT STATIONPUMP EIP EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R /WTHH Public Utility, 12 ", DIP Johnston County BRANCH OF BUFFALO CREEK RIPRAP SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO.8/17/993/29/2021...\BP4.R002_HYD_PRM_wet_PSH4.dgnHNTB-L- 120' 130' 150' 160' 170' 120' 130' 150' 160' 170' 11+0010+00 12+00 13+00 14+00 15+00 16+00 17+00 4 NC License No: C-1554 Raleigh, North Carolina 27609 343 E. Six Forks Road, Suite 200 HNTB NORTH CAROLINA, P.C. SKETCH OF BRIDGE IN RELATIONSHIP TO PAVEMENT -L- POC STA. 13+00.00 -L- POC STA. 20+50.00 18+00 19+00 20+00 21+00 140' 180' 190' -L- STA. 15+43.20 BEGIN BRIDGE -L- STA. 16+50.80 END BRIDGE -L- STA. 15+32.50 BEGIN APPROACH SLAB -L- STA. 16+61.50 END APPROACH SLAB 140' 180' 190' 22+00 BUFFALO CREEK BRANCH OF BP4.R002 END PROJECT BP4.R002 BEGIN PROJECT BP4.R002 MATERIAL TO BE REMOVED -L- POT Sta. 21+82.06 -L- PCC Sta. 13+05.32 -L- PT Sta. 19+84.53 -L- PC Sta. 10+00.00 15 -L-10 -L-20 -L-PI = 18+50.00 EL = 166.21' VC = 289' K = 79 ELEV. = 162.14 -L- STA 13+00.00 BEGIN GRADE ELEV. = 175.01 -L- STA 20+50.00 END GRADE ELEV.= 157.62' -L- STA BEFORE 10+00, 77.89 RT BM#1 RR SPIKE IN BASE OF 14" PINE V = 45 MPH (+)0.2400% (+)0.7400% (+)4.4000% (+)4.8200% (+)0.7400% ELEV.= 157.13 -L- STA 15+66.29, 61.37' LT BM#2 RR SPIKE IN BASE OF 23" PINE -L- STA 15+43.20 BEGIN BRIDGE -L- STA 16+50.80 END BRIDGE -L- -L- 1 2 4 3 F F F F F F F F F F AR GV GV BORE PIT BORE PIT BORE PIT BORE PIT AR GV GV LEGEND W1 WETLAND & STREAM IMPACTS -L- SHEET 3 OF 9 PERMIT DRAWING W2 MECHANIZE CLEARING IN WETLANDS = 0.001 Ac / 39 SF E E ** * * ** * ** * * HC HC EXCAVATION IN WETLANDS HAND CLEARING IN WETLANDS HAND CLEARING IN WETLANDS SCALE 1" = 40' HAND CLEARING IN WETLANDS IN WETLANDS MECHANIZED CLEARING HAND CLEARING IN WETLANDS = 0.009 Ac / 410 SF MECHANIZE CLEARING IN WETLANDS = 0.002 Ac / 81 SF EXCAVATION IN WETLANDS = <0.001 Ac / 1 SF MECHANIZED CLEARING IN WETLANDS HAND CLEARING IN WETLANDS IN WETLANDS DENOTES EXCAVATION CLEARING IN WETLANDS DENOTES MECHANIZED CLEARING IN WETLANDS DENOTES HAND NAD 8 3 NA 2 0 1 1NC GRI DRETAIN RETA IN RETAIN LIMIT (TYP.) EXCAVATION BRIDGE REMOVE EXIST. C C C ELEV. 156.0' TO SHOULDER CLASS "II" RIPRAP C EST. 5 SYGF EST. 2 TONS CLASS 'I' RIP-RAP -L- STA. 14+66.44 FLUME CONCRETE MODIFIED DESIGN DISCHARGE DESIGN FREQUENCY BASE DISCHARGE CFS YRS YRS BASE FREQUENCY OVERTOPPING ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE CFS CFS YRS FT FT FT DESIGN HW ELEVATION BASE HW ELEVATION BRIDGE HYDRAULIC DATA DATE OF SURVEY W.S. ELEVATION AT DATE OF SURVEY FT = 1020 = 25 = 155.2 = 3240 = 100 = 158.2 = >3240 (+) = >100 (+) = 161.51 = 06-06-19 = 151.09 00 00 1010 1010 2020 2020 3030 3030 4040 4040 5050 5050 6060 6060 7070 7070 8080 8080 9090 9090 100100 100100 110110 110110 120120 120120 130130 130130 140140 140140 150150 150150 PROJ. REFERENCE NO.SHEET NO.5 10 WETLAND CROSS SECTIONS SCALE 1"=20' HORIZONTAL 1"=20' VERTICAL 150 160 160 150 160 145 155 WLB WLB ON SR 2159 (BAY VALLEY RD) BRANCH OF BUFFALO CREEK REPLACE BRIDGE NO.215 PROJECT: BP4.R002 JOHNSTON COUNTY BP4.R002 -L- STA. 14+00 -L- STA. 15+00 -L- STA. 15+503/29/2021SHEET 4 OF 9 PERMIT DRAWING 162.26 WLBWLBWLBWLB EXIST. R/W EXIST. R/W VAR. 3:1 0.0410.040 162.54 WLB WLB EXIST. R/W EXIST. R/W 3:13:1 0.0400.040 163.03162.54 EXIST. R/W EXIST. R/W EXCAVATE TO ELEV = 154.00 0.0400.040 18" RCP 24 " RCP 24" RCP RAP RIP RAP RIP RAP RIP SR 2159 BAY VALLEY RD - 21' BST SR 2159 BAY VALLEY RD - 21' BST 72" CHL 3SBWGR TO BEULAHTOWN RD TO TEDDER RD GUY GUY GUY GUY GUY GUY EIP EIP EIP EIP AXLE RIPRAP BST DRIVEP B 7 2 P G 10 9 (CE NT E RE D ON P L) 2 0' J OI NT DRI VE WAY E AS E ME NT OVERGROWTH WOODED WOODED WOODED WOODED WOODED WOODED WOODED WOODED CONC DRIVECONC S/W BRANCH OF BUFFALO CREEK BRANCH OF BUFFALO CREEK EIP WIFE, POCONNA S CUDDINGTON MATTHEW L CUDDINGTON AND WIFE, LOUISE H CUDDINGTON RICHARD E CUDDINGTON AND GAIL A. RENFROW LORIE M ALVIS WIFE, LAUREN TOMFORD DARREN TOMFORD AND BETTY BROUGHTON JAMES C PEARCE WIFE, SHERRY E MUNDEN JOSEPH M MUNDEN AND COUNTY OF JOHNSTON BRIDGE 215 TREE L INE T LP EIP TPOST VAULT STATIONPUMP EIP EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R /WTHH Public Utility, 12 ", DIP Johnston County BRANCH OF BUFFALO CREEK SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO.8/17/993/29/2021...\BP4.R002_HYD_PRM_buf_PSH4.dgnHNTB-L- 120' 130' 150' 160' 170' 120' 130' 150' 160' 170' 11+0010+00 12+00 13+00 14+00 15+00 16+00 17+00 4 NC License No: C-1554 Raleigh, North Carolina 27609 343 E. Six Forks Road, Suite 200 HNTB NORTH CAROLINA, P.C. SKETCH OF BRIDGE IN RELATIONSHIP TO PAVEMENT -L- POC STA. 13+00.00 -L- POC STA. 20+50.00 18+00 19+00 20+00 21+00 140' 180' 190' -L- STA. 15+43.20 BEGIN BRIDGE -L- STA. 16+50.80 END BRIDGE -L- STA. 15+32.50 BEGIN APPROACH SLAB -L- STA. 16+61.50 END APPROACH SLAB 140' 180' 190' 22+00 BUFFALO CREEK BRANCH OF BP4.R002 END PROJECT BP4.R002 BEGIN PROJECT BP4.R002 MATERIAL TO BE REMOVED PI Sta 11+52.99 D L = 305.32' T = 152.99' R = 1,913.35' PI Sta 16+48.30 D L = 679.21' T = 342.97' R = 1,980.00' -L- POT Sta. 21+82.06 -L- PCC Sta. 13+05.32 -L- PT Sta. 19+84.53 -L- PC Sta. 10+00.00 -L- SE=0.04 SE=0.04 RO = 98'RO = 98' V= 45 MPH V= 45 MPH -L- -L-15 -L-10 -L-20 -L-PI = 18+50.00 EL = 166.21' VC = 289' K = 79 ELEV. = 162.14 -L- STA 13+00.00 BEGIN GRADE ELEV. = 175.01 -L- STA 20+50.00 END GRADE ELEV.= 157.62' -L- STA BEFORE 10+00, 77.89 RT BM#1 RR SPIKE IN BASE OF 14" PINE V = 45 MPH (+)0.2400% (+)0.7400% (+)4.4000% (+)4.8200% (+)0.7400% ELEV.= 157.13 -L- STA 15+66.29, 61.37' LT BM#2 RR SPIKE IN BASE OF 23" PINE -L- STA 15+43.20 BEGIN BRIDGE -L- STA 16+50.80 END BRIDGE -L- -L- 1 4 3 F F F F F F F F F F AR GV GV BORE PIT BORE PIT BORE PIT BORE PIT AR GV GV BUFFER IMPACTS ALLOWABLE IMPACTS ZONE 1 ALLOWABLE IMPACTS ZONE 2 B1 B3 B4 B2 ZONE 2 BUFFER IMPACTS = 596 SF ZONE 1 BUFFER IMPACTS = 1057 SF ZONE 2 BUFFER IMPACTS = 872 SF ZONE 1 BUFFER IMPACTS = 991 SF ZONE 2 BUFFER IMPACTS = 309 SF ZONE 1 BUFFER IMPACTS = 461 SF ZONE 2 BUFFER IMPACTS = 331 SF ZONE 1 BUFFER IMPACTS = 696 SF SHEET 5 OF 9 PERMIT DRAWING LEGEND BY CONTRACTOR SIZE DETERMINED BORE PIT BY CONTRACTOR SIZE DETERMINED BORE PIT BY CONTRACTOR SIZE DETERMINED BORE PIT BY CONTRACTOR SIZE DETERMINED BORE PIT PROPOSED 4 IN. FORCE MAIN PROPOSED 12 IN. WATER LINE NAD 8 3 NA 2 0 1 1NC GRI DRETAIN RETA IN RETAIN LIMIT (TYP.) EXCAVATION BRIDGE REMOVE EXIST. C C C ELEV. 156.0' TO SHOULDER CLASS "II" RIPRAP C EST. 5 SYGF EST. 2 TONS CLASS 'I' RIP-RAP -L- STA. 14+66.44 FLUME CONCRETE MODIFIED DESIGN DISCHARGE DESIGN FREQUENCY BASE DISCHARGE CFS YRS YRS BASE FREQUENCY OVERTOPPING ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE CFS CFS YRS FT FT FT DESIGN HW ELEVATION BASE HW ELEVATION BRIDGE HYDRAULIC DATA DATE OF SURVEY W.S. ELEVATION AT DATE OF SURVEY FT = 1020 = 25 = 155.2 = 3240 = 100 = 158.2 = >3240 (+) = >100 (+) = 161.51 = 06-06-19 = 151.09 TRANSPORTATION FACILITY LINE TRANSPORTATION FACILITY LINE TRANSPORTATION FACILITY LINE TRANSPORTATION FACILITY LINE 145145146146147147147147148148148148149149149149149149149149149150150150150 150150 1501501501501501 5 0150 150150150150150151151 151151151151 151 151151151 151 1511521 5 2 1 521 5 2 152152152 152152 152152 152152152152 152152 152152 152 152153153153153 153153153 153153153 153 153 153153153153 153153 153153 153153153 15315315315315315 4 154154154 15415415415415 4154154 154154 154 154154154154154 15415 4 154154154154155155 155155 155155155 155155155 155155155 155 155155155155155155155155155155155 155 155 155 155 155 155 155155155 155155155 15515515515515515 5155155155155155 155155 156156156 1 5 6 156 156 156156156156156156 156156 156 156156156156 1 5 6 156 156156156157 157157157157 157157157157157157157157157 157 157158158158 158158158 158158158 158158158 158 158159159159159 159159159159 159 159159 1591 6 0160160160 160160 160160160160 1601 6 0 160 160 160 160 160 160160160160160161161 161161 161 161 161161161 162162 162162162 162162 162162 163163163163163 164164 164 165165165 165 16516 6166 16616716 7 1671681681691691691701701701701701711711711 7 1 17 2 172172173173173174174174175175 175175175175175175 17617 6176176 177 177177177 177178178178178178178179 179179179 179 180 18018018018 0 1 8 0 180180180 180181181181181181181181181 181182182 1821821 8 2 1821 8 2182182183183183 183 18318318318318418418418 4184 1841841 8 5185185185185 185 185185185185185185 185185186 186186186186186186187187187187 187188188 188 188188189189189190 19018" RCP 24 " RCP 24" RCP RAP RIP RAP RIP RAP RIP SR 2159 BAY VALLEY RD - 21' BST SR 2159 BAY VALLEY RD - 21' BST 72" CHL 3SBWGR TO BEULAHTOWN RD TO TEDDER RD GUY GUY GUY GUY GUY GUY EIP EIP EIP EIP AXLE RIPRAP BST DRIVEP B 7 2 P G 10 9 (CE NT E RE D ON P L) 2 0' J OI NT DRI VE WAY E AS E ME NT OVERGROWTH WOODED WOODED WOODED WOODED WOODED WOODED WOODED WOODED CONC DRIVECONC S/W BRANCH OF BUFFALO CREEK BRANCH OF BUFFALO CREEK EIP WIFE, POCONNA S CUDDINGTON MATTHEW L CUDDINGTON AND WIFE, LOUISE H CUDDINGTON RICHARD E CUDDINGTON AND GAIL A. RENFROW LORIE M ALVIS WIFE, LAUREN TOMFORD DARREN TOMFORD AND BETTY BROUGHTON JAMES C PEARCE WIFE, SHERRY E MUNDEN JOSEPH M MUNDEN AND COUNTY OF JOHNSTON BRIDGE 215 TREE L INE T LP EIP TPOST VAULT STATIONPUMP EIP EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R /WTHH Public Utility, 12 ", DIP Johnston County BRANCH OF BUFFALO CREEK SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO.8/17/993/29/2021...\BP4.R002_HYD_PRM_buf_PSH4.dgnHNTB-L- 120' 130' 150' 160' 170' 120' 130' 150' 160' 170' 11+0010+00 12+00 13+00 14+00 15+00 16+00 17+00 4 NC License No: C-1554 Raleigh, North Carolina 27609 343 E. Six Forks Road, Suite 200 HNTB NORTH CAROLINA, P.C. SKETCH OF BRIDGE IN RELATIONSHIP TO PAVEMENT -L- POC STA. 13+00.00 -L- POC STA. 20+50.00 18+00 19+00 20+00 21+00 140' 180' 190' -L- STA. 15+43.20 BEGIN BRIDGE -L- STA. 16+50.80 END BRIDGE -L- STA. 15+32.50 BEGIN APPROACH SLAB -L- STA. 16+61.50 END APPROACH SLAB 140' 180' 190' 22+00 BUFFALO CREEK BRANCH OF BP4.R002 END PROJECT BP4.R002 BEGIN PROJECT BP4.R002 MATERIAL TO BE REMOVED PI Sta 11+52.99 D L = 305.32' T = 152.99' R = 1,913.35' PI Sta 16+48.30 D L = 679.21' T = 342.97' R = 1,980.00' -L- POT Sta. 21+82.06 -L- PCC Sta. 13+05.32 -L- PT Sta. 19+84.53 -L- PC Sta. 10+00.00 -L- SE=0.04 SE=0.04 RO = 98'RO = 98' V= 45 MPH V= 45 MPH -L- -L-15 -L-10 -L-20 -L-PI = 18+50.00 EL = 166.21' VC = 289' K = 79 ELEV. = 162.14 -L- STA 13+00.00 BEGIN GRADE ELEV. = 175.01 -L- STA 20+50.00 END GRADE ELEV.= 157.62' -L- STA BEFORE 10+00, 77.89 RT BM#1 RR SPIKE IN BASE OF 14" PINE V = 45 MPH (+)0.2400% (+)0.7400% (+)4.4000% (+)4.8200% (+)0.7400% ELEV.= 157.13 -L- STA 15+66.29, 61.37' LT BM#2 RR SPIKE IN BASE OF 23" PINE -L- STA 15+43.20 BEGIN BRIDGE -L- STA 16+50.80 END BRIDGE -L- -L- 1 4 3 F F F F F F F F F F AR GV GV BORE PIT BORE PIT BORE PIT BORE PIT AR GV GV BUFFER IMPACTS ALLOWABLE IMPACTS ZONE 1 ALLOWABLE IMPACTS ZONE 2 B1 B3 B4 B2 ZONE 2 BUFFER IMPACTS = 596 SF ZONE 1 BUFFER IMPACTS = 1057 SF ZONE 2 BUFFER IMPACTS = 872 SF ZONE 1 BUFFER IMPACTS = 991 SF ZONE 2 BUFFER IMPACTS = 309 SF ZONE 1 BUFFER IMPACTS = 461 SF ZONE 2 BUFFER IMPACTS = 331 SF ZONE 1 BUFFER IMPACTS = 696 SF SHEET 6 OF 9 PERMIT DRAWING LEGEND BY CONTRACTOR SIZE DETERMINED BORE PIT BY CONTRACTOR SIZE DETERMINED BORE PIT BY CONTRACTOR SIZE DETERMINED BORE PIT BY CONTRACTOR SIZE DETERMINED BORE PIT PROPOSED 4 IN. FORCE MAIN PROPOSED 12 IN. WATER LINE NAD 8 3 NA 2 0 1 1NC GRI DRETAIN RETA IN RETAIN LIMIT (TYP.) EXCAVATION BRIDGE REMOVE EXIST. C C C ELEV. 156.0' TO SHOULDER CLASS "II" RIPRAP C EST. 5 SYGF EST. 2 TONS CLASS 'I' RIP-RAP -L- STA. 14+66.44 FLUME CONCRETE MODIFIED DESIGN DISCHARGE DESIGN FREQUENCY BASE DISCHARGE CFS YRS YRS BASE FREQUENCY OVERTOPPING ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE CFS CFS YRS FT FT FT DESIGN HW ELEVATION BASE HW ELEVATION BRIDGE HYDRAULIC DATA DATE OF SURVEY W.S. ELEVATION AT DATE OF SURVEY FT = 1020 = 25 = 155.2 = 3240 = 100 = 158.2 = >3240 (+) = >100 (+) = 161.51 = 06-06-19 = 151.09 TRANSPORTATION FACILITY LINE TRANSPORTATION FACILITY LINE TRANSPORTATION FACILITY LINE TRANSPORTATION FACILITY LINE HandExisting Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural SiteStationStructureFill In Fill In in Clearing in SW SW Impacts Impacts StreamNo.(From/To)Size / TypeWetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)W139" Box Beam Bridge0.0000.0030.01TOTALS*:0.000 0.003 0.0090 0 0*Rounded totals are sum of actual impactsNOTES:Revised 2018 Feb SHEET7OF 9WETLAND AND SURFACE WATER IMPACTS SUMMARYWETLAND IMPACTSSURFACE WATER IMPACTSJohnstonBP4.R002NC DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS3/23/2021 Site Station StructureNo. (From/To) Size / TypeB1 L Sta. 15+32 to Sta. 16+17 LT1057 596 1653B2 L Sta. 16+48 to Sta. 17+50 LT991 872 1863B3 L Sta. 14+66 to Sta. 15+40 RT461 309 770B4 L Sta. 16+02 to Sta. 16+73 RT696 331 10273205 2108 5313 0 0 0 0 0NOTES:Revised 2018 Feb SHEET 8 OF 9ALLOWABLE MITIGABLE3/23/2021ZONE 2(ft2)ZONE 1(ft2)TOTAL(ft2)ZONE 2(ft2)ZONE 1(ft2)TOTAL(ft2)Johnston CountyBP4.R002BUFFER REPLACEMENTIMPACTSRIPARIAN BUFFER IMPACTS SUMMARYNC DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYSTOTALS*:ROAD CROSSINGBRIDGEPARALLEL IMPACTZONE 1(ft2)ZONE 2(ft2)TYPE ZONE 1 (ft2)ZONE 2 (ft2)B1 L Sta. 15+45 to Sta. 16+04 LT 143 105143 105Revised 2018 Feb SHEET 9 OF 9WETLANDS IN BUFFER IMPACTS SUMMARYNC DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS3/23/2021Johnston CountyBP4.R002WETLANDS IN BUFFERSSITE NO. STATION (FROM/TO)TOTAL:Rev. Jan 2009