Loading...
HomeMy WebLinkAboutWQ0042506_Application_20210510Non -Discharge Branch Upload/Submittal Form Initial Review Reviewer Thornburg, Nathaniel D Is this submittal an application? (Excluding additional information.)* 6' Yes r No Permit Number (IR)* WQ0042506 Applicant/Permittee Town of Pittsboro Applicant/Permittee Address PO Box 759, Pittsboro, NC 27312 Is the owner in BIMS? a Yes r No Is the facility in BIMS? r Yes c No Owner Type Municipal Facility Name Grant Drive RWDL County Chatham Fee Category RW Distribution Line Fee Amount $480 Is this a complete application? * a Yes r No Signature Authority Signature Authority Title Signature Authority Email Document Type (if non -application) Email Notifications Does this need review by the hydrogeologist?* r Yes NO Regional Office CO Reviewer Admin Reviewer Complete App Date 05/10/2021 Below list any additional email address that need notification about a new project. Email Address Comments to be added to email notfication Comments for Kendall Comments for RO Comments for Reviewer Comments for Applicant Submittal Form Project Contact Information Rease provide information on the person to be contacted by NEB Staff regarding electronic subnittal, confirrration of receipt, and other correspondence. Name * Sue Morris Email Address* smorris@withersravenel.com Project Information Application/Document Type * r New (Fee Required) ✓ Modification - Major (Fee Required) ✓ Renewal with Major Modification (Fee Required) ✓ Annual Report ✓ Additional Information ✓ Other Phone Number* 919-417-7889 O Modification - Minor O Renewal O GW-59, NDMR, NDMLR, NDAR-1, NDAR-2 ✓ Residual Annual Report ✓ Change of Ownership We no longer accept these monitoring reports through this portal. Please click on the link below and it will take you to the correct form. https://edocs.deq.nc.gov/Forms/NonDischarge_Monitoring_Report Permit Type:* Applicant/Permittee * ✓ Wastewater Irrigation ✓ Other Wastewater ✓ Closed -Loop Recycle ✓ Single -Family Residence Wastewater Irrigation Town of Pittsboro Applicant/Permittee Address* PO Box759, Pittsboro, NC 27312 Facility Name * Grant Drive RWDL Please provide comments/notes on your current submittal below. Check #5334 was delivered via Fed/Ex and received by your office on 5/6/2021. ✓ High -Rate Infiltration • Reclaimed Water ✓ Residuals ✓ Other At this time, paper copies are no longer required. If you have any questions about what is required, please contact Nathaniel Thornburg at nathaniel.thornburg@ncdenr.gov. Please attach all information required or requested for this submittal to be reviewed here.* (Application Form} Engineering Rans, Specifications, Calculations, Etc.) 20210504_DEQ PKG_7.1 Ph.1 Reclaimed Water.pdf 22.92MB Upload only 1 FLFdocurrent (less than 250 NB). Miltiple docurrents rrust be confined into one PDF file unless file is larger than upload limit. *17 By checking this box, I acknowledge that I understand the application will not be accepted for pre -review until the fee (if required) has been received by the Non - Discharge Branch. Application fees must be submitted by check or money order and made payable to the North Carolina Department of Environmental Quality (NCDEQ). I also confirm that the uploaded document is a single PDF with all parts of the application in correct order (as specified by the application). Mail payment to: NCDEQ — Division of Water Resources Attn: Non -Discharge Branch 1617 Mail Service Center Raleigh, NC 27699-1617 Signature Lir,5Lizr Submission Date 5/7/2021 TO: WithersRavenel Our Peupte. Your N s:cess. 55 Grant Drive, Suite D Pittsboro, North Carolina 27312 t: 919.469.33 40 I f: 919.467.6008 Dept. of Environmental Quality - Division of Water Resources Non -Discharge Branch Attention: Nathaniel Thornburg 9th Floor - Office 942X 512 N. Salisbury Street Raleigh, NC 27604 WE ARE SENDING YOU THE FOLLOWING ITEMS ❑X Attached ❑ Shop Drawings ❑ Copy of Letter Letter of Transmittal 5/05/2021 JOB NO. 02150098.62 Nathaniel Thornburg Chatham Park - Section 7.1 Phase 1 Reclaimed Water Main Extension Permit FOR ELECTRONIC SUBMITTAL ❑ Under Separate Cover via ❑X Prints ❑ Change Order ❑X Plans ❑ Diskette ❑ Samples ❑X Other ❑ Specifications Check # 5334 1 Plans -11x17 1 Plans - 24x36 FOLDED 1 Cover Letter 1 $480.00 Application Fee Check #5334 1 Reclaimed Water Systems - Project Information Form (RWPI 06-16) 1 Reclaimed Water Systems - Distribution Lines Form (RWDL 06-16) 1 Property Ownership Documentation (Deeds) 1 Technical Specifications 1 Engineering Calculations/ Reclaimed Water Model (by McKim & Creed) 2 CDs with PDFs of submittal documents -HESE ARE TRANSMITTED a� ...,.:cked belov ❑X For approval ❑ For your use ❑ As requested ❑ For review and comment ❑ FOR BIDS DUE ❑ Approved as submitted ❑ Approved as noted ❑ Returned for corrections ❑ Other ❑ Resubmit ❑ Submit ❑ Return copies for approval copies for distribution corrected prints ❑ PRINTS RETURNED AFTER LOAN TO US INL.WIHKKJ. Please contact Lesley England via email at lengland@withersravenel.com or via phone at 919-238-0373 with questions and/or comments. COPY TO: SIGNED: Lesley R. England If enclosures are not as noted, kindly notify us at once DocuSign Envelope ID: 4E8CE50A-9850-4C5F-967E-4301121 EDD37 K:\15\15-0090\150098.62—CP Age Restricted 7.1 and Mellott\CAD\Drawing Sets\Construction\PH1\0.0 COVER.dwg— Friday, April 30, 2021 12:33:52 PM — HEINZMANN, FRANKLIN GENERAL NOTES 1. ALL CONSTRUCTION SHALL CONFORM TO THE TOWN DESIGN AND CONSTRUCTION STANDARDS. 2. CONSTRUCTION DRAWING APPROVAL IS REQUIRED BEFORE CONSTRUCTION ON THIS PROJECT MAY BEGIN. SURVEY BENCHMARK NOTE BENCHMARK IS NC GRID MONUMENT "GUNTER" NAD 83 (2001), N 716,792.43, E 1,954,320.02 NAVD 88/GEOID 12B ELEVATION: 418.86' cHA CONSTRUCTION DRASWEINS FIORN PLAN REVISION CLOUD NOTE REVISION CLOUDS SHOWN ON THE PLANS ARE TO ILLUSTRATE CHANGES REQUESTED BY THE TOWN, VIA THE WRITTEN TOWN 7.1 PLAN REVIEW PROCESS, AND ADDITIONAL DESIGN CHANGES, AS NOTED IN THE CERTIFICATION OF PLAN REVISIONS. SUMMARY INFORMATION DEVELOPMENT NAME: CHATHAM OWNER / DEVELOPER: CHATHAM LOCATION: EAST CHATHAM COUNTY PARCEL #'S (PIN #'S): 90944 1015, ZONING DISTRICT: PDD PROPOSED USE: SINGLE PARK PARK OF 15-501 (9752-18-6885) 7146 (9752-47-0648) FAMILY SECTION 7.1 RESIDENTIAL SUBDIVISION PHASE 1 INVESTORS LLC AND NORTH OF SUTTLES ROAD DB 1809 PG 0167, 7101 (9752-27-6874) DB 1761 PG DB 1963 PG 0998 DETACHED AND RESIDENTIAL TWO-FAMILY SITE DATA \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ SITE DATA PHI ACREAGE 64.701 [AC] ACREAGE THROUGHFARE 1 R1W 12.77 [AC] - ACREAGE TOTAL MINUS RAIN 51.93 [AC] PROPOSED # OF LOTS 154 [EA] SINGLE FAMLY 110 [EA] RESIDENTIAL, TWO-FAMILY 44 [EA] PROPOSED DENSITY 2.38 {MAC] PROPOSED IMPERVIOUS AREA 20.42 [AC] 32% ROADS (PUBLIC) 5.79 [AG) SIDEWALK (PUBLIC) 2.15 [AC] GREENWAYS 0.75 [AC] LOTS 11.73 [AC) - MINIMUM LOT AREA 4200 [SF] MEDIAN LOT AREA 6008 [SF] AVERAGE LOT AREA 6161 [SF] LF OF STREETS 12503 [LF] LF OF 5' SIDEWALK 15295 [LF] LF OF 10' MULTI -USE PATH 1733 [LF] LF OF 10' GREENWAY 3266 [LF] LF OF 18" CURB & GUTTER 5208 [LF] LF OF 30" CURB & GUTTER 17208 [LF] TOTAL LF OF WATERLINE 9293 [LF] LF OF 6" WATERLINE 4616 [LF] _ LF OF 8" WATERUNE 2006 [LF] LF OF 12„ WATERLINE 2671 [LF] LF OF RECLAIMED WATERLINE 2577 ILF] LF OF STORM DRAINAGE 14572 [LF] LF OF SEWER LINES 626211F] PARKING REQUIRED (2 SPACES/UNIT) 308 [EA] PARKING PROVIDED (2 SPACES/UNIT) 308, [EA] ��������������aaaaai SEWER ALLOCATION SEWER ALLOCATION LOT TYPES UNITS FLOW FACTOR :TOTAL (GPD) SINGLE FAMILY 3-BEDROOM 110 3 BR x 60 I 19,800 RESIDENTIAL, TWO-FAMILY 3-BEDROOM 44 3 BR x 60 I 7,920 27,720 SETBACKS SINGLE FAMILY RESIDENTIAL, TWO-FAMILY MINIMUM FRONT SETBACK: 10' 10' MINIMUM TO GARAGE FRONT: 20' - MINIMUM SIDE SETBACK: 3' (8' CORNER) - MINIMUM REAR SETBACK: 10' 10' MINIMUM BUILDING SEPARATION FOR RESIDENTIAL, TWO FAMILY SIDE TO SIDE: 6' REAR TO SIDE: 30' REAR TO REAR: 40' PERSON TO CONTACT REGARDING STAFF COMMENTS OR QUESTIONS: LESLEY R. ENGLAND, P.E. ALICIA ALBINI WITHERSRAVENEL, INC. WITHERSRAVENEL, INC. 115 MacKENAN DRIVE, CARY, NC 27511 aalbini@withersravenel.com FAX: (919) 467-6008 TELEPHONE: (919) 238-0373 lengland@withersravenel.com RESIDENTIAL SUBDIVISION PHASE 1 PITTSBORO, CHATHAM COUNTY NORTH CAROLINA DEVELOPER/OWNER CHATHAM PARK INVESTORS LLC 105 W ESTO N ESTATES WAY CARY, NC 27513 ATTN: MR. CHUCK SMITH, PLA, ASLA TELEPHONE: (919) 481-3000 FAX: (919) 677-8600 VICINITY MAP CHATHAM PARK - 7.1 RESIDENTIAL SUBDIVISION PHASE 1 WR PROJECT NO.: 02150098.62 TOP PROJECT NO.: CD-2020-08 INDEX OF SHEETS Sheet Number Sheet Title 0.0 COVER 0.1 GENERAL NOTES & LEGENDS 1.0 OVERALL EXISTING CONDITIONS 3.0 OVERALL SUBDIVISION PLAN 3.1 SITE PLAN 3.2 SITE PLAN 3.3 SITE PLAN 3.1 SITE PLAN 4.0 OVERALL UTILITY PLAN 4.1 UTILITY PLAN 4.2 UTILITY PLAN 4.3 UTILITY PLAN 4.4 UTILITY PLAN 5.1 ST P.M DP.AINACE PLAN E,.2 ST I1M DRAINAGE PLAN S.3 ST I1M DRAINAGE PLAN E,.4 ST RM I1AIPJACC PLAN G.1 G[ ADIPNG PLAN C.2 CI1A INC PLAN 6.3 GRADING PLAN C.1 CI1A INC PLAN 7.00 ER SI N AND SEDIMENT C NTR L AI TES & CALCULATI NS 7.01 VCRALL [I1 SI N C NTI1 L STAGE 1 7.02 [11 SI N C NTR L STAGE 1 7.04 [11 SI N C PNTfl L STAGE 1 7.05 ER SI PJC NTI1 LSTAGE 1 7.06 VERALL ER SI N C NTR L STAGE 2 7.05 [11 SI N C PNTfl L STAGE 2 7 10 ER SI 8.01 GRANT DRIVE STA. 10+00 - 20+00 PLAN & PROFILE 8.02 GRANT DRIVE STA. 20+00 - 31+00 PLAN & PROFILE 8.03 GRANT DRIVE STA. 31+00 - 42+00 PLAN & PROFILE 8.04 ASPEN AVENUE PLAN & PROFILE 8.05 PROSPECT PLACE PLAN & PROFILE r 8.07 WABASI I STREET PLAN & rfl FILE 8.08 IMACINE WAY (N RTI I) STA. 10100.00 21132.15 PLAN & PR FILE 8.09 IMAGINE WAY (WEST) STA. 10' 00.00 23 22.91 PLAN & PP. FILE 8.10 SEWER UTFALL PLAN & rfl FILE A & B 8.11 SEWER OUTFALL C AND WATER & RECLAIMED OUTFALL PLAN AND PROFILE 8.12 ST RM RAINACC UTFALL PLAN & rn FILE 8.13 ST RM DRAINAGE UTFALL PLAN & NI FILE 8.15 ST RM DRAINAGE UTFALL PLAN & PR FILE 8.17 ST RM DRAINAGE UTFALL PLAN & NI FILE 8.18 ST RA1 DRAINAGE UTFALL PLAN & rn FILE 8.19 ST RM DRAINAGE UTFALL PLAN & PR FILE 9.1 SCM 2 rLAN & DETAILS 9.3 SCM 1 PLAN & DETAILS 9.4 SCM DETAILS SCM DETAILS 10.01 TYPICAL fl ADWAY SECT! NS 10.02 SUBDIVISI Al & R ADWAY DETAILS 10.03 SUBDIVISI N & R ADWAY DETAILS 10.05 WATER 8, SEWER DETAILS 10.07 WATER, RECLAIMED WATER & SEWER DETAILS 10.08 ST RM DRAINAGE DETAILS 10.09 ST RM DRAINAGE DETAILS 10.11 ER SI PJ C PJTR L DETAILS 10.12 NCDEQ NCCO1 PLAN SI !HT L1.1 LANDSCAPE PLAN L1 2 LAN S L1.3 LAAIDSCAFT PLAN L1.4 LANDSCAPE PLAN SCM rLANTINCf L2.0 LAAIDSCAFT DETAILS BOARD OF COMMISSIONERS PLAN APPROVAL PROJECT NAME: CHATHAM PARK SECTION 7.1 RESIDENTIAL SUBDIVISION PHASE 1 PROJECT NUMBER: TOP #SUB-2020-01 APPROVAL DATE: 10/27/2020 PREPARED BY: WithersRavenel Engineers I Planners I Surveyors 115 MacKenan Drive 1 Cary, NC 27511 1 t: 919.469.3340 I license #: C-0832 1 www.withersravenel.com TOWN OF PITTSBORO ENGINEERING: DATE: PLANNING: DATE: PUBLIC WORKS: DATE: FIRE DEPARTMENT: DATE: EROSION CONTROL: DATE: I CERTIFY THAT THESE PLANS WERE PREPARED AND THAT THIS PROJECT SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE FOLLOWING PLANS, THE LATEST EDITION OF THE INFRASTRUCTURE & UTILITY DESIGN AND CONSTRUCTION STANDARDS OF THE TOWN OF PITTSBORO AND OTHER APPLICABLE TOWN ORDINANCES AND POLICIES. THE ENGINEER WHOSE SEAL AND SIGNATURE APPEAR BELOW CERTIFIES THAT THE TOWN OF PITTSBORO DESIGN AND CONSTRUCTION STANDARDS HAVE BEEN THOROUGHLY REVIEWED FOR APPLICABILITY TO THIS PARTICULAR PROJECT. ANY PROPOSED EXCEPTIONS OR DEVIATIONS FROM THE STANDARDS ARE LISTED SPECIFICALLY ON SHEET N/A OF THESE DRAWINGS. FURTHERMORE, THESE PLANS WERE PREPARED IN CONFORMANCE WITH THE APPROVED PRELIMINARY SITE PLAN FOR THIS PROJECT. KNOW WHAT'S BELOW. CALL BEFORE YOU DIG. °°\ `\ C°A R p°° °° ° oo °oFEssio °° %- �o QQ SEAL +9� %� • 0 8 ° 027568 0 • I,° %°°ohs (\iI/ GIN N�� ' Pia°°o ° R EN °°° °0p0000000°pp0°4/30/2021 DocuSign Envelope ID: 4E8CE50A-9850-4C5F-967E-4301121 EDD37 :17 PM - HEINZMANN, FRANKLIN n\PH1\0.1 GENERAL NOTES & LEGENDS.dwg- Friday, April 30, 2021 \CAD\Drawing Sets\Const ed 7.1 and Mello K:\15\15-0090\150098.62-CP Age R ■ WithersRavenel Engineers I Planners I Surveyors 115 MacKenan Drive 1 Cary, NC 27511 1 t: 919.469.3340 1 license #: C-0832 1 www.withersravenel.com GENERAL SITE NOTES: GENERAL UTILITY NOTES: STORM DRAINAGE/GRADING NOTES: 1. PROPERTY BOUNDARY SHOWN AS PROVIDED BY WITHERSRAVENEL, INC. 2. TOPOGRAPHIC SURVEY SHOWN AS PROVIDED BY WITHERSRAVENEL, INC. AND MCKIM&CREED LIDAR. 3. PROPERTY DOES NOT FALL WITHIN FEMA FLOODPLAIN PER FEMA FIRM MAPS 3710975200J, EFFECTIVE DATE FEBRUARY 2, 2007. 4. STORMWATER DISCHARGES INTO TRIBUTARY OF HAW RIVER. 5. THIS PROJECT IS LOCATED IN THE CAPE FEAR RIVER BASIN. 6. THIS PROJECT IS LOCATED IN THE JORDAN LAKE NUTRIENT MANAGEMENT WATERSHED. 7. PER REPORT BY GEOTECHNOLOGIES, INC DATED 03/20/17, THERE ARE NO CORROSIVE SOILS ON SITE. 8. ALL DESIGN AND CONSTRUCTION SHALL BE IN ACCORDANCE WITH TOWN OF PITTSBORO, THE NCDOT ADOPTED COMPLETE STREETS PLANNING AND DESIGN GUIDELINES, AND THE MOST RECENT NCDOT MINIMUM CONSTRUCTION STANDARDS FOR SUBDIVISION ROADS. WORK ON THIS PROJECT SHALL CONFORM TO THESE PLANS, THE LATEST EDITIONS OF THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION (NCDOT) ROAD AND BRIDGE SPECIFICATIONS, THE NCDOT ROAD AND BRIDGE STANDARDS, THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL HANDBOOK, THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL REGULATIONS, CHATHAM COUNTY EROSION CONTROL STANDARDS AND SPECIFICATIONS, TOWN OF PITTSBORO STANDARDS AND SPECIFICATIONS, THE FINAL GEOTECHNICAL REPORT, AND GENERAL DESIGN STANDARDS. IN THE EVENT OF CONFLICT BETWEEN ANY OF THESE STANDARDS, SPECIFICATIONS, OR PLANS, THE MOST STRINGENT SHALL GOVERN UNLESS OTHERWISE NOTED IN THESE PLANS. 10. ANY DISCREPANCIES FOUND BETWEEN THE DRAWINGS AND SPECIFICATIONS AND SITE CONDITIONS OR ANY INCONSISTENCIES OR AMBIGUITIES IN DRAWINGS OR SPECIFICATIONS SHALL BE IMMEDIATELY REPORTED TO THE ENGINEER, IN WRITING, WHO SHALL PROMPTLY ADDRESS SUCH INCONSISTENCIES OR AMBIGUITIES. WORK DONE BY THE CONTRACTOR AFTER THE DISCOVERY OF SUCH DISCREPANCIES, INCONSISTENCIES, OR AMBIGUITIES SHALL BE DONE AT THE CONTRACTORS RISK. 11. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL JOB -SITE SAFETY, INCLUDING BUT NOT LIMITED TO TRENCH SAFETY, DURING ALL PHASES OF CONSTRUCTION. 12. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING AND LOCATING ALL EXISTING UTILITIES PRIOR TO STARTING CONSTRUCTION. LOCATION OF EXISTING UTILITIES SHOWN ON PLANS IS BASED ON BEST AVAILABLE INFORMATION BUT CAN BE CONSIDERED ONLY AS APPROXIMATE. 13. THE CONTRACTOR SHALL PROTECT ALL SIGNS, MANHOLES, TELEPHONE RISERS, WATER VALVES, ETC. DURING ALL PHASES OF CONSTRUCTION. THE CONTRACTOR SHALL REPAIR, AT THEIR OWN EXPENSE, ANY EXISTING UTILITIES DAMAGED DURING CONSTRUCTION. 14. TRAFFIC CONTROL ON PUBLIC STREETS IS THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE IN CONFORMANCE WITH THESE PLANS, THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES, AND AS FURTHER DIRECTED BY THE TOWN OF PITTSBORO AND NCDOT. 15. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING OR OBTAINING ALL REQUIRED PERMITS AND APPROVALS PRIOR TO COMMENCING CONSTRUCTION. 16. ALL ENVIRONMENTAL PERMITS APPLICABLE TO THE PROJECT MUST BE OBTAINED FROM NCDWQ, USACE, AND/OR FEMA FOR ANY RIPARIAN BUFFER, WETLANDS AND/OR FLOODPLAIN IMPACTS (RESPECTIVELY) PRIOR TO COMMENCING CONSTRUCTION. 17. NCDOT ENCROACHMENT AGREEMENTS ARE REQUIRED FOR ANY UTILITY WORK (INCLUDING MAIN EXTENSIONS AND/OR SERVICE TAPS) OR ROADWAY CONSTRUCTION WITHIN STATE ROW PRIOR TO COMMENCING CONSTRUCTION. 18. R/Ws LABELED AS PUBLIC WILL BE DEDICATED TO THE TOWN OF PITTSBORO WITH THE FINAL PLAT. 1. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE LATEST TOWN OF PITTSBORO STANDARD SPECIFICATIONS AND DETAILS. 2. ALL CONSTRUCTION WITHIN THE NCDOT PUBLIC RIGHT-OF-WAY SHALL BE IN ACCORDANCE WITH THE LATEST NCDOT STANDARD SPECIFICATIONS. 3. ALL STORM DRAINAGE SHALL BE CLASS III RCP UNLESS OTHERWISE NOTED. 4. ALL UTILITY LINES SHALL HAVE EASEMENTS CENTERED ON THE LINES UNLESS LOCATED COMPLETELY IN ROAD RW. 5. WATERLINE SHALL BE 2' MINIMUM OFF EDGE OF PAVEMENT UNLESS SHOWN OTHERWISE. ALL WATER LINES SHALL BE DUCTILE IRON PIPE. WATERLINE SHALL BE INSTALLED AT A MINIMUM DEPTH OF 3' FROM FINISHED GRADE. 6. A 3' - 5' CLEARANCE SHALL BE MAINTAINED AROUND ALL FIRE HYDRANTS, INCLUDING CLEARANCE FROM TREES AND SHRUBS. 7. WATER MAINS SHALL BE LAID AT LEAST 10 FEET LATERALLY FROM EXISTING OR PROPOSED RECLAIMED/SEWERS, UNLESS LOCAL CONDITIONS OR BARRIERS PREVENT A 10-FOOT LATERAL SEPARATION, IN WHICH CASE: THE WATER MAIN IS LAID IN A SEPARATE TRENCH, WITH THE ELEVATION OF THE BOTTOM OF THE WATER MAIN AT LEAST 18 INCHES ABOVE THE TOP OF THE RECLAIMED/SEWER; OR, THE WATER MAIN IS LAID IN THE SAME TRENCH AS THE SEWER WITH THE WATER MAIN LOCATED AT ONE SIDE ON A BENCH OF UNDISTURBED EARTH, AND WITH THE ELEVATION OF THE BOTTOM OF THE WATER MAIN AT LEAST 18 INCHES ABOVE THE TOP OF THE RECLAIMED/SEWER. g WHEN A WATER MAIN MUST CROSS OVER A RECLAIMED WATER AND/OR SEWER MAIN, THE BOTTOM OF THE WATER MAIN SHALL BE AT LEAST 18 INCHES ABOVE THE TOP OF THE RECLAIMED WATER AND/OR SEWER MAIN. IF THIS SEPARATION CANNOT BE OBTAINED WHILE MAINTAINING THE REQUIRED COVER, BOTH THE WATER AND RECLAIMED WATER AND/OR SEWER MAINS SHALL BE DUCTILE IRON PIPE, WITH JOINTS EQUIVALENT TO WATER MAIN STANDARDS, FOR 10 FEET ON EACH SIDE OF THE POINT OF CROSSING. A JOINT OF WATER MAIN PIPE SHALL BE CENTERED AT THE POINT OF CROSSING. 9. WHEN A WATER MAIN MUST CROSS UNDER A RECLAIMED WATER AND/OR SEWER MAIN, BOTH THE WATER AND RECLAIMED WATER AND/OR SEWER MAINS SHALL BE DUCTILE IRON PIPE, WITH JOINTS EQUIVALENT TO WATER MAIN STANDARDS, FOR 10 FEET ON EACH SIDE OF THE POINT OF CROSSING. A SECTION OF WATER MAIN PIPE SHALL BE CENTERED AT THE POINT OF CROSSING. VERTICAL SEPARATION BETWEEN THE TOP OF THE WATER MAIN AND THE BOTTOM OF THE RECLAIMED WATER AND/OR SEWER MAIN SHALL BE MINIMUM 18 INCHES. 10. WHEN A WATER MAIN PIPE CROSSES OVER OR UNDER A STORM SEWER, VERTICAL SEPARATION BETWEEN THE PIPES SHALL BE MINIMUM 18 INCHES UNLESS BOTH PIPES ARE DUCTILE IRON OR ENCASED IN CONCRETE FOR 10 FEET EITHER SIDE OF THE CROSSING. 11. SANITARY SEWER MAINS SHALL HAVE A MINIMUM VERTICAL SEPARATION OF 18 INCHES BETWEEN STORM SEWERS. 12. CONTRACTOR SHALL VERIFY LOCATION OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION. LOCATION OF EXISTING UTILITIES SHOWN ON PLANS IS BASED ON BEST AVAILABLE INFORMATION BUT CAN BE CONSIDERED ONLY AS APPROXIMATE. 13. SEWER LINES AND SERVICES INSTALLED WITH A DEPTH OF COVER LESS THAN 3' OR OVER 20 FEET SHALL REQUIRE 1. ALL AREAS SHALL BE GRADED FOR POSITIVE DRAINAGE, AND AS SHOWN ON THESE PLANS. THE CONTRACTOR SHALL MAINTAIN ADEQUATE SITE DRAINAGE DURING ALL PHASES OF CONSTRUCTION. IN ADDITION TO THE MEASURES SHOWN IN THESE PLANS, THE CONTRACTOR SHALL USE INTERIM DIVERSION DITCHES, BERMS, OR OTHER METHODS AS REQUIRED TO DIRECT DRAINAGE AS SHOWN ON THESE PLANS AND TO PREVENT SILT AND CONSTRUCTION DEBRIS FROM FLOWING ONTO ADJACENT PROPERTIES OR ROADWAYS. 2. CONTRACTOR SHALL COORDINATE WITH THE UTILITY COMPANIES FOR ANY REQUIRED UTILITY ADJUSTMENTS AND/OR RELOCATIONS. 3. ALL MATERIALS USED FOR BACKFILL SHALL BE FREE OF WOOD, ROOTS, ROCKS, BOULDERS, OR ANY OTHER NON -COMPATIBLE SOIL TYPE MATERIAL. UNSATISFACTORY MATERIALS ALSO INCLUDE MAN-MADE FILLS AND REFUSE DEBRIS DERIVED FROM ANY SOURCE. ALL FILL MATERIAL SHALL BE TESTED AND APPROVED BY PROJECT GEOTECHNICAL ENGINEER. ALL FILL SHALL BE PLACED IN ACCORDANCE WITH PROJECT GEOTECHNICAL ENGINEER DIRECTION AND RECOMMENDATIONS. TESTING RESULTS SHALL BE PROVIDED TO OWNER TO VERIFY PROPER PLACEMENT. 4. MATERIALS USED TO CONSTRUCT EMBANKMENTS FOR ANY PURPOSE, BACKFILL AROUND DRAINAGE STRUCTURES, OR IN UTILITY TRENCHES FOR ANY OTHER DEPRESSION REQUIRING FILL OR BACKFILL SHALL MEET THE REQUIREMENTS OF THE FINAL GEOTECHNICAL REPORT RECOMMENDATIONS. 5. THE CONTRACTOR SHALL, PRIOR TO ANY OPERATIONS INVOLVING FILLING OR BACKFILLING, SUBMIT THE RESULTS OF THE PROCTOR TEST TOGETHER WITH A CERTIFICATION THAT THE SOIL TESTED IS REPRESENTATIVE OF THE MATERIALS TO BE USED ON THE PROJECT. TESTS SHALL BE CONDUCTED BY A CERTIFIED MATERIALS TESTING LABORATORY AND CERTIFICATIONS MADE BY A LICENSED PROFESSIONAL ENGINEER REPRESENTING THE LABORATORY. ALL SOIL USED SHALL BE IN ACCORDANCE WITH PROJECT GEOTECHNICAL ENGINEER REQUIREMENTS. 6. ALL DEMOLITION DEBRIS AND OTHER EXCESS MATERIAL SHALL BE HAULED OFF -SITE. 7. REFERENCE STRUCTURAL DRAWINGS AND SPECIFICATIONS AND GEOTECHNICAL REPORT FOR BUILDING PAD AND PAVING SUBGRADE INFORMATION. 8. PROPOSED CONTOURS AND GUTTER GRADIENTS ARE APPROXIMATE. PROPOSED SPOT ELEVATIONS ARE TO BE USED IN CASE OF DISCREPANCY. 9. CONTRACTOR SHALL OBTAIN ALL PERMITS REQUIRED FOR BLASTING ROCK IF BLASTING ROCK IS ENCOUNTERED. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR COMPLYING WITH ALL BLASTING AND SAFETY REQUIREMENTS. 10. CONTRACTOR SHALL INCLUDE IN THE CONTRACT PRICE ANY DEWATERING NECESSARY TO CONSTRUCT THE PROJECT AS SHOWN ON THE PLANS. 11. CONTRACTOR SHALL VERIFY AND COORDINATE ALL DIMENSIONS SHOWN, INCLUDING THE HORIZONTAL AND VERTICAL LOCATION OF CURB INLETS AND GRATE INLETS AND ALL UTILITIES CROSSING THE STORM SEWER. 12. CONTRACTOR SHALL PROVIDE ALL MATERIALS AND APPURTENANCES NECESSARY FOR COMPLETE INSTALLATION OF THE STORM SEWER. 13. ALL RCP STORM SEWER SHALL BE MINIMUM CLASS III REINFORCED CONCRETE PIPE, UNLESS OTHERWISE NOTED. I I CONSTRUCTION DRAWINGS FOR CHATHAM PARK SECTION 7.1 RESIDENTIAL SUBDIVISION PHASE 1 PITTSBORO, CHATHAM COUNTY, NORTH CAROLINA DUCTILE IRON PIPE FOR THE ENTIRE RUN BETWEEN MANHOLES OR CLEANOUTS. 14. THE LOCATIONS OF EXISTING STORM SEWER STRUCTURES SHOWN ON THESE PLANS ARE APPROXIMATE. WHERE GENERAL NOTES: 14. ALL MANHOLES LOCATED OUTSIDE OF PAVED AREAS SHALL BE INSTALLED BETWEEN 2 AND 3 FEET ABOVE FINISHED GRADE. PROPOSED STORM SEWER PIPING TIES TO EXISTING STRUCTURES, PIPES, SWALES, ETC., THE CONTRACTOR SHALL FIELD ADJUST PROPOSED STORM SEWERS TO MATCH THE LOCATIONS OF THESE EXISTING FEATURES. THE PERMITEE OR DESIGNEE SHALL SCHEDULE THE PRE -CONSTRUCTION MEETING SEVEN (7) DAYS PRIOR TO COMMENCING WORK WITH THE TOWN OF PITTSBORO PUBLIC UTILITIES INSPECTOR AT (919) 533-5480 OR JDAVIS@PITTSBORONC.GOV. 15. FOR 8"-12" SEWER LINES, 4' DIA MANHOLES SHALL BE USED FOR DEPTHS UP TO 12', 5' DIA MANHOLES FOR DEPTHS FROM 12' TO 20', AND 6' DIA MANHOLES FOR DEPTHS GREATER THAN 20'. 15. CONTRACTOR SHALL REMOVE ALL TOPSOIL THAT IS DETERMINED BY THE PROJECT GEOTECHNICAL ENGINEER TO BE UNSUITABLE. 2. THE PERMITEE OR DESIGNEE SHALL NOTIFY THE TOWN PUBLIC UTILITIES OFFICE FORTY-EIGHT (48) HOURS PRIOR TO STARTING EACH PHASE OF CONSTRUCTION AT (919)-533-5480, EXCLUDING 16. THERE SHALL BE NO DIRECT CROSS CONNECTIONS BETWEEN THE RECLAIMED WATER AND POTABLE WATER SYSTEMS. WEEKENDS AND HOLIDAYS. ONCE THE WORK HAS BEGUN, AT LEAST A FORTY-EIGHT (48) HOUR NOTICE SHALL BE GIVEN PRIOR TO ANY SORT OF DISRUPTION TO THE TOWN'S SERVICES SUCH AS WORKING IN A TOWN ROADWAY, TAPPING WATER MAINS, PLUGGING SEWER, ETC. NO WORK SHALL BE PERFORMED ON WEEKENDS, AFTER WORK HOURS OR HOLIDAYS UNLESS GIVEN PRIOR APPROVAL. IN ALL CASES WHERE RECLAIMED AND MUNICIPAL POTABLE WATER ARE SUPPLIED TO THE SAME STRUCTURE AND/OR OTHER SAME FACILITY, A REDUCED PRESSURE PRINCIPAL BACKFLOW PREVENTER SHALL BE PROVIDED ON THE MUNICIPAL POTABLE WATER SERVICE. THE PRIVATELY OWNED AND MAINTAINED RECLAIMED WATER SERVICE PIPING WATERSHED NOTES: NOTIFICATION MUST BE PROVIDED BY DIRECT COMMUNICATION. VOICE MAIL OR EMAIL WILL NOT BE A CONSIDERED NOTIFICATION UNLESS ADEQUATELY RESPONDED TO BY A TOWN OF PITTSBORO REPRESENTATIVE. THE PERMITEE OR DESIGNEE SHALL BE RESPONSIBLE FOR NOTIFYING ALL CUSTOMERS AFFECTED BY SERVICE INTERRUPTIONS. THE TOWN OF PITTSBORO WILL NOT APPROVE SERVICES INTERRUPTIONS UNTIL PROOF IS PROVIDED THAT PROPER CUSTOMER NOTIFICATIONS HAVE BEEN PROVIDED. TOWN OF PITTSBORO CURRENT STANDARD SPECIFICATIONS AND DETAILS ARE AVAILABLE ONLINE AT PITTSBORONC.GOV, UNDER THE ENGINEERING DEPARTMENT PAGE. THE CONTRACTOR SHALL UNCOVER ALL EXISTING TOWN UTILITY LINES BEING TIED INTO TO VERIFY THEIR TYPE, CONDITION, LOCATION, INVERT, SLOPE, AND ANY OTHER INFORMATION NEEDED TO DETERMINE THAT THE UTILITY CONNECTION WILL FUNCTION AS DESIGNED. THE CONTRACTOR IS RESPONSIBLE FOR MAKING ANY REPAIRS NECESSARY TO THE LATERAL OR MAIN LINES OF THE TOWN WATER, RECLAIMED WATER, SANITARY SEWER, AND/OR STORM DRAIN SYSTEM NECESSARY FOR THE CONNECTION TO FUNCTION AS DESIGNED. THE CONTRACTOR SHALL LOCATE OR HAVE LOCATED ALL EXISTING UNDERGROUND PRIVATE UTILITIES (ELECTRIC, TELEPHONE, PIPELINES, ETC.) AND STRUCTURES IN ADVANCE OF CONSTRUCTION AND SHALL ELIMINATE ALL CONFLICTS PRIOR TO START OF CONSTRUCTION. (NOTE: NORTH CAROLINA 811 PROVIDES A COMMUNICATIONS LINK WITH YOUR LOCAL UTILITY PROVIDERS. CONTRACTOR PROVIDES INFORMATION ABOUT EXCAVATION; NC 811 TRANSMITS THE INFORMATION TO THE UTILITIES AND SENDS OUT LOCATORS TO MARK YOUR UNDERGROUND LINES FOR FREE. CALL 811 OR 1-800-632-4949 THREE WORKING DAYS BEFORE DIGGING.) BACKFILLING SHALL NOT BE STARTED UNTIL LINES ARE APPROVED BY THE TOWN INSPECTOR, AND GEOTECHNOLOGICAL FIRM. ALL BACKFILL SHALL BE #78 STONE, SCREENINGS, OR NATIVE MATERIAL UNLESS OTHERWISE APPROVED ON THE PLANS, AND SHALL BE INSTALLED IN ACCORDANCE WITH, TYPE I TO 95% COMPACTION. BACKFILL PLACEMENT AND SURFACE REPLACEMENT SHALL BE IN ACCORDANCE WITH 16" MIN DEPTH ABC SHELF. 6. AN APPROVED SET OF PLANS SHALL BE MAINTAINED ON THE JOB SITE AT ALL TIMES THAT WORK IS IN PROGRESS. DEVIATION FROM THE PLANS SHALL NOT BE ALLOWED WITHOUT AN APPROVED PLAN REVISION 7. THE CONTRACTOR SHALL SUPPLY THE TOWN INSPECTOR CONSTRUCTION MATERIAL TESTING DOCUMENTATION THROUGHOUT THE PROJECT. AND OTHER APPURTENANCES SHALL BE IDENTIFIED IN CONFORMANCE WITH THE NORTH CAROLINA PLUMBING CODE. WHEN RECLAIMED WATER DISTRIBUTION MAINS ARE UNAVAILABLE, BUT PLANNED FOR FUTURE CONSTRUCTION IN ACCORDANCE WITH THE RECLAIMED WATER SYSTEM MASTER PLAN; ANY SERVICE LINES TO SECONDARY WATER USE FACILITIES, SHALL BE CONSTRUCTED IN ACCORDANCE WITH RECLAIMED WATER STANDARDS AS DESCRIBED HEREIN INCLUDING ALL REQUIREMENTS COLOR AND TEXT IDENTIFICATION. 17. CROSSING A WATER MAIN OVER A SEWER. WHENEVER IT IS NECESSARY FOR A WATER MAIN TO CROSS OVER A RECLAIMED/SEWER, THE WATER MAIN SHALL BE LAID AT SUCH AN ELEVATION THAT THE BOTTOM OF THE WATER MAIN IS AT LEAST 18 INCHES ABOVE THE TOP OF THE SEWER, UNLESS LOCAL CONDITIONS OR BARRIERS PREVENT AN 18 INCH VERTICAL SEPARATION - IN WHICH CASE BOTH THE WATER MAIN AND SEWER SHALL BE CONSTRUCTED OF DUCTILE IRON MATERIALS AND WITH JOINTS EQUIVALENT TO WATER MAIN STANDARDS (RESTRAINED) FOR A DISTANCE OF 10 FEET ON EACH SIDE OF THE POINT OF CROSSING. 18. CROSSING A WATER MAIN UNDER RECLAIMED WATER, OR SANITARY SEWER. WHENEVER IT IS NECESSARY FORA WATER MAIN TO CROSS UNDER A SEWER, BOTH THE WATER MAIN AND THE SEWER SHALL BE CONSTRUCTED DUCTILE IRON AND WITH RESTRAINED JOINTS EQUIVALENT TO WATER MAIN STANDARDS FOR A DISTANCE OF 10 FEET ON EACH SIDE OF THE POINT OF CROSSING. A SECTION OF WATER MAIN PIPE SHALL BE CENTERED AT THE POINT OF CROSSING. WHERE DUCTILE IRON PIPE CANNOT BE USED (EXISTING PIPING) THE WATER, RECLAIMED/SEWER SHALL BE ENCASED WITH QUICK SET, NON -EXCAVATE FLOWING FILL EXTENDING THREE (3') FEET ON BOTH SIDES OF THE CROSSING. RECLAIMED WATER DISTRIBUTION LINES SHALL MEET THE SEPARATION DISTANCES TO SEWER LINES IN ACCORDANCE WITH 15A NCAC 02T .0305. ALL PIPING SHALL BE RESTRAINED MJ SLEEVES, OR OTHER APPROVED COUPLINGS, AND WRAPPED WITH PURPLE POLYETHYLENE WRAP AS SPECIFIED. 19. RECLAIMED WATER DISTRIBUTION LINES SHALL NOT BE LESS THAN 50 FEET FROM A PUBLIC WELL UNLESS THE PIPING THE PROPOSED DEVELOPMENT IS WITHIN THE JORDAN LAKE WATERSHED AND THEREFORE MUST MEET STATE AND LOCAL STORMWATER MANAGEMENT REQUIREMENTS AS OUTLINED IN THE TOWN OF PITTSBORO STORMWATER ORDINANCE AS WELL AS THE STORMWATER ELEMENTS DEFINED IN THE CHATHAM PARK PDD. THE FOLLOWING REQUIREMENTS APPLY TO THE SUBJECT SITE: • STORMWATER SYSTEMS SHALL BE DESIGNED TO CONTROL AND TREAT THE RUNOFF GENERATED FROM ALL SURFACES BY ONE INCH OF RAINFALL. THE TREATMENT VOLUME SHALL BE DRAWN DOWN PURSUANT TO STANDARDS SPECIFIC TO EACH PRACTICE AS PROVIDED IN THE NCDEQ DESIGN MANUAL. TO ENSURE THAT THE INTEGRITY AND NUTRIENT PROCESSING FUNCTIONS OF RECEIVING WATERS AND ASSOCIATED RIPARIAN BUFFERS ARE NOT COMPROMISED BY EROSIVE FLOWS, STORMWATER FLOWS FROM THE DEVELOPMENT SHALL NOT CONTRIBUTE TO DEGRADATION OF WATERS OF THE STATE. AT A MINIMUM, THE DEVELOPMENT SHALL NOT RESULT IN A NET INCREASE IN PEAK FLOW LEAVING THE SITE FROM PRE -DEVELOPMENT CONDITIONS FOR THE ONE-YEAR, 24-HOUR STORM EVENT. • NITROGEN AND PHOSPHORUS LOADS CONTRIBUTED BY THE PROPOSED NEW DEVELOPMENT SHALL NOT EXCEED THE FOLLOWING UNIT -AREA MASS LOADING RATES: 3.80 AND 1.43 POUNDS PER ACRE PER YEAR FOR NITROGEN AND PHOSPHORUS, RESPECTIVELY, FOR THE OVERALL PDD BOUNDARY. • ALL STORMWATER SYSTEMS USED TO MEET THESE REQUIREMENTS SHALL BE DESIGNED TO HAVE A MINIMUM OF 85% AVERAGE ANNUAL REMOVAL FOR TOTAL SUSPENDED SOLIDS (TSS). • CONTROL POST -DEVELOPMENT STORMWATER RUNOFF RATES SO THAT THERE IS NO INCREASE IN PEAK FLOW RATES FROM THE PRE -DEVELOPMENT CONDITION FOR THE 1-YEAR, 2-YEAR, 5-YEAR AND 10-YEAR 24-HOUR DURATION STORM EVENTS AT THE WATERSHED LEVEL. • THE CHATHAM PARK PDD SHALL HAVE A MAXIMUM IMPERVIOUS DENSITY OF 70%. FOR ADDITIONAL INFORMATION PLEASE CONTACT THE STORMWATER ADMINISTRATOR. I I GENERAL NOTES & LEGENDS AND INTEGRITY TESTING PROCEDURES MEET WATER MAIN STANDARDS APPROVED BY THE TOWN ENGINEER, OR UTILITY DIRECTOR, BUT IN NO CASE SHALL THEY BE LESS THAN 25 FEET FROM A PRIVATE WELL. 8. EXISTING VALVES SHALL BE OPERATED ONLY BY TOWN OF PITTSBORO STAFF OR IN CASE OF AN EMERGENCY, IN THE PRESENCE OF TOWN STAFF. THE TOWN REQUIRES A 48-HOUR NOTICE FOR SYSTEM SHUTDOWNS. CONTRACTOR IS REQUIRED TO NOTIFY AFFECTED CUSTOMERS 24-HOURS PRIOR TO SHUTTING DOWN. BUSINESSES MAY REQUIRE AFTER HOUR SHUTDOWNS. RESIDENTIAL FLOWS AFTER SHUTDOWN MAY REQUIRE A PUMP. CONTRACTOR IS RESPONSIBLE TO INSTALL 2" TAPS TO RELIEVE PRESSURE AND ALLEVIATE RESIDUAL FLOWS WHEN NEEDED. 20. ALL PRIVATELY OWNED, AND MAINTAINED RECLAIMED WATER SERVICE PIPING, AND APPURTENANCES SHALL BE EASEMENT ABBREVIATION LEGEND 9. NO BURNING OF DEMO DEBRIS DURING CLEARING AND GRUBBING. IDENTIFIED IN CONFORMANCE WITH NORTH CAROLINA PLUMBING CODE. 21. EASEMENTS LABELED AS PUBLIC WILL BE DEDICATED TO THE TOWN OF PITTSBORO WITH THE FINAL PLAT DE PUBLIC DRAINAGE EASEMENT PDE PRIVATE DRAINAGE EASEMENT DHMAE PUBLIC DRAINAGE AND HEADWALL MAINTENANCE 10. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS PRIOR TO CONSTRUCTION. 11. PRIOR TO ANY CONSTRUCTION IN THE PUBLIC RIGHT-OF-WAY, THE CONTRACTOR/DEVELOPER SHALL NOTIFY THE TOWN INSPECTOR OF ANY CONSTRUCTION WITHIN THE PUBLIC RIGHT-OF-WAY. IT SHALL BE RESTORED TO ORIGINAL CONDITIONS USING THE FOLLOWING REQUIREMENTS: A. ALL TREES IMPACTED BY CONSTRUCTION THAT ARE NOT PART OF THE APPROVED PLANS, SHALL BE REPLACED WITH THE SAME SIZE AND TYPE OF TREE AT A LOCATION DETERMINED BY THE TOWN. B. ALL IRRIGATION SYSTEMS SHALL BE RESTORED TO FULLY FUNCTIONING STATUS. ANY IRRIGATION LOCATED BENEATH ASPHALT OR CONCRETE SHALL BE SLEEVED WITH SCHEDULE 40 PVC TWO NOMINAL SIZES LARGER. C. LANDSCAPE BEDDING SHALL BE OF A SIZE AND COLOR TO MATCH EXISTING BEDDING AND SHALL BE SPREAD A MINIMUM OF TWO INCHES THICK. ACCESS EASEMENT GE PUBLIC GREENWAY EASEMENT MUPE PUBLIC MULTI -USE PATH EASEMENT PUDE PRIVATE UTILITY/DRAINAGE EASEMENT UE PUBLIC UTILITY EASEMENT PUE PRIVATE UTILITY EASEMENT PSCSAE PRIVATE STORMWATER CONTROL STRUCTURE AND ACCESS EASEMENT SDTE PUBLIC SIGHT DISTANCE EASEMENT SSE PUBLIC SANITARY SEWER EASEMENT PSSE PRIVATE SANITARY SEWER EASEMENT PSLE PRIVATE SIGN AND LANDSCAPE EASEMENT PMKE PRIVATE MAIL KIOSK EASEMENT D. THE ENGINEERING DEPARTMENT AND PUBLIC WORKS DEPARTMENT SHALL BE CONTACTED TO INSPECT ALL WORK BEFORE A CERTIFICATE OF OCCUPANCY IS ISSUED. 12. ANY WORK PERFORMED WITHOUT THE APPROVAL OF THE TOWN PUBLIC UTILITIES DIRECTOR, OR DESIGNEE, AND/OR ALL WORK AND MATERIAL NOT IN CONFORMANCE WITH THE SPECIFICATIONS IS SUBJECT TO REMOVAL AND REPLACEMENT AT THE CONTRACTORS EXPENSE. 13. THE TOWN OF PITTSBORO IS NOT RESPONSIBLE FOR LIABILITY INCURRED DUE TO DELAYS AND/OR DAMAGES TO UTILITIES IN CONJUNCTION WITH THIS CONSTRUCTION. THE TOWN WILL NOT PARTICIPATE IN THE COST OF CONSTRUCTION OR UTILITY RELOCATION. 14. NO FINAL ACCEPTANCE SHALL BE ISSUED UNTIL A FLASH DRIVE AND ONE (1) SET OF RECORD DRAWINGS, CERTIFIED AND SEALED BY A REGISTERED PROFESSIONAL ENGINEER, HAVE BEEN SUBMITTED AND ACCEPTED BY THE TOWN ENGINEER. 15. CONSTRUCTION OF CONCRETE OR PAVING ITEMS SHALL NOT COMMENCE UNTIL ALL UNDERGROUND WORK HAS BEEN INSPECTED, TESTED, AND APPROVED. 16. DISPOSAL OF AND STOCKPILING OF EXCESS MATERIAL WITHIN THE PITTSBORO TOWN LIMITS OR PLANNING AREA SHALL BE DONE IN SUCH A WAY THAT WILL NOT CREATE A NUISANCE, AND MUST BE DONE IN ACCORDANCE TO THE APPROVED PLANS. THE PLACING OF MATERIAL ON PRIVATE PROPERTY OF ANOTHER REQUIRES WRITTEN AUTHORIZATION. 17. TRAFFIC CONTROL SHALL BE MAINTAINED IN ACCORDANCE WITH THE NCDOT AND MUTCD SPECIFICATIONS. 18. THE CONTRACTOR SHALL PROVIDE ADEQUATE MEANS FOR CLEANING TRUCKS AND/OR OTHER EQUIPMENT OF MUD PRIOR TO ENTERING PUBLIC STREETS. IT IS THE CONTRACTORS RESPONSIBILITY TO CLEAN STREETS, ALLAY DUST, AND TAKE WHATEVER MEASURES ARE NECESSARY TO ENSURE THAT ALL ROADS ARE MAINTAINED IN A CLEAN, MUD AND DUST -FREE CONDITION AT ALL TIMES. THE CONTRACTOR SHALL UTILIZE A STREET SWEEPER FOR STREET CLEANING. 19. ANY CONSTRUCTION DETOURS WILL REQUIRE AN ALL-WEATHER ROAD SURFACE. Job No. 02150098.62 Drawn By TE Date 11/09/20 Designer FH 000000000o° oo°o` N C A R oo°OOO po (� oo0000000 °o ARP- o°= °`o °°�FESS/�'° oo°°oo Q- by , o Q SEAL o 0 0 g o 027568 0 0 ° y EN R . °°° °O0Q°0000000°p0° 4/30/2021 Revisions REVISION PER TOP 1 01/25/21 COMMENTS 2 REVISION PER DEQ 04/30/21 COMMENTS Sheet No. 0.1 DocuSign Envelope ID: 4E8CE50A-9850-4C5F-967E-4301121 EDD37 n\PH1\1.0 OVERALL EXISTING CONDITIONS.dwg- Friday, April 30, 2021 12:39:03 PM - HEINZMANN, FRANKLIN \CAD\Drawing Sets\Const ed 7.1 and Mello K:\15\15-0090\150098.62-CP Age R -��\� � i / // / // ,� ll l '�' � � / it /' \� / � '� � l � � / / / (�.. I� I I // I I / / // ��/- \`/ /-- /� ��� � � � /• / , /� � ' "'/ _ _ -- �\ \— � \ =\\ --J / //� / / / //// /l// lI/I lIl I11 1_ \, \ - /_ \ �_� ,� / ///�///� ` 111 1( I 1 /�� �� I ( / -\ / / \ \ 1 l / / /�- // // �___�\ \\ \ \ \ "\\\ \,'��J/ii // // /i// ///// /l// IIII III // r 1 -��.,� s. s � o, � s - _ ,� l �r/l � �\ � 1 r 1 /^\�/' \\ / /' / / // / / \ z--- --_////// // / I II )1 �/-/ Q h (i1 \ / / // /// / 111 f I r ` �/ / / / / - - \ - ��\ \�� I o 0 0 0 � _� I I 1 1 �_ / \ -�\�\\)\ \\ _ / / �/ / / // / / / // I l l J 1 / 1 I / 1 / 1 / �_ i / \ \ �� 4 �\ l \ / //// \ - % \ \ 1 I I / / \ / / , - _ / ' MARY VALERIE BALLIT J / ( ) / / / J / ' / '� / / 1�\ \ \ I \ \ \ \ \ \ - \ �` \ / / / / / /// / / l l / lI I I I / / \ I -_ /� / \ o IIII .. /l/I/l-, 1 111 \ `\ ^ / _ _ J / / / / / // ( �✓ I \ \ \ \ _-� , \\ // /// // // / // / /l ///l I - I ��, _ I , \ 1 \ \ \ \\ \ 1 J / / \ / - J� DB 721 PG 152 / / s \ \ \\� l ' ! / / // / � / / � ll /� l l I I l I I \ / � _ � � / �. � � f � I I // � / �\ I � � \ � � / � � / i I� l / I 1 1 \ \\ 11 f / I�� �� I �) I / / � - / � � GESUALDO A COSTANZO, CO -TRUSTEES � / / / / / / / � �// �o� ✓ _ � \ ( .i % `�\ 1 � \ \ \ \ IIII\ _ / / / / //, // / / /// ///� / /� /// / I I / I � �� \ -�� _-� — t .,.._�,�� \ / i � / / 1 1 I ( / I � \ / �//, � � / � / I � )�i�/ //� l /, \ � % � l � � o BM. 94 PG. 153 � / o�` / / / / �/ � I \ / \ ( \ \ \ � � \ \ \ + \ � j ���%/ , -//, „//� / \ 4j = _ ---� �. .I / / / / \ \ \ \I III (/>>»<<` / / ' /�'/(/)1'�r/r`/i `_ 1--,_ � /I / /---� _/ PI 4 / r \ _ \\\ \\ ��///� �i�'ii�/�� / 0 J _��� / _ / ZONERA2 / / / / / / / \ \ \ \ Q\ IIII \ \� / / / �i/ - - \ - N 9753 40 236 / / / / / / / i % \ \ \ 1■���;%� ��/� - / ,--_/�' _ \\ \ \ 111 1 1 1 I \ Il /� I �l III/ l l �� I ( _ -__ 1 \ \-/ / / / / / r / / \\ \ \ 1-\1 \ `\�__,� / / \� / I �i� / / \ \ \ 1 ( 1 I/� 1 J/ (I `Z\ N/F \ / ( �- _ l \ / / / / / / �__ \ �\ �-� /i// C/ / 410 � '�a..��� __�����.'� -1 - \ I \ I 1 \ II 11 I/ l r ( \\ter _mil <�� \ \ J J --- -J \ \ / // / // / / \ \----^\\ \ \\� - / /J \ / — - - \ v - __- \ \ - �� \\\ \ \\ \\\ 1 1 \ \ 11\ �( I I Y l l/ \\�\//�i A&JDB.N96RPG 207LLC \\J�� ( / \ 1 \ \ \ ` ,_ // / \ / - _ 1 \ \ /� X`\/ \ IIII 1 \ / / \ / / / / �_-__ \ - I � ter � �/J \ / \ \ \ \ \ 1 IIII I 1 \ J ( �) // / / BM. 19 PG. 6 1 (- v �\ \ \ \ I \ -- _ — / / / \ /�� 1 _ J \ / ` \ J \ \ y `` / h j- / / �� / ) \ I \ 1 I I I \� \ \ 1 / I \ I)//// / / PIN. 9752-29 2426 / ) \ > \ J - - ` - - - - - / / / /� / 1 ` =L i— — 450, 1 ` \� X ( _ \ \ �- I I i I % \ - "�-/i/ /I ZONEO1---> 445 / I �, CHATHAM DEVELOPMENT ONE INC. /// / / / ( ¢ - 1 V \ \ \ I (( / /�I _ - - _ ) 1 - 1 \ / \ \ / / I I I I 1 / // J / l I _ _ _ \ LIMITS OF _ J I - / \ \ / / _ / -/ /� _ - LIMITS OF - - --_- \ \ \ ( / DB. 18009TP6G. 167 i� / / �/ I /� / \ `\ \)1 I I I 1 1 J / //// / 1 1� / / // // / �j// I l l I \. I I ��I_ — _- _CONSTRUCTION (TYP.) - - _ - - _ / / / I \ I I) / 1 / / LIMITS OF / / -�- pK „- - / / -� // CONSTRUCTION (TYP.) _ \ _ / I / PB. 2015 PG. 291 298 / / / �' �. \ J ` I \ I l I (� / J I / l//// // / 1 /� / // / I I 1 ` - / \ --/ _ - \ / / / / / %�/ ���i- �- ` - - \ \\ \ / / / / / \\ \ - / l I % / / / l I CONSTRUCTION (TYP.) _� c - / / / // /j // / - - \ - - - - -\ \ \ \ \ - - / / / / PB. 2016 PG. 241-243 / / l ( .\ . ' . , J / / / / ,/// I ( I PERENNIAL / ! I \ k - - - -\ - / / _ - _ - - _ / / / / PIN. 9752-18-0689 N/F \ �)A\ JJ / / / / �/ / // / / I r CHANNEL �- - - \ _ - _ A l�//i / / 1 I l �l 1 /� /` I I I I I \ 1 I _l 1 �� -� \ -- j / ///o // / /�_/ / _� _` ��-__ _- __ / / ZONE PDD / CHATHAM DEVELOPMENT ONE INC. ; `;�; %,� / / / / ( / // /// / ( I \ \ I I \ \ \� / J \ / / \ \ _ _ / % i E, DB.1809PG.167 1 /- /// / / 77/////// // 1� 1 \ \\ \\ \ 1 \ \ \ \ \ \ \ \ 1 \� // / / h/ / j/ / j J \\`//-� -�\\ \ // J / / %,'. / / LOTS \ 1 i/o / / / /// f' I I 1 / \ \ \� I / ' /' /j / / / /---_ / \ ��� -� I i _���/i// �_� \''f // l/ / or /�jl I I \/1 IIII \ \ 1 1 I \ \ \ / / _ \ _- // / // / / / p 1_---� 42 / / // /i lI 1 I I I / //�// // / _� °o \ //� 5 === t r / �/ PB. 2015 PG. 291-298 =_ / - \ / / / ! I \ \ \ \ \ \ I \ \ \ / _ _ - — I 420 / / �/ �5+� , P IN. 9752 29 0838 _ ` \ I\ 11 O / / v - - - - / / / / / / // / // - \ \ / - - - \ 1 \ - - _ \ . �' '� % -- �,0 r ZONE PDD _ - _- ��► ` / 1 / / / / I l\ ( ' \( (i< ��/ / I� IIIII l 1' I I(/ J II / \ \ \ �) , I I 1 / I I I \ I J / 1 / 1 \ \ / / / / // / 5 /// i //� - _ \ // - \� \\ \ - - \ II1111I / �� _ ;/ - ___ -- �. /( t/ '1 \\ \ I l )I II 1 I) // I I I / 1 \ / �/ / / /� _-/- \/ \\y I \ _ = iss? �� �� �� i/� /R�5/i/� LIMITS OF \ \ % ll( �� \ 1 I I I I I 1 ( \ J / /�---� \� / / / / // / / / / _ \ \ /-\ -� i - /// /0 i �i���-=- CONSTRUCTION (TYP.) I /, \\\\� �0. \\\ \ IIII\\ I I I / ( ( I I / ) - / \ \ \415� - i / // 0.L ��/%' / \ __ - \\ \ \ \ ` ' 11 III / \\ \ \ \\ \ !I 50'I 20' 30' 30' 20' 50' I l I I / I / / - r // / / /j / // / // - - - \\ 1 / \ / // �- _ \ l l l / - _ i/i' ti� / L - r> /!/�i //, \ \ \ \ \\\ \ \ IIII 1. I I ( 1 I / / //�, / / / /_-- \ - \ _ - / \\ «` \\ � )\ \ l l i / 1 \\�\�\ \\\ \ \�\ 11 I N 6 \ N I " 1 I l ,I 1 1 \ f I l / // / / ,� / / \ \\ �1 \ _ \ \ g� 415 -"/ 7 /O/ : z / / / A \ — S— / / w w w w w / / \ �/ — \ �� , '�-_'_--%��; �3 r IIII \\\ Illy ) 1 r/ IJJ / IA \\�\\ \\ \ \\\\ I zl`!a z\z ro/1o�/ o I // / I i I I I I I I / / /, j/ // l--__/�,/ ////i////�/'�/��i �\ \ \�,- _ /- IIII, �� //IIII 11 /�_ �� /� __ -_ _=y / ///� / �.•.. �l� \)1 �) I I \ \1 11 l 11 1 I I I N I 1 1 I 1 I \ / / / / / / _ _ I / - �— — i .. /j// / i ♦ _ \ \ 1 I/ I '� / I I N N N N N 1 \\\ \ --�_ -// / // // 1) I I / / � / //.,/, // / / - 11( ,III III 111 111 I \I I � \ / , \ \ I ( 1 / r / , / - - - - - - / , -/ -/ / / \ \ \ \ - / „ilia - -� /- �/� I �^ /- 1 �� IIII /1 IIII,,.1�1�11 I / -� o/ / \\\ // 415 / '// _ �' % ` �= J = /� \ f \ I ,-1 II i(N I' I�rf I I �j I I // / /// / ( I(II IIII II LIMITS OF I I I , / lI I / \ \ \ 1 I 1 I I / ( / / // / / / �/ - - / / / / / / / / / j / - I - - // /G // ` _ �j //� _ _ l �� ` ` ' II 1iI I I , I// / N I I \ // /// / )1 11 II CONSTRUCTION (TYP.) ° o % / / I \ \ I _ / / / / / / / / - / ///j / / / / / ' \ \\ I''r --/��� /;�-,-//, -- - : ��l // v IIII II` II ° 1 /III \ \ \ \ l I / / / /, / / / - -� \ / - - -- // �� /-_-/ -_ - - (I_� Ill ��► 1 \ \ /l 111 / l ! I I��Ir1 f I I I ( (/ 1 \ \ \ I \ ( I / // / / / / / — ' \ \ / - _ --- ----_- / / / - i_-// �- _-_ 9"' 1I Ili / l/f ,� /\ l / JI III 1 i1\ I 1 1 \ I o / / / / / �/ / / //� r / / IIII // I / J 1 1),j \ -. \ I Z1 I I ,a5 / / / "(` I r//�%/ '/ �/ � � — / —Q�� .C• r _ � \ l \ \ I / //// /// /,' //j' // // �1,i%%/— —�\ IIII � / /��\\ I ` —J �- � \ /// -�, /'/ :,: ; \ I `� II 1 1 / Ill/ 11 /Ill / l I 1( - I \ - /\ \ I \ / ( / / --- / // / / / /--- \ _-, ll IIII //f /// / I / 1 l IIII / I / / / /// / / / \ // - \\!// /// //�//�/���/ ( ,,:; \\� _ I 1 - IIII l l / �l I�\I I l / ) tl I\ 1 )\ 1 / / I l / / / ---� // / / - 1 /•V II /I, / / , l/II/,I IIII ll �1,1, _ 1 I ( 1 /,' / l ' I I \ / \ 1 l� / ,// / , / /� ,,� /, , / / /--_� -� �/ \\� I\ _ 1 `\�20� �` //'//- \ :' : \ �r I If / I�/ // / / 1�lll Ill/I _ 1 \ 1 I / ___ / / / / / _-_ ���� / /'-\ s n�L �_-_\ \ / / / N/F �/ �� \ 1 l l // / I ll l /l l /% J / I r / / I / \ f \ 1 I / , / % / / / / / / / /14'/ / / - \ \ \ / \\, /// / I \ \ I 111 ll Il / '� J \ \ I / Il \ l / /� _\ �_� /�// // / IIII / II\ �_// ' 1I \ �// / / / / 'CHATHAM DEVELOPMENT ONE INC. \ \:%•• \ 1 S I I I I I / I / // / / / / / lllllll� // lI l l / I 1 \ I / / i \ I I / / / / / / / // / \ - / / - \ \ \ \ \ X // / I l I I / IIII/ // / ////� /, / / LIMITS OF 1 1 \ 1 i / /' /_ I / l ( I / / / // /// / / / / / / / \ - � / �- \ \ - \ 1 t II 1L / / / // / / DB. 1809 PG. 167 �. 1 /// / / / \ �o loll l l \' l ll / /I Il//lI Ill l \ \ - \ \ 1 I 1 / / / \ �� �I IIII// / / j LOT7 I `�.�� I /l 1, / 1// / Ill////�y, // // \� Ill/�l\\ lam lll� `/ / , \CONSTRUCTION ( \ l ( \ I / / // / I / \ I I I i / `� -7 /// // / / // / / // / - _ - / - \\\ �I // \ \ l Y /// �/ , / PB. 2015 PG. 291 298 \ ` u \ / / / / / /� / / ^ / i / / / / \ \ (TYP.) I I \ \ I / �� / _ ( I I I I I ( ( / / /, I I / / / / / / / / / / 1 \ / / / \ \ \ I \ / ' - \ \ 425// / / //� / vl // /l �i// ll 1l / IIII /// Ill ` ✓ f\ �` / / // / / / PB. 2016 PG. 241-243 ^. \/ \ \ \\�\ ` v : �' / / \ \ \ I / / / / I I 1 \ \ / I / \ \sr \ \ b� % / I III (lI I / , �/J 1// /// /�//I/ / // \ 1 1 �/ / �/ / I / / ll \ \ �a- 1 - \ \� \�/ �/ / PIN 9752-1&5526 �, \\ " / /y / // / / . I / / I I /// -/ / // ,/ / �S \ 1 \ \ 1 \ \ 1 / / / \ I 1 I \ \ \ \ / IIII f / / / I \ f \ \ _ _ / \\ // , \ 1 ///� ( / %:. -�- / \ `_ / �� / l�/�l/� \ (I I / / / / /// l I'r l /�/i�14 / \ \ \ \ / / I /i / 1 I 1 I / I I / / - _ - �. \ III \ ) l 430//i / / / / / ZONE PDD I / / // , i/.i��/ l , , -' III \i�li(I I /� l�//i l / ( \ I \\\ \\ \ \ "\ / / / ) / ( \ \ \ \ \ / / i I 1 ( ( / I \ \ \ / \ \ \ I I `` �- ,/ h//II/ %I // I �,� _ \ I \ 1 '` --- I \ \ \ \ 1 / I I I 1 1 / _, \\�� �/ / �., /��� , , I///////a�/ / / l l 'J 1 -�\\ \ \ �•�l �\ \ \ / / ��-- J/ \ \ \ \ \ \\ \ / I I 1 I I I \ \ \ \ \ ' /- �� 1 1 ` I I I / ,iii 1' N/F I N/F I > I \ -) I „ / / //ii /'" l J Ill V l p / \ 1 l \ 1 \ \ \ \ 1 / / \ 1 I / J / I `\ I I / / /// '�/ 11 I III PRIVATO III LLC. 1 / I I I PRIVATO LLC. I / I I// N/F //� ��i///�///� // / / / /,/, I .� �� \ \ \ °� 1 \ / / \_) \ \ \ \ \ I - - ) v I I \' l k \ \ \ 1 / III 1 I \ I \ ( / / / //1( IIII - \� J - I / / /\ CHATHAM DEVELOPMENT ONE INC. // iii IIII // // /- / I /l l lI 1 I \ \\ % \ (\ I 1 X \ \ \ - \ \ \ \ \ ( I I I \ \ \ - \ \ \ \ 1 I I I I I IIII I - DB. 1877 PG. 718 I I I _ I I I DB. 1809 PG. 167 ////��//J� //J / / / / / I I I / 1 1 I /\ -/ - LIMITS OF \ x \ \ \ \ - - - \ \ I 1 \ f \ 1 \ \ \ / / �� III \ 1 DB.1840PG.649 / //I / \ \ 1\ ( J \ 1 1 l 1 1 \ \ \ \ \� ( 1 l /III Ii - LOT 4 I ;",", LOT 5 I / / / // / l Ill I 1 '� / - _ - v \ ) \ 1 I \ \ v v v I v 1 // I - \ I / LOT 10 �/ IIII / / ` l �l l / I / - / -_- -CONSTRUCTION TYP.) \ \\ \ I ( ) 1 I I \ I / / I \ I I \ \ \ \ \ \ \ \ \ l / \\ \ \ / l� IIII,// BM. 2015 PG. 291-298 I ' �ooii I BM. 2015 PG. 291-298 (� ( // / �r/j J ^ �/ /�/ % I / / - ( A \ ( I ( 1 / V \ V I I V A \ v v A A V A v A \ \ . R -1 I 1 I I 1 IIIII IIII �_ PIN. 9752-08-7668 ���"�� PIN. 9752-18 0689 A BM. 2015 PG. 291-298 ��r �� // j /// / I \ /� // / __ - 7-• ) \ V� " V / \ �, / / 1 \ 1 \ \ V A \ \ VN s'> V A v A / I LIMITS OF I / III I /� \ I I/ \ PIN 9752 18 6885 I�/ - _ / /// // / / �i/ - - . \ \ I / / I \ 1 I \ \ \ \ s \ \ \ \ \ / I / I 1 \- r /\ \ \ 1 / % 1 \ I \ \ \ \ \ \ \ \ \ \ \ \ \ I CONSTRUCTION (TYP.) J I/ // I� ZONE PDD ) ZONE PDD / ? \ \ ZONE PDD 11/II /� = /1\ / / / / // / -�� \ \ \ \\ \\I \ \ ( / / / - )` I' I \ 11 I�I����\1 ��l (�_ , / / , \ \ _ I \ \ `� > I I / I \ \ \ \ \ \ \ \ \ \ \ \ \\� �/ // I� L I L'� i \\ `�„, ,, / I�,�( ill/ f� / o ///�// 1 ) 1 I I / r/ / 1 1 \� \ \ \ \ \\\ \ \ \ �\ \ I \ \1 \ �\xx I /////II �_ -1 I / r / LIMITS OF (Illf (IIII II /�� - �(I / << r a l / ) / / / \ \� \ l I \ \ \ I \I �% I J� 7•� III III / > / / / / / / I I I CONSTRUCTION (TYP.) I I ( II I ( \ )� / f I / / / / \ \ \ k� //� ) I \ -I , II ` I I I 1 / I / , \ ) \ \ \ \ \ \ \ \ \ - I 1 / , / I I 1 / ��I/III 1 1 /� ) I �J \ `, / I I V1 ExISTINGB" )/IXII I1111111I1111 1111I1111II(�\ / 111�/l/l / / I / �' /// / / \ I I I I Q I I( \ { (RECLAIMED WATERLINE) •\ / I. \ IIIII III III I) ) r I // / / \ // / / / // / // / / / \ \ \ \ I PERENNIAL CHANNEL f 1 I / / / / I / J I / I I ) 1 \ \ 1 \ \ \ I )/ / \ \\ /1f 1 I1 / r \ r / JI 111 ll II Illlf( ( / II // / I/ / \ I / 1 / / I / / I`\ / / /) \� ' 9I 11 , \ EX STING20'PRIVATE I w w 1 J I / j IIII I I II IIII III \ JI) / / 1 LIMITS OF//// /// / / /// / / / / �- \\ \ \ \\ \ - �l I '� \ l� \� \ \ I 1 ( I / / / I / / / I I 1 1 1 ( 1 \ 1 1 ` \ / / / - - S �// / / / %JI I 1 / EXIST. 12"DIP I II % / / I Il I III 1 I I / / / \ \ ( \ / / I / I L \ _ / / I 1 1 / I/ III 1 DRAINAGE EASEMENT r I m / II I / III I) % ) / /� / / ( / / \ \\\ _ \ \ I \ 1 \ / / / ( I I I 1 % 1 1 / / / - x8 / / / // I I / (WATERLINE) 1 1 / / 1111 I I 1 1 11 / / CONSTRUCTION (TYP.) / / / ,_ \ \ \ � \ \ / ) 1 1 1 / / / / I 1 / J / / / / / ( / J '\\- // // //// / 111(J� ' PB 2015, PG, 291-298 / 1 ll / 1 1111 1 11 / / \ I 1 / / \ / / / I / / / / / / / - - �� / / I / I o\ \\ I I I \ I I I I / // 'IIII// I /_ I �-- �> , / \IIII / 111 IIII//I // I I / / ��\ I \� I , ) \ ,_ ) \ / \ \ \ ) / / I IIIII 1 I III EXISTING 12" CPP / / I I / / _ \ \ \ \ l \\ I l l f / / / / ) % / / / l / / / \\ >G/ / / // /, / / /\ \ 1 EXISTING 5' PUE J/� ( _ I ( I I \ I lI �l / I / /, _ ) II �ih i�, I I / 1111 (TO BE REMOVED) / I / I �/ / /� I \ \� \ ( I / _ \ \ \ 1 1 1 1 1 I I I I I / / / / / / / I I / / / / / / / / / - _/ / ( v \ / / x // /// // / C PB 2015, PG, 291 298 ��-- _ _ \ I L I ,, I EXISTING GRAVEL DRIVE III ( .., 1 \ l I / / / ) \ ) , I / / / \ _ _\� \ \I� \ \ // I \ I 1 I / / / / / / l 1 I l / / / / / / / / / \ / / // I s\ \_ , / / /// // 1 \' \ I --- - L��//// / I Ih �' 1 i / /' / __ \ 1 I i I 1 1 1 I 1 f �j / 7 / l / I / / / \ /'� // / / 1 \ I \ - - - r = I EXISTING STRIPING 1 �\ - 1 (TO BE REMOVED) I I 1��\�L\=== / l I / J / �I / / / / - \ \ \ \ Y ' / / / / / v l _i .�•_- J /� /��,-/ii r�'� �)\\ l�\� -�/ / / / // (I / / / /- \\ > Q Z /I I I \ 1 1 1 I I i / I I , / / / / \ _� TO BE REMOVED ' / \ \ \ \ m / I ) I < / / / / / / / / / 1 / / /� - / / // �, i l I l l / / \ � i/ // / 1\ \\\\\\I�_ I 1 N �� , 1 .. --- - -=�=�y;' �` i.� 4��/' �/-��`�`� IIII �� \ �I ' 1 J / I // / / / / ��_� \ / 4¢S�\ 1\ \ mI ` 1 / I I / ) I I / / / / / l l I l l / / l I / 1 I /, / �� / - /� / /�/ ,� ,� / /� �\ \� I,1 1 /// 1 1 / // // , 1, l ll / / '-- 1 I, ,, ;-/,/�;� \ _ C=�-���� w w ,� i / l/� J ��\ ����\ l Ill/Irl I// // l l r �I �/ / / / / / -�// / / -� �\ \\\ ,o, a \ \ \ 1 I I I ( / I / I ( �\ I II �// / / \ \� \ = - '� - `i I h ) / ` I I / / Ib / I I / // / / / // / / / / - \ \ I \ 1\�� 0 1 1 \I I / / \ l / / / / / / l l 1 I I I / I I / / / ) I I I I I I I 4�0 /� /i//_ J .1\ \� �'�� �_ >>.>o>°>.> �� II I �/1/Ill 111 / / I I/� // / / 1/ / - \ \\ \ 5o I \ I\ \ 1 I / I I / - �i�i ' /l I I `i \ \ / / l l l ( ( / J / l / / 46\ \ \`I \\\I \ I \ h I I I I c ( I 1 / / l I l I / / //i _ � � ll / I I \ i I I //// / fi � �,% \ � ' /I I I II I I lllllll111 / l d I I \ 1 / / / / // / \-� \ \\ o� I o� � \ \ / / / / / I \ I I I I IIII I / / /� / , y��v� \ �• I/ ... \ \ EXISTING S�GN / I � I a I I ) } / � / / - _ ) \ \ 4SS / '� I I f / \� -,, \ i sr \ \ TO BE REMOVED J I I �I 1 l 1 I 1 ) IIII /�/ /I/Ili �I //Y. \` I / / / J 1 , // / / / I ! �\ \\ \ \ \ _ � `L 2�, 1 l \ � \ \ \ \ \ \ I ( � / / I ) \ I 1 I / \ 1 I I 1 I 1 / �/ /� / / /• / �i% \ \ ��R -) R R �_R <. z (� II�\I 1 II I II 1 l (// /� I�// �Il �� -, < / /,I� % //, Ill l� (---\\\\\\�\ \\ oo I�O,y� ( \ \ \ \\ \\ \� 1 \\ I ( / / / / / 1 1 / > / I I I I / \ 1 I I I /, l/ IIII / IIII / // //� _/ -/ � ____ _ \ _ _ _ _ ��s // � � \ J � I I I I I , �/ �,' // ,� ,� , , J , ; - /, I ( � 1 . \ F , � \ \ \ / , 1 1 \ / , I / / / � I I ( I l / 5 � � , k, \i.� ��\\ \R 475 -- - — _ _ .- -_ >l « /// / /�/�i%r.� I % �/ / /// / / /-J I / (I ) \ \\\ ���\o`��°� °�F,\?j \\ \\ \�\\ I// / I \ \ \ \\\ \ ( / / /IIII /// // l 1 1 I / \ I \ I I/,l //,/�IJ //�llf/(� — /�(S/ �,u / \ / ��, - -= _-= --- --�_ �i >� �� �:/i�� IIII 1 \�0 // , /� -- 1 / - ti \ ° I \ 1 \ I I \ ( ( / I 1 / // / / / ,i'/� \ /'!/ -Q� % (� �- GRANT DRIVE ////i//// l l �r �l r\\��// IIII 1/�' 430 // / ///// �- /\1 1 ) ( \ �\ \ �F J I 1 I I - / I 1 \ / / // / 1 / / // / / -- _ \ � EXISTING 5' PUE � -` -EXISTING 26' B-B W/9T R/W r / / / / / / Ll l I l L l j �r�' / / / / / I � � ^ / // �/ / / / // / / - / / / \ \ \ r� � ��\ �'� . �°� � / I \ �1 \ \ \ l l i � / / ' � � J j \ � \ \ \ \ 1 / // / / / / J / I l \ 1 1 / // l ll/ //\ / � \ � \ _ _ = � / � 'C ,f �// I PB 2015, PG, 291-298 \ (FUTURE 71'B B W/ 97' R/W) // / / //� / �/ ///� lr // J / /// I / / / \ ` / / / / / / / / / / J\ \ \ \ \ 2 - / / / / \ / / / / / 1 I l l/ \ \\ \ -- - `j / " / '/ �/� /� ( 1 1 J I ) I \ \ \ \ PB 2015, PG. 291-298 , //// / / N�0 / / // / /// %// �� / / / %� / /, / / - / / // / IMITS OF _J/_ \\ \\ _ / / �/ \ \\ \ \\\ \ I / / / - 1 II ( // / \ 1 ) / I - / / / r/ l/ l // ,� / �� ` /// / �///'/ � / -i, r 1 1 ,� \ �F � � �, J II \ \ \ I / , / �_ / ,_ _ � / I / / / / / / / � / � I I II / 1 1 \ � \_- - =_i= _� %; f _ _ / / / /// / ^�\�/ / / / 1 / - / / / �// / / / / I CONSTRUCTION TYP. _\�\\\\\ \ _ - / / \ \ \ I ! / / /i _ �= J I l /' /' / / / I 1 I (I \ �L \ j __- \ \ / ri I �I I \ 1 EXISTING UE \ / EXISTING UE /// , j/ //j /// // //,/// / / `// IIII / / - I / %�/ l ! / , / _ _ / / ( ) r_ \ \ \\� \ _� J \ \ \ (I / / / �/ - -- / I / / / / / \ 1 I I \\\ - 0 �'�// / / _ I \ \ - - - . PB 2015, PG, 291-298 // / / / // / / � /2 / / / / / / /// / - - / / - _ ��\� � � / ) \ \ I / // / I I I ( / / / /r / _ / , / / / - � \ 1 I 1 1 \ \ �� \� � /� %/ _// \� ( / // I I \ PB 2015, PG, 291-298 / /// /// / / / / - _ _ � / / / I I \ \ \\�� - � = _ � / - - �� � / !- \ \\ J I ) \`_ -J , /,/, ./-// // IIII//, i/�/ / / / ' l/ // / /l l�//s / �� //-_ h I / /.- \ \ \\\�— _ ! \ / / I\\ III /// / �i/ // //-___ �� I t ( , / / _ \ \ \ \ __�. �/ // _; \ // 1 \ / / / / ( __ // / // h _ \\ \\_�_�, \\ II III ( r / // - I I / / \ \\II\ _ 475�J/���;ii_� \ \ \� // (� I I I \ I y // / / EXIST. 6" PVC LIMITS OF / / / // / / �%' / / // / �/ / / / /� - - - / / / _ _ _ \ \� - - I \ \ / / \ J I 1 ' / / / _^ \ \ \ l - \\ / j ( 1 1 J �� - // (RECLAIMED WATERLINE) // / J , CONSTRUCTION (TYP.) /// / / / / / _ \ \\ ��- - \ I / \ I I I / // / / \ \ �z \ \ // // =_/ / /�/ // / /---- J / / I r \\ \--- �` 1 \ I / / / -� / l / -� \ \\ \ _--�= 480�\\ IIII \_ � \ 1 ( I \ \ ` � �_� // //// /// / // /// ��/�/ /� / // / � ham/ //// / /, // / /------/ '/ I 1 1 -�� \\ - ` \ � 1 / / / / / \\ _ _ - �\\��J� /-�� \ \ I I / I \ /' - / / /// /_ - ��/ / l/ II IIII I �� // ////�// // /i / // -__--- // 1 _-� �\-� I I I / / ,____ / \\ _ _ \� \/�_ �/ - \ 1 I I \ \ \ / /// �// /�/////i/ / / -- IIII lj / / I I \`/I l/ /- // �// / // s / �/ — =_. --- / I l l /r-- — ��� z, ��\� \,_ --i I II 1 I I // --;_� l / //--\ \ = - \ EXISTING UE - / / / /r-460 -� / % / / / I ( / j / / / /, / / / _ / ' - - / I - - \ \ ��� \ '�� �` - \ I \ I \I 1 / - - - 0 / - \ / _ \ I I ( I \ \ / _� // / !// // - // ll / l Jl / / /// / /�-_/, / / _ �__ \I III I 1 / / --- o I/ / / / / / -- \ _ -- �- /\\ \\ \ / I I I I 1 / - �Q / / / / / \ �/ _ _ =LIMITS OF /� / - PB 2015, PG, 291-298 /_ / / /// / /_ \ // / / / \ / / / / / /// / / / / \ / / I 1 / - - \ 1 \ \ \ \ L1 / / / - _ - / / / / / - <_ _ - _ CONSTRUCTION (TYP.) / `/%�� - / / \ \ , \ / /// // /// / - / / // I/ , / // \-%-,_-- \� \ \\ \ I I p / — — --_- 7// // // / j//--� _-__ ,___ ///, �_\\�I _ / / / / /// // l / ✓ `JS %/ // �I �I / I \ � / / /. IIII //, / /// /// / / ��_� \ _��� / / / -� � \\\ \\\ \ I \ \ I I /`�--' 485� �l /// / // �� ---- \\ �/ \ \ �� CSC, � I \ � � / / / /�`___-/ \\`-�\�\\ IIII\ / \\ \ - L 495 ��\ �///�- �\�✓ \ 2�\ � \ \ � / IIII/ /1 11 s- �,/ l� l /� I 1 /Z� / / // /// / � / / /� _-- / �//// /-_ \�-, \ 111 \\IIII 11 11 I / _,- _- / // � ----_ _- - _�_\ ////� /�\`� /�\- \� 4,%.F I \ \ --- / l / �/ - l / J i I ,// / �/ ! / / /IIII IIII// /- �_� -- / IIII \�\\\\� \ \\ \ \ I I / �/ // / - _-- - _- --\\� / - o � S I � \ ) / //// / /// //�, / // / - - 'PERENNIAL / / / / �� � y J ({� � / / / / / / / / �' // � _ _ 465� � / 1 1 I - \ \\ \� \\ \\ ) 1 \ \ \ \ � I I / LIMITS OF �i i\ // / / /_ _ - - - - - - 0- ��\ \ � //� � � \ \ � \ yooryOS,\\ \ \ \ � � / / /// / III I( ,l/ l � CHANNEL////// � O� Q� j / l I// / / // �i/ i� / /.----\ / /// / -.\ \\ � \\\\\\\\ \ _ \ \\\ \\ \ \ I � / / / / � /--- �_ .- �\.�� '��_ � \ 'Q / l �./r � ' / - - \ \ / // � - � � � \ \ I / / / CONSTRUCTION (TYP) / / / - - ' � - - � - � '� -�\\% �_ \\\ � \ \\\�°Ts°eli��°\ \ \ -/ / ///// I//II1111 r/ (/ / /-/��,J / / �oQ //gym �� I / // / / / /)/�// // / / / / _ \\ \ IIII I \\ 1 `\ �\\ \\ I 1 � � _ _ //1''- F \ \ \ \ \\ N/C1' °9\ 1 1 �/ I / I I \ /% �/ f o / l �j l l / / - , \ / / / / \ \ \ � \\\ \\\\ \ � \ \III I \ \ I / / / / / / / - / / / � � _ _ 506 \�i /� � \\ \\ \ � \ �� � / / l l \\ \ /l�r�-� �/' � :�° / / 11 � / I III II // // / /i/ >' �, \ / /// /-\ IIII\\ -- I \ \ 1 \ I I / / , / �/ � - � i� _ _ __� =\\��i //- \_ \ \\ \ - // / / I /� \\\ � // �� / / �/l / / 1 // // // /�� � -moo \��/ j// // -� ��'--\\�\ \\ � \1 11 \�� I /// // / / � �' ,' � - _ \� \� \\\ �� \� \ _ / / / / / I I ( �%� I I / / // _ \ \ \ \\\ \\\ / \ \ \ \ 1 I 1 ( / / ,495 / ; _ / /, ' ;, / ��_/� / - l 1 -\\ ^\\� Imo\ _// ///� �/ // I/(�\ IIII � I( / I /1 I �// /IIII" 1 / J I II11 IIII,,/// // � /^_\\ / \ \\\ \��--- I I\l l \ 'r 1 11 f ///�// ;%-�_//// /' i//// � _51�=_;��;���\-I; ' \ I \/>\ � / IIII / lI \i\\� \�\ \\ � �\\� , / / \ /�/ / , /o�// �/ / I �/ // � //// //_� \ � \ � 1 11 \ IJ / / - z- - _� --_ _ �� `�_ �\ \ \ �� r 1 I \ \ \ 1\ / / _ - , / / , 1 I/ r//,��/%/ / ///-, \ �/ , �'///\\\�\\\ \\\\\\\Qo , I IJJII III / -- _, /, �,/ // ;�/, _ / � \\ \ �� \ \\ / / // � \� 1 1\ \ 1\\// q / III !°ri // \ / / II 1=-�� ///� /-//�_,� \ - / // _- \ � � IIII\\ �' / //l I / I � �/// //� / / / i__ - — � _-, \ \ \ \ \\\\-\ I 1 )/ l r / h /�JII III / // -J�� \\\-'�/ // / \ \ IIII\\' / / 1I // I I �/ / / o��`_�� // / / / / - i-y--__--_- -- _ 1 \\ /\ ( / / / /1 I/ / / / / \ \ \ l 1 l I 1 \ \ 1/ // � / / / / �, IIII //��/ // // \\ \ \ \� / / /l/ / // I 1 I (�'/,lam /// / /o �` /, / __- / / // / I w= \\- \ \\ \ \ / / \ \ I , IIII Il 1 1\\ / / / ///////// -, ��� /// //�--_475�\v/ //// -,\\ �\ \\\\\\\�\\ / / //////� / I / / `'//�-- / /, _- / // �__-�` ,- 1 \ \ � \ � / / / / / I I 1 I \ /I -� _� //I �///// %-/�`/�/// /j / /// //�- //-- \ IIII /�/ -� \� \ \ \ \ \ \\\ -�/ /// / / / l // ll �/ ///� _�--, // _- / / � `-� / / / /// / ///o`? / / � / /� / l I // / /// � sr \—__// / — � \ \ \ \rn \\\ / / // // / // / / 11 / / / / 5`L \ -\\® \ �\�_,/ \ \ \ i ( // / I \ 1 1 I // I l �I I I II r%��, y � 30' / -/ / � / //_/ / �, / / , / /�- �o\� --/ / J ,--�\ \ \\ \ \\\s \ � // / / // / � __ _--- _ \ \\\ � �\ �� / I / 1 / // / � l /ti / �, � / // � r- � _ \\ / � // \ \\ � \ \ \ 1 // IIII l / / � // I l/ l/ / l/ / / / //' �/ /' /i _------ \ __ J \ \ \ \\ \ \ 9� \D \ \ > / I \ \ / /� / ` / / I ( '� � � 30' � �— / / / / /// / / /// � r // /i�// // l / / / // // — _ � \\\� ,' / � ' � �' \ \ \ \\\ \\ \\ \\\ \ / i l ( l / I l l l / � / / / i ' /� // / � J � \ � I —I \ \ s � / I \ I I l/ I � � /, // / ///,- / // / / � - , // �\\=�\ \\\ \ \ 111 fll II (I / I // / / / // � / ,/ / ,/ — — �\ \ / �\\\\\\ \ / 1 \ I II II(( /�i l/ l� 1/�, � •20' -/// // /�l // �/ %�// // //�/� /�_ 48\\ \-�/ /, -� \\ \'>\ \ I �/ / /l l l I /l/ /�� // // // ,°,� -\ \�-�- \ r / ,,,�o_ ^ �' IIII // / / // �- / ///// / /- -�5�\ \ // / \\ \ o \ _ h // - J // / / / �/ _ �\ �_�--, \\ \\�\� \ \\ I)1111I 111 I 11 /I/ lI /l 1 // / \� IIII .�\ � / 1 I \ II // �I ��50// � �, / / / /y// / / // / / // / // _ �\ � \\ I \ � J II/ Il II ///� / J/ � / o� °, 50' IIII // /�� / �. /i/ / /-��/ // / IIII � � \\\ // / -_ _ �_�\\\ IIII\ \_i I I / / / //�/ / / / // / �. _-- \ - \\ � _ \� / / � ti � /// �S / / �_/ // /i � /�// / �- \\ \_ / -- - \ II II lI l ! IIII / / / / / / /, \ - \ / 1 / l IIII / S // / / / \ \\ / \ \ \ \ \\ ll I III I I I / / / / l l l / , / / / , / /'/ / // / / / / / CHATHAM PARK INVESTORS \\ IIII I 1 I I // // / / // � / / / I / / / / _ LLC. \\\ \� _\ \ \\� \ // /, III/ / /I l �"//� / \ ti /, /// / IIII / // �/ /////�i / �/ �, \\ \� - / /--_ __ \� \ \ \ I I 1 II / Ill / / / / / / / // / / / i// / / IIII IIII\\ \ \ \ � \�' -\✓ \\ \ � l// // /l l l I / 11/f�/ � / � / / �/ /�/ / �/ O // � /. � //�'////�/// RtSc�Y� ROB-_ �\�\�-_/ ///------\\\\\\\\�\\IIII// ) \ , 111111 111 1 III // / /// � / � / / /'/ %� / / / / //�/ TRACT II - \\\\�\\� \ \�\ \ � \ \\ 1 \`I � //// // / / / / /.� ��� / / / / /j / / //��O/ / / / LIMITS OF / / / / �\ \�� _� / _----- \\ 1 \ IIII\\' / I III 11 11 /lI l/ / //l / l // / / / '( / %� / / / / // , / / IIII DB.1875PG.47 � /// ��, _ / �-__-_ \\\\\111 I1 I /I 1 / �l� � / Job No. DrawnB \ \\\ \ \ \ � \ \ \ � \ IIII / l / // / / / `� / % / � / � � // �/ / /// / / // / / / CONSTRUCTION (TYP.) �/ / '�j / / / /// � _ 49\� -�\ \ \� \ / / / - \ \ \ � I I 1 I I l / / / / / / / / / PIN. 9752-47-0648 Y \\\\�\\\\\\\\\ �\ \ \ \\ \ l// I ) �/ // / l l / / / ��/ / _//// ///// /� I��I((�� /,// /////'///j IIII / IIII / / \\� \` / / IIII \\\ II I I i1 1 I / / /// / / / /� / / ,�� 02150098.62 TE \ \\\\\\\� �\\ \<\ \ \ \� \� \ � � �� l // // // / / i / / '_ rr // /// / / / /�/ � �� � �\ - i % -- � \\��\\\\\IIIII I\ \ \/ , / f 11 I I II III IIII I l/ I /l/ / / // / / �/ J/./�/,/�/ // ,-ZONER-10 \_ _1\ 111 Date Desi ner (\ \ III// // / /// / /// / / //�////// -III I / // / / / // /// / ///// / / / / /-�, � \ �� -- ',-;\ 1\ \\\\�I 1 \ % 11 I I I / /// /o' / // / / / /\� � ^� _ I / g �\ \ \ \ \ 4) \ \ \ l / /// / // I/ / / / - _ I (( / / / // / // / / / / \ \ / - \\ \ \ 0 1 \ \ / , / I I 1 I I I I I 1 I / / / / /// / / LIMITS OF / \ \ / 11/09/20 FH \\\\\\\\\� \ \\ \ 0 �� \ \ \\ \i / // / // //l /�i `/ // /////// / _ -�J I I / / / /// / /�/ / / / / 500� \ \ \\ / _-- \ w\\ \� / / II 11 �ll IIII / // // / /// / / //� / /' / // / / 635� \ - I 111 \\ \ \\ \ \\\ \ \ \ \ \ \ �\ \ r \l/ IIII // i , , / , l l r / / // / // _ _ - 1 1 ( I / / / // / / / / / / // / / \\ \\ / / j =- _ -^ \\ \ IIII \�\\�? \\ \ // I 1 /I I I I 1 I / // / / CONSTRUCTION (TYP.) i \ \ ) I \ 1 \\ IIII\\\ \ \� \ \\ \ � \\ I \ \ / / IIII /, /i / //IIIII/ / � _ yv 1 / / /� ///�// / /� /� / / - \ \\� ---\\�\\� \\ \\� �/// // (11 11 IIII I) 1 Il/ / l IIII / / l/ // ;, // � /, � ,.,\ \ � \\I V\\-\\ IIII\\\ \ \\ \ \\\ \� \\ // / /// // IIII/ / //ii/r r/ __ \ I /// / / / �// / / /- -\� \ \\ \�/' /� —_� — IIII \\�\\\\\\\ / / I I II I I / // / / / I( / II l � �� \\�\ \ IIII \ \ \ \�\\\� `� /////,/ /'/ // / I r/ , , /////// _- \1 \ I„/ /,/ , / /// // // / \\ \ \\ /// \\ \�\ , / 11 II I IIII( / / / / f ,/-/ 1, \ \ �/ICI \ \ IIII \\� \ \ \ \ \ � \ \ '� I / // / / /' / - / /// // / ,� \ \ \\ ) / / / / / LIMITS OF - / l / I I I i ! / / // 1\ \ \ \\\ \\�\\\\� \ \ \\I\\_ ) (\ III / / / /�/ \ / / IIII il( / l // - ` ^)III 11 I I / / / / / / / / / - \ \ \ \ \ / ,�� CONSTRUCTION (TYP) \\\ \\�\ \\�\\\\\� \ l ( 1 /l,I I l I /I I I I ( f 1 I 1 \ f\ / \ \ 1 1 I / / I / //� / / _ J / / / / ) \ �J \ \ 1\I 11 J o°°°°� o°�°�°°° oo°° / / / \\ \\ \ \ \ / / l /l / — \ I I l / l / / / \ \ / \'�\\\ \ \\ JJ I l I III 1 ` I\ I I / / / / i 1 I o o 00 o / / / ) IIII\ \ \\ \ \ \ \ �1 / /// / //`/ // _ I I /�/�/ / / / // / ��65 I III IIII //// / / // I lI / /%` / �' \\\ /��'�y/ �- �\\\\\\\\�\�\\\\\\\�\ , I ( 11 Ill 11 11\ \\\\\11\1 IIII I 11 11 / / / / /�/ / / / 1 \ \\�s� ` /1/ )/�I�h� o°oo°FESS/ °°°�2°°° / // \\\\\\\ \I\\ \ /// / / / /// 0I II 1 I / 4, \ -- \ \\\\° \ I II / I / / �,1 ° o p o / / / / / // I \\ \� �, \\ \ \ �\ \ / �` / I / / / Ill 111 ////, /\ I 1 l IIII I I I 1 / 11 / / \ \ \ \ ,�/ �, _-- \\ \ \� \\ \ \ II l I \ 1 I 1 I I �� / S I r���� °=ono ti� o� / / / / // //�>>\ I \O�\\\ \ \ / _ \ ,,/dam ( // // I I IIII /�` \\\ (i(i ( / I I 1 / / \ / /\ \ / __� \ \\\\\\ I I I I - IIII o ,Q �, o / / / I \ \\ \ \ \\ �� / i/�/ �( r I / I/ / / / l II II/ / /I 11 /, / r / , \ \\�\ \ \ I \ l III I I 1 / l / l l , , \ \ \ v /\ :`S \ \ \ \ I I I / J 1 ) I 0 0 / / / / / / J I I / \— \\ / / _\ IIII\\\ \\\ \ \ I 1 1/ / / / /// / / /// / / / / --' / I i�l SEAL / / , / / // \ \ i _ / I I I( 1 l ,_�-1 \\ 1 \� I I I I ll l l l l / \\ \ J/�' % ; �-� �- IIII \ \ I I I / / / ) f I l / / / /' f \,___- ;-/' Ili /� 1 0 / / /1 \ \ \ \ + , / _ / / I 1 / / / / \ \ \ I I I I l l / / l / ! \ —/ / / / —`� /\ / \ \\\ \\ \ \�\\\\ I I I I 1 / / / // / I I I I / / / / / — _ �" \ o 0 027568 S o / /// / /// / J \//)\\\\\\ \ \ 1 I ( \\ \��\\ \' r \ / ��/j </l I111 11I1 ll1 \ / �4�0=`�11\ IIII I I / / / //, / ///\\\\`� ///-�� _� �\\ \\\\\�\�\ I \1 \II 1�///// /, / /// // /// /// // / / / //I ^I�i o 0 0 0 / /�// /� / / \\ \ \ \ �^ / 1 i / _ I 1 11 I // // / /�' _ \\\ -ems // �, \ \<\ \\\\\\\\\\ J \ 1 III / l �/l l l l l I / /X l/i / / -' --- ' !//; IIIII o�°oF es.o°0, // // / / / i /// /�( \ \ \ \ 1 \\ \ �� /X / III 1 1 1 I '----J I III I 1 I I / // / / // / / '�/ \\�- ///�_ ,_\-\\�.,\\\ \\\ \\\ / 1 I I / / / / / -' / F NINE IIII/ — \-;,, s \\ I ll llI l / l/ / / / / / / , / / ,/�_�_/ // /�I , ° o o ° / / / / / / / / j\ \ \ \ \ t►,\ \ ` / —445 v / / / / I I I \ - J ,I/ I I I 1 I 1 I / / / / / x / _ \\ \\\ E& \ \\�\� ' \ / I I ( I I / / / / ° o° o° ° / \ \ �\ \\/ J / / / I I I I I 1 1 I I //--_ I I / / �/ / °\_-�\_ ,�` - \ \ o \\\ \\\ \ I I )I I /�/ / �/ / / /�/ / I/- ° s °o o° P o \ \ \\\ \\ \\ / / I I I / // / / / J / / / LIMITS OF / - / / / / o \, o / / / l/ / / / /,//��°/ \ �� } / 1 II„I, II\ i I /,� _ _- // I I 11 1 II // / / / / _\--_- - -_� �__! _�� �\\\\?�\\�\,\� IIII �\\ // I 11 I 1/ - _-/ /// �/ / R. EN / / , / / / \ I \ \'\ <,\ / / I _ _ - . _ _ \ \ \ \ 1 I I I I I / l l / l / / // // / / / CONSTRUCTION (TYP.) / - // / / /i // / ooO y °°° / / _ \ / \( I N/F / / _ _ / I / \\ \s \ \\ \\\ \\ \\ I 1 1 I I / / / / / / // °Q000000°o°p0 \ \ \� \\ I / > 1 ) 1 / /J/ II 1 J 1 IIIII IIII//� // / / // / % ��--- =-i r- _���\\os,\\\��\\\\\\\\\\\/ /J 11 1 I 11 1111 l IIII l l/� / / -- / / - i///i//�,�1 / 4/30/2021 / / / / / / -- \ \ \\ \ \�'�. . /� / / I I / / / - _ �_ _ -- - \\\ \� IIII II II I // / �/ �/ 1// y\ _-/���////- ! / / / �� / / / / / / // _ \ \ \\\ \ \ \\ \\ / \ - \ I \ / / / J CHATHAM PARK INVESTORS LLC / / / % / / / / / / / _ _ _ \ \ \\ \ I I I I I I I I I l l l l / / / / / ,� // / / / / // \ \ ^ \ \ \ \ \\ „ P . ///-- i ` (/ / // // DB. 1567 PG. 800 / ( / / / / // / / / / / / / ( / / / / / / �� =� - - _ _ �_ _ _ - / - \ _�\\\\ \\\ \\\� \\ \ \ \\\ \\ I I / / / l / / / /`_ - - / / % / - J / / // i �� �. I / l / J /� / / / / \\ \ \ \ \\ \ �\ \ I l / / I / / / / / / / / / /, / / _ - - _ _ - _ - IIII\\ sip \\ IIII\\ \\� f ! 1 11 (( I I 11 / / / f / / / \ \ / / 525-���/ /�i - J / I J /// /// \ \ / \ \ \ �\ \ \ \ \ \ _ _ \ - \ \ I (� I I ( / / LOT3 I I 1 / / ' / / �// % I / l I I I 1 / /// /�/ // /�/ �.- - - -__- - \\ \\\\\�\`�\\ \\\\� \\\ \ / I 1 \ (I 11 ll I 1 / 11 /IIIII ( I ( / 1 ( / / _ __ ///n`'� % //� _�/ Revisions ( J �/ / �/ \ \ I \\ \\ I I / //// / / J / / / ______-_ _-__ \ \ \\\ \\ \\\ �\ \ -� /I 1 I II I I 1 II �/ I Ill I ( I ( \ (\ / // /\�� ram/ - �' I I /� / / / /� 5//// /�\\\\ \ \ \ \�\� \ \ \ \,\ \ / - \ \ \� 1 I 1l III 1 BM.2015PG.291 298 \ \ l // / / �// / / I/ J I / J / l /// / / // /��°' // / / i \-_ __ - - - - - - _- \� \\ \ \\\SAS\\\ IIII \\\\\\\\\\ \ I 1( I 1 I I 1 / l l l l / f I 1 1 1 / I / / //=520 �/� /�✓ /�� REVISION PERTOP / / �/ _ / / j N6/� �J/i IIII \ \ \ \ \ \ 1 \\ \� \ _ - I I I I 1 1 PIN. 9752-00-5565 1 , / / - / /// 1 / l / / / / / // / / / / /� - _ _ - — - \ \\ \\ \ \\ \\ \\ IIII / J 1 1 1 1 )) I I 1 I / / / I 1 I I I 1 1 1 b \ I / /// / / / /� = i/� J�i (� 1 01/25/21 - \ / \ \ \\ \\ \\ \ \ /\ \\ \ -�\ \ \ r /I / / / / / / / / / // /�/ / / // // _ _ _ - -\ IIII IIII \\\ \ \\ IIII\ \ / II I I I 1 I IIII I ( I I I I I I I I / _ _ / ✓//Jti ; - r COMMENTS - \\�///// f /%IIII%i/(� ,\�\\\�\ \�\\\ \\ \.�� SAS \ �_\ )I III 111 / ZONE PDD / // / / IIII �� j�// / / / / / / / // / / / �/ /�� _---___� \�\\\\\\\\\\\\\\\� \\\\IIII\\�\�� 11 I111 11 11 I II( I111 ( 1 I \\ 1 1 I 111\� \(\\ /l/515�%�/�//\- _ -// /i '// �60 �I \\ \ \\ IIII \ \ \\\ -¢ ° I 11 V I / /, / / ,/ ,/ / / , / / -/ / / /, / , / / / // //�`� -__-- _ \\ \\\s� \\ \\\ \\�\\\\\\ �/ III II IIIII IIII IIII l 1 \\ 1 I I ) \ \\\��__ �' �,. / REVISION PERDEQ - // / // /,///�� / / / /� \\\ \\\ \ \ \ _ \\ IIII \ 1 \\\,'� \ - \ \ \ \ \ 1 I \ \ % I III l / 7 /, / / / / // / /// /// / /, - /� l/ / // //// / // / /// j - i �c - _ _ \\ \\\\\\o\\\\ \\ \IIII IIII\� \' / I 1 I I I 1 I I I I l ( 1 \ \ \ \ \ 11 \ 1 1 IIII \ \ \ \ \� i / \\ � 2 COMMENTS 04/30/21 �/ / / // //i 1 \\� 1 \\\ \ \\ ` 1 \ ) 1 I I / �/ / // / / - /� /j / / / / / /o' // / / / / -\— _ _ - _ - _\\ \\ \�\�\\\�1\\\��\\\ IIII \\\ \ // /III I1 I I 1 I I 1 I I III l I I 1 \ \ \\ \ \ I I1 l l� \\ \ ��\\\ \\��- -.� / \\\ . \ �-- ;! .,�!/�,,, -//� / ,/./ IIII \\ 1 \\ \\�\ \ \\ --- \\ I I\ I 11 I I f / , /// / /�o�/i j /i / /�//i/// %� / 5ti// / // i \\ \\ \\\ \ \\ \\ \�/ / / 11 I I I I I I \ \ \ \ I I \ \ \\ \ ) I \\ \1 \ \\\ \ \\� \\ _ I I I //�// / / �// /////-, / / /�/ / / // _�-__---- \ \\\ \\\ IIII\ II II I I I 1 \I 1 \ \ \ \ \ \IIII \ c/ \ \ 1 \\ \\\ \\ \ \ I III I I I I I I / / / / // /i/�// �/ ///, �i/ /�/ / / / /// / / // /� --_ _ �_;\\\ \S�\�\\\\\ \���\\\\�\\ /_I 111 1 11 111(1 \ \\\ \ \\ \\\IIII IIII 1 �\ \ 1 \1 r\I\\\ \\ \\\111IIIII11\���_1`__��/\��, \ \ �� 1 I 11 I I I I / / /// // IIII/ / / , ,/�/ / / / / /// / / / i / / - _ �� \\ \ \\ II II\\ 1 \\ 1 - \ \ \1 l III \ \\\ 1 // / / / // /� / // / �// / / /// // //// / / --c— _ _IIII\ \ IIII \\\ \\\\\\�- �IJ \ II \\ \ \ \ \ \\ \ \ \ \ \ �\ \ I\ II \��..-..-..-._ \\� \\ \\ IIII\ \ \� \\��; \\ \ / ♦ I LL I1 I I 1 / / // // / ii/ / / �� / / / /// / / / // ��-_-� - \\. \�\\ IIII\\\ \\\\\\\\\ JJI�I`I 1\ \ \\ \ \ 1 \ \ s \ I \\1� \\ \\\\\\11111� ;`._---__�_ \\\ \\ I \\\ \ \ \\ �� -� \ \ / IIII 1 111 I 1 I / l / /// /j /i/ // / /// / / // / / // // / / __ � s \\ \\\ � � � 1 `�` \ \ \\ \ \ \ \ \ \ \ \ \ \--_-.=.,� \ \\ \\\- \\\ .\\ � ss I I \I I / /// / / / / / / I / / / / /''// / /// �h/„ / � // % - _ �_ _ \ \\�o\ \\ \ \ \IIII I 1 \\ \ \ \ \ \ \ \\I \ \\\\s_ � = — -= - J I IIII\\ \\ \ \ \ n \ \ I \ 1�1 \ I I I l / l I / // // / I / / /i / rig / / / / hi / / - _ \ - - - - - \ \\\ \ \� \\�\\\\\\\\\\\\\�\\\ /� I 1 I I I 1 \ \ \ \` IIII \\ �� \ \ \ \ \ \ 1 \ \ \ �s - _ - - -' \\ \ \ v \1 \\ I \ I �\ \ I 1 I I // � / �/ / / //l / / / / / r/ / IIII /// /IIII// // _ \ \ \\\ \\ \\ IIII \� IIII\ J II\ I\ 1 \ \\ \ \ \\ \ \ \ \ \ \ �\ \ \ \ \\\�� -- /\\\\\\\\ \\\ \ \ \\\1\ I \\ \1 , / / /,�//,//, /-/�/„I�,/,/�,// //�///////,�///// _- -� \\\\\\\ \\\\\\\\\\����\\\�\\\ I ( 1\�\ \\\\\s,\ \ \ \ \ 1/ \ \ \\s��-_—_= ' IIII\ \ - \\ \\\ \ \\ - / �I \ \\ \�\\ 1 I/ / / / / / / / / // \ \�\y\ \� \ s\ \ \ \ \ \ \ \ \ 1 \I \ o = _- _ _ _- _ / ,; \\\\ \1 �\\\\ I\ \ \�\-\\\ \\� I \\\ Il III IIII l,I/ ll/ 11/,�/ // �/ / / l/ / / / / /// /✓// / ,/ // __ �\ \\ \�\\\\\\\\ \ \\ ��\\\����\\ 11�� - \ \ \ \ \ \ \ \\ \\ (1 I I J \IIII \\ IIII_-_-_--- __-- // __.))) 1\ 11 �\\ _\I \" 6°\ \ \� lI 1 \I 1 I II Ij / I /, / / / �� /�l� / // IIII////i/,�°/// // // -_ \\\sue\\\\ \\ \\,\\\\�\\\\\��\����h\\\\\\\\����\-\ \\ \ \ \\ l / -i ,� \\\ IIII\`\___--- _�= _ 1 1 I // / / / / / / / / / / o/ / / / / LIMITS OF - \ s \\ \� \ \\\ \ '/ �� J�/JI III \\\� \J \\\\\\\�� !/ \ 1 \� \\\ 1 111 I I I I I ll 1 I l / / //i / / / // /// /// //// ///� / / / CONSTRUCTION �� \ \\\� \ IIII IIII \\\���\\ \525`--_---- _ - \�////�_, 11 \\ \\ .J \\� \ Ii 1 111 f,1 //l / ____ \ «`\\\ \ \\\ \\ \\\ \ \\ \ \ I� _ __-_ _ -_�\ // / / / / / / / / / / / / / / (TYP.) - \ - \ \ IIII \\\ \ \ \� \ \ \ • \ \\ \ / \ \ _ _ - / / I I \ \\ \ \, \� \ \ _ ) ) \ IIII I I I '/ l l / / , , / / j / / / / / // / / / / III I/ , /// / _ / \ \ \� \\\ IIII\ \ \\ �\\ \\\ �1\ \ \ \ \ LIMITS OF \ \ \ f /%�l / \ �� � - ` �\ -- �'/- III -�\�� �11 -�\ \`\\ \ \ \ \ 111 I I I / /� / / / / // // ,/ / // _ __--___\_ \ \ \\ \� \\� \� \, \ \IIII \�\ % / ? \_-\ _ S _ --_ -__ �\ _�// -� l I 1 1 IIII IIIII )l f 1 / l / / / // , / / l / / �h �/ / / \ \ \ \\\ \ \\\ \ \\\\�\\\\ \� \\\ \ \\ / / / 30� — _ \` -'" //_ \III \ \ \ \ A6S \ \ \� \ _ \ 'l I I I I l / / / / / IIII ////h /, / - / - - \ \ \ \ IIII IIII\\\ \\\\ 1 )� CONSTRUCTION (TYP.) \ \\ \ \ I / / / / / / /// / - ^_ - \ �\ ` _ _ - _-\-\\ Q \-///%�� a Ill \ �\\\i \;� /1 111 I�\\)11�)\IIII 1111111 IIIII 1 // I I r / / / ///IIII// IIII// /i / / �/' �/ --\ \ \ \ \\ \ \\\ \ \ \\\ / / \ \ �1 I / / -\ =� =---_ ;� \\ \\ / /i // \�\\ I 1 \ \ \\\ ` _ / / / / / / - \ 1 \ \ \ \\ IIII\ \ \\ �\\ \\\� r l ) \ \ I / / / // �� \�/,//�� \ I I / \ , \\ A- I I II I I 1 1 1 // I I / / // / _ _ \t\ \ \\ \\\ \ / / > > \ I I // _ _ \ / \\\ - � � ��` ®`���_� �_ \�\�-�.\\ IIII 1 I I it III \\ I 1 I I 1 / / /// ,/�// /, �/ / �__ \,--\ \ \ � \\ \\ \\\ \�\\\ IIII\\\\\IIII I � I 1 1 I' /�/J/IIII 1 ///// // / � �\\ s__sss — ��\ �\\ / J �. \\ A,, �\ \�, \ 1 11 1 I II I (I ( / / / / / // / / / / / I s \\ \ \\\ IIII\ I // / / / / / / / / - \ \ \ --------,\, \ GRAPHIC SCALE \ �// / / \� JI I 1 \\ \o \\\ _ \\\ \\ I 1 I I \I I I I III 1\ 1 / / // / / I \ \ \ IIII\\ \ \ \\ / / / // / \ \ l / / / / / / \ o \ IIII \ \ I / / / / / ---- ----� //�/// \— r^ \\�r\ \\\\\� \ \\�' I 1 I I II I I l 1 I // /� // / / o l r\ I \\ \ \\ IIII \\\ \\\ I I / / / / / / - \\� too o so too zoo �� \�� / \` J \ \ \� �\ \ I% 1 I 1 IIII 1 1 1 \ \ I \ \ I I l l lI r // / ! / / I / // // , /h / / / \ 1 �\ \ \\ \\ \\�� J / // / //o / /, / / / / / // / \ N/F / IIII IIII \\\ \ \ / ' / / / / / // / \ \ \ \ Sheet No. ._ / / �\ \ \ \ \ �\ - \ \ IIII \ \ I 1 I I I 1 I (III I I 1 \ \ 1 I // / / / \ \\\ \ \ \\\ \ I / / / / / / / / / \\ \ \ � \ \ \\ \ \ \ / / / / / / ROCKY CRISSMAN AND WIFE �0--/��\\ I/ ��\ \\ \` \I II I I I II 11 1 \ \ 1 I 1 ( / / / / // / / / / 1 \ \\ \\\\\ IIII\\\\\\�\ �\/ / //' / / / i- -\\ . - /// \\Q I _\ \ \\ J \ \ \� \ \ 1 Ily I 1 I I I II 1 1 1 \ \\\ \ \ \ I I 1 i // / / / / / ,�// // / , ( \ \\\ \ \\\ IIII\\\ \ \ \\\ \� 1 1 1 (1 (/ /I /I / �// , /// / l/ lI/ II/ I I / / / JANIEC CRISSMAN \IIII\ \ �� \ \ IIII 1 I I 1 I I I 1 I I (1 1 \ \ \ f ( I , / ,/ / \ \ \\ \ I DB. 1499 PG. 378 LOTS 1 & 2 �\ -%/, ��\\ \\ S\\\ \ 11 I I 1 1 \ \\\ �\ III\\I1 I /// / /// / // / / I \ / \�\ \ \\\ IIII \\ \ IIII I I I I I I l /�/// l 1 /I l \1 \ /inch=100Ft. ��—=i _ \\J / \ \ \ \ A \ \\ \ \ \\\ \ •� \ ) I 1 1 I I I I I 1 \ \ \ / / J \ \ \\ \ \\ \ \ `_ / I _ �.\\\\ \ I / \ ` J \ \ \ \ \ \\\ I 1 I I III I 1 1 I 1 ( \ \ \ \ \ \\\ \ \ \ 1 \ I I I ll / l l ( C \ - \ / \ \ \\ \ \\\ \\ \ \ \\ \\ \\\ \ - J 1 1 I / / / / / / / / 1 I / I BM. 2007 PG. 489 PIN. 9752-37-7288 \ \ \ 1 • 0 _ , _ — _ \ / \ l \\ \ I I I I I I \ \ \ \ \ \ \ 11 1 I I ( / / I I \ \ �\ \ \ \\ \ \ \ \\ 1 I I / / / / / / / I I I / \ \ \ \', \ �\ \ `�\ I I I I I I \ \ I 1 I I \ \ / \ \ \ \\ \ \\ \ \ \ 11 / l / I / / / f I I I / ZONE R-10 \ )IIII I \-,--- \\\\\�\�, \ i \��. \, ��\.\`i \\�u\\\.\ \� I�. III, II 111�1.\,��\I��.,I �.\\\\��\.\\ \��\\\\�l\\.\�\I.,\� \�\l,l, ,\\\� S4�\ \ \. \ _ �/ ,7\ l \- `. \\\`.\\` \\\`,\\`�\\`\\\\ V`\\.\\',__ / I\,(� I�11111,1,1,r� 1I I I I / I /\ I �I I WithersRavenel Engineers I Planners I Surveyors 115 MacKenan Drive I Cary, NC 27511 I t: 919.469.3340 I license #: C-0832 I www.withersravenel.com CONSTRUCTION DRAWINGS FOR CHATHAM PARK SECTION 7.1 RESIDENTIAL SUBDIVISION PHASE 1 PITTSBORO, CHATHAM COUNTY, NORTH CAROLINA AA RKWAY —� 70' R/W) — 241-243 EDOM PA 3/B WITH 2016, PG. OVERALL EXISTING CONDITIONS DocuSign Envelope ID: 4E8CE50A-9850-4C5F-967E-4301121 EDD37 01 PM - HEINZMANN, FRANKLIN n\PH1\3.0 OVERALL SUBDIVISION PLAN.dwg- Friday, April 30, 202 \CAD\Drawing Sets\Const ed 7.1 and Mello K:\15\15-0090\150098.62-CP Age R E INC. . � �D■ � I WithersRavenel Engineers I Planners I Surveyors 115 MacKenan Drive 1 Cary, NC 27511 1 t: 919.469.3340 1 license #: C-0832 1 www.withersravenel.com it I 111 � ' — USSET R � �' � R UN -./ , , // I // \ \ � / 1 �i i , � , , � � l N/F � � sir / �/\ MARY VALERIEBALLIT _-''�/ / GESUALDO A.COSTANZO,CO-TRUSTEES \ NIIIIIIIIRD �'WAlrfillig / i DB. 721 PG. 152 / � BM. 94 PG. 153 \ -__---) -i-' _ N/F . ' � �; CHATHAM DEVELOPMENT ONE INC. / V �� DB. 1809 PG. 167 � � 7 / I / .. ' • �� � � LOT 6 i \ / / � � \ PINZONE R-A2364 � / � N/F // � .„-- / PB. 2015 PG. 291-298 � 7 A&J VENTURE TWO, LLC / PB. 2016 PG. 241-243 V / / \ / / � DB. 1961 PG. 217 / BM. 19 PG. 6 / PIN. 9752-18-0689 �/ ZONE PDD N/F \ \ CHATHAM DEVELOPMEN ENE INC. \ ` PIN. 9752-29-2426 \ END OF CONSTRUCTION / / f / / / DB. 1809 PG. 16' \ LOT 9 / PB. 2015 PG. 291- \ / / ZONE 0-1 20' BUFFER WABASH STREET STA. ± 17+94.00 w ce PIN. 9752-29-08 \ t� �� I- o - �, I / / i ZONE PDD \ 1 II ( PERENNIA- - - - - - - - - - - - - - - - - - - - - - - - IP --------------------- Z / _ Jr• �� / II CHANNEL - / - - - -\ �� - , ''''''�_/ __________________..------ r. / / ,. ,+, h I. '• :�• •,pL IJ' ,� 11 I II11 �T1 1 1 1 III 50'1F- 20' 30' 1 30' I I / Ili/ I I 20'\ 50' \ \ 79 O 78 i— 80 O 81 O 82 O 7 83 O 7 84 O 7- 85 O T 86 O 87 O 88 O 55' RNV 27BB 89 O 90 O IMAGINE ■ 91 O 92 O WAY 93 O 94 O 95 O 96 O, I 4— 97 Ce Icr, I2 98 `�' ---- m �:::� I I 1 0 I / %4 o 1 0 0 N N N o v o N N N 99 i• 1 1\ 11 SC #2 ( 1 � "� • I \ 1 �" I I (WET POND) 77 48' B B 3s•• �♦ • I N/F / / CHATHAM DEVELOPMENT ONE �i INC 1 �.�� i' 1Il♦ I 1 1\ O o -� I p III p \ I ( / I 11 CONSTRUCTION DRAWINGS FOR CHATHAM PARK SECTION 7.1 RESIDENTIAL SUBDIVISION PHASE 1 PITTSBORO, CHATHAM COUNTY, NORTH CAROLINA DB. 1809 PG. 167 / I co co I \ I LOT 7 ��♦.` �♦ Z Z I 1 , ® ® ® CD . ®(11D ® • PB. 2015 PG. 291-298 �O r. // ' I ® ® PB. 2016 PG. 241-243 PIN. 9752 19 5526 ZONE PDD \\\ 1�. / , ,\\ /f I //✓ _ // / / / �\� / 1 76 O / // / • \ / // / \k ` I 1 1 /D / \ \ \ / // \ / I 74 — -_I �� M — ` I / 13 11 I I ® II I ® , 1 . 1 \\\ , \� �1 I , �� \ / /`\ \ II ® II _ I\ I ,,- r ....., _ \ 1 zcp ■■ r r \ \ \ \ \,. I \ 73 I O N/F ■■ 1 N/F I I \ / / \ \ I ` 20' BUFFER PRIVATO III LLC. PRIVATO LLC. IA N/F • / / a ® ® I \ / DB. 1877 PG. 718 = 1 DB. 1840 PG. 649 CHATHAM DEVELOPMENT ONE INC. ) \ � \ \ I \ 1 \ \ \ / I 2 ® \ 5' CONCRETE v """' _ DB. 1809 PG. 167 I I \ \ \ 72 1 / SIDEWALK (TYP.) / / LOT 4 BM. 2015 PG. 291-298 = LOT 5 BM. 2015 PG. 291-298 „ \ I LOT 10 - ! ,-- - / % /BM. 1 N \ � \ \\ / /OI155' R/W \ I CD \ I \\ ( 9752-08-7668 ZONE PDD ■A PM �����PIN.9752-18-0689 ZONE PDD � ��\ c� 2015 PG. 291-298// I V PIN. 9752-18 6885 / / / / / / ! / / / / \, \ \ \ \ I / / / \ I 27' B-B ® •( 1 / \ • ' \ I ® 11PIN. ® ` \\ END OF CONSTRUCTION - \ ZONE PDD / / / \ \ 71 \ \ ASPEN AVENUE I �J ��: r }1 �• o/ �N•// / / / / \ \ / /1 / / / / \41) \ \ 11 EDOM PAI 3/B WITH 2016, PG. //,/ \ \\` / / / 1\\\cC I ® CO \\w / /PIALCHANNEL / SCM #4 / / / / / \\ \ \ \ s', % j � I I �■DRAINAGE ■■ EASEMENT PB 2015 PG 291-298 — w - m / (WETLAND) / / / / / / // \\ \ \ / / / / / / / \ \\ \ / , \ \ ® / % /... / ® \ 1: 69 \ / / / \ \ Nx4 I I EXISTING 5' PUE v • • 95.5 R/W / / / / \ ) / ® \ I PB 2015, PG, 291-298 =_ I _ 1 // / // / SCM #1 \ \<y \\ 107 • / \ \ I I - . - - - - - - - (WET POND) \ \ \ `\ 68 \'L� \ % I , 1 al ' 1 ¢ z I \ \\ ca IP ov I \\ \ 1 �\ BRIDGE ( I �\/' I 67 \ I� \ /- / \ \ I 1 00 \ \\ 1 ,/ / ABUTMENT OVERALL SUBDIVISION PLAN EASEMENT �•� O Oi. 1 I 1 .../ I % \\ / / - oo 10 66 ` ' /1 / v� °�F, V v 65 a v v / �� v /�%j/ \ \\ GRANT DRIVE >�� :. %� /i �� 1 o _ 24 O 18) / EXISTING 5 PUE (EXISTING 26 B B W/97' R/W) V �`�, I / / / \ O'1'F 1 A \ / �� , =�1 / \ A ■ START OF CONSTRUCTION GRANT DRIVE STA. 10+00.00_ PB 2015, PG, . EXISTING �' PB 2015, 291-298 FUTURE 71'B-B PB 2015, PG. UE PG, 291-298 PB 2015, W 97' R W �-�''-1 / �O A 1 — i / F / 291 298 1 � // 25 \ \ \ / EXISTING UE //'' 1 1 / 1 � %f� / / \ V A / PG, 291-298 N. � / / 22 \ \ \ - / � �%% \ 41' B / / 21 \ \�� \ \ / / •i '', -••// /1 / : �,� ���.�s 1 ✓ 20 \ \I% O \\ \\ / / / /j 11/ ��•-/ ��� / 28 ` / %/ / \ \F O \ / / ` - _•64 IMAGINE �. \� 63 ,2 O 62 / �� \ 61 60 i \\ / / / \✓ 'r / I \ WAY 59 58 —� v / \ \ \ \ / 57 56 \ .i�' / 55 \ ■�� / / \ ♦ / EXISTING UE PB 2015, PG, 291-298 1/0AFS \ • 19 'p \\ „\ \ \ \'9 / ///,/7 \\ '� \ 18 \ 30 / �� _ \ 17 \ / / / %VA \/ PERENNIAL // / / \� -'� \ \ / ♦ / / \ 1 54 / / — _ _ _ SCM N D 1 1 / / N • \ ET POND) A I A / , / �� 53 �'1q�o�O o✓'cT A2s� Oy T° aos FUTURE SECTICiN DEVELOPMENT 7.1 CHANNEL / / / i o(`a BRIDGE \ \ \ 16 �� / / � / EASEMENT UTMENT\ \ \ \ 84 15 2T B B / / /-- / / / Q0 / / C\ \\ PUBLIC RNV 14 \ \ d / / �� VV vv 20B-g v /--- / / / / ���%\ 13 `vim N. ` \ 1 / �`� 31 32 \ \ - \ \ l / !/\PJ 52 33 \ �\ 55' R/W , ♦ Cam` 34 35 v�� 2TBB �� / P� 51 O 36 �� �. / / 50' // / L� � V �' O \ 55' R/W 38 ` / / / / / \ / 39 / /� 20' \ /o� / 30 / \ \ \ / I 27 B B 40 ^0 42 \ \ % / 49 1 \ PARKING CALCULATION CHART / / o 3a / \�� / / // // ti �44 20'/ 31 BB t // ; 43 1 pRo E 0 ��► SP 44 / I I T ~�' / Job No. 02150098.62 Drawn By TE / 50' \ 11 10 \ - �� Date 11/09/20 Designer FH SINGLE FAMILY (110 UNITS) , �� / N 5' B-B \ ` / /i. 48 N/F I 1 g \ stagi 2SPACES/UNIT REQUIRED 2SPACES/UNIT PROVIDED (GARAGE/DRIVEWAY) 0 GUEST SPACES REQUIRED 0 GUEST SPACES PROVIDED (0 ON -STREET) RESIDENTIAL, TWO FAMILY (44 UNITS) \ \ \ \ �� / / / / / ,�O / �� \ / / / / per' / / / \ / / / . / ,/ / / ll • �Ot\ / 12 1 \ \ I I O $ \ O 1 1 7O 1 5 -, O \ 4 O CHATHAM PARK INVESTORS LLC. TRACT II '_ p / DB. 1875 PG. 47 PIN. 9752-47-0648 ■ ' ZONE R-10 oo°°°N CAR °0Oo° 00 0 0° ° ° 0°°° °°ESS/ ?/ o o = �° OF ° °° °' o Q ti9 °� t SEAL o o g g °% 027568 ° o °° 0 0 ,,rp � o f Z-- 0 O ° °°�Fy R ENG°P° °O0Q0o0o000000 ° 4/30/2021 2SPACES/UNIT REQUIRED 2SPACES/UNIT PROVIDED (GARAGE/DRIVEWAY) 0 GUEST SPACES REQUIRED 0 GUEST SPACES PROVIDED (0 ON -STREET) \ / / ✓ \ \ \ \ ® \ / / / \ \ \ ` \ O / \ / \ \ \ \ / / / / \ \ \ \ // / V A\r / 0 • \ • // \ \ / i / \ \ \ MAXIMUM ALLOWABLE IMPERVIOUS SURFACE / / 'I \ �\ I '' 1 (MAIS) AREA PER LOT SUMMARY -PHASE 1 ,i / / / \ \N \ \ 1 1 LOT(S) MAIS (S.F.) / / A A N Nv AMENITY AREA I Revisions 1-44 2,940"� \ \ A �A I 1 REVISION PER TOP 01/25/21 COMMENTS 45 46, 53, 57-64, 70 73, 87-96, 101-104, 121-132 & 138-154 3,250 V \ \ \ \ \ 47-52, 54-56, 65 69, 74 86, 97-100, 105-120 & 13 137 3,960 V A \,,,,_,, REVISION PER DEQ 2 04/30/21 COMMENTS / / A N/F \ �v • / / / \ CHATHAM PARK INVESTORS LLC \ �� \ \ \ DB. 1567 PG. 800 \ \ LOT 3.41 \ BM. 2015 PG. 291-298 \ .\ \ PIN. 9752-00 5565 \ \ \ / \ \ ZONE PDD \ I 1 20' B-B 16' B-B - - Ael - -� r��►.... SUBDIVISION NOTES: �\ _ �� . E_� - PROPOSED SPEED LIMIT AND ( 1. DRIVEWAYS ON CORNER LOTS SHALL BE ON THE FAR SIDE OF THE LOT. _ STREET CLASSIFICATION _ G' RAN 2. ALL SINGLE FAMILY UNITS ARE REQUIRED TO PROVIDE 2 PARKING SPACES EITHER IN A GARAGE AND/OR DRIVEWAY. (84,R/"JR/1/E- - 0- 3. ALL DRIVEWAYS USED TO ACCOUNT FOR 2 PARKING SPACES SHALL BE A MINIMUM OF 16' WIDE AND HAVE A MINIMUM 20' ROAD CLASSIFICATION R/W WIDTH SPEED LIMIT FUTURE DEVELOPMENT — LENGTH SHALL BE MEASURED FROM THE RIGHT-OF-WAY. GRANT DRIVE PUBLIC STREET 84' 35 MPH I L 1 ASPEN AVENUE PUBLIC STREET 55' 25 MPH SECTION 7.1 J 20' B-B END OF CONSTRUCTION II GRANT DRIVE STA. 41+11.00 GRAPHIC SCALE 4. DRIVEWAY PARKING IS REQUIRED TO BE 20' IN LENGTH TO COUNT TOWARDS PARKING REQUIREMENT, MEASURED FROM THE RIGHT-OF-WAY. PROSPECT PLACE PUBLIC STREET 55' 25 MPH Sheet No. 3•0 100 0 50 100 200 IMAGINE WAY PUBLIC STREET 55' 25 MPH 5. A CENTRAL MAIL KIOSK FOR 154 UNITS WILL BE LOCATED IN THE FUTURE AMENITY CENTER AREA. 6 REGULAR SPACES WABASH STREET PUBLIC STREET 55' 25 MPH 1 inch = 100 Ft. AND 1 ADA SPACE WILL BE REQUIRED. THE MAIL KIOSK AND PARKING SHALL BE CONSTRUCTED PRIOR TO C.0 FOR PHASE 1. THE PERTINENT CONSTRUCTION DETAILS FOR THE KIOSK AND PARKING WILL BE SHOWN WITH THE AMENITY MERRIVILLE ROAD PUBLIC STREET 55' 25 MPH CENTER PLANS. ABUNDANCE LANE PUBLIC STREET 55' 25 MPH DocuSign Envelope ID: 4E8CE50A-9850-4C5F-967E-4301121 EDD37 PM - HEINZMANN, FRANKLIN n\PH1\4.0 OVERALL UTILITY PLAN.dwg- Friday, April 30, 202 \CAD\Drawing Sets\Const ed 7.1 and Mello K:\15\15-0090\150098.62-CP Age R ■ • TOWN OF PITTSBORO UTILITY NOTIFICATION NOTES: FIRE HYDRANT NOTES: PIN. 9752-19-5526 / \Xx : — - - /j / ZONE PDD r , // \ WithersRavenel Engineers I Planners I Surveyors 115 MacKenan Drive I Cary, NC 27511 I t: 919.469.3340 I license #: C-0832 I www.withersravenel.com PER LATEST TOWN OF PITTSBORO STANDARD SPECIFICATIONS, FIRE HYDRANTS (IN 1) N/F �� \ MARY VALERIE BALLIT 1. THE OWNER/CONTRACTOR SHALL NOTIFY THE TOWN OF PITTSBORO AT LEAST 48 HOURS PRIOR TO BEGINNING ANY CONSTRUCTION. ONCE CONSTRUCTION HAS BEGUN, AT LEAST 48 HOURS NOTICE SHALL BE GIVEN PRIOR TO ANY SORT OF DISRUPTION TO THE TOWN'S SERVICES SUCH AS TAPPING WATER MAINS, DISTRIBUTION MAINS) SHALL BE SPACED SUCH THAT ALL STRUCTURES FALL WITHIN A 500-FOOT RADIUS OR AT LEAST ONE HYDRANT. // / j / GESUALDO A. COSTANZO, CO -TRUSTEES / / l i / \ DB. 721 PG. 152 / // / / '♦' / BM. 94 PG. 153 OPERATING VALVES, CLOSING STREETS, PLUGGING SEWERS, ETC. ///// / /� / PINZONE R-A2 64 r 2. NOTIFICATION MUST BE PROVIDED BY DIRECT COMMUNICATION. VOICEMAIL OR \ -_-' EMAIL WILL NOT BE CONSIDERED PROPER NOTIFICATION UNLESS ADEQUATELY / �' / RESPONDED TO BY A TOWN OF PITTSBORO REPRESENTATIVE. // / A&J VENTURE TWO, LLC / / / DB. 1961 PG. 217 \ 1111 3. THE OWNER/CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING ALL i►�` / BM. 19 PG. 6 CUSTOMERS AFFECTED BY SERVICES INTERRUPTIONS. THE TOWN OF PITTSBORO WILL NOT APPROVE SERVICE INTERRUPTIONS UNTIL PROOF THAT PROPER CUSTOMER NOTIFICATION HAS BEEN PROVIDED. / ,< / / ; / PIN. 9752-29-2426 8" DIP WATERLINE TO BE / / ZONE 0-1 EXTENDED WITH FUTURE DEVELOPMENT / / 4. EXISTING VALVES SHALL BE OPERATED ONLY WITH A REPRESENTATIVE OF THE TOWN OF PITTSBORO PRESENT. / 11� PERENNIAL _ ---------�-------- �' II I 1 CHANNEL - /------------------------ � -\ � � - 1111 I PIPE CORROSION POTENTIAL NOTES: h I / \ /� \ - 8" DIP 97 1. GEOTECHNOLOGIES, INC. WAS REQUESTED TO PROVIDE THEIR OPINION OF THE POTENTIAL FOR CORROSION OF DUCTILE IRON PIPE INSTALLATIONS FOR THIS n�; I 1 ) / / 6" DIP - --(WATERLINE) � (WATERLINE) 1 � • Iw ■ (DIP) PROJECT. PER THEIR REPORT DATED 03/20/17, THERE ARE NO CORROSIVE SOILS ON SITE. i i 79 P'mmLim� _'' ' 78 80 81 82 83 84 85 6" DIP - 86 87 88 89 90 91 92 93 94 95 96 I G it.? N IN 98 �� (WATERLINE) IMAGINE WAY_ 20' 30' 30' 20' 50' — m UTILITY LINE SIZING NOTES: N N •� a----� "NORTH I I VV vu vu vu vu vu vu ISS vv / ' 99 WATERLINE SIZING BASED ON REPORT TITLED, VILLAGE UTILITY PLAN UPDATE ti o oN I SS • SS SS • SS SS SS Potable Water", PREPARED BY MCKIM & CREED, DATED AUGUST 2019. I \ \ 1 SCM #2 / 1 77 I O ��� � 1 I� I \ 1 (WET POND) �I I _ �1 1 1 \J #17FHA 1 11 FIRE ACCESS NOTES. TIE TO MANHOLEo ) (TOP #2100469.11) i/�/ / co \I \ \ I r #13 FHA II #16 FHA I I � , � �. • ® ® ® ® ® � ® • ® e ® ® 113 I FIRE ACCESS MUST BE PROVIDED DURING CONSTRUCTION PHASE. NO BUILDING MATERIALS ARE TO BE PLACED/ STORED IN MANNER AS TO PREVENT EMERGENCY VEHICLE ACCESS. 7/ / I, /7 / I 76 /� \ / �� / k� 1 • II n I� I I I I I �� /1 1 \ �\•/ I / t II I 1 CONSTRUCTION DRAWINGS FOR CHATHAM PARK SECTION 7.1 RESIDENTIAL SUBDIVISION PHASE 1 PITTSBORO, CHATHAM COUNTY, NORTH CAROLINA \ / //I / 8" DIP o oilv / \ / //I 75 74 — I III I / \ \ v / (WATERLINE) -� _ 1� / v �v ;� //�/ IQ II ICI I I I l 11 mi �� �' �,, v v / •, I I ICI I I 1 �1=f I I vv / ® 1 EXISTING 12" / / \\ \ `\ \ I I ICI I I _ / / \ / / \\ \ ® 6 DIP , (WATERLINE) I k \ \ / I Z \\ \\ ■ 1 _ - �v�'i / \ \ OUTFACE A -.\ /�0 / \\ \ \ \ 73 �- I 1 / - N/F PRIVATO III LLC. ■ I N/F PRIVATO LLC. - I \ / / \ \ \ N.\s \ / / \\ \ 1 I I 1 `(WATERLINE) 0 \\ ® I \ \\ = - DB. 1877 PG. 718 1 _ I— DB. 1840 PG. 649 CHATHAM DEVELOPMENT ONE INC. DB. 1809 PG. 167 I 1 1\ \ \ \ ✓ / I _2 1 ® I I \\ 1 ��- LOT 4 iooil LOT 5 - A I A \ 72 I / \V = - BM. 2015 PG. 291-298 i """' BM. 2015 PG. 291-298 LOT 10 A I \ A / I I I , , \ 111 I ® \ A \ ( = PIN. 9752-08 7668 I i — 1 PIN. 9752-18-0689 I �� BM. 2015 PG. 291-298 / ! / / / / I \ \ V OUTFACE B I / / \ ® III / \\ 1 CI \ 1� ZONE PDD ( i ZONE PDD _ _ } Q PIN. 9752-18-6885 , \ / / / / / \ I 1 I I ' \ #14 FHA \ ® i N Y o �� ZONE PDD ✓' A / \ \ / `) / \ S \ / 71 I 8"DIP WATERLINE TO ` \ \ BE EXTENDED WITH - I b Q I 1 I 1 I I EDOM PAI 3/B WITH 2016, PG. I / / / / `� I EXISTING 8" / / // / / / // / / \ / PERENNIAL CHANNEL (RECLAIMED WATERLINE) / / / \ I REMOVE SCM #4 / / / \ 1 \! \ 1• \ \ . \ -9 FUTURE PHASE — �� �S ® �\ \ \ A \� V \ Si, — 1 �// - cc EXIST. 12" DIP / / / / \ \\ / ® / O ® V\ I �I = I 1 r r = b, v m BLOWOFF AND / / \ \ TIE TO 12" DIP / (WETLAND) (WATERLINE) / / / • \ �\ / / \\ 69 ,� / / \ \% 1. \ ` ��F%` � �J ' I / // \ / / \ \ / \ A (WATERLINE) / �, / / ,., 1. \ #15 FHA EXISTING 12" CPP / \ I I \_ I I I I I I I I I I I I I I I _ I (TO BE REMOVED) / / / / / \ \ ® �� OUTFACE C ® ® \ \ N. - �� I — 1 ►a I // / WCM�#1� 1 I / / \68\\\ v�®\,\I $ — -- --- _ ��� / ` z 55/i�\V\y IIIIII`, �.;iT `` / �IIIIIIII —�, .12"DIP I T ���7 / /I l // ' r(WATERLINE) _ / o #12 FHA / ® V 1 i �� W W mhit APPROXIMATE LOCATION — I ```� W / J �! 0a. 67 • — \ / „ I ►► \ #1 FHA \ / OF 12" DIP FORCE MAI 1 / / F-- 0 �. ' 6"DIP \ 1\ #11 FHA 1® / / \ / t / — �•;• A (BY OTHERS) / 1� \ \ I /t' / I L _ / / � . , \ _ �� (WATERLINE) 260 LF STEEL CASING r � l �� � —/ / SS \ `sd �p `� 66 \ ® I�' � ®j V / . / �' / — \ I ® / � PIPE (BY OTHERS — � \ 'L�. / 1 / � ....\ ‘10,;,„ ____„/ 65 � ' s GRANT DRIVE \ %� ei/ 1 \ \ \ o �.� '��� V SS �, / (EXISTING 26 B B W/97 R/W) tri 6 x4 REDUCER ,�� �� / O \ ti \ \ \ � / l •�� `;; \ F � ■ 8"DIP � OVERALL UTILITY PLAN (FUTURE 71'B-B 14 PB 2015, PG. W/ 9T R/W) 291-298 EXIST. 6" PVC - (RECLAIMED WATERLINE) REMOVE BLOVVOFF AND TIE TO 6" PVC RECLAIMED ( RECLAIMED\ I �_, � / WATERLINE) 1•/ � � / / / ,i_ , / � ® 1 !l / ����/� vvV � / � /��,I 21 \ 4" PVC / ,'� �� (RECLAIMED WATERLINE) ♦ �' ♦ �� ✓ 20 / / / O #18 FHA \ �O \ \ �'6` � \� 26 \ - - \ vF. � \ \ � \ \ - - / / � \ ��� 27 \ V \ \ \ / , / ` 28 \ \ / \�� � 64 IMAGINE s♦ 62 // �� •. � 61 60 / V� / / \ r� 1. / 1 WAY 59 — 58 — — 57 � --�` \ , \ #10 FHA v� A / 56 ' / 55 V ♦���. / 6"DIP (WATERLINE) �roa Q .�Q �FUTURE DEVELOPMENT/ 7.1/ (WATERLINE) / \ \ /�A(WATERLINE) / ���� • / / //O�Q'/\\AV/ /Q° /°/ /40LFSTEELCASINGPIPE�.�vv/34 //BORE / /:��, �\ \ 9 �� #2FHA 18 � \1 W ,�\��V6"DIP/A OA30 �� � \\16\\/ 15\\ `�vOv A\14V/33 &JACK/��%\\13�� O 2g / / /�� / / /\ / /31 / _\ / / 7 1 /�� fpCRM #3 � 1� \V ET POND)\1111/�/s�//�c V / 1/"�o9��sPERENNIAL// 1 1 32 ��--/.. ♦A 1 �1/�aTs����o� O v ����//�51/ 35 36 �� �� (WATERLINE) J I� / 54 /�`//\�.-�� �'°go��oT�O�CHANNEL / / / P52/ •SECTICiN 8"DIP // / // (, O ���� \\#3 \O (WATERLINE) 37 ��//5050 O// • \ / / k� / / / / / / / / / / // / / / / ® \ / / / �/ /WITH / �� / / \ ` o / / /\ / \ / /// /ti/�� / ti° ti��� // � / / ( \ \ \ F \ \/ 30A,�/ 20'/\\`/ ^,� p�'� / / \ �� 'V� \ / \\ 4" PVC RECLAIMED WATERLINE TO BE \ EXTENDED WITH FUTURE PHASE / / / 8" DIP (WATERLINE) BE EXTENDED FUTURE DEVELOPMENT \ N/F CHATHAM PARK INVESTORS LLC DB. 1567 PG. 800 \ LOT 3 \ \ BM. 2015 PG. 291-298 PIN. 9752-00-5565 \ ZONE PDD FHA�� `� \ \ \ \ \ \ /I III /#7 FHA III / 12 O IIII 6"DIP \ (WATERL\ Imo) \ 8" DIP (WATERLINE) \\ \ \ \\ \ \ i \ \ N \ 38 — ��, ��SPE O 0 \ \,� _ 0 \ � - I © \ \\ \ 5 0 ® 0 O \\ \ \12" DIP (WATERLINE)I:10:04,00A #4 FHA \ \ \ \� � � \ \ \ \ #5 \ \ II \ \ R\,; T - - - O FHA FHA - 41 PLACE -1 ( / / / / / / I I 1 �, `. 42 —' I I I( / , 43 44 45 � 46 47 ........ �� \ #9 S Ir _ -/• 6" DIP (WATERLINE) 8" DIP WATERLINE )ESS/��//// I I 12" DIP WATERLINE _ _ _ ( ) _ _ FHA / I1I I 48 ): / vv49\\ • I ill _ 1 / /� / 1 1 1 1 1 / • I 1 I 1 / // // � ''�� / // / / / , / / / / '°°� #6 FHA - 12 DIP WATERLINE TO BE EXTENDED WITH FUTURE PHASE CHATHAM PARK INVESTORS LLC. TRACT II DB. 1875 PG. 47 PIN. 9752-47-0648 ZONE R-10 Job No. 02150098.62 Drawn B Y TE Date 11/09/20 Designer FH o°°°0000000000000°0 °°°°°°°°° o0 o00 '(N �' li l0O`000/TO p:000,n0°,(z...V SEAL g o 027568 o °00000 \,l ° °°Q000000 oo° p0° 4/30/2021 Revisions 1 REVISION PER TOP 01/25/21 COMMENTS 2 REVISION PER DEQ 04/30/21 COMMENTS (RECLAIMED WATERLIP E) -___ ►► -- _ = `—.' \ \ willow - \ GENT ---R� \ ) i • I / l8q V � , _ J J \ \ \ �\ G RAP IC SCALE \ \ \N 100 0 50 100 200 \ \ FUTURE SECTION DEVELOPMENT 7.1II ICI 1 L 8" DIP 4" PVC RECLAIMED WATERLINE TO BE (WATERLINE)4" PVC EXTENDE WATERLINEto 8" DIP WATERLINE WA ERLINELTO BED FUTURE PHASE \ TO BE EXTENDED EXTENDED WITH \ \ 1 inch = 100 Ft. WITH FUTURE \ \ \ FUTURE PHASE 1 \ \ \ DEVELOPMENT N/F Sheet 4•0 No. ELECTRICAL NOTE: ELECTRICAL LAYOUT WILL BE PROVIDED AND DESIGNED BY DUKE ENERGY. \ ROCKY CRISSMAN AND WIFE JANIE C. CRISSMAN I ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH TOWN OF PITTSBORO AND NCDOT STANDARD DETAILS AND SPECIFICATIONS, LATEST REVISIONS. \ N / �� / DB. 1499 PG. 378 LOTS 1 & 2 I BM. 2007 PG. 489 PIN. 9752-37-7288 ZONE R-10 DocuSign Envelope ID: 4E8CE50A-9850-4C5F-967E-4301121 EDD37 08 PM - HEINZMANN, FRANKLIN n\PH1\4.1 - 4.4 UTILITY PLAN.dwg- Friday, April 30, 202 \CAD\Drawing Sets\Const ed 7.1 and Mello K:\15\15-0090\150098.62-CP Age R ■ ■ v u N/F / / // / / WithersRavenel Engineers I Planners I Surveyors 115 MacKenan Drive 1 Cary, NC 27511 1 t: 919.469.3340 1 license #: C-0832 1 www.withersravenel.com PRIVAT LLC. } ro N/F / / / MATCH LINE SH EET 4.4 / / —r Q N CHATHAM DEVELOPMENT ONE INC. / / / N/F I I DB. 1840 P PG. 649 i �' Y b v DB. 1809 PG. 167 ■ ,. / 1 PRIVATO III LLC. LOT5 CC LOT10 / / DB. 1877 PG. 718 BJ[r • SC M #4 / / MATCH LINE SHEET 4.1 // / / LOT 4 I _ PIN. 9752-18-0689 a H a BM 2015 PG 291-298 �� / / / / / I PIN. 9752-18-6885 (WETLAND) / / / BM. 2015 PG. 291-298 / � ZONE PDD O m / ZONE PDD / / / PIN. 9752-08-7668 -r • 0 on / / / / / / / 1 • I ZONE PDD �I / / / / / ce v m / / -ID/— AND TIE TO i / / / REMOVE2" (IL_ Cji - - - / I // / DP (WATOERLOFF INE) 400 FES • / / / / / / �I / I I / l / I _ I _ = 1 ` EXISTING 28' TOWN OF //// // / // / // • — • — • — • — EXISTING 12" CPP / PITTSBORO PUBLIC UTILITY /� / / / ® \ (TO BE REMOVED) / AND GREENWAY EASEMENT / t� / SCM #1T II ��� \\��—/ �� �� \\ \\ / //r / / l ' Y I (WET POND) 20'DE I ��, / **V.!, 9'PUE 12"GATE VAE I / / I /I MATCHLINE 5 MATCHLINE 5 _ // / / I I • ®1 it (TYP.) -- 1 / / / I / / .• - _�' \ � ` \- � _ J / I / 150-HW \ 100-HW I \ 12" DIP/ \� APPROXIMATE LOCATION I i W � 401-YI / •W W W W W / / OF 12"DIP FORCE MAIN I I i', i N Z yy (WATERLINE) I #1 FHA x \ /\ / (BY OTHERS) ' \ G 4� , / \ 1 I I 1 1 ♦ — I I / / W \ // / 260 LF STEEL CASING \ 1 1 ♦ii _ I i�•/ I / W \ i/ PIPE (BY OTHERS) 45° 1 \ L — — — — ■ I /i� / ♦ 0' PDE 104 MH �i / BEND ! BRIDGE / \ — I ,I / / /' / ` / / 1 i —�� ` / R \� / ABUTMENT J -� — i�' = - - - - - / - R \ \ / / 1 1•- R � EASEMENT / zi ' �R ♦ _ 1 wr z / - - 50.14 LF 8" PVC h k� ' ♦ 101 CB !� gS II, :� _------- - ', . � �� / � � �J � / ` v / /•/ PSCSAE �� �;% �\ / ice`// I � / I 11 S01°11'56.14"W Y�►�� ♦ BOA / '� �. /� ` / 402-CB� / ♦ 3/4" WATER METER R O Si ,' ' if/ // ♦ / (TYP. FOR ALL LOTS) FZ / 9' PUE `�•/\ `4i �i�• // /♦ / / = / GRANT DRIVE `` _ / 4" PVC \ / *�� ;' /\/�o>/ -� / 20' PDE /♦ / al�� ........ V ,� / (EXISTING 26' B-B W/97 R/W) (RECLAIMED WATERLINE) �'_ *••�/,' /� :• i♦ / R / `/I'' t� 105-MH ../ (FUTURE 71'B B W/ 97' R/W) ���- / \ Vr PB 2015, PG. 291-298 6" x 4" REDUCER 1 < ` o,V- \ GATE VALVE / RECLAIMED WATERLINE)4" •/ ��. ��� ( \ \ `' 7 // // 102 CB I (TYP.) 1 • / ; / f ../. REMOVE BLOWOFF AND TIE TO 6" PVC RECLAIMED 45° BEND `/,/ / I CONSTRUCTION DRAWINGS FOR CHATHAM PARK SECTION 7.1 RESIDENTIAL SUBDIVISION PHASE 1 PITTSBORO, CHATHAM COUNTY, NORTH CAROLINA ....... ice/ / (RECLAIMED) i r4 �. \ f / �� (WATERLINE) �� �"r ' 30'UE / / ••I/ ��j�����151-YI 22 iii 21 � Q�/ ���� \ 151A-YI 45° BEND , / // �• �p�• �152-C' / / 6" DIP (WATER) / it��/ i�/% \ \/ \\ ��' /\)/* . / p p, , \ Q (WATERLINE) i' <� 152A-C'. I` / / ��J �Air��� 45° BEND V�� I / /�� (RECLAIMED) / a VN If/ //lk ��� • / 45° BEND /* �� �� A \ \ �• . \ / \ 12" GATE VALVE 43 / / lip. \ / \ \\ (TYP.) 19 / / A� \ lli�.�>► A ► / A #2 FHA /Nov' \ \ \ �� ��_ A\\ BRIDGE / \ ��� \ \ J / ABUTMENT 43'-CB �, < \ PERENNIAL CHANNEL / �• 9' PUE 18 O s FUTURE SECTION DEVELOPMENT 7.1 \ g \\\ \ / / / /\ \ , EASEMENT ��� W. //1 / \; '� W '� `. 17 � / / N R—/_15CB ., \\ // \ O \ —45° BEND OTA�O� T�O s EXISTING 28" TOWN OF / / / / / / OQQ� �� / 45/ ° BEND (RECLAIMED) \ \ • \ Q �\ \ \ / / / N \ ��T AG PITTSBORO PUBLIC UTILITY / / / / oQa • 154 CB BJ -K/C x� AND GREENWAY EASEMENT / / 45° BEND 4" GATE VALVE \ \ \ /�Q / / ` 5��� /i!A Q� �� / / (RECLAIMED) (TYP.) V A ��` \ \ 06 / // / CASING PIPE 40 LF STEEL 04)-1 \ \ \ ♦ \ \\ \ / / / / BORE & JACK 9' PUE -9 P '• / / / / / F \ \ \\ // • \\ \ 7 \\\ / \///// I154A-CB\\ ® N/ \ / � // \ Y// / / \ / / / \ \ / / / / / / / / \ \ \ / ,✓ \ //� // I \/ //////11/0FH / ///// //Z \//II j ///// //ct \/// / / / \�� / / / / / -------r \ / \ / //tii / / / 4�/ /// / // 4 // / /k/ / / / / \ / \ /20 / // / /\\ \ ////4/ \ \ \ \ / •44/ \ o/,�/ 30 \\ 4`\ \ p // 20' / / / A\\ \ / \ /P\ \ 50' \ � \ // 0��� \\ \ \ / ti / \ \ / \ / / / / / �.,� / 4" BOA W/ 4" GV (RECLAIMED) 10' PUE / / / 8" BOA //GV WATER / I \ \ \ \ \ \ A \ \\ � w to J ) I \\\ \ \ N w// tow w°000N/ Z J°°°�'c\00z Z a i:a:n Job No. 0215009 By TE Date ner ofo//// °oo\Ill o°. o°°oFo °o//° °° 'oo o co o 0 0 0��// o%00�so°FNoo/0F °°° lF °°°°°°°°°° G\ °°° °°°°°y°°°°°° 000 °°°°° 4/30/2021 Revisions 1 REVISION E COMMENTS , SHEET KEY MAP COMMENTTS01/25/21 2 REVISION PER DEQ 04/30/21 COMMENTS / \ \\ / \ \ \ N/F / \ \ \ \ CHATHAM PARK INVESTORS LLC / \ DB. 1567 PG. 800 \ LOT 3 \-----4\ � \ B M. 2015 PG. 8 / \ PIN. 975 00-5565 """"""" \ ZONE PDD \ '• 1111111111 1_� \ \ \ fo. OP its I GRAPHIC SCALE 50 0 25 50 100 .c� / \ \ \ It_ 1I.2 J.4 A \ \ / \\ ��/i�1�� /=, 1 inch = 50 Ft. \ , ��♦%''' ,` Sheet 41 No. • \/ \ \ i������ ''����� ELECTRICAL NOTE: ELECTRICAL LAYOUT WILL BE PROVIDED AND DESIGNED BY DUKE ENERGY. v \ \ \ I ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH TOWN OF PITTSBORO \ \ 1 AND NCDOT STANDARD DETAILS AND SPECIFICATIONS, LATEST REVISIONS. \ I \ \ DocuSign Envelope ID: 4E8CE50A-9850-4C5F-967E-4301121 EDD37 n\PH1\4.1 - 4.4 UTILITY PLAN.dwg- Friday, April 30, 2021 12:53:25 PM - HEINZMANN, FRANKLIN \CAD\Drawing Sets\Const ed 7.1 and Mello K:\15\15-0090\150098.62-CP Age R ■ WithersRavenel Engineers I Planners I Surveyors 115 MacKenan Drive 1 Cary, NC 27511 1 t: 919.469.3340 1 license #: C-0832 1 www.withersravenel.com \ �, �������11 �.��r / / 23 20' PDE�� 210A CB w4r MH �\ ® \ \ — — — \ �O ♦ ■�s�� �� 124 MH LF 8" PVC � V 4" PVC SCHEDULE � A \ �� \ �� ]O V � \��� ��1 �1 \ 65 O � / , S63° ` S63° 00' 16.68"E / ,. ���►� \ \ �� I 40 SANITARY o \ `, S \ 0 \ \ `'���� \ \ \ �� \ SS SS / / I SEWER SERVICE \ �O 2O � \ \ \ \ WI \ 1F W ,••` \ 150.83 LF 8" PVC ,i` ® 24 (TYP. FOR ALL LOTS) \ � 9� j \ \ `—�, W \ ,'�. \ c,6 � O,� \ \ �119.08 _ :=�� ` \/yS31° 32' 34.10"WI\\ LF 8" PVC`\��—,,',\ 125-MH�8" DIP WATERLINE105-MH ��9 �— ( ) i TOP OF BANK/S68° \122-MHLS 53' 03.94"E —— i1♦�1247-CB / \\OG��r \ \ 117z PVC SCHEDULE 40 SANITARY209 CB IMAGINE WAY- \ /25\ 9' PUE\\ NK4" \\\TOPOF BA HWSEWER SERVICE 64 - ` 6" X 6"TEE \ j� \ \/O\"7 \ —10 — (TYP. FOR ALL LOTS) 210 CB-�\\ \MATCHLINESHEET43���_ (3)6"GV \ ,��``\\//�248C•♦.ZONE1\ �,�� \ \ \18FHA26\\\\—MATCHINESHEET4.2�/.20DE62DE�\` \ #10FHA////•135MH \ \ONE � /`A/ �O605958\\\ \269.22 LF 8" PVC\\_2 / / 57 6" DIP (WATERLINE) Q�' \ — / / /211 /.��. S41 ° 25' 32.25"E \ \ / � / / / \\ \� 351-YI 56 ` \ / ���� / 27 \ / / / 11 JB �. \ 103A-CB \ \ / \ / CB \ o / PSCSAE , / ....... \\ �1` �ip \ 55 \ \ ♦ ` / ,..+ `� / V✓ ` \� \ 5 ZONE 3 / / • O 1 \ O ` / GG \ A�1�/�c \\ � � / � 1A1 ��� 352-DI A��� i A � ���� �, � � /_ 353-DI � ■ 12-JB ���� I ��\ 212CB O I♦I j/ \ 1 1� I -%•_ \ \ \\ 54 , / I 1 ell :�! \ / / — 1 10' PDE 21 CBS//'II .. / • \ 103-CB ��, �C / / - _ _ \ SCM 43 \ 1 ■ 1:::: / 1, 30 / , ,� (WET POND) \\ ��\ 1 ■ I1 ■. 1 PSCSAE 6 MH 217.72 LF 8" PVC / ,. ♦ / / S47° 04' 21.14"W , 214 CB • ♦,� \ 105.09 LF 8" PVC \ S26° 45' 49.58"E / \ \ ■ 1 , \ 1 • 20' DE / / / / / / / /\ \ --� \\ 215ACB /Qv \ \ \ \ / / \ / / ,,\I\ \ \B 33 • \ // 55,I ♦ / � 5 CONSTRUCTION DRAWINGS FOR CHATHAM PARK SECTION 7.1 RESIDENTIAL SUBDIVISION PHASE 1 PITTSBORO, CHATHAM COUNTY, NORTH CAROLINA 14 / DE 106 CB 113.53 LF 8" PVC ♦ \ \ • / 137-MH ✓< 9' PUE • \ S88°54'27.77"E 34 20'PDE \� ♦ • \\ / DE \ \ • • \ 14JB / / 51 �• — — 108 MH 35 30' PDE \ • / / \ • / 13 105 CB ♦� ►� O/ 301-DI \ • \ I 8" DIP . _ I ' \ • • \ \ 20' DE (WATERLINE) / I �. 215-CB — All1 , �-`I )1� ` 108A-CB 268.78 LF 8" PVC 37 \ \ • / / I. O / / / % 3S■,���� \ S67° 48' 41.19"E ■ / 50 DE 10'X70'SDTE / \ \ \ P \ 38 �\ I 1 / / / // / / / \ (TYP.) /7' #3 FHA / gurus" � 1 1 1 � A it •�� \ O 40 1 \ O I / \ I \ / DE 4 x4ll TEE / — �� ,, �� • \ 107A MH \ 41 \ GV / � / 105A-CB � 107-MH � ♦ \� CI. \ \ ��!__ • 49 \ / 1 \ 15-JB �. \ • \ \\ /#7 DE 108 CB \ \ 43 \ • \ FHA \ if \ 1 ♦ I 109-MH 124.94 LF 8 PVC 45 / _ 1 1 6 X6"TEE \• \ ••S80° 55' 49.68"E / 46 \ �, I �� /I/ / / &;. / (3) 611 GV •• PR SpECT SDTE \ \ 302 JB 47 10' X 70'(TYP) 16 JB \, ' / r• ♦ ♦ ♦ �•�,`` p�gCE I I •� / // / 84.37 LF 8" PVC 10 \ ♦ 110ACB • 11 \ /216-CB S52° 25' 46.07"W ; — 110 MH / •� \ \ — .�♦�`—��,— 48 O `/ 6" DIP (WATERLINE) 12" X 8"CROSS 1 1 1 \ S—■���-1 — 90 \ ��1I�1 111A-CB 136.45 LF 8" PVC / s / / i (2) 12" GV 12 1 I 1 \ \ \ .�� ��� W SS ��. I I ■//I. S76° 54' 01.07"E limill SS 1��� �%1w / / (1) 6" GV \ 109 CB i�'! W ; t�", ;l— \ \8��DIP WATERLINE ( ) \ 1 71. \ it W .��I #9FHA I — _-_ I v �� 110 CB W SS !11_�. / / CHATHAM PARK INVESTORS LLC. / \ 10' X 70' SDTE 115 YI 6 4" PVC SCHEDULE O -- 1-�' w / \ \ TRACT II • / / `> 1 40SANITARY - _ W \ 7' _ _ \ SS DB. 1875 PG. 47 .155 CB (TYP.) O SEWER SERVICE 9' PUE J — _ —� I — W \ // / / PIN. 9752-47-0648 'P 4 \\ \ (TYP. FOR ALL LOTS) #8 FHA I I— — — W / ZONE R-10 II* ®/3/4" WATER METER304 JB— — \W 111-MH./ \\\\\ \ \ 10' PDE (TYP. FOR ALL LOTS)/ ♦ I 111-CB — — / / 6" DIP — _� \ 116 YI 30 / `\ \ 2 I i \\ (WATERLINE) \ \ W \\- / \ � 0 I \ \ ._ 303-DI \ ' \ \ 1 \ I 2" WATER METER \ W 17-JB 155A-CB \ ♦ \\ \ \ \ 1 v •�� \ V A \\ A� I 1 112CB \ \ \ \ 12" GATE VALVE \ \ `- N • \ (TYP.) \ 117YI i 1 I 8" X 6" TEE \ *6 NN \ Ai ` \ \ 156-CB v I 1 \ 11 CB I Z 2 N 2 N \ \ \ 11 DE \\ \\N\ 114-CB Z z I 1 \ i I ' 2 2 \ \\ 1 1 18JB a _ a _ \ / \ \ 1' MUPE 12"DIP (WATERLINE) I 1 . \ N 8" DIP (WATERLINE) ,, 4" GATE VALVE \ ,Y 9' PUE% 305-JB'■ \\ \• / \\ \ (TYP.) X N' i 20 DE I \ \ Q \ \ \ \ #4 FHA / r / \ I • ■ I 157CB \\\\ � r / I I \\ / \ \ ` R \ AIR RELEASE VALVE ASSY. /,'i \\\� f RIN l r l^■ \ \\ i I 1 ■ • ■ ■ ■ I 9' PUE R \ 158-CB \ / \ \ \\ � � R w � ���� l r � � ■ SHEET KEY MAP \\\\ / r I ■ \ \ \s.1 306-JB 12"x8"CROSS W 1 I ■ Job No. 02150098.62 Drawn By TE �� • \ ` #5 FHA I (WATER) ` \ (2) 12" GV I ■ 8 Date 11/09/20 Designer FH ,1 \ ` W �1` ` CB 8" GV I ■ ( 9' PUE R \ (2) ■ 311-CB 12"BOA W/12"GV I — —=_� 12"DIP / 1'MUPE #6 FHA (WATER) SEAL o o 0 0 0 0 o c oo�g°°�027568�°00°0 o °o GINS o (.'° 0,0„,•-°O00000c oo�r o` e o°o N o0 o R. E o °0p000000a00000 4/30/2021 R W 'V� �� — 310-CB (WATERLINE) 8" DIP \R ■ 4" PVC \ � (WATERLINE) i ■ 3 — — \ \ — — — — 3A-CB — (RECLAMEDWATERLINE) — -------- ¶ij'';i VV —■ 1 W W I(TOBE W �Ii1� I� LOCATED ATHHPOINT) � ■W i - 309 CB \\\���_ _ � �j//i�`11 Imo;, — — RR I �1 — — i ■ ■■ _ C= a ✓`1I//////III R GRA1 I ■■ \ �! 1111I,, ,,, R— I ■ R / 308-CB p R R R R R (84 �V�I V R R R R/� — — -_t ■_ R R F R R �- --- -- -- ■ 1 re„ Revisions ---- IN FUTURE DEVELOPMENT — 1- 31 CB - — — - - ar 7 x� 19-JB REVISION PER TOP 1 COMMENTS 01/25/21 r — — — — SECTION 7.1313A-CB — — — — — — I i I 312-CB 4" BOA W/ 4" GV : I 20-JB 1 1 I I (RECLAIMED) REVISION PER DEQ 2 COMMENTS 04/30/21 L ■ I I 1 L4"x4" TEE 10' PUE J} (3) 4" GV 8" BOA W/ 8" 4" PVC 9' PUE 21-HW GV (WATER) (RECLAIMED WATERLINE) 20' DE 4"BOAW/4"GV (RECLAIMED) 50 40 GRAPHIC SCALE 0 25 50 100 1 inch = 50 Ft. Sheet 4 No. • 2 ELECTRICAL NOTE: ELECTRICAL LAYOUT WILL BE PROVIDED AND DESIGNED BY DUKE ENERGY. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH TOWN OF PITTSBORO AND NCDOT STANDARD DETAILS AND SPECIFICATIONS, LATEST REVISIONS. DocuSign Envelope ID: 4E8CE50A-9850-4C5F-967E-4301121 EDD37 n\PH1\4.1 - 4.4 UTILITY PLAN.dwg- Friday, April 30, 2021 12:53:44 PM - HEINZMANN, FRANKLIN \CAD\Drawing Sets\Const ed 7.1 and Mello K:\15\15-0090\150098.62-CP Age R ■ SHEET KEY MAP N/F WithersRavenel Engineers I Planners I Surveyors 115 MacKenan Drive 1 Cary, NC 27511 1 t: 919.469.3340 1 license #: C-0832 1 www.withersravenel.com MARY VALERIE BALLIT 110 GESUALDO A. COSTANZO, CO -TRUSTEES EXISTING 60' R/W, 2' NORTH AND EAST OF PROPERTY LINE DB. 721 PG. 152 DB 361, PG. 312 / PB 13, PG. 7 BM. 94 PG. 153 PIN. 0-2364 -\ ZONEONE R-A2 50 GRAPHIC SCALE 0 25 50 100 r -1I l 1 inch 50 Ft. • \ 8" BOA W/ 8" / GV (WATER) = .WI 1W, i 1 ELECTRICAL NOTE: I ELECTRICAL LAYOUT WILL BE PROVIDED AND DESIGNED BY DUKE ENERGY. 20' PDE 267-CB 268 CB ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH TOWN OF PITTSBORO 262-YI 26 YI 264 YI 265 YI 266 YI - _ - - - - 'I• , i. , AND NCDOT STANDARD DETAILS AND SPECIFICATIONS, LATEST REVISIONS. ` / _ -I - ♦♦ I / ♦ ` 261-YI / ♦ i I ♦ \ / / ♦ ♦ ♦ 8" DIP (WATERLINE) 97 260-HW ♦ ♦ 128A-MH ♦' I I ♦ ♦ ♦ ' 101.16 LF 8" PVC 1 79 \45OBEND 80 81 82 83 CI85 86 87 88 89 90 I 91 92 93 94 95 96 I �02° 36' 57.39"E I Iw E 78 / I� 98 . •. 6"DIP 6" DIP 249 CB �� I cn (TYP.) - 6" X 6" TEE 116-MHI 235A-CB 252.00 LF 8" PVC (WATERLINE)/ 253.87 LF 8" PVC 252 00 LF 8" PVC , I = 251-YI (WATERLINE) (3) 6" GV I i N89° 55' 39.16"E 126-MH 237A-CB N89° 55' 39.16"E IMAGINE WAY 127-MH 238A-CB N89° 55' 39.16"E ` N - 50' 115 MH \ / , /� `el Q - - - - - - a= / MIIIIW - MI - - - II im ii CONSTRUCTION DRAWINGS FOR CHATHAM PARK SECTION 7.1 RESIDENTIAL SUBDIVISION PHASE 1 PITTSBORO, CHATHAM COUNTY, NORTH CAROLINA i` IiiIi o \ • ' W W W W W W W W W W W W W W 250-CB 20' PDE • / W W W 11_� I' I' I ''� SS SS SS S' S' Ss SS SS SS SS SS8X6TEE202A-CB 37.43 LF 8 PVC 133.84 LF 8' PVC--- n ii, I �1 �� wI w SCM #2 N00° 5T 15.16E S89° 55' 39.16W _��-- - - - 128 MH \� w w -- --- --- --- ---- ---- - -' �� f N/F NN (WET POND)•I 114 MH 237-CB 238 CB 239 CB \ ■'I„IfDUCKA KELLY • 6" X 6' CROSS ' �;3/4 WATER METER4 PVC SCHEDULE 40 t w w I , 235 CB 240-CB DB. 762 PG. 735 Z Z \ (4) 6" GV n�� DE (TYP. FOR ALL LOTS) SANITARY SEWER SERVICE 9' PUE #17 FHA I 1 PIN.9752-39-8029 "�- (TYP. FOR ALL LOTS)1 11 `. III I 234 CB 236 CB DE I ZONE R-A2 UI U M M �� M M 202-CB ` II #13 FHA #16 FHA I I 1 2 \ , - �� ■ ■ F ■ 11 II 11 I I ® ® ® ® ® ® 0111) ® ® ® ® I 111111 I PVC I 20' SSE S02836' 57�39' W 1N - 11 203-CB I 1 1 t \ // • 146.49 LF 8 PVC i \ 76 /vim /N34° 03' 59.04"E ♦ 1 11 I I 10' X 70' SDTE (TYP.) I U' I ®1 10' PDE J I 11 I \ // // %/� 222.41 LF 8" PVC �\•/ /♦ N00° 00' 28.41E 1 11 204-CB 220-YI 221-YI L 11 MH / \ I I 200 HW / / IN 11,'- 252-DI \ /�/♦ I 1 \ • It - - _ ■� 1 8" DIP 129 MH \ \ 74 LIE (WATERLINE) 11 • / ///� // 75 I 218 YI 219-YI III _ 217-YI 10' PDE I \•••.-//�//204ACB \ /NF \ \ • / III 1111 201-DI,101II 1® iim II / \ I ® I 139.14 LF 8" PVC \II \ / PSCSAE / \ 1 I II 1 1 / ♦ \ 117 MH _ II Q 1 S00° 35' 25.89"W N / / \ I 1,� II \-----\ \ `- \ / / ♦ \ \ II N. � / ♦ � I I 1 I // \\ II 227-DI \ 1 229-DI AEIL 1111 \ // c'� ♦ ��.■ 242-CB `I / 20' PDE J \ \ \ 73 O II N / ♦ \ 241-CB / \ 201A-YI II 1 ♦\ f_1�/1 ♦ \ \ 1 140 MH ♦ ® \ \ \ // / 1 / 1 ® ,\ I \ \ \ \ '' II 11 I \ 1 \ \ S \ \ / / 204.26LF8"PVC \/ 1 ♦\\ I \ \ \ 1 \ 100 MH N31° 55' S7.80"E ♦\ I /X / 72 II L9PUE 1 1 1 39.26 LF 8" PVC ♦\ h I / 1 \ \ \ N \ \ / \ \ / 161.83 LF 8" PVC S00° 20' 57.02"W II 1 I 1■I• ♦\ 1 \ 45° BEND ♦ 1 \ \ \ \\,/_DE\\\I1GV(WATER) OUTFACE B t,ll. II 1 I 6" BOA W/ 6" // ♦�,��'r'` ♦ \ \ \ ice 130MH\ � \ cow II I 1 I 1 . f' ♦ \, ♦\ ® \ S\20' SSE\\/ /112-MH 205-CB 62.58 LF 8" PVC A`#14 FHA , ♦\�� \ \ �C `,, I ^145.71 CL \ 71 205A CB I1 I I ` N \ \� / N27° 54' 41.93"E 11 \ ♦ \ 1 0 ,, LF 8" PVC / \ \ I+. I 1 1 1 1 _ ` 243-CB S45° 46' 54.64"E / g \ \ / 1 1 1 1 1♦ I \ ° ♦ \ 73.46 LF 8' PVC \ \ reirr DIP \ S21 10' 52.75"E `�I� \ \ 20 SSE 46 \ \ / \ f 230 DI \�•1' 1 \ \ / l 1 (WATERLINE) �� ,I ® ♦. \ \\ SS \\ \// j \\ \\ \ I 1 ♦, 1. 243ACB 1 223ACB \ `,I ♦�••• \\ �`��X,�%, •\ \ / \ co"' `133.94LF8"DIP I i �, \ \\ DE ' \ \ 1 \ \ •` ` \ \ \ / 70 118MH DE 105.12 LF 8" PVC® 44 \ ♦ , �� \ / \ \ \ �,/ 20' SSE 139 MH � S3226-CB.81 "E\\131-MH \\\ 11.' 228 DI /N54 57 56.55E \\\ ® ,\\�`t\\\\101MHQ `\\� \ 224CB1♦ \ \\ \ I:1 135.52 LF 8" PVC / / \ ♦ \ .�,� ® N65° 52' 09.06E G / 0 \\\ \\\\ ,\1.4. \S32° Q `\ 1: \7760LF8PVC\142MH$:t 21' 16.67"E12063LF8"PVC138 MH\\ LF PVC F` \57881.14 #15 FHA \ 9 PUE PDE DE 102 MH20 / / 222-DI 225-CB j; 25 CB \ I 14023 LF 8" PVC ® \�1132-MHm1 \ 02150098.62 TE '30' DE 47°34' 43.53"E\'PERENNIALCHANNEL1: FH 170 FES 57WATER I♦\11/09/20 2 2 -OUTFACEA♦;, + .804 LF 8" PVC ♦ 254 CB \�� ® 232 DI \`♦��' �. •0 00 00 °oo 0000000 °oo A lc\ °o°°� 000000000 �.°OOo °°° 0 000°° .SS/0°°°00�2 °°° d = 0 n... tiy o Q SEAL o o 0 o 0 027568 o /°° °0 p ` o �A. � o Q °c oo� °000 G I NECK°o° �\ °o ooF o0000o G� °°o °°oO y R EN oo°° °p00000000000 4/30/2021 Z Z 20' SSE \ m ¢ / 3/4" WATER METER 119 MH ♦ 5 / ♦ OUTFACE C `' \ S48° 43' 53.46"E ' \ • � © J J 79.71 LF 8" PVC / / / o I m �- (TYP. FOR ALL LOTS) \ ♦ / / ♦ 245CB` ��� 143-MH UU Q Q • S10° 22' 39.96"W ♦ ' / ` ' / o • • p ,� ♦ \ ' `♦ ,` <,. \` DE I \ 1 . �,�.. /' ♦ \ ♦ 207 CB \� \ 246 CB li / _ / 67 #12 FHA 44 , �V ® \ \•• 217.65 LF 8" PVC DE \II A / � / 13 MH I ♦ \� yo \ S64° 33' 58.73"W / �g / \ �/ 8" X 8" TEE V 103-MH 74.55 LF 8 PVC ` 'll��• ��♦ v �� • / /` :� ` I 10 S41 ° 47 35.68E `�� �� \ I \ / ��. / (3) g GV ♦ \ \ ?,cc• 6" DIP \ ,,' . , \ \ /+ 85.58 LF 8" PVC \ • 233-DI / \ I �/ � / _ `�t. \ \ \ \ ti� (WATERLINE) , \ S81 ° 56' 40.49"E� 1 \ \ /� � 67.87 LF 8" PVC �/ � S41°53'08.84"W \ \ \ SS \ \ 120 MH \ ♦ \ 123-MH / 1 C7Q / \ \ �� \ �. 202.08 LF 8" PVC 7 1 / / \ \ 2 / \ 3 F \ 66 79.37 LF 8" PVC \ ` `207A-CB • \ r 59' 45.79"E #11 FHA ® 'Sr/ 246A-CB • / _ \ `� �S89° /� S47° 19' 41.63E `'�; o \ - \ \ - - _ 1 / 134 MH S171-YI �O� \ �\ \ �, _ _ \ / / Revisions \ �, `�, ♦ 208-CB / / O23 20' PDE �� o _�- �r� \ 210A-CB / / REVISION PER TOP 1 01/25/21 COMMENTS Q \ \ \ _ 121 MH. ♦ `_ `. \ ® ♦' \ ♦ ��_ �� 21 124 MH 115.42 LF 8" PVC 4" PVC SCHEDULE \ O� ] \ \ \ \ \ ti \ �� Oo 65 \ O �� \ S63° 00' 16.68"E / I 2 REVISION PER DEQ 04/30/21 COMMENTS 40 SANITARY \ `, s \ \ \ O \ - _ \ Q \ \ SS SS _ ♦ / . ♦ \ / 1 SEWER SERVICE �O T 1 I al... \ \ �, \ \ �W W '•' ,• •�' ,,` \ ® 150.83 LF 8" PVC 24 (TYP. FOR ALL LOTS) \ F \ "'7 \ I� �� W W \ ° c,6 O� \ Al \ \ �` / S31 32' 34.10"W \ / \ �9 119.08 LF 8" PVC �■ ��1-1 ,-� \ 125 MH 8" DIP f BANK S68° 53' 03.94"E \ 1 247-CB / ,' (WATERLINE) 1-�1 ♦ . 105-MH O 1- TOP OF 2�� \ - - '� - / ♦ . / \ \ 122-MH , S 7 \ \ 4" PVC SCHEDULE 40 SANITARY 209-CB / w \ /` 9' PUE \ BANK \ \ \ TOP OF BA / IMAGINE 10 HW SEWER SERVICE 64 WA - 6" X 6" TEE j ,♦• \ \ / / ® O25 \ \ I / I � (TYP. FOR ALL LOTS) ` 3 6" GV 210 CB (y �•�`\ / , 248 G: . -� \ \ \ MATCHLINESHEET 4.3 i O �� / •� / �_ ■ ZONE _ /// A �� \ �� ■ \ ►�\.� #18FHA \ \ MATCH LINESHEET4.2 _ /-�' �` \ // • • \ \ 26 \ \ ..-',/ � 62 /�]y . 20'DE O #10FHA DE \ 135-MH \ \ \ do ZONE / �� / / ♦ O 60 \ 269.22 LF 8" PVC/ / / \ \ \ 59 CI\ \\ � / 57 6" DIP (WATERLINE) Q�' \ - / / _2 /.��. S41° 25' 32.25"E \ \ / ♦ / / / \\ 351-YI 0 56 \ ���� / 27 \\ / / 11JB \\\\ \\ 103ACB \\ \ / %•. \ •4.., / / 211CB O GG ///// `ScP \ \ /� PSCSAE / \\ ` �ip \ \ 5� ZONE 3 / / ♦ / / V✓ 4 � ` ♦`� �� \ �/L 28 \ \ / // ♦ // ���� 55 / / O O _ \ \ p �i / \ �� � / Sheet 4.3 No. / \ \ / ♦ •/ ` 352-DI 1 \ / j 1 12JB ��� ,� 90 l� /- 353-DI ` ♦� \ ���� ♦ ■ 1 212CB �• /� ♦ / DocuSign Envelope ID: 4E8CE50A-9850-4C5F-967E-4301121 EDD37 00 PM - HEINZMANN, FRANKLIN n\PH1\4.1 - 4.4 UTILITY PLAN.dwg- Friday, April 30, 202 \CAD\Drawing Sets\Const ed 7.1 and Mello K:\15\15-0090\150098.62-CP Age R / / N/F I / I / / / / / WithersRavenel Engineers I Planners I Surveyors 115 MacKenan Drive 1 Cary, NC 27511 1 t: 919.469.3340 1 license #: C-0832 1 www.withersravenel.com VARIABLE WIDTH TOWN OF EX. MH 10 / MH 2 ■ /// / / PITTSBORO PUBLIC UTILITY AND A&J VENTURE TWO, LLC1 _// / 100 MH / X / GREENWAYEASEMENT PUMP `,� DB.1961PG.217 �� I ■ — MATCH LINESHEET43 /� / / STATION / ` BM. 19 PG. 6 ■ — = / PB 2018, PG. 333 PIN. 9752-29-2426 — N� ZONE0-1MATCH LINE SHEET 4.4 / / /// // / / N\ / I ,=) ZONE / / / / I / / / / / / N / / /_ I / _ _--�•� — _ 143.55 LF 8" PVC / / / I ZONE 2 - ' S52° 11' 54.23"E / / / / _ / / ' I I CONSTRUCTION DRAWINGS FOR CHATHAM PARK SECTION 7.1 RESIDENTIAL SUBDIVISION PHASE 1 PITTSBORO, CHATHAM COUNTY, NORTH CAROLINA � / MH 3 / / / `o N� F _ _ _ EXISTING \ PERENNIAL CHANNEL o / ZONE 1 gANK / 5 / / I \ WETLAND OF ZOP / /--I—_..._` kilo I _ _ .♦ /, / �c / EXISTING , �� ' `/ # SCM #' \ � _-c0? 3PNK MH 2O \ // � _ � � \ � � / ' 0 � � 31A-FES � ZONE 1 / / � � � \ \\� \ �� MH5 RIM ADJUSTMENT // ------ � / / // \ 162.37 LF 8" DIP / / \ \ \ co \ I % �� _ _ — — / (ELEV= 425.817)1 20' SSE S41° 35' 14.50"E / � / \ \ EX. MH 11 ` � SS c\, ZONE 2 / \ ► \/ PROPERTY — I. / 10' PDE 1 10' PDE — // _ `4141iir/ BOUNDARY \ _ 30A FES/ .RI�/'���SS��\—\ _ _ _ \ �I I ... �� �� — PSCSAEt\\ ASS �� �� \ \\� I� ��`�����— ��ZONE3 / ������� S FM \ \� �\ EX.MH12 . 31BDI / SS : �l��j i`�`��=5j..�` \ F�VI — �\ EXISTIN�O' PSCSAE .� \ \ — — .... \ N/F CHATHAM DEVELOPMENT ONE INC. �� \ \�fj�•. \ \— \ \ \ , �, 30B-FES 10' PDE IMH 6 \ \ \ DB. 1809 PG. 167 \ \ LOT 9 EXISTING �� s \ \ s \ \ PB. 2015 PG. 291-298 ��►t HOSPICE i� _�� \ MH 4 \\ \\ PIN. 9752-29-0838 \ ZONE PDD `,'/,j ��� lass. ��1 1``��1 EXISTING 30' TOWN OF / PITTSBORO PUBLIC UTILITY TIE TO MANHOLE \ \ \ \\\ ~(,',�` AND GREENWAY EASEMENT (TOP #2100469.11) \\ y \ \ \ \ \ \ ss \ MH 7 MH 8 \._ la 11 IIIIIIILIIIl1 \$� \is \ \ \ \ SS SS \ \ N ������i� ����,� 1 \ i \\ \ \ \ 20' \ \ EXISTING 20' PRIVATE \ \ �� SANITARY SEWER \ EASEMENT PB 2015, PG. 291-298 EXISTING 20' PUBLIC SANITARY \ \ $� SEWER EASEMENT \ DB 1732, PG. 22 I PB 2015, PG. 291-298 \ PERENNIAL \ \ \ o O � �J ` \�- . FM ,� S \ \ / - • -S>4 / \\ \ �\ \ \ \ r \\ I �\ I \ I - - - - - - ---- \ � SS\ I 7 r ^ 11 \ CHANNEL \ 50' \\( \ \ Z\ \ \ \ o 20' ZONE 3 \ �71 \ --i \ ) S 30' ZONE 2 / \ \ \ PSCSAE ZONE1 \ \ \\ \\ 30' \ 20' ZONE 1 \\� \\ \ � \\ 50' ZONE 2 \ • N w _ in Z U a w _ in Z U a ` ZONE3 \\ / \ \ / \ \ / \ / 1 \ \ \ / / \ # \ I N/F /\ CHATHAM DEVELOPMENT ONE INC. \/ l DB. 1809 PG. 167 LOT 6 PB. 2015 PG. 291-298 \ �' I PB. 2016 PG. 241-243 1 I PIN. 9752-18-0689 I 1 ZONE PDD 1 \ 1 \ \ \ \ ` \1 N/F I I CHATHAM DEVELOPMENT ONE INC. I DB. 1809 PG. 167 LOT 7 PB. 2015 PG. 291-298 PB. 2016 PG. 241-243 PIN. 9752-19 5526 ZONE PDD \ \ \ \ \ I I I i N/F CHATHAM DEVELOPMENT ONE INC. DB. 1809 PG. 167 LOT 10 BM. 2015 PG. 291-298 PIN. 9752-18-6885 I ZONE PDD \ \ \ \ \ \\ \ \ \ \ \ \ \ \ Job No. 02150098.62 Drawn By TE Date 11/09/20 Designer FH o0p0o0oo000000000 0000.0 N CAR 0 0000 oo° °000000°Ooo°O �/ oo o ti �_° Q0,z):.S 9� y °oo o SEAL o ° ° 0 0 027568 0 0 0 0,L��'a o °0°°°NGIN�°P?o ° °.Fy R. E,,:e oO0p0oo0000004/30/2021 Revisions REVISION PER TOP 1 01/25/21 COMMENTS SHEET KEY MAP 2 04/30/21 COMMENTSREVISION PER DEQ COMMENTS 1». innim1m ) - GRAPHIC SCALE los ,/? — = IP 50 0 25 50 100 • — 411011 J.4 I r — 111� aI 1 inch = 50 Ft. ✓' ��� �/��lELECTRICAL iiii�,,` III NOTE: ELECTRICAL LAYOUT WILL BE PROVIDED AND DESIGNED BY DUKE ENERGY. Sheet No. • ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH TOWN OF PITTSBORO AND NCDOT STANDARD DETAILS AND SPECIFICATIONS, LATEST REVISIONS.44 DocuSign Envelope ID: 4E8CE50A-9850-4C5F-967E-4301121 EDD37 :56 PM - HEINZMANN, FRANKLIN n\PH1\8.1 - 8.3 GRANT DRIVE PLAN & PROFILE.dwg- Friday, April 3 \CAD\Drawing Sets\Const ed 7.1 and Mello K:\15\15-0090\150098.62-CP Age R ' / I� � �' \ � � : � / � I I v v ZONE PDD � �� s����� � `� \l / \ / � ( 1 1 I ' I A ���/. \ 11� I 1 I � r � � � 1 I I (( 4 1 �' v�p ►� �400-FES I I /� \ �/ / I I � I I i � ,(1 1 I / \III - I \ / \\ \ I I I/ /\ SOT I 1 \ z 1 \ \ ( / �i� I \ I I\ \III 1 \ '/'//%////i. a '_ °"` � \ 1 1 I I I I � ,� � � .0 1 1 L_ I �� �� I \ 1, PRIVATO LLC. 1 I I \ °o m N/ � \ � I � I I I I ] I\ � •`►,� `'''� .40 III I I I I m ►- / 1 l �w m I \ I :o /, i4 I \; \ 1 / 4.� �V.�iv�', �J� • ` � �� �-1\� I _ ,- I \ \ / I��/ �' f I ) // I / I I I // 1 I I\ �\ / I 1 I I 1 DB. 1840 PG. 649 / _ 1 EX CB 13 / / h / / �� / III III m \ 1 I \ l I 1/ �% /bo /`°°/�/ / \\ I / \ 1 ) I I I I I I\ , 1 \%% LOT 5 o/ j 1 I d I I // \/ yl� I I \ /\ / I I I I 1 ,�� \ 1 C BM. 2015 PG. 291 298 OP 1 / I \ / / / I // // / // /7i ?`` -�- - ����41I1 I/ �� / I I - \ , \\ OFFICE I 1 \ ����� R i /�/ PIN 9752-18 0689 I / _ - �� �y "�, III 1 \ \ II W \ ��// I %/ / / / / / (( YI sr I I \ 111 / 1 I 1 1 \ 1 O ZONE PDD lip Ili, \ , \1 I I I \ \ \ 1co 1 \ �- JI / /� / \�401 7- \ 1� \ / _ `,�) , I • \ 0� i���� '� a 44 \ I / 1 \ I ^ I I \ I / I\ I I I \ ° N/F 1 \ EX CB 12 _ -. EX _-• _ �0� %�1AaA ��0 1 �\ - III , .\��'�"� �, -..�� I I\\ / \ I *�� �- ,vim®�ro�, v�� ��,� — 1 \\ a I 1 I \ \ \ 1 PRIVATO III LLC. \ \ J s �. 1 r� 1. � " ° ���- d �0, \ ��\` / \v I II = I DB.1877PG.718 1 \ �� i �, ��. ''= ����������. w gs0����i�, ) // I \ \ \ � Ex-cB-11 // t .,r / �Ie� I I I 1 ��� V � w � LOT 4 � -_ ��.�� �Ir `I. 1� �N�� � � \ 'r�-�` �► \�w�i r�( \ '��, ! � III \ I _ �y \ .. / \ \ I BM. 2015 PG. 291 298 ` �, ����`..���'�w: - I l \ ` - __ - �` 1�� •�� !•.�`: r 1 , I I I �\ _ _ _ - _ I /\ , \ \ \ \ I PIN. 9752 08 7668 \ .1 \ 1 \ �' �! \ \ 1 �� 11 I ZONE PDD � .� � � r'_. � � \ l \ VI \ 1 � �tifie5---- ‘i �-_ ����� — .� — --� ■pyiW� awl 111 MI i ',,;1• <� `��� t• ./� _� - I l ���'►1 ���� ` 1 _ � �� tiw ., / � � / lei !rsII 9.469.33, est 774 \\ ���' . ������/� ��f�� \ \ I\ \ / \ �►vj� `.� 435 \)\ _� / ��l � `ti ♦ •� izArn \ ---,---■S•" \\ \ \ -�i�� mow, - — ,�L� �.Lv � aill �►� ���� , '� -.- \ \ \ :: GRANT DRIVE � ,t :!r'i _-._ �— / _� 45 \ \\\ v �. /I EX DI15// I I I �� �� ®-i/�`'°�� \ / / I \ - � � // I I I �. ��� l�r►o��,� � 4SS w\\\ \ \\ \ - - - \ \� \ \ � - , _ - F�a-_ / I I I I I I � �� ���."��, AO / / I ' \ _, / / ( / / / l I / , .� • _ l ._....� / fir__ �, / / / i r / / l I , ���,., / -'���� 4 ' ;�► �r � � yi �/� .11 \ \ \ \ _ : r \� �� , - / \ \ \ \\ /� \ - - - \I � / / / / / / �►w 450 l ����w \ \\ �'' 48 / / / / \ EX CB 4 / / ' / / / / I l l l // / r.��. / / / A9 /�_ \ \ �, - � - -_ - ; ; Z✓ / / r / / l l l / / / v V A yh r �i i � � �' _ 4go / / / / / / / / / \ 1 \ — ... �. / ,,®®fir / �j �i _ i / / / , l / / / / / / / / / / / / / / / '/ �� 44vi.: / / / �..�- , / l l , / / 440 ��.r—� _sue -,� -:/i„ fit , / , A / / ' ///�`, // /�, / /,/� // ////,/�� ////� , ��•� �� �, \ / i �� j�� 7i I V / / //°�' //ono / / Ao// , \ 1 \ \I /��.� I/ \ / / / / / / / / \\ \ �/ `� ;\ / �� •.��' ®1�J // / / I \ \ - i / / / / / / / / / •/ // / / / / / / / / / / / of / b•/ / /// / l 11 /' /,' / / / / / / // / / 111 l \ \ j/ I /- k// \ /'/ l l i ` `• �`SO ���1: CONSTRUCTION DRAWINGS FOR CHATHAM PARK SECTION 7.1 RESIDENTIAL SUBDIVISION PHASE 1 PITTSBORO, CHATHAM COUNTY, NORTH CAROLINA �\ A \ V l �� �,�A A I A \ \ / / / // / / // // / /�/ / / , / /�/ / / / / vl/ / / / ( I/ \ \/ R �I(` 7� VA �/ / ��\ \ \ EX V \ �/ ��1��, \ v v / / / / / / /, , / A �/ _ i / l / \ l I III I 1 1 I, \/v �����„ I� . e, >, � _ / �,• I A A V 1 \ A / I. �� _ 1 . . ..53A-�. ..,..... �I��� / .� EXCB5 , V A V A \ / / / / / / / l , / I I v \ �/ �,% /\� o . ♦���� i' / ;� \ / / / // //, _ / I I 153 � . \ EXJB9� / I \ \ \ \ `.-- / / / / / / \\ / I ( � '/ //I / / // // / / / / //// / I 1 I 1 1 I I I/ I I / 1 M i�� I ‘�����> \�\\\\• \\ \\ \ ^ \\ \o\ '`''��� \ \\ \\\\\\\ .°X0 �� /,/z/I \ \ \\ \ \\ � , �,\ ( \ �- / / / / // / ---' \ I \ \ \ _ / / / 1 / �/ / / / \ s �- / l / I \ \ \ \ \ / , / // I 1 I /// // / / / / /,- I I I I \ \\ \ \ \ \ � / / / �� i I/ / / / % /////1 (/ / / / ///�//,�\_ (I \ I 1 \ \ 1 ,--/ /- , / / / / / / I I 1 1 / // /, /,-\ 1 / , / — / / J/// _� / / / 1 I I III I I I1 I I / 1 1 I 1 I /I / 1 I 1 I IiiiIiii, / I/ 11 I 1 I I I//I / / / I I I / / / 1 // I/ 1 I I I/ I Ili I I /I 1 1 . R / / �.. '� \j /• I �'I / , , I I I , , / I _\__ri \\ \ \ �\ =� I I \ I I \ I \ I o I \ \ / / / / / ,;// / /porE776 / /',' `, 1 1 I / / / / I 435— 1 I r I ��� \ > \ i --' II I /��///// -- / / l I I // /I/ r ) 1 \ /\ �\ l\\5� \ \\ / °10> I I \ 1 I \ \ /� // / /// l l/I� i \ �/ f j / // ,/ I 1 I / / / // // / ) I I so `_-� \_____ o \ \/ �3 \\ �\ GRAPHICSCALE zs so too //l / \ , I \ \ \ \ �- ,� I I / /' / Il( /� � / / / I I \ \ I 1 1 /// /// I (1 I / / / \ \ \ 1 \ \ / I / I I /// // / I ► / \ \ / I / / I I I / \ \ \\ \\ I I \ \ \\\ ! ; ) ,I / ,/ /J 1 I I // / /,/// // // /I 1 I i I / \ I \ I / I I l / / /i \ \ \ \ I I I \ \ ' / ' '/// ' / / I 1 1 / / /, / / I I / I � \ \ I / / / / / I I / l l I \ \ 1 ` \ / \ , , / �/, / / 1 i11 111( / I II1,',/i \ \ \ I \ \ I ///// I I 1 1 \ I I ' I \ \ I \ \ I ! \ ' /' / / // / / I I 1 I I I \ \ II \l \1 I /- / I I \ \ \ / _// - --_- - / / ,' l //ii_, \ ' / \ I ,/ �I l l I I l / I , /, 11 //// / / / / / /) I I / / / / / I // /, , , / ,II i / ,, / , / / ,/ / / ,t/, 4/ I / , ;=i��i/'l tl \ mil' I / --�'-�/ / 1 /1 1 i /r I I 1 j / ` r I I 1 I I � / / I II/ / I /l 1 / II / 1 / I / , / 1 I , / / / , \ l I / /// / / / ' l I I I I \ \ , I / I / I ' / II ------- 1 inch = 50 Ft. � `� � I \ \� ` \ / l' l' / /' / /' ' l I I I \ I � L\ \ `\\ \ \ \ ` / l L / / / / I (/ / ' / III I 1 1 I ) \ . \ / , ( / / / / I , I , /, - \ \ \\ \\ \ � N ; \ \ \� I----- \ \\ \� \� \ \ \� �\ \\ � 1 ' I/ � � �' \� \�\\ \ / ' 'I 1 / ( \\ \ \\ . 1 '- , � , /' /' /' ' I I / / l // / / ' 1 / - / GRANT DRIVE [STA. 9+50 - 20+00] 490 490 ORO ALL CONSTRUCTION SHALL BE IN ACCORDANCE WON TOAN OF PITTSREVISIONS. ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■I- ■■■■■■■ N o ■■ o ■■■■■■■■■■■ ■■■■■■■■■ AND NCDOT STANDARD DETAILS AND SPECIFICATIONS, LATEST REVISIONS. ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■,� ■■■■■■■■� ■■1m ■■■■■■■■■■■■ LOW PT EL: 46+50.00 SCALE. PVI STA:19+25.00 1111111 .. . ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■�� ■■■■■■■■ ■■ PVI EL: 462.61' 11 = 50 ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■ ■■ 111111111111 ■■■■■■■■ VERT. IIFMIN MUM CLEARANCEE CANNOT BE ACHIEVED WITHOUT EXCEEDING 485 ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■ STA: I I ■■ EX-C STA: LVC 250 00' 485 MAXIMUM PIPE DEFLECTION FOR THE WATERLINE, THEN CONTRACTOR TO ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ w ■■■■■■■ ■. 1111 INSTALL 45° VERTICAL BENDS PER DETAIL. ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■�I■■■■■■■■■■■■■■■■■■co ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■_■■■■■■_■■■■■■II■■■■■■■■■■■I■■■■■■■ ■■■■■■■■■■■■■■■■■■■ SEWER NOTE: A MINIMUM COVER OF 4' SHALL BE PROVIDED ON ALL PVC SDR-35 AND PVC ■■■■■■■■ ■ ■ ■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■MEER' MEM'll�MMEM�■,I■■■■■■■■■■■ ■■■■■ ■■■■■■■■■■■■■■■■■■ SDRA6 SANITARY SEWER. SPECIAL BEDDING IS REQUIRED CA FOR 1B'E 480 ■■■■■■■■ 5.50'l ■ 5.50' ■ 5.50' ■■■■■■ 5.50' lo ■■■■■■■■■■■■■■■■■■■EMMENTO•MURI!_� �■ ■■U ^•■■■,,I■■■■■■■■■■■ , 480 INSTALLATION DEPTHS SEE DETAIL SHEET 10.5 IF 4' CANNOT BE ON ■■■■■■■■ ■ ■ ■■■■■■ to / ��� .■ �� ��— ■■■■■■■ 1111111111111111111111111 PROVIDED, THEN CONTRACTOR SHALL NOTIFY ENGINEER'S ■■■■■■. ■ ■■■■■ 1111 ■■■■■1J ■■1 '�� ������1111111111111111111EO I REPRESENTATIVE PRIOR TO INSTALLATION. COS M� I�� V � LOEGR ���' - o� o� o� o� o� l � ,'■ II ■■■ i J w w w w w INIPPIAIII ',,�I■��■■■U�■■■■■■■■11 ■■■S■�\\C\■111 TIE GRANT TO EXISTING DRIVE UTILITIES AND STORM DRAINAGE NOTE: E 475 PW°121116111 ::■11;:::�;;�, STA 17+26.73 475 BACK RAINAGE AND OERWIRM DSENOTED. , , I NOMMIll .:::�::�.. G UNLESS SS OTHES SHOWN ARE EXISTINSCREENED EPPO-Oril I 1 jpilill 1!!;,iii 470 lipippplam■■■■, I/L�■■ EXISTING 6" EXIST NG WATERLINE AND FA �� `\ � 470 /� 1 RECLAIMED WATERLINE RECLAIMED WATER SHOWN APPROX _, iiiii �,.��11�.��11 DIP CONTRACTOR TO VERIFY DEPTH IF I AND ADVISE ENGCONDITIO II IIIIIIIIIIIIIIIIIIIIIlIggillII�'STING \ ■■■.E■■■■■ ■ ■■■■■ /U�lJll.■■■■,4,.■■■■■ !Jl' WATERLINEI ■■■■ SINEER CONDITIONS VARY ■■■■■■■■■■■■■�■�■■■■r.■■,`Sr' \\ il FGCL ■■■II ■�■■■■ ■ ■■.;���1II ■■■■.'.■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ 12" x 12' CROSS ■■■..■■■■,I,■� 4' MIN. 465 ■ ■ ■■_ ��s■■1a ■■■■���� 12 x 2"CROSS ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ (WATER)■■■■■II,■�■■ ,®®®� 465 11 / /rig.. — � E��.■■■■II ■■■I/�■■ (WATER) ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ EXISTING 6' (RECLAIMED WATER) TEE ■■■■..■,■■■ �„■■■,'' _ 4 1 Job No. 02150098.62 Drawn By TE ■■�I�� Km ■■■ ■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■,I ■■■, ,� 111 1 -.= NG 15" RCP EGL (-50') ■III■■■■■■■■11■■III ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■II ■■■� (RECLAIMED WATER) ``� - _ Date 11/09/20 Designer FH ■/EX/ EXISTING RCP ■,_I ■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ TIE TO 2" WATERLINE I■■■■■■■■■■■■■■■���\ .■■■■ ■■■,��a�_ (RECLAIMED ' ��® 460 ■■■■■\,■„■■I!II�_■I•• � ��111� '�" ■I/.■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ � AND 6" RECLAIMED WATER �� �„■■ 460 0oes00000000a000 o0 o°°o° C N �i /i /� 0 °000 , o °° ESS/4 °° o% o° o = o -- ti o o o ° �� SEAL 9' o 0 0 0 027568 0 0 °°°OF 6000oUUp6G"o °°°o 4/30/2021 NE ��■■■„ ■■I ���"EXIST15�R�P-: `V.�I■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■�■■BM 'I ■■ elm �'� ���••� 18' M impum 4" RECLAIMED MI EGCL �► 11111114 \►-��I� �® .■- - ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ WATERLINE ■■ 12"DIP -, 12' GV 18 MI ��... _ �� + -.� ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ WATERLINE +�► (WATE') 455 ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■��1 455 11 1,) . ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ _ i■■■ 1 450 \ 450 Revisions REVISION PER TOP 1 01/25/21 COMMENTS 2 REVISION PER DEQ 04/30/21 COMMENTS 445 445 1 440 440 435 435 Sheet No. 8.01 ■LO CO LO V V CO O LO V LO CO V V CO co N V LO CO LO V V V V CO LO Io LO COCO V V CO O CO W O I V V N- N N- • cocoCO c V V O) V Cr) c co V V CO N co O) CO I— co V V O) N co o) co a) V V CO CO N- o) o) a) a) V V V Cr) O o) O a) co V V N N O O N- W 0) V V V CO N- co 0) co V V co N O co N- co N V V CO LO O N- Lc)N- N �� V V N N LO LC)N- N (N( V V CO LO CO N co O V V C) N N- V o) V O O V V O O I0 O O O V V CO N Cr) CO co LO O ll) V V N CO M N O V V V C) 6) • (O V 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+00 16+50 17+00 17+50 18+00 18+50 19+00 19+50 20+00 DocuSign Envelope ID: 4E8CE50A-9850-4C5F-967E-4301121 EDD37 21mueaanaur_1m11W AVIREE MAK CAD Drawn- Sets Cons : 15 15-0090 1 '..... - • .-e ,--wimaxwaraistIrmonemikwa6 , --____64. itiNivitto- - 455 .'�0.jN ► � �• 3„--s' , • mot/ f % III // 'I/I I f I I I 1111 II I f 1 1 , Hi I IIVI1\ ////IIII;II �l\\\\I\ I / / // J I I I \ Iiiik I1I& \ �l r Ifr��\\\ IN \ \ I II\\ I j \ I1 '�I III I I 111 `l 1 II 1 II II \ \ \\\ I \ \\I II I I I I I I `\ I 1 1 I I I f/ \ I I I I ``1 \ I I I 1 // II I /I \ I \ \ \ \ 1 \ I I I / III I I I I1 1 / 1 / l to / ////// / / / / // / / / l/ / / // / // /' ; I I l l I i I I i; /l /l l /l /l /l//' //h/ // ////// //////// //// / / / �// / l / l/III III I ll / l 1 f I I / / // / / / °� / // / / / / / // // // / / / / / / / /�/////l/ll/�1 /// / / / a�/�/�/�/ ///// / //////// / / //////'/ / / //// / / / / / // / //l I L�� I 1 II I I I / / / / / /////� / /�/l l/ 1 I / / // /� / I 1 1 I I / / / / / / / I /// / // / / / // / / // //I 1 1 I I 1 / / / / //// / / // / / / I / I 1,- / I 1 / I/// / // II // / // I I I / / / / / / / /I I l 1 / I // // / / / / I ) I I/ // / // / / / / 1 I I / / / / // // / // / / I / 1 1 I I I I / / /1 1 / /1 /I ////r) JJ /// / / / / 1 I I I I / / / / / 1 1 1 I I / 1 I ! I / I 1111I11////// /llJ�ll//Il/II'III 1 I I 1/ I / // / // 1 1 / l/ / / l I I l I I I \ l i / /, vv v v I I 11 II / // // / / / / / / // , / // // / 1 1 1( / // / / / / / 1 / �� 1 1 / \ \ \ / / / / // / /// ////2 / / // / l/)`a SEE SHEET 8.11 FOR UTILITY `\ \ ( I \ / ' / / / / / / / / / / / / / / / / / / / / / CROSSING PROFILE \ I I 1 / ( / // / / / / / / / / / / / / I \ 1 I I 1 I I / / i /- / / / / / / / / / // / I I I I c \ I 1 1 I I I I I I / / / / // / / /////// / / ////// / / /_v / / / 1 \ I I ' I I 1 I / //l / ��/// / ///// // / / / ///////// / / I I I I I III // / / // / / /// / // / / / / / / titensigtinistassaisubmwiorammketAMINIW PROSPECT PLACE N VV \�\V�\��VA / / / / / / �5i� \ \ \ _ / / / // /// // //// ,�� ////�� \\\ \\\ 7 / / / / / / 480 475 470 465 460 455 450 445 440 435 430 425 V LOW PT STA: 20+50.00 _LOW PT EL: 461.11' PVI STA: 19+25.00 —PVI EL: 462.61' K: 55.6 AD: 4.50 LVC: 250.00 C) V 20+00 20+50 BRIDGE (BY OTHERS) ‘\, EXISTING FORCEMAIN (APPROX. LOCATION) —I 8" C-900 PV Co co V coo 21+00 COrn V V 21 +50 EGR (50') i — i rn m V V 22+00 CO N LO CO V V 22+50 S,;Rc n —a ,lp 1 2a GV (WATER EGL (-50') CO CCOO co V V 23+00 4" GV — — (RECLAIMED WATER) CCOO 0 V V 23+50 ✓ o V CO 24+00 GRANT DRIVE [STA. 20+00 - 31+00] LOW PT STA: 22+84.01 LOW PT EL: 458.65' PVI STA: 24+75.00 PVI EL: 456.01' K: 49.2 AD: 10.17 LVC: 500.00' LC) v LO ✓ V 24+50 �4" RECLAIMED WATERLINE 1 12"DIP WATERLINE CO 0) CO CO co 25+00 co co ✓ co 25+50 N CO CO V CO 26+00 520 480 Z1,5 475 /510 470 500 460 495 455 490 450 485 445 480 440 475 435 470 430 CO N V V 26+50 V N V V 27+00 4"X4"TFF — (RECLAIMED WATER CO CO V CO 27+50 18" MIV—\ 12"x6 CROSS (WATER) CO V 28+00 12" DIP WATERLINE 0 O co 28+50 EGL (-50') CO LN LOC) 29+00 EGR (50') HIGH PT STA: 32+29.35 HIGH PT EL: 511.58' PVI STA: 31+60.00 PVI EL: 517.44'- 1 K: 30.0 AD: -13.32- LVC: 400.00' 18" MIN 4 RECLAIMED WATERLINE CO COO CO CO LOC) V 29+50 N CO OC) LO LC) 30+00 CO N Lam() LOC) 30+50 520 515 510 505 500 495 490 485 480 475 470 465 CO 0) `O O 31+00 GRANT DRIVE / SCALE: 1" = 50' HORIZ. 1"=5'VERT. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH TOWN OF PITTSBORO AND NCDOT STANDARD DETAILS AND SPECIFICATIONS, LATEST REVISIONS. WATERLINE NOTE: IF MINIMUM CLEARANCE CANNOT BE ACHIEVED WITHOUT EXCEEDING MAXIMUM PIPE DEFLECTION FOR THE WATERLINE, THEN CONTRACTOR TO INSTALL 45° VERTICAL BENDS PER DETAIL. SEWER NOTE: A MINIMUM COVER OF 4' SHALL BE PROVIDED ON ALL PVC SDR-35 AND PVC SDR-26 SANITARY SEWER. SPECIAL BEDDING IS REQUIRED FOR 14'-20' INSTALLATION DEPTHS SEE DETAIL ON SHEET 10.5. IF 4' CANNOT BE PROVIDED, THEN CONTRACTOR SHALL NOTIFY ENGINEERS REPRESENTATIVE PRIOR TO INSTALLATION. UTILITIES AND STORM DRAINAGE NOTE: SCREENED BACK UTILITIES AND STORM DRAINAGE SHOWN ARE EXISTING UNLESS OTHERWISE NOTED. ro cc s 3 l/1 0 CU Lc, cu ro 0 15 MacKenan Drive IMAKIMMI t: 919.469.3340 license #: C-0832 w a_ Job No. Date 02150098.62 11/09/20 Drawn By Designer TE FH °0000000000000 A 0000 � No C 00R O� 0 9°o° -57 ° 00FESS/0 0 02 ° ° SEAL 0 %0 0 0 027568 0 p C 0 0 �oo�o/kG (� G�Ct'°° �00� °°O0 �oo I' 0000IJOr%°°'' R . EN° 000600000000aoc 4/30/2021 Revisions 1 2 REVISION PER TOP COMMENTS REVISION PER DEQ COMMENTS 01/25/21 04/30/21 Sheet No. 8.02 DocuSign Envelope ID: 4E8CE50A-9850-4C5F-967E-4301121 EDD37 :31 PM - HEINZMANN, FRANKLIN n\PH1\8.1 - 8.3 GRANT DRIVE PLAN & PROFILE.dwg- Friday, April 3 \CAD\Drawing Sets\Const ed 7.1 and Mello K:\15\15-0090\150098.62-CP Age R ! �� I I \ • / WithersRavenel Engineers I Planners I Surveyors 115 MacKenan Drive 1 Cary, NC 27511 1 t: 919.469.3340 1 license #: C-0832 1 www.withersravenel.com _�� 116 YI \ \ \\ \ \ \\ \ \ \ �' / I I I \ \ \ I,1llJ904i' I �� I1\\\\\\tl1+4 .Of � I I ♦ \ \nIII // //II I I// //1 / 80 117 YI \ \ � I II I III ► I I I I I I I I\ \�\ I 1 J I I I \ I I I / / �ti`' / / / / -' / I/ / / / / / / / ��> I I I I I I r \ ■ / / / / J I I! I l 48s ���� �, �_ _vim _� 11 I I I I I I / / I1// / / / / //1'21k ' - I // ■ ___ // \"cas ii,305JB �S I 1 I l 1 ■ / / / / 4g5 �� ����aw \ I 1 III / l / / / / i �► ----"a�'w� \ I \ I I / I 1 / / l 1 I 1 r 490\ I e``����,,, ' \ I / ` \ \ 1 I I I I / 1/ I /' / goo v� ����' \o\ \` ` \III I / \ \ I / \ \ 1\ N / I / ) / / /ham 500 ��� \ i► \ ��o���� / / soo \ \ \ \ \ \ I I I / A \ V 1 o/ / 11 Z L / // ��j► 505 ��� V` V v vv I \ V 1 I I I I .,1 +41. ■ 1 / ��,, ► NI I \ \ \ I 37 I I \ \ �- ��� / / �' Soy!IIIMNIIMMIL \� \ \\ vv � \� `� 1 / \ I 1 I 1 1 I I I A I\ III I 1 I 1 I' I ■ m 1, �■ I \ � �'\� r7''h�4►�� •�► \' .,•� �� �► �,. o� �V`. \ � \�yf %. Off. •I� /// �� sov v v 5v\ v v / 510 �\ \\ \ \ ,Co\ 4riaift.ft...- -- , - ,� s \\ \ \ \ \ � v �` vvv v \ vvv ► \\ \ \ \ vv v� v I 1/ A I 1 1 I ✓ v l 1 I III I \\ \ \r \ I / I I I 1 I \ ►�\ \� \ \ / 1 I I I I I 1 1 1 \ vv �� vv vv i I I 1 V A A 1 I III \ 1\, \, \� — ) , I I \ 1 / I \ I I I I I I I I , I I I 1 1 I I II 1 j III Ili 1, ■ \ a, C. m �� — I 1 \ w� � pRNE ■ GRANT' I I ■ e, �.��� v 1 _3i, \ \ : �\ \ \\ \\ °t I 1 I \ \ J \ \ \ I III I I ��=-311 �� 41+00 ,� ' `.� �, .....� \\ \ \ \mil 306 JB\` 11 I \� _ / / I I I 1 ,/ .. l�_� , ,� _ \ \ "'�-,.,, I �� • �� �.�_,.L�� \\- . \ . , 307 CB \ \ \ � �� I I I GRANT DRIVE f� � � • imer �- _ � 41%- � ���7�+9iis -®`mom ��?� ��.. ..., 4 ■ �� �` _ 1 \ 5 �...�. ..7, �� I� lijam „, arimar— —1"--"rM� .I • ' �_- � - - .515 �� _ —�� � 4+ ��_ �� v�1.,.....,,z,_ ..���.��► ; � .�_ ._� A �� --i -- r -- li *� ice_ y = 'c:, ��- \ �� � .� - ' -_ -��_ \ S10 I" Q \ \ \ 36+00 �Tieal ����.a :�� \ 1111.- -3111 silk ii / 2 / �� �- - _ �� .' _ L�►�ll��\IYL�I��iVlf`att1ll�►�" `_�IAN_ i A�� �� ������� 52,0 '' '�� `' CONSTRUCTION DRAWINGS FOR CHATHAM PARK SECTION 7.1 RESIDENTIAL SUBDIVISION PHASE 1 PITTSBORO, CHATHAM COUNTY, NORTH CAROLINA s / -4111111114,18%... 14.1211WIVIIL'vmmineagallw Wbk- IlateMISIMilibri----..•Nialm Wiffigr4 anow / / / / z ,--- 520 lok i-mmans / / / jF308 CB -'�i�� 313A-CB��- \ \ \ \ \ \ \ / - / / / i / �� __ 50wt��r�� \\\ `mow —ce '''''''''.1"'.--............---.... �� \ \ \ \ \ \ \ \ \ \ a, / l l h / l / / i ///'/'/' /// / /'/ / / '' �-,iimite �� ���_'�� `\\ —�-� \ \ goo \\ \S \\\\70 \ \ \\\\ 11 1 I I / / // / / / // / / // / / / / /� /// / / / / / / / / / / / / / �i // / / / / / �// //// // / / // / / / / / �' ,' , / / �� 5 �� / / ' S35� �a�-�� / /' / i ---- ,\ / ' // / '�/ --- ��� / / /' ,' ,� --- ���ll�� / — — 535 �Nililitialk ��� l�a���'w�� \\ \\\ \\\��� ���� V��wp \\ \ \ \\\\\�,,� �\ �`- �g9s� _� ` \\ \ \ \\\-500 - �� �� \\\\��\\\\\\ Aso �__ ��\�\ �_ \\\ \ \\\\\ �� �—, ,_\ \ \ \ \ \ \\ \ \\\�s,0-- ��; ,\—\\\ �\� \ \ \ \ �SS�� ��;_� \ \\\ \ \\\\ \*o.\\ �, \ \ems \\ \ \ \ \ \ \\ \\ \\ \� \ \ \ \ \ \ \ \ \ / / /// / \ \ \ \ \ \ \ \ \ \\\\ \ \ \ r I I 1 \ / \ \ \\\ \\ 1 // / / / \ \ \ I I I / / / / / \ \\ �\ \� \\ \ 1 I I I 1 / / / /// // // / / / / / \ > > 1 IIII I / / // // //�/// Ir \\ \\� / / % l� l / I l / // ( I l l /// /l l l 11 /i r I/ (/ / // // / I 1 1 I I I RO I l I / / / / / / / / / // / ' / / // / / / / / / / / / / / / / V' E\ \ \ \ \ \ _/ E� �\ \ ` \ 7 / i ,— -------, " \ \ / / �' �' 1 \\\ \\ \ \ \ \ \ \ \\\sus\ \\ \ \ \ �,\�\\\\ \\ \\ ` \�\� �\ �� �� NN \\\\\\\\\ \\ \ \\ \ \ \ \ \\ \ �� \� \ \ \\\ \\ \\\� \\ �� ��\\ \\\\\ \� \� \\\\ N. \\\\ \\\\\\\\\\\\\ \\\\ I �— N. I 1 1 I / 1 \ \ 1 \ \ / l l / / \ 1 1 \ \\\ / / / / l //\I ( I 1 / / I I I I I I I I I I I I I I l / 1 I I i 1 / I / //// 1 I IIII I \ I I 1 1 1 I I Il 1 I I III 1 1 I I I I 1 1 I I I I 11i1 1 I I I I I I I I (///I/ I 1 I 50 GRAPHIC SCALE 0 25 50 too ///// //� / // // // // // // //// / / / / ./ / / / / / / ,,,-' ,,,-' �� \ \ / / �' — — 1 \ \ / / / �' ,— �' �_ \ \\\\ \\\ \ ��� �� ��� \ \\ \\ \ \ \ �� \ \, \ \ \ \ \ \\ \ \\ \� �� �\ \ \ \ \ \ \ \ \ \ \\\.\. \ \ .�� �_�, �_ \ � \.\\\ \ \\\\\\\\\\\\`--_� \ \ \\\ \ \ \ \\\\\�\\��\\,\---- \\\ \\ \ \\ \ \ ,_— \ ` J 1 \ \ \ \ I I I I I I I \ \ 1 I I I I I 1 I I \ . \ ` \ �\ �; 1 i 1 l I I I I I I I I I I I 1 I I I I IJ ` I I I I I I I I I1 I 1 I I / I I / / I 1 / / I 1 inch = 50 Ft. ( ( A 1 1 1 1 < < < < < < < < < < < < < < < < < < < < < < < < `( `( `( `( `( `( `( `( `( '( '( '( '( '( '( '( '( '( '( '( '( '( '( '( \ `( 1 1 1 ( GRANT DRIVE [STA. 31+00 - 42+00] < < < < < < < < < < < < < < II �( III ` I `( `( `( `( `( `( `( `( `( i \ ( A 535 535 ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH TOWN OF PITTSBORO AND NCDOT STANDARD DETAILS AND SPECIFICATIONS, LATEST REVISIONS. HIGH PT EL: 511�5835 1 ■111�11■11 LOOW PT EL: 502.4672 1■IIII EGL (-50') _ _ > HIHIGH PT EL: 51426457� 11 SCALE. I I ' PVI STA: 31+60.00 ■ —■■■—■■—■■ PVI STA: ■—■■■■ STA: 40+95.00 � r GRANT DRIVE STA. 31 +00 - 42+00 PLAN & PROFILE PVI EL:517.44' PVI EL:497.86' 497.8 ' N PVI EL:516.53' 1" = 50' HORIZ. AD 30 ■ —■■■—■■—■■■ 4.9 ■—■■■■ / 9.4 \ 1 " = 5' VERT. WATERLINE NOTE: IF MINIMUM CLEARANCE CANNOT BE ACHIEVED WITHOUT EXCEEDING 530 LVC 32 400.00' ■ _■■■—■■—■■■ LVC:450.00' AD: 8.20 ■ J J / AD:36.35 LVC:250.00' N530 MAXIMUM PIPE DEFLECTION FOR THE WATERLINE, THEN CONTRACTOR TO o0 00 _■■■—■■_■■■■■■■— o0 0 �\ INSTALL 45° VERTICAL BENDS PER DETAIL. o� I Q \Q 1- -■■■-■■-■■■■■ Q + co Q I , SEWER NOTE: cow _1 ■ �w •■ c� � .. �`w 3:1 TIE TO EXISTING A MINIMUM COVER OF 4' SHALL BE PROVIDED ON ALL PVC SDR-35 AND PVC 525 7 cc ■ \ J cc ■■—■■■■ cc o -N Q m �, m Q ,�II 525 SDR-26 SANITARY SEWER. SPECIAL BEDDING IS REQUIRED FOR 14'-20' INSTALLATION DEPTHS SEE DETAIL ON SHEET 10.5. IF 4' CANNOT BE Y / ■__ ■■_■■■■ • >_; ' PROVIDED, THEN CONTRACTOR SHALL NOTIFY ENGINEER'S (Ncd N N o o Q MEI FA REPRESENTATIVE PRIOR TO INSTALLATION. 7 ..---- co- rm y / / / ■ \ ■■ ■■■ d ME• EGR ' ,■■ 520 / ■ \� O O■■■■■■■�. o 520 UTILITIES AND STORM DRAINAGE NOTE: SCREENED BACK UTILITIES AND STORM DRAINAGE \ �� „■—■■_■■■■■E�� 1' Q Q �iiii 111 SHOWN ARE EXISTING UNLESS OTHERWISE NOTED. / STA: 36+29.61, 28 / VERTICAL SIGHT DISTANCE FUTURE FGCL / \ / � � � v , - - - - � � � VERTICAL SIGHT DISTANCE � 515� i v� // � vvv \ � II ��� 'FGCL ®i_�= 515 � III / / / A ■■■� 4�� BOA WATERLINE) / / \ VERTICAL SIGHT DISTANCE / ■■,'' � _ (RECLAIMED 510 / i AIR RELEASE VALVE / 510 y / / (LOCATED Al HIGH POINT) \ . NE �i11 •�� r 12" BOA y 4 3So MI ■■■•—,■■■■■■■■■— ■./d (WATERLINE) Job No. Drawn By ,.02150098.62TE Date 11/09/20 Designer FH ��� imil ■111111■- � ■■■■ ■ ■ y 505 4' RECLAIMED WATERLINE `■■■�■�—■■■■■■■—■■■■ 505 oo°o°�o C N° 0 l0°l0 , :e''oo o° O o ° ESS °°° 1. °o 00-y o Q SEAL o 0 0 0 027568 0 ��o<s°��G IN�� �P���� °0Q°00000°o°p0°4/30/2021 -Egam .1 12"DIP -��� -' ''�_� lg„RCp ■••,__■■■■■■■—BIO ■ WATERLINE _. Eau ��mmine�����—� �. N '- M\ Mal ■■■■■■ICI 500 FHI �`;--- ■�■■ ■■■■■ _... ..,-- ,�.,,.,,.,,, ,�� 500 \�. "'"' _ """' ..�.� _......--.._ il „ .__.__.___.__•- ` i 495 :cP -- , , , 12'X 8" Ross --■■■ CO 495 Revisions ::, " CO 1 REVISION PER TOP 01/25/21 COMMENTS �' """""�i�■■■ - Tr Q \ _,— ��■■■ 2 REVISION PER DEQ 04/30/21 COMMENTS u_ _ ■-■■■ \ \ / / \ / 485 \ / 485 ` J / 480 480 Sheet No. 8 0 N CO O I I� CO V O M CO LOCOCO O I� CON V N N I� L(i CO N N LCJ CO I� O O N LCJ CO N CO O N CO O CO I� COO O Lip I� N Lb L(� OLc) LCJ O CO N co O O LCJ V I� N CO O CO Ln N O O N Ln O N CO O O O O O N CO V O C'7 coLc)Lip CO (NO)N O CO Lip O LCJ I� I� N O N CO CO O V I� OLc) Lc) N LCJ CO O M CO O I� N N co M CO LC) coco M CO CO LC) V M V CVCO LC) CV V I� N Lc) CO Lo M• 31+00 31+50 32+00 32+50 33+00 33+50 34+00 34+50 35+00 35+50 36+00 36+50 37+00 37+50 38+00 38+50 39+00 39+50 40+00 40+50 41+00 41+50 42+00 DocuSign Envelope ID: 4E8CE50A-9850-4C5F-967E-4301121 EDD37 09 PM - HEINZMANN, FRANKLIN n\PH1\8.4 - 8.x ROAD PLAN & PROFILE.dwg- Friday, April 30, 2021 \CAD\Drawing Sets\Const ed 7.1 and Mello K:\15\15-0090\150098.62-CP Age R 10 WithersRavenel Engineers I Planners I Surveyors 115 MacKenan Drive 1 Cary, NC 27511 1 t: 919.469.3340 1 license #: C-0832 1 www.withersravenel.com 41307 CB r �\ \,_ - --- *Ale, w.. is_--49,-♦ - - - \ �`� , / o ``7 r �/� ���/� i / _ \- _ _ N.\ ‘ r - —\ , ..., r. ___ 0, ____ jill DI / � I V/ �_—_ \\ \� � mow. I l l � — / / ���/ / /✓ i-o��\�°�� —�� / ♦ ws — \ \ \ \\�� \ \ S 1 - \ h --___ �'I \ 131-MH � i / \ I � / ,1, • p ������ 0� / �,^ / �� �p �\ `` �` _ - 47 _ _ _ 495— - \ \ \ \ \ \ \ 4_ - - - \ \ \ \ \ \ - - - - t1� �1"�� \ \ �� \ s` 1 .11 / / • �t 1 / / � / / / /� ����`�� \at -495 _ - � - \ \ `�O 4$S � ��, � ® \ �•��� I �� �r � � � _ � ■ g�:�' �j�\� I I I � -- - ,- , -����\��� �•r r �' _�-� - 'Wilt `\ // 1111MH - - � \ \ \ \ \ �1• � _ � �\ \ \ \ \ \ � �S 485 , � \ � I �I ibili � _--- - -_ �\ -- \ ,/ / IVI�� / \ '', _ 5 i/ ��, `�1!�� �� 15JB`11 �� � �� Irr � ------___N, \ \\9\\\ \ \\ \ s \ „91 � 1 ar`�, ® \ \ / / �� / � / C� III � � iii \ \ \ \ \ \ \ I I1' — � it i I � II � J\ � \ --� / ___--�� 1 •, I 50 ° \ \ \\\ \ \ \ \ \ 211CB 111 • // / / _//�\1� rr �. 11I \ \ \ \ \ I I \ , 125-MH 132-MH / / �'' l �-- -----500 \ / qo — A� �1� \\�T.�i i �. _\ \ =' \ \ \ \ \ \ •►���� / / / / l • .. _ _ 11.11.1.'\ 9gv ��� � �_/ � �,w // _IN ��16-JB�\ \�\ \ \ \ � 0� PC. 11+ v 03.: \485////-,,/j �//// � / \ ��diliktu����1q�tV \ v ' � 1 1 �> 137-MH v \ / 1 • / / / � � mIN•mo. vanilla / / �1� � 505 _ r I��. \ .215A-CB 'ilk‘ co. � �a� �Z / 1 233-DI i / / / / v \ \ t ..., Olt co 112 CB ill TA ��� QR 11/ / ' �` 310A CB �� 'cgr c) - )� I I // / ,),,,,,pair. Al co _V VA' lar 10° CO ��0-JB/ t!� / \ i / / �`�� ■ �� t `14, / 7 / / \� / / �00 / ���,w►1+761' ! ■ �'� \ lip "21 CB / / co i co / ► ICO •✓ - / o r .--. co — __ —,N, �� �� 2 \ \ :� /. . . 7 7 \ / I / / ✓ / ///' I - ``�` ,! �' f ' : V ?i�' / \ \ / •.�� �� 245 CB •'g��.- �' \ -----I / \ / / �`. / / - — 500 - `1 ` p • - ••�J �f"• ��I ` ��� -��� I , °a�� �,1 _ _,� 246 CB / Ql / �n �,y / \ / it ( r / / \ / �, AVENUE • �� ` `�' Q /TIIIIIIIIII,P1'!%Pl4--- - _ ASPEN \ \ \ '1(00;i . 215 CB ► \ ���. /� D . ° �1,4��.... 0. 247 CB _ - - ►( "�=� I \ / 244 CB \ _ J l \ / / \ \e� �( to - - 505 A 0 1 �g�� ♦;� l\ i AA ` - - - '\ f ` /"� � \ \ \ r� ©� 00 ���r _� -� / / / / o 114-CB 510 � � \ 1• r�� ` , \ \ / 15' \ ` � / / �i ♦ \ I I \ \ \ N� ��� I ` ♦Iill1 � ►� T!1 253 CB " / / / / / 5p5 515�\ ' • I \ \\ \ \ \ A, � _�-�I &All MW 1�17 Ti�J/��1 `II � / `i' / // / \ \ \ / CB I I Ilk Pi v S� A \ E�Ii►1�t1'111Ji� 778\5 At 1��a; / \ � \- \ \\\\\ 136-MH / \ / �AN .��oi.�:41\/♦ ��- rnn \ \ �a� .siatill 248CB��� _,�0��,1� \ ✓ -- i is al s. \ \ ::1111: \ \ \ OS o\ \ \ \ \\ \ \ \ imli 135 MH :i•_ 480 ����mor \\ �mommounow. 246A CB 13 MH �, \ _ 470� � \ \ \, a \ \ \ \ \2 \' \ \ \ ����� \ \ \ \ sb —254 CB • \ i / /\ ,, - i� / CONSTRUCTION DRAWINGS FOR CHATHAM PARK SECTION 7.1 RESIDENTIAL SUBDIVISION PHASE 1 PITTSBORO, CHATHAM COUNTY, NORTH CAROLINA \ \ \ \ \ \ \ \\ \ �����75 4 \ _-\ my /�-_� �\.,,..,.:' \`S20 \ \\ \ �\ \ \\ \\\ \\\\1II. _���,\\ \-�/�//--- -� -___ - .„ .. /41:, os x\iii os 495 -500 \ \ \ ������\ mil""'"I\ -Em.... . \ � ,♦. ,,,I_\��,• — — s°5. � \\\ \49:0 \ \ \ \ I I Illlll I I \ \ \\\/ :0...m465 \ \ R65 \ �_-�__—/ --_ I::._ ��—\�S\\\ \490\ \ I\ \ 1 I I\ 1 I III I \\ \ \�\\� \ \ — /\�� / / ` --,-- __ \\ / J— k \Imy. . ‘* \ \ \ \ ____ / ' 8 Ii0 \or• .-, 84* ‘ v \ //\,�� ��`\\ \\�'SOS �`4��`_ \ \\ � \ s,0limutimawissisila�\\\ 500 � ��� \ \ \\\\\\ \ \ l I I \ \ \\\\ \ \\ � \ \\\� \\\�6,p\\\\ \\ ADO\\\ \ \\\\\--_-I1 /� �j \J � \ /�`��- � (�/� 460- � lk \ _— �✓�\ • 40 _ N \••„. 111\ \ ♦ 510 \ `\ \ \ \518 AVM \ t �s►1 \ \ \ \ \ \ \\\ �480 \\ - \ \ \\\ \ \ �� / -‘,,. ` ` \ 312CB" ♦ 14 \ \ \ \ �\ \): \��t�� \ \\� \ \ s ��\ \\ \ \ \ �ice-� � ------_ _11- - - - 1 A\A 1 V 7 1 I I I I KVIOA111.\ \1 P V411 1/4, \ . . . - ' r N ,,, h, ` , s \ \ _ \ \\ \\ \S�\ ``��, ' `� � � :\ ` `i �o \ 2°\ l \ \\ -----_—, —\ \ \ \ \'S,\ \ \ \\\ \ \ \\ \\\ \\\\\\\ lI 1 I I\I 1\ \ \ \; \ \111 1 \ -- ,\ \�\\ \\\ \\\\ \\\�\��\`— \ \ —_\\ /✓11 /i%/j/ j/�,� / :_ tri /l \\ \ / / / / { \ — — \ \ \ \ \ \..,____, „„. / / `` ` ` \ \ \ \ \ , / 7 \ \ \ \ \ \\\\\ \ \ \ \ \ \ \ I I 1 \ \ \ — �\ \ \ \ \ I C \\ \\ \�\ \ \ \\� \ \ \\ \�\_\ \ \ \ \ \ 1 \\\\ \\ \ \I \ \ I ////// / / //// / /i 50 I I GRAPHIC SCALE 025 50 100 / l / \ ... _ \-- \ \ \\ \\--. \ ----\ \ \ \ \ \\ \ \ \ \\ II lll�\--_—' \l II I \\\\�—__—\\\\\ \\\� \ L — \ — \\\ \ \ \\� I\ \\\ \\\ \ �/ / 1\II� / Il\ l I 1 I I I I \ 1 \ , WATERLINE NOTE: SEWER NOTE: UTILITIES AND STORM DRAINAGE NOTE: \ \ \ \ \\ \ \\ \ - - - \ ) \ \ N \ \ \ \ \\ \\ \ \ \ \ \ \ \ 1 \ \ \ I \\\\ ` _� �� N \ \\ \ \ \\ \ 1 \ \ I \ \\ \\ ��) I / \ \ I \ \ \ \) / / / I \ \ \ \ \ /� / \ \ \ \ / I \ \ \\ I \ \ \ 1 1 \ \ 1 I / ) \\ \ \\\ \ 1 inch = 50 Ft. IF MINIMUM CLEARANCE CANNOT BE ACHIEVED WITHOUT EXCEEDING MAXIMUM PIPE DEFLECTION FOR THE WATERLINE, THEN CONTRACTOR TO INSTALL 45° VERTICAL BENDS PER DETAIL. A MINIMUM COVER OF 4' SHALL BE PROVIDED ON ALL PVC SDR-35 AND PVC SDR-26 SANITARY SEWER. SPECIAL BEDDING IS REQUIRED FOR 14'-20' INSTALLATION DEPTHS SEE DETAIL ON SHEET 10.5. IF 4' CANNOT BE PROVIDED, THEN CONTRACTOR SHALL NOTIFY ENGINEER'S REPRESENTATIVE PRIOR TO INSTALLATION. SCREENED BACK UTILITIES AND STORM DRAINAGE SHOWN ARE EXISTING UNLESS OTHERWISE NOTED. \ \ ` - \ \ \ \ (-- i \ \ \ \ \ \ . \ X \ \ \ \ \ \ \ `\` \ `- _- \ \ \ \ \ 1 - \ \\ \ \\ \ \ - - \ 1 \ \ \ \ \ \ \ \ \ \ \ \� \ \ \ ) \I1 \ ) N\ / \` \ \ ) \ \ \\ \ \ / \ \ \ \ \ \ I \ \ \ \\\ �\ \ \ \\ r \ \ \ \ \\ \ \-\\ \ \ I \ I / \ \ \ \\\ I \ \ \ \ \ \ \ I I \ \ \\ ALL CONSTRUCTION AND NCDOT STANDARD SHALL BE IN ACCORDANCE WITH TOWN OF PITTSBORO DETAILS AND SPECIFICATIONS, LATEST REVISIONS. . , \ •' . J) 1 \ \ . / . \\ I N IIN N -•c -•c -•c -•c •c -•c -•c 1- c c 1. 1. 1. 525 1. 1X 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I N N IIN N N N N N N N N N N N IX N N N IX 1 1 525 515 1 1 1ASPE'N AVER 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I N N IIII N N N c N N N N N N 1. 1. 1. 1. 1. 1. 1. 1X 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I 515 cL Jai o J 0 0 1 I I W > W O r- , J Lo m - iii rs �? �o �? c, N J c7 O HIGH PT HIGH STA: PT EL: 20+70.00 481 66' SCALE. ASPEN AVENUE PLAN & PROFILE - I I I 114-CB / STA :12+88.71,' FA:12+88.71,' 00 PROSPECT 45 ASPEN AVE 1 1 STA: 14+77.56, ■ m U I I I I : 17+82.67, 13.50' f 1 1 TA: 19+67.85, 13.51 1 1 1 1 m v PPIVIEL:4802600 N EL 480 zz �� co ■ � 1 = 50 HORIZ. 520 c� _j coo Q Ln _ (0 v 520 510 —215A-C STA: 11 II — v Lr5Q .. m LVC AD:-2.00 i0000' n r 1 = 5 VERT. 510 �o N T o \ N co HIGH PT STA: 16+32.00 TEL EL:494.13' m U v 8 _ O 0 ocoO O ` LnQQ (NIHIGH (D EGL (-50') EL 1_ �� rn N J�� 17-JBr —STA: 13+31.45 , 6.24' R ,I I I I STA: 14+82.57, 5.50' R r PVI STA: 16+ �� �� N� \�\\ Nv) / 1 1 I STA: 20+70 EL: 481.66' 1 I ■ FA:21+70 EL: 477.66' / w q q Q \ a W co co MI PVI EL:493901 K: 108.6 —, // ■ " _ co m - AD. -1.10 LVC: 120.00' WA ■ ■■ 515 — STA 12+4 1 II — 515 505 A 16+32 00_1 A 17+52 00J ASPEN AVE =1 MAGINE WAY 505 �r \ = I o \ \ ■ \ EGL (-50') o EGCL \ 1- w w EL. 488.80'1 -STA: 18+31.84 STA: 10+00.00I 21+19.25, 13.50' L i I , A . p.--a. ti I CD 0 246A-CB MIMI=\ C —246- Lob 505 = FGCL \ — _ — — _ �05 =' Oil co _ 495 / 4"x4"TEE / -- ------ ---_ \ EGR(50') ■ 0 8" (WATER) BOA ( RECLAIMED WATER ) \ ` i ■ MI II - - - EIM ■ 0 N N 18"MIN ■ \ ------ 15°RCP ■.■■—■®- ■ N o N o 111 500 -�� 1.so % 1 500 '''�'- - . .I I\ '1 \:_ N \ 490 n 18 MIN ! 4 MIN. ■ 18" MIN � —.__ 18" —'' Job No. 02150098.62 Drawn By TE �1 -- -----RCP - - ` �--___ _ - -� --- Date 11/09/20 Designer FH �� -- - - - - FGCL WATERLIDIP NE .1 . `` ■■■■■ \ 300 ■ °00000000° oo°0000N CAR iOOOoo o ° Q� 9� ° o SEAL o °o 0 0 o 027568 0 ° ° ° ° oo g°° FN � °o o ° ° o ) Iv o (� P °OOQ00000000°p01° 4/30/2021 495 I �4 BOA 12" x 8" CROSS 8"DIP WATERLINE = i 4 • 485 - --- '' ■■■■■ \ , 4' MIN _ 485 (RECLAIMED WATER) ( WATER ) _\, ■ ' 18"MIN \ \— \ �_ 18"MIN ��-/iii�������� 42" RCP C@?.53% \�__� Art —■ \\ ■ — �s�ii�/ 42"RCP (WATER) x 6' TEE ----"'____ =-_ —■ 8" x 6"TEE 8ii DIP \� i . ■ 490_ �Ziii=����������� 42"RCP 490 _ 480 (WATER) WATERLINE ___ II ® 480 iiiiiiiiiii 124.3 i�-18"MN _ ----15„RCP ii "", I ` 8 x 8"TEE ______ =iiiii� /"""'I_---- ■ —■ —■■■ - (WATER) O - 3:1 TIE TO \ 485 Air —■ —■■■ \ �� 18" MIN i EXISTING \ 475 Revisions _■■■III \ 15p"$3CFg•-PV _ \*IIIII 1 REVISION PER TOP 01/25/21 COMMENTS C@2$$% FUTUREFGCL \ — ■ —' ■"' \ / \ \ 2 REVISION PER DEQ COMMENTS 04/30/21 —■ —■■■ \• / O 18 " MIN \ 480 ■ 480 470 �FaA -ad.,�� 8"BOA S0� 470 ■ —1 ■111 \ @67 (WATER) / 11 475 475 465 465 W 137-MH - 4' DIA. s -1 ■111 ct Ltj CO^ s 134-MH - 4' DIA. STA: 21+06.54 - 5.5' R RIM: 480.31 I 1 / INV. IN: 472.70 (135-MH) INV. OUT: 472.50 (133-M I I I 1 133-MH - 4' DIA. s II- \ EXISTING GRADE' Lb CO 8- STA: 21+75.61 - 5.! RIM: 477.26 I I INV. IN: 468.30 (13r INV. OUT: 468.10 (' IIII STA: 16+13.6E RIM: 494.37 I INV. OUT: 486 co CO CO III 135-MH - 4' DI STA: 19+55.2E RIM: 484.98 I INV. IN: 477.2E INV. OUT: 477 470• 470 460 _ wctz z 460 Sheet No. • 0 4 ■ LC) CO M L() O O CO Lip CO LC) CO L(i O L) Lip CO O) LC) L(i V O L) L O N M V N O LL) LLO I� N N 6) co 6) O O L) Lc) N LC) M N O O L(i L(i N- O M CO O L(i L(i N LC) V O O O O L(i L(i CO N- V CO 6) 6) 6) O V L(i M N LC) CO CO CO 6) O V L(i CO C) LC) I� I� O 6) O V L(i O O co O V 6) O V L(i 6) CO CO L(i O 6) O V L(i V co N- co V 6) 6) 6) V V CO V N W co N- 6) 6) V V M 6) O r` N O 6) 6) V V CO N co M 6) V V CO I� N- co 6) I� CO CO V V O co N co co O CO CO V V CO CO r` N co Lc) CO I� V V CO O N co (NI Lc) N co r` V V CO co N- co• co V V CO N N O co r` V V N I� CO N-co CO N r` r` V V ,_co 6) CO co r` r` V V co Ln co WV M r` V V ,_co r` CO co V V CO CO CO co V 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+00 16+50 17+00 17+50 18+00 18+50 19+00 19+50 20+00 20+50 21+00 21+50 22+00 22+50 23+00 23+50 k k 1 1 1 1 1 k k k k k k k k k k k k k 1 1 1 1 1 1 1 k k k k k k k k k k k k k 1 1 1 1 1 1 1 1 k k k k DocuSign Envelope ID: 4E8CE50A-9850-4C5F-967E-4301121 EDD37 :40 PM - HEINZMANN, FRANKLIN n\PH1\8.4 - 8.x ROAD PLAN & PROFILE.dwg- Friday, April 30, 2021 \CAD\Drawing Sets\Const ed 7.1 and Mello K:\15\15-0090\150098.62-CP Age R .300HW. WithersRavenel Engineers I Planners I Surveyors 115 MacKenan Drive 1 Cary, NC 27511 1 t: 919.469.3340 1 license #: C-0832 1 www.withersravenel.com 111 Y../. pr � '� Nir _o / � � /'/ /j/ : \\ II - ' II 71\6° ��•,�-\��.`` I I I I / / i / �- � t► \ 7j • - / \ IIII1 I /' • - / 1o3-CB/ / // ���Xo�`� ♦ I /// �/� . 1 � \ l „ , _/ � 1 ��/ - 1 / ir / v ,sp .�/ � , \ I \ III r//�,'- � 7 ago -,/ /.►- /V,0 ���►• \ k\ 1 '- /'/ / o7/ 106MH//\// -- ----- \V\\rAIIII(I\\V�\ ,'/ / 5o/ ��•�/, / / / /5"; . // •F\, . e/ ���5 // I ♦�\ \ \ I I I I / / 215A CB� // • / V/ / �-�` — A lV // // 37MH, /_, / / / 137 /\Ai \1`L111II /,-' //� :9 .1 ago //� - — \V\7\ / �+ Illr � 45b �®/ 3v ��� I°\__ I/ (i\ii'l: /1// *�t � / ��`<'' //�6_ /��/� �� 32 � I ,i- II /:-.-------;;; // 55_ ,�ce� -_____ //\'/ � 154-CB/\' /,-/*�/ 104 L \4 r r�w..��\\ y a � /� --- � mamma onto _-I lk sitiowl".1* e 215 CB CI Sift° \ Amimora zy a z��� // .i 9 5//�\8 —���s. \� fB / / /l // ���� o���—i. \ \ \ \ \ \o .�r— v ww L/////0///// ���7 /:1111:5:01 — s —35 106 CB ail ., ip ,. pip- Aro apossimmi 0)-- - • -P-d- ---I • /---:y // ��� �+ 0� 7' ,i a _Ilgali A \o�Ii / // / / / • / /07/ Q9S ,z �•\�1 5 6 / Min�/11 VA/ �OI • ��� //� ���/ / 475\,. /���, A \ \ ,\ \ alipmw// \ \ / / � //� /// l l � co/ lit •�� 39 \ VA \ ////,� // / / / / B�,�� / 105A CB J .iy sumo �- �. � �_ / / / 15 Jr�� ‘ AkilkVtiO • ®ip WW1 /' 4 „•• 107AMH4e — N. I /44 % I / h a /. ` ` /� �e \ \ l l / l l l '� rk1 / 1 1_ \ 107 CB NI \ l (� / 46 l l I ♦ ..---- -, IrliiiiiiiP \ �4 \\ \ \i t� !vlrA / /� `�� 107 MH r I / 47 / C o / �� ♦ a. / / \ / / \ I I l 4 l 0 / 4� , . / �`� �,., � � / 108 CB 1 �� . ` \ I I I I I I / I l I 43. / / / / / �S �° / s / ,. , / �i N�/, �� / , / , , �y _�\ \ ��� I I I 302 JB N / / // I I t ` � ♦� / �- , / / /J . j� � V \ 110ACB\ kit 1 I I I l �l l l l 1 I / / / �� ♦ ��i / a � ��\® C%/J � ��9i�1®1 , Iodik I I I co w / / / <r 48 / h l / Ii / / / I �46 / -`���� / �1�� 111ACB / / , / ♦ ,h 4. / / •%`, 10 �'iitiip� �I ►.' "����,. m��i�iE�°�1�lEal�'— / / / � — / ,l���' `\��I '� ` — — 11 / �l— ,�_I, ■■ Q / / / // ♦ o / ' \ ` r�`-1 vie , ♦ alA�MH i — / /dik 15 _�� v.\ — _ i / kf woo `. •A►w �1� l 5 �5 / \��� �i ,..+ _ / /�, _:' --- N'��V� �r 1p `r�`�I1� o/ ♦ _ 4"�-. � / / / / / o// �\� 4161,1 / / w� `>5 12 iPco iimiliirmm ' i / �I / \�\� / .��. �_ -� - '�_'�_i+nn����,��/"' bo ' �t� el / j n 490 109-CB _ _�'�11i` torI / ��o �� -...___ a �� w��r,�1�����r�..."'",..-- �� ���t► CONSTRUCTION DRAWINGS FOR CHATHAM PARK SECTION 7.1 RESIDENTIAL SUBDIVISION PHASE 1 PITTSBORO, CHATHAM COUNTY, NORTH CAROLINA / / � �� / / / �� // ����� �a�� � � \ - 1 / � - - - - C� \ \ \ 1 111 i 1�\ 110 CB � �'� ��> ♦ / h / 4, ♦ / / / / / ilF , .. 1 115 YI / \ I 1 f ./ti`/ -� . tea. boo / / / / / / u \ \ \ \ I /, �� 30 DI/w=�� _ ��� ���..``��� / / / / / / / i / �`�� \ \ \ \ \ �� y /' ///�� i / / / dr \III Jr��c�.��:1tte / 0 / / / / / / ♦ ♦� �♦ 1/4 495 \ .// _\ / / /o/ / �/``, \\ ���r304JB I/V1 I / / / `�, ♦ A / / // / / R / `� `+►♦rj;1�i 48p\ \\ 2 \\I \I y/// PI / ►' I ��--�.0 4 / / / / / / / / Aftip- lar A\ r I ♦ v av \ 1 \ \ \ A ► / CHI I I I 1 I 112cB,AllgipA / / / / / / / / / . ` • fir, 485 \ \ \ �� A 480 V / �I If/17JB ` �/ / / / / • ` ` \ \ \ \ \ �< �.` \ / I I 113 CB -• / / / / / / / / / / / / / �� `� 490 \ \ \\\ 1 / I I I I III / / / / . �� / /, / / / / �� i1 ' \ \\ \ \ \ / / III i . / 14 CB / / ��5 // / / / / / � // 117 YI \ \ I I / / / / 155ACB' �.R95 / '� , VT � \ l I I 1 I I I / l / tit / / / / / / / i / / / / / 495 \ 490 ( / / / / / / / / / / / 156CB / / • 1 I I III1 ��1i / / / / / / / / / / / / / / o� 5° zuuuuNukva.11t..ramk:"'t:..Luhvma::: gy�1� �s 30�JB I I I I l / Ar / / / / / / / / / / / / / /////��// �495 V�VA I/I I I 18 JB / / 0 / / / / / / / ///// / / / �� !�Aoo°4 / / / / 1 1 I I I I I , , / / / / / � I I � I / / / o /�.r�,��► 1111I / / I I I I / �,1i�0o� � � �� o � i � ���r V � — s— o� V sos \ V A� A VA� \\ \ \ �'� \VAw,,, � II I I � I I Hit � I I 1 I / I /o,/ / / / I I / / / / / / / ' //` u II (� / / /saozs /_� GRAPHIC SCALE sa ,00 �o /\ ///I // / //WATERLINE NOTE:SEWER NOTE:UTILITIES AND STORM DRAINAGE NOTE. Sao �\\\\\\\\\\ �.. �.o — \\\ "VV � i / / 1 / 1 I I II / 1 / f 1 I�• /It / I o / / /MAXIMUM 1 inch - 50 Ft. -\s\ IF MINIMUM CLEARANCE CANNOT BE ACHIEVED WITHOUT EXCEEDING PIPE DEFLECTION FOR THE WATERLINE, THEN CONTRACTOR TOSPECIAL INSTALL 45° VERTICAL BENDS PER DETAIL. A MINIMUM COVER OF 4' SHALL BE PROVIDED ON ALL PVC SDR-35 AND PVCSDR-26 SANITARY SEWER. BEDDING IS REQUIRED FOR 14'-20' INSTALLATION DEPTHS SEE DETAIL ON SHEET 10.5. IF 4' CANNOT BE PROVIDED, THEN CONTRACTOR SHALL NOTIFY ENGINEERS REPRESENTATIVE PRIOR TO INSTALLATION. SCREENED SHOWN ARE NOTED. BACK UTILITIES AND STORM DRAINAGE EXISTING UNLESS OTHERWISE :.\� — � \\\�\ \ \ \ \\ \ \ \ \- — — \ \ s7n \ \\ \\ \ II'\ \\ \ ��I1I •�� / I 1 /� I I// a I / / / / I : I � I / �� / ALL CONSTRUCTION AND NCDOT STANDARD SHALL BE IN ACCORDANCE WITH TOWN OF PITTSBORO DETAILS AND SPECIFICATIONS, LATEST REVISIONS. _ . \ , .N ,/ 500 PROSPECT PLACE 500 515 515 LOW PT STA: 12+68.03 _■ J LOW PVI PT EL: 471.81' STA: 12+20.00 ■■■ LOW PT LOW STA: 480 PT EL: 48010' 0 ' —■■■— —■ -- b w w Q , / / ALE. PROSPECT PLACE PLAN & PROFILE > J w— PVI EL: 469.41' K 3 ■ ■■■ P PIVI EL: 481.35' —■■■ —■ -- o ww / / 1 " = 5 0' H O R I Z. E L AD: 7.44 .4 ■ ■■■■ 1 —■■ —■ -- o <, / EGCL 1 " = 5' VERT. AD: .8 495 �o o LVC:100.00' �" '' —■ -- ��m/� 510 -o ono ■ o ■■ —■co++ 0-5 �'� 0) poo \ < ' 1 ■ o J ■■■ ■■ —■ w ~n ~n �EGR (50') N O I- w 1 i- w O O cd w CO q n w 4: 16+90.62, 1; III I ■■■ —■ EGL ( 50') 7, Lb I STA 20+76.0 ■■ 1±:! �1 \ 8 HKOSHLC I HL = 0 MERRIVILLE RD EGL (50) ■■ ■ n~ n~ ■■■■■ ■■ MIE ,: 20+30.56, 13.59' ■■ ?5, 13.50' R I 1 1 485 0 ■- ■■ :5 500 J g� 0 , 08.. -■■ 500 o 0 o _, EGCL l cd E. LC) CO LP CO o U LM N N EGCL .....,,,,___.,, LLJ CO CD 00 0_ LLJ \ Lb IMI CO CO MY Pm 480 \ / � 0- ,'� � � 480 495 495 2.08% ° � \ \ � m co � O� o� EGR 50' ( ) � � ��■ ■-■■ 49 \ �� � �� / ����� ����' /� 2 ■■ /— 4' MIN. ip'� 8" x 6" TEE ■■ ° Si 1 CO i N ii�� �� g5°lo /�i O (WATER) 4" X 4" TEE V ,m �� Q / � I�� CP a' PNC @� ■ � ���'�� ��' ■■ (RECLAIMED WATER) c� � o� .. o � �� / 249 ���'�� 18" � ��,.s�� R � iii .��...�.... 18" MIS i 112� �gF ■ ■ i//1i�� 50 6"DIP �■■ 475 4' MIN.— / EGCL \ v 4' IN. i.... 18"MIN // 0 ME i �� P WATERLINE 490 ..� ��� ,���'� ■ Job No. 02150098.62 Drawn By TE �� I 18"MIN 1A � /I 2 A ' RG� �� ����� ii'" ��i�" �� - � � i�'' ��' � �' ��■■ Date 11/09/20 Designer FH i 8" DIP � / / _i �//������ .......... � �//i���� �G@g0 R°o /* i'�� ,. , , ■�■■ � WATERLINE 8"MIN / � � �, n / ii��������'� �����������"��i \ � 30" RCP �i�''I ������ ,,� ■ o°°� �° °�FES.S/� °'°off°°°'o o Q by o ° ° SEAL 0 /0 027568 0 0 P o°1 °°°lFy R o°Go °oa °° s °°° ::‹ °0Q0°°o°o°°°p014/30/2021 470 ��■ ��� 1 6�� x 6"TEE `� /............................ ������������� �� 12Q 47Q 4 ,��� 18"MIN 0.' 485 I (WATER) �Am,'" �i- ..,ii� RCP, MIM ��■ 8' BOA 4' BOA ■� 6' DIP ��������iiiiii 18" MIN ,,-- ■ // '� 8� (WATER) (RECLAIMED WATER) ■, WATERLINE I ��,�iii �� 25g�o ■ \ �� i ��� ���,�'� �i 6 ��i p�G @ \ \ i� 12" x 8" CROSS ii� ■ 465 (WATER) ■ // 465 4�0�/ 136 480 L� / 18" MIN / 113.53 LF 8" PVC @ 0.84% 460 1 460 4 5 475 Revisions 1 REVISION OMMENTSOP 01/25/21 / 1 1 1 I 1 1 1 1 2 REVISION PER DEQ 04/30/21 COMMENTS / 455 / 455 4 0 470 I I I I 450 = cG I J = = cG 450 465 = cG 465 w Lo O I c = Q O --5.5' L1 i (109-MH 65 (107-P I � (p 1 (110-MH 80 (109-P 57' L1 1 ) (111-MH 00 (MH-1 up rzi Q u? rmo I O 0 0 Q Q CO 1 - Q- - Q u7 O C7 w LC)CO CO RI I V I� ��CO p CO Ln co NO co co D _ M O �V� i,p D O m0� CO O N N LC) v D O p�v co z I- 0_ =+VI— �v0 / +'V VH Nvz z 0 +(VV1— mvz 0 _ +COVH �vz 0 CD�vz +NV H_ 0 _NN_V1— COvz 0 - }4H ��0 445 x w w - ��' cotz �� ncCz z z Cb ��z z • ��z z ��z z 445 460 ��z z LEz 460 Sheet No. 8.05 �� �� �O �O ,, �� ,,. �� c,„ HO�N� W N V ui N V V MN M I� CO •I- V V H�Ofl CO V co V O co• V V CO V �� CO I- V M I� Co V V ��fl W W W O V V M ���� N V Lc) M CO CO I� V Lc) CO CO• W N V ui 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+00 16+50 17+00 17+50 18+00 18+50 19+00 19+50 20+00 20+50 21+00 DocuSign Envelope ID: 4E8CE50A-9850-4C5F-967E-4301121 EDD37 06:41 PM - HEINZMANN, FRANKLIN .XX DETAILS.dwg- Friday, April 30, 2 n\PH1\10.4 \CAD\Drawing Sets\Const ed 7.1 and Mello K:\15\15-0090\150098.62-CP Age R ■ WithersRavenel Engineers I Planners I Surveyors 115 MacKenan Drive 1 Cary, NC 27511 1 t: 919.469.3340 1 license #: C-0832 1 www.withersravenel.com WATER LINE EXCLUSION AND EXTRA PROTECTION ZONES* WATER LINE EXTRA PROTECTION DUCTILE IRON PIPE WITH RESTRAINED OR MECHANICAL JOINTS* 4" A W 2 > 4" ENCASEMENT FOR PIPE CROSSING* STIRRUPS STIRRUPS GRAVITY SANITARY SEWER PRESSURIZED SANITARY SEWER MECHANICAL OR 2'L f f 2" EDGE SPACING 24" SPACING 36" RESTRAINED JOINTS (OR NO JOINTS) 2" r F'� NO. 3 STIRRUPS a d p d g U) P'1 1 1 I I 36" O.C. ° I I °. to 6 > 6 I I r I I (4) NO.4 BARS a: 3- a '-t 1 ati a d '-t QFe - z �\-� - r. ° a H o q�� ° ° ° .. a ° HIGHER WATER OR SEWER MAIN 1 ° ZONE B 4 /Ifi / d d ° d d 2' /6' MIN. ,. s 6' MIN.' z 2 2" /r U 10' MIN. 10' MIN. GRAVITY O / .............. 1 6' MIN." NO �/ a � o /�/�/ PRESSURE O VARIES JOINTS / 6' MIN.' ► OR FORCE / SANITARY /��! ° ° LOWER WATER OR } ZONE B SEWER MAIN ZONE A // / / / / / 2' 10' MIN. 10' MIN. ° ° 4 SEWER MAIN ° . .d a 6" ° 45 90° a2 .... ......... _ _ — a I d ° 14 I a a a a 14 d — . 1 1 °. yr �r c d 4---T- �r a. a 4---T. d d 6" EXTRA PROTECTION DUCTILE IRON PIPE 6" CO > 6" NOTES: (GRAVITY OR PRESSURIZED) SEWER LINE A SECTION A -A CONSTRUCTION DRAWINGS FOR CHATHAM PARK SECTION 7.1 RESIDENTIAL SUBDIVISION PHASE 1 PITTSBORO, CHATHAM COUNTY, NORTH CAROLINA ZONE A: NO WATER LINES ALLOWED/MINIMUM SEPARATION. ZONE B: EXTRA PROTECTION REQUIRED FOR WATER LINES. NOTES: NORT NOTES: NORT * REFER 15A NCAC 18C.0906 NORT ����� m����� *REFER REFER TO TOWN OF PITTSBORO STANDARD SPECITICATIONS SECTION 15A NCAC 18C.0906 m�"#�„ 1. CLASS 'C' CONCRETE *REFER TO TOWN OF PITTSBORO STANDARD SPECITICATIONS SECTION 15A NCAC 18C.0906 �a178� TOWN OF PITTSBORO ��a178!z� TOWN OF PITTSBORO �,a1787a1 TOWN OF PITTSBORO WATER AND SANITARY SEWER STANDARD CONSTRUCTION DETAIL WATER AND SANITARY SEWER STANDARD CONSTRUCTION DETAIL WATER AND SANITARY SEWER STANDARD CONSTRUCTION SEPARATION/PROTECTION DETAIL EFFECTIVE: 10/01/16 STANDARD NO: MU-02-003.00 EFFECTIVE: 10/01/16 SEPARATION/PROTECTION STANDARD NO: MU-02-004.00 EFFECTIVE: 10/01/16 SEPARATION/PROTECTION STANDARD NO: MU-02-005.00 NOTES: 1. SPACING FOR SPIDERS TO BE 2 PER 18 FOOT LENGTH ~ 5�4" `•" " FINISHED GRADE OF PIPE, ONE SUPPORT AT EACH END. 2. ENTIRE SPIDER ASSEMBLY TO BE BITUMINOUS COATED AFTER FABRICATION. 3. FIELD MODIFY AS REQUIRED TO PROVIDE DESIGN ENCLOSED ENDS WITH 511/, ° � 74 � 1�� 1" RAISED LETTERING (RECESSED FLUSH)��� CLOSED PICKHOLES ° • a d • 'Argo�� d ����� `� - Illllllllllillllilll •r �� '�:1 �j Iplllillllll �� �'/ ►)� IIlIIIllilllilllllplll . •. ° ��:� i�Y y � �� ENCASEMENT PER TOP SPECS. r� /�1 VALVE PANTONE BOX COVER, 522 PURPLE. SLOPE IN CARRIER PIPE. 8" BRICK MASONRY . — — / (2) BOX SHALL BE CENTERED �1i�• ti .� /� 11 .� �,{i •. i•�•1�• / /� �%-� l� �� �1��� • • ���� �:� • \ \ ���. / / � � STANDARD RECLAIMED VALVE BOX CAST INTO y\/ • Q • 472 1� Y4 OVER VALVE l// �ll I� I � � �Y %l/ 11 // lJ. � \/\//\//\/\//\ /`./ //\/\//\/v/\//\//\\//\/% !/\/ SURFACE MATERIAL. SEE COVER DETAIL (THIS /\// SHEET). a' � 6 11 // p % 111 F \ � 111 (� � lll 111 //�//////\� /\/\\/\/\//\/\/\�\/\/\/\� �/\/ j\% a ... .. . . STEEL SPIDER SUPPORTS D // /// � (// �//�/\/\/\\/\\\/�\\/\/\/\/\/\� l�jll�llll � CONCRETE a .. a ° 4 RECLAIMED //// � �T/lll/llll/ll/\\�y��!�\\��\��y%�\�y������\� ENCASEMENT a ° a d 2 PER JOINT OF PIPE 2" BEVEL DWATER �flJ � 2„ 111 iI i ��.. RECi.nrnrPn a a . a -II-II-II-II= ,-II-II-II-11- / ALL PARTS SHALL BE OF d WATER II II-II-II-II-11-1 -II-II -II -II.. THE SAME MATERIAL AND NOTE: • .II r- 1 D 5�2' SUPPLIED BY THE SAME VALVE OPERATOR EXTENSION SHALL BE INSTALLED IN . .. .. w I VALVE BOX COVER, D , MANUFACTURER ALL CASES WHERE THE VALVE OPERATOR IS GREATER < • 0 a G G � 0 PANTONE 522 PURPLE. LID THAN 8-FT DEPTH FROM THE SURFACE. a , < a . •,. < . a . .a d v I)-- o°.. .. n ,ad• .. as .. d . e ��� PVC C-900 OR C-905 • f�/. MECHANICAL JOINT GATE COVER DETAIL / '� 6„ WATER MAIN VALVE, RESTRAINED. 0 ,� TOP VIEW � � � \ / / I �Y �Y :Y �Y �Y / 2 Y" 4 CAUTI 1.� V Q _ _ 6„ N ;-•� I O RECI�gt 1 11==11=11=II11= �II�II�-�=� _ _ _ - Y)�.��.��.��.��.� L! i L L L! �._ �•�•�_•�•�•�• • •� • •� • •� I �J � / L ��� ��� 3 w i / — — / COMPLETE BOX WqT i r ER DO ti1ED � NOTORWK JI �� i � rl�i�Sa��+ `. , r� 12" WASHED STONE BEDDING UNDER WATER, RECLAIMED WATER & SEWER DETAILS D.LP. CARRIER PIPE -1= �••�•�••�••�••�: m / ! •: •���:r :ram. ' 1�II;� �/` � CAU PIPE &VALVE ASSEMBLY 2" DRAIN PIPE �� �I�I�I�hI�I�I�1�1�1 ����� 1•�i�i I«(�� N REc 8„...�•�.�.�•�•�•�•�•�.�•�•�.�.•. �� • iI % NOT�)MED WATE DRINK ROO �r.•. AT LOW END ��� 1�2' NOTES: '����!; • i��: •'�'��h.'�%%��%%ii�•%���CI� tii z� , ♦ �• ., STEEL ENCASEMENT PIPE DRAINAGE GRAVEL 97 " ��� � �� �� � 1 VALVE BOX COVER SHALL WEIGH A MINIMUM 13 lbs. ) _�I•�:!�!'1��• ���• •'� � � � �'!I�� •����.���;��'.��=�.!'i� ��•.��. � •r = �:�5 _=''�r�%��%%%%��_°t �.t��;Ltil � :�=!!'����:�• � � • ,. :I•fX t•-•.�.�!X1�Y��Y :.<�•�••�••�•!•.�.•r • �.. +� • ���•!•� �Y �Y �Y •. -�Y �Y,yiX:i- '. .. ����.g���J� � Y i��Y � LY it-L. iY iY Y LY-Y-�L•`t LY Lf %%%�:�����•._�•...__ °._�Y �Y.� ,� L,T •l S S1 •:�1 •:�•��•�����_� ._���:� .: ELEVATION (12 CU.FT. STONE) �� G 2 ENTIRE VALVE BOX ASSEMBLY &COVER SHALL BE CAST ) xti� ; • • � ����ti�y� •�•'�� ,ii��� ���-� ����t �ti.��•l ��-�:�� LLY _� ���{I��• �•��i����•� it�•� i�• �•i� iv•i��i�iY••.�.�I����� t �t��II ����:�ti�•��' `':�: �•'==1��5�!��!'=��j 1' BOTTOM SECTION _ _ . , •� _• s._ z��., .�.•.�z��a�����•.z�- �� _- �• Y - .._;�� �..�• zip ���• .�• � x �.�• • • •�• �.Y _►:�,�' `° 1:�'!� '�=�1:1���< �• •- � •- I. � � FROM CLASS 35 GRAY IRON. 1 • .��I •-. ��Y /8 3) ASSEMBLY SHALL BE DOMESTICALLY MADE AND 4? � i� is �•u1 ••1i���� �.!I ��t��.�!Y z. -Y.?c-��•%� •• t.. � .� 71� •`tom,- � MANUFACTURED IN THE U.S.A. 10' (VA RIE NORT SQUARE UPPER SECTION 4) ASSEMBLY OTHER THAN COVER SHALL BE PAINTED BLACK. NORT ����� ����� SHOES ON EACH STEEL ENCASEMENT PIPE TOWN OF PITTSBORO TOWN OF PITTSBORO �,�,a178��� �,�,a178��� FOOT OF SPIDER (SEE STANDARD SPECIFICATIONS) STANDARD VALVE BOX STANDARD CONSTRUCTION RECLAIMED WATER GATE VALVE ASSEMBLY STANDARD CONSTRUCTION DETAIL, DETAIL, D.I.P. CARRIER EFFECTIVE: 10/01/16 (FOR RECLAIMED WATER) STANDARD NO: RW-06-013 EFFECTIVE: 10/01/16 STANDARD NO: RW-06-014 _ PIPE �> - s" x %" STEEL PLATE ; . y.,...:.� : ' .. i�i ;•.:. - +.• "ti -• .� THREADED COUPLING '� 6"-12" STANDARD "RECLAIMED � MANHOLE RING AND COVER WATER DO NOT DRINK" LABELED (2) 1/2" x 1 �" HEX HEAD, STAINLESS 4 WASHERS AT 180° COUNTERSUNK. � FINISHED GRADE STEEL BOLTS AND BOLTS &WASHERS CONTINUOUS :`;: iii •' ' ; FROM FINISHED GRADE ' I � � TO BE TYPE 316 STAINLESS STEEL. WELD BOTH ' '. ''•'..',•:- ,; —III —III —III —III 1 111 III —III —III —III —III —III III —III —III —III —III —I � i i=l I 1=1 I I —III —III —III —III —III- I II I 11I 11 I I " VENT �H ° °R q q HOLE SIDES (TYP.) �` 1 �- I "— ORT '/ �� PLAN VIEW < (2)OPEN PICKHOLES 1" DIAMETER �g0 O,N • e _ ` •'' " 2" GATE VALVE THREADED ��1%0 f ' y ' # ECCENTRIC ° . CONE _ m O o < 3 RECLAIMED WATER METER &VAULT NO LEAD CORPORATION STOP , li .. Y �....o i •` = • INLET/OUTLET SECTION COMBINATION VALVE SIZED AIR FOR THE FILLETS R 1/8" ' r� i78��, , / ce a � , •• +�O lob No. 02150098.62 Drawn By TE •'•��••�•' •�• PROPOSED USE 1•�/ RAISED LETTERING 14� O ATER .t" o° PLAN VIEW J� '""' S' ""^ :IIIIFIII=. (RECESSED FLUSH) Date 11/09/20 Designer FH o o v� w h ,; ^" CAUTION RECLAIMED WATER t: �. ����'. :' +. •:..:1:: ' DO NOT DRINK I.:•. , .. ° COVER TOP VIEW O ,•,:; r!':r .,. C A °Oo°�yNO N o R0°OoQ o � o00 000 °o O °°0 SS/° 0 `' ,' o 0 0 0 d =00 �O �i9 ° y o c o o 0 ° Q ° o SEAL S o 027568 0 'o °o o° Q o o °o° N� NEB o \ o o°o �� °OOo o°°° Q' „ p 000000 O ooO Fy NCj °oo °000 R . E °°oo °000000a000 4/30/2021 0RT J Y PRECAST MANHOLE TAPPED TEE FITTING W/ RESTRAINED� NO LEAD BRASS 1 & COVER SPECIFICATIONS:o000000000000BLOW-OFF WO'1441Noyo WEDGE ACTION RETAINER GLANDSNO LEAD TEE CONNECTION TOSECTION° COLLARRING CLASS 35 GREY IRON.00°° ASSEMBLY LEADo°° 2" GATE1. 178�; TOWN OF PITTSBORO �0 PVC RECLAIMED c BRASS PIPE VALVE TAPPED TEE FITTING W/ 2. COMPLIES WITH ASTM A48 CL35B. MINIMUM WEIGHTS WATER MAIN 3. MANHOLE COVER TO BE PAINTED PANTONE RING 180 'd d� STEEL CASING PIPE, CARRIER STANDARD CONSTRUCTION STANDARD VALVE BOX INSTALLATION PANTONE 522 NO LEAD CORPORATION RESTRAINED WEDGE 522 PURPLE, AT MINIMUM 10 mils. COVER 120 COVER LABELED RECLAIMED WATER PURPLE ° ACTION RETAINER 4. ALL LETTERING SHALL BE CLEAN, CRISP, PIPE AND SPIDERS DETAIL �'" (SEE DETAIL RW-0s 013) SANITARY STOP _ GLANDS AND CLEARLY LEGIBLE. TOTAL 300 SECTION VIEW SEWEIR MANHO EFFECTIVE: 10/01/16 NOT TO SCALE STANDARD NO: MU-02-002 RECLAIMED WATER 5. DOMESTICALLY MADE & MANUFACTURED IN METER & VAULT FINISHED GRADE CAUTION RECLAIMED NOT DRINK WATER DO € CAUTION RECLAIMED WATER DO NOT DRINK THE USA. �.,,.., �,,,, in . a I I ;1.� ; .. •M - FINISHED GRADE ;ti is '• E.-, !^TAMPED — — — — _ _ 4„MIN. f ' BACKFILL n RECLAIMED 2" PVC � *' 2" GATE VALVE ` ` d 6" ' WATER MAIN LOCK CAP PIPE 6 SDR 21 PVC THREADED INLET/OUTLET 1" THICK i ��=' � �� �!•t -• �� �•r = � �i �� �,�- t t • . a, f •��• 12" FOUR ANCHOR BOLTS Revisions 1 ■' :f WATER -PROOF f��•'' �' 12"-No.57STONE ��.=:'t .t � � RI• \•�mw.an� fll , ���•.� .�+• MINIMUM 1/2" MINIMUM REVISION PER TOP 1 COMMENTS / 2 "SDR27 PVC NON -SHRINK GROUT �� �� ����t:.� I.1••.1 1.441- /i�!��.� •.�� ife • A's, PROVIDE PIPING IN PANTONE 522 � •.o �,s,�w};'„�i.° NO LEAD TEE CONNECTION TO ALL CONNECTIONS / SHALL BE CORED '-- t t" 4" 48" } 2 REVISION PER DEQ 04/30/21 COM MENTS PURPLE WITH THE WORDS "CAUTION BLOW -OFF ASSEMBLY RECLAIMED WATER DO NOT DRINK"BLOCKING PVC TRANSITION ADAPTER (SOCKET x STAINLESS STEEL FEMALE IPT) (TYPICAL) 2" NO LEAD BRASS SANITARY SEWER NOTES: ‘;4/11.101 NIPPLE 1. TAP SIZE AND ISOLATION VALVE TO BE SAME SIZE AS AIR VALVE. NOTES: ': 2. ALL PIPING AND FITTINGS, IN THE MANHOLE, SHALL BE NO LEAD BRASS OR BRONZE UNLESS 1) FOR MAINS THAT ARE TO BE EXTENDED, USE A VALVE EQUAL TO THE MAIN SIZE AS THE OTHERWISE NOTED. NOR Ty BLOW -OFF VALVE AND THEN REDUCE TO THE 2" SDR 21 PVC PIPE. 2) SDR 21 PVC PIPE SHALL BE PROVIDED WITH 200 P.S.I. PRESSURE RATING AND CONNECTED WITH M ‘4 R T,y 3• CONCENTRIC CONES MAY BE USED FOR AIR VALVE MANHOLES LESS THAN 5' IN DEPTH. BELUSPIGOT SOLVENT WELD JOINTS. O' 4. INSIDE OF MANHOLE TO BE PAINTED PANTONE 522 PURPLE WITH THE WORDS, �O' O O Y pp *Noy 3) SDR 21 PIPE SHALL BE PROVIDED IN PANTONE 522 PURPLE AND LABELED "CAUTION RECLAIMED WATER DO NOT DRINK". O O m ��� 0 CAUTION RECLAIMED WATER DO NOT DRINK, STENCILED ON TWO SIDES. RING TOP VIEW 178%� 178��: . TOWN OF PITTSBORO �,. TOWN OF PITTSBORG STANDARD RECLAIMED WATER BLOW -OFF ASSEMBLY, TYPE 3 STANDARD CONSTRUCTION DETAIL / STANDARD COMBINATION AIR VALVE MANHOLE STANDARD CONSTRUCTION DETAIL EFFECTIVE: 10/01/16 SANITARY SEWER (EXISTINGMANHOLE) STANDARD NO: RW-06-011 EFFECTIVE: 10/01/16 (FOR RECLAIMED WATER) STANDARD NO: RW-06-012 10.0 Sheet No. 7 11101 WithersRavenel iiOur People. Your Success. May 5, 2021 Department of Environmental Quality Division of Water Resources Non -Discharge Branch Attn: Nathaniel Thornburg-9th Floor, Office #942X 512 N. Salisbury Street Raleigh, NC 27604 RE: Chatham Park - Section 7.1 Phase 1 Reclaimed Water Distribution Permit Dear Mr. Thornburg, On behalf of Chatham Park Investors LLC, please find the attached documentation in support of a reclaimed water main extension application for the referenced project. As noted on forms RWPI 06-16 & RWDL 06- 16, project will consist of 2,577 LF 4" PVC that will serve a residential subdivision. Initially the reclaimed water line permitted with this project will be tied to reclaimed water permitted under separate cover west of this project and within Grant Dr. This portion of reclaimed water ties to the domestic water main within Grant Dr with an RPZ backflow assembly. Once reclaimed water is available from the Town of Pittsboro, the connection to the potable system will be removed. Please find attached one paper original and two digital CDs (PDFs) of the following information in support of the application: • $480.00 Application Fee (Check # 5334) • Reclaimed Water Systems - Project Information Form (RWPI 06-16) • Reclaimed Water Systems - Distribution Lines Form (RWDL 06-16) • Property Ownership Documentation (Deed) • Technical Specifications • Engineering Calculations/Reclaimed Water Model • Plans • Two (2) CDs with submittal documents (PDF) If you have any questions regarding this request or if you require any additional information, please feel free to contact me at 919-238-0373 or lengland@withersravenel.com. Sincerely Wi hersRa Lesley R. En Project Man!_'-r 115 MacKenan Drive I Cary, NC 27511 t: 919.469.3340 I f: 919.467.6008 I www.withersravenel.com I License No. C-0832 Cary I Greensboro I Pittsboro I Raleigh I Wilmington DWR Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources 15A NCAC 02U — RECLAIMED WATER SYSTEMS — PROJECT INFORMATION INSTRUCTIONS FOR FORM: RWPI 06-16 & SUPPORTING DOCUMENTATION Please use the following instructions as a checklist in order to ensure all required items are submitted. Adherence to these instructions and checking the provided boxes will help produce a quicker review time and reduce the amount of additional information requested. Failure to submit all of the required items will lead to additional processing and review time for the permit application. For more information, visit the Water Quality Permitting Section Non -Discharge Permitting Unit website. General —This form is required for all projects involving the generation, utilization, and or distribution of reclaimed water. At least one of the following forms must also be included in the application package. However, multiple forms may be applicable. Unless otherwise noted, the Applicant shall submit one original and two copies of the application and supporting documentation. Please check the boxes below as appropriate to indicate which additional folnis are included in the application package: ❑ Reclaimed Water Generation (FORM: RWG) — for wastewater treatment facilities producing reclaimed water. ❑ Non -Conjunctive Utilization (FORM: RWNC) — for reclaimed water utilization activities, when the reclaimed water utilization activity is required in order to meet the wastewater disposal needs of the facility. ❑X Conjunctive Utilization (FORM: RWCU) — for reclaimed water utilization activities, when the reclaimed water option is not necessary to meet the wastewater disposal needs of the facility and other wastewater utilization/disposal methods are available. ❑ Bulk Distribution (FORM: RWBD) — for distribution of reclaimed water in a bulk manner. ® Distribution Lines (FORM: RWDL) — for construction of reclaimed water distribution lines. ❑ Wetland Augmentation (FORM: RWWA) — for projects seeking to utilize reclaimed water for the purpose of wetland augmentation. ❑ Local Program Approval (FORM: RWLPA) — for projects seeking peuuitting delegation for reclaimed water users. A. Cover Letter (All Application Packages): ❑X List all items included in the application package, as well as a brief description of the requested peunitting action. B. Application Fee (All New and Major Modification Application Packages): X❑ Submit a check, money order or electronic funds transfer made payable to: North Carolina Department of Environmental Quality (NCDEQ) according to the following fee schedules: X❑ STANDARD REVIEW — Submit the appropriate fee for all new and major modification applications as listed in the table below. Facility Classification New Permit Major Modification 1 Major Generator/User (ADF > 10,000 gallons per day) $1,310 $395 Minor Generator/User (ADF < 10,000 gallons per day) $810 $245 Reclaimed Water Distribution Lines $480 1 N/A A major modification shall be defined as any peunit modification that: increases the generating facility's average daily flow (ADF); increases the utilization area acreage; adds additional utilization areas not previously approved; or includes the addition of new treatment units/processes not previously pei�uitted. There is no fee for minor permit modifications. INSTRUCTIONS FOR FORM: RWPI 06-16 & SUPPORTING DOCUMENTATION Page 1 of 2 C. Reclaimed Water Project Information Form (FORM: RWPI 06-16) (All application packages): X❑ X❑ Submit the completed and appropriately executed Reclaimed Water Project Infounation (FORM: RWPI 06-16) four. Please do not make any unauthorized content changes to this foul'. The applicant name in Item I.1. shall be consistent with the applicant name on the plans, specifications, agreements, etc. The Applicant's Certification on Page 3 of this four shall be signed in accordance with 15A NCAC 02T .0106(b). The application must be signed by a principal executive officer of at least the level of vice-president or his authorized representative for a corporation; by a general partner for a partnership or limited partnership; by the proprietor for a sole proprietorship; and by either an executive officer, an elected official in the highest level of elected office, or other authorized employee for a municipal, state, or other public entity. An alternate person may be designated as the signing official if a delegation letter is provided from a person who meets the criteria in 15A NCAC 02T .0106(b). ❑ If this project is for a renewal without modification, use the Non -Discharge System Renewal (FORM: NDSR) application. There is no fee for peunit renewal without modification. D. Existing Permit: (All Modification Packages): ❑ Submit the most recently issued existing peunit. ❑ Provide a list of any items within the peunit the Applicant would like the Division to address during the peunit modification (i.e., compliance schedules, pei, lit description, monitoring, pei, lit conditions, etc.). ONE ORIGIANL AND TWO COPIES OF THE COMPLETED APPLICATION AND SUPPORTING DOCUMENTATION SHALL BE SUBMITTED TO: NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF WATER RESOURCES WATER QUALITY PERMITTING SECTION NON -DISCHARGE PERMITTING UNIT By U.S. Postal Service: 1617 MAIL SERVICE CENTER RALEIGH, NORTH CAROLINA 27699-1617 TELEPHONE NUMBER: (919) 807-6464 By Courier/Special Delivery: 512 N. SALISBURY STREET RALEIGH, NORTH CAROLINA 27604 FAX NUMBER: (919) 807-6496 INSTRUCTIONS FOR FORM: RWPI 06-16 & SUPPORTING DOCUMENTATION Page 2 of 2 DWR Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources 15A NCAC 02U — RECLAIMED WATER SYSTEMS — PROJECT INFORMATION FORM: RWPI 06-16 I. GENERAL INFORMATION: 1. Applicant's name: Town of Pittsoro Mailing address: P.O. Box 759 City: Pittsboro State: NC Zip: 27312- Telephone number: (919 )542 2063 Email Address: ckennedy©pittsboro.gov 2. Signature authority's name:Chris (per 15A NCAC 2U .0106) Kennedy 3. Applicant type (check all that apply: X❑ Government > ❑ Federal ❑ State X❑ Municipal ❑ County ❑ Individual ❑ Corporation ✓ For new pe'its, submit documentation that the company is registered for business with the NC Secretary of State. ❑ General Partnership ✓ For new peuuits, submit a copy of the certificate filed with the Register of Deeds in the county of business. ❑ Privately Owned Public Utility ✓ For new pei'its, submit a Certificate of Public Convenience and Necessity from the NC Utilities Commission, or a letter from the NC Utilities Commission's Water and Sewer Division Public Staff stating an application for a franchise has been received and that the service area is contiguous to an existing franchised area or that franchise approval is expected. ❑ Home Owners Association ✓ For new peunits, submit a properly executed Operational Agreement (FORM: HOA); and proposed or approved Articles of Incorporation, Declarations and By-laws. ❑ Developer (where residential lots are to be sold) ✓ For new peunits, submit a properly executed Operational Agreement (FORM: DEV) 4. Demonstration of historical consideration for permit approval: Has the Applicant or any parent, subsidiary or other affiliate exhibited the following? a. Has been convicted of environmental crimes under Federal law or G.S. 143-215.6B? ❑ Yes or ❑X No b. Has previously abandoned a wastewater treatment facility without properly closing that facility? ❑ Yes or ❑X No c. Has unpaid civil penalty where all appeals have been abandoned or exhausted? ❑ Yes or ❑X No d. Is non -compliant with an existing non -discharge peunit, settlement agreement or order? ❑ Yes or ❑X No e. Has unpaid annual fees in accordance with 15A NCAC 02T .0105(e)(2)? ❑ Yes or X❑ No Title: Town Manager FORM: RWPI 06-16 Page 1 of 3 II. PROJECT INFORMATION 1. Application type: Select (See Instruction B) Fee Submitted (See Instruction B) 2. For modifications, provide the existing peu,uit number: WQ00 and most recent issuance date: 3. Provide a brief description of the activities proposed for peu,nitting: 4. What is the status of the following associated peunits and/or certifications ? (if not applicable, please mark as N/A) Permit/Certification Date Submitted Date Approved Permit/Certification No. Agency Reviewer Collection System (Q > 200 000 GPM Dam Safety Erosion & Sedimentation Control Plan Nationwide 12 / Section 404 Pretreatment Sewer System Stounwater Management Plan Other: ✓ For any of the peunits and certifications listed above that will directly impact the construction of the proposed reclaimed water project, please provide documentation of peu,uit approval or final certification. Note: This application may be considered incomplete, or the resulting peu,uit may be issued conditionally if a pending issuance of any of the related peunits/certifications directly impacts the proposed facility. 5. Documentation of the presence or absence of threatened or endangered aquatic species at the project site utilizing infounation provided by the Department's Natural Heritage Program is required for construction of all new WWTP projects and/or non - conjunctive utilization sites, and for any project involving expansion of a WWTP and/or non -conjunctive utilization site in accordance with 15A NCAC 02T .0105(c)(10). Provide the location in application package where this documentation is located: ; or explain why this item is N/A. Project scope does not include either new construction for/or expansion to a WWTP or non -conjunctive utilization site. 6. Does this project utilize public monies or lands? ❑ Yes or X❑ No ✓ If yes, was an Environmental Assessment required under 15A NCAC O1 C? Yes ❑ No Include one of the following final environmental documents with this submittal: ❑ Finding of No Significant Impact, or ❑ Record of Decision - Describe any mitigating factors from the Environmental Assessment that impact the design and/or construction of the reclaimed water project: 7. Is any portion of the proposed project (reclaimed water treatment units, storage units, distribution lines, or utilization areas) located within the 100 year flood plain? ❑ Yes or ❑X No ✓ If yes, specify which portion(s) of the project are affected? ✓ If yes, has the Applicant submitted written documentation of compliance with §143 Article 21 Part 6? ® Yes or ❑ No Documentation should consist of a letter from the local authority (i.e., county/municipality) stating that the project complies with any local floodplain ordinance that may apply. FORM: RWPI 06-16 Page 2 of 3 Applicant's Certification (signing authority must he in compliance with 15A NCAC 02U .0106): 1, Chris Kennedy Town Manager (signing authority name — PLEASE PRINT) attest that this application for Chatham Park Section 7.1 Phase 1 (facility name) (title) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that any discharge of wastewater from this non -discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. 1 will make no claim against the Division of Water Resources should a condition of this permit he violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. I further certify that the applicant or any affiliate has not been convicted of an environmental crime, has not abandoned a wastewater facility without proper closure, does not have an outstanding civil penalty where all appeals have been exhausted or abandoned, are compliant with any active compliance schedule, and do not have any overdue annual fees under Rule 15A NCAC 0211 .0105. Note: In accordance with NC General Statutes 143-215,6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 asell as civil penalties up to $25,000 per violation. Signature: Date: 111EZIz I FORM: RWPI 06_16 Page 3 of 3 DocuSign Envelope ID: A6DAB4A1-FC8C-4A1 F-AB30-5DF3AD63CFC0 DWR State of North Carolina Department of Environmental Quality Division of Water Resources 15A NCAC 02U — RECLAIMED WATER SYSTEMS — DISTRIBUTION LINES Division of Water Resources INSTRUCTIONS FOR FORM: RWDL 06-16 & SUPPORTING DOCUMENTATION Please use the following instructions as a checklist in order to ensure all required items are submitted. Adherence to these instructions and checking the provided boxes will help produce a quicker review time and reduce the amount of additional information requested. Failure to submit all of the required items will lead to additional processing and review time for the permit application. For more information, visit the Water Quality Permitting Section's Non -Discharge Permitting Unit website General — This application is for projects involving the construction of reclaimed water distribution lines that will supply reclaimed water for conjunctive use activities. Unless otherwise noted, the Applicant shall submit one original and two copies of the application and supporting documentation. Do not submit this application without an associated Reclaimed Water Project Infounation (FORM: RWPI) four. A. Reclaimed Water Distribution Lines (FORM: RWDL 06-16) Application (All application packages): ® Submit the completed and appropriately executed Reclaimed Water Distribution Lines (FORM: RWDL 06-16) four. Please do not make any unauthorized content changes to this foul'. If necessary for clarity or due to space restrictions, attachments to the application may be made, as long as the attachments are numbered to correspond to the section and item to which they refer. ® The system name in Item IL 1. shall be consistent with the user name on the plans, specifications, agreements, etc. ® The Professional Engineer's Certification on Page 5 of this foul' shall be signed, sealed and dated by a North Carolina licensed Professional Engineer. ® The Applicant's Certification on Page 5 of this four shall be signed in accordance with 15A NCAC 02T .0106(b). The application must be signed by a principal executive officer of at least the level of vice-president or his authorized representative for a corporation; by a general partner for a partnership or limited partnership; by the proprietor for a sole proprietorship; and by either an executive officer, an elected official in the highest level of elected office, or other authorized employee for a municipal, state, or other public entity. An alternate person may be designated as the signing official if a delegation letter is provided from a person who meets the criteria in 15A NCAC 02T .0106(b). B. Property Ownership Documentation (All Application Packages): ® Per 15A NCAC 02U .0201(e) or 15A NCAC 02U .0202(f), the Applicant shall demonstrate that they are the owner of the property where the reclaimed water lines will be installed. Documentation shall consist of one of the following (or a combination of): ❑ Legal documentation of ownership (i.e., GIS, deed or article of incorporation), or ❑ Written notarized intent to purchase agreement signed by both parties with a plat or survey map, or ® An easement specifically indicating the intended use of the property and meeting the requirements of 15A NCAC 02L .0107(f), (i.e. municipality right of way) or ❑ A written notarized lease agreement signed by both parties, indicating the intended use of the property, as well as a plat or survey map. INSTRUCTIONS FOR FORM: RWDL 06-16 & SUPPORTING DOCUMENTATION Page 1 of 2 DocuSign Envelope ID: A6DAB4A1-FC8C-4A1 F-AB30-5DF3AD63CFC0 C. Engineering Plans (All Application Packages): ® Per 15A NCAC 02U .0201(c)(1) or .0202(c), submit standard size and 11 x 17-inch plan sets that have been signed, sealed and dated by a North Carolina licensed Professional Engineer. At a minimum, the engineering plans shall include the following items: Table of contents. A general location map with at least two geographic references and a vicinity map. Plan and profile views of all pump stations and reclaimed water line extensions as well as the proximity of the reclaimed water line extensions to other utilities and natural features. Depict minimum separation distances required by 15A NCAC 02U .0403(h), (i), and 15A NCAC 02T .0305). Minimum cover in accordance with 15A NCAC 02T .0305(g)(4). Location and details of all pump stations. All labeling and color coding requirements per 15A NCAC 02U .0403. Plans shall represent a completed design and not be labeled with preliminary phrases (e.g., FOR REVIEW ONLY, NOT FOR CONSTRUCTION, etc.) that indicate they are anything other than final specifications. However, the plans may be labeled with the phrase: FINAL DESIGN - NOT RELEASED FOR CONSTRUCTION. D. Specifications (All Application Packages): ® Per 15A NCAC 02U .0201(c) or .0202(c), submit specifications that have been signed, sealed and dated by a North Carolina licensed Professional Engineer. At a minimum, the specifications shall include the following items: ® Specifications for standard equipment may be omitted for municipalities with approved standard specifications. Use of standard specifications must be noted on each page of the plans. ® Table of contents with each section/page numbered. ® Detailed specifications for each reclaimed water line and pump station (as applicable). ® Site Work (i.e., earthwork, clearing, grubbing, excavation, trenching, backfilling, compacting, fencing, seeding, etc.) ® Materials (i.e., concrete, masonry, steel, painting, method of construction, etc.) ❑ Electrical (i.e., control panels) ® All labeling and color coding requirements per 15A NCAC 02U .0403. ® Specifications shall represent a completed design and not be labeled with preliminary phrases (e.g., FOR REVIEW ONLY, NOT FOR CONSTRUCTION, etc.) that indicate they are anything other than final specifications. However, the specifications may be labeled with the phrase: FINAL DESIGN - NOT RELEASED FOR CONSTRUCTION. E. Engineering Calculations (All Application Packages): ® Per 15A NCAC 02U .0201(c) or .0202(c), submit calculations that have been signed, sealed and dated by a North Carolina licensed Professional Engineer. At a minimum, the calculations shall include the following items: ® Provide justification for the required pipe capacity, and details for how pipe sizes were deter tined. ® Minimum velocities to be maintained in the reclaimed water line. ❑ Friction/total dynamic head calculations and system curve analysis for each pump used. ❑ Pump selection infounation including pump curves, manufacturer's infoiniation, and recommended installation guidelines. ® Detailed specifications for each reclaimed water line and pump station (as applicable). ❑ Floatation calculations for any pump stations entirely or partially below grade. ® For connection to a pump station, submit an evaluation of the existing pump station's ability to handle peak flows. Provide calculations to detail how peak flows were deteu,nined. ❑ For connection to a force main, submit an evaluation of the existing force main based on peak flows to the proposed project and peak flows already tributary to the existing force main. ONE ORIGINAL AND TWO COPIES OF THE COMPLETED APPLICATION AND SUPPORTING DOCUMENTATION SHALL BE SUBMITTED TO: NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF WATER RESOURCES WATER QUALITY PERMITTING SECTION NON -DISCHARGE PERMITTING UNIT By U.S. Postal Service: 1617 MAIL SERVICE CENTER RALEIGH, NORTH CAROLINA 27699-1617 TELEPHONE NUMBER: (919) 807-6464 By Courier/Special Delivery: 512 N. SALISBURY STREET RALEIGH, NORTH CAROLINA 27604 FAX NUMBER: (919) 807-6496 INSTRUCTIONS FOR FORM: RWDL 06-16 & SUPPORTING DOCUMENTATION Page 2 of 2 DocuSign Envelope ID: A6DAB4A1-FC8C-4A1 F-AB30-5DF3AD63CFC0 DWR Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources 15A NCAC 02U — RECLAIMED WATER SYSTEMS — DISTRIBUTION LINES FORM: RWDL 06-16 I. CONTACT INFORMATION: 1. Applicant's name: Town of Pittsboro Mailing address: P.O. Box 759 City: Pittsboro State: NC Zip: 27312- Telephone number: (919) 542-2063 Email Address: ckennedy@pittsboro.gov 2. Signature authority's name: Chris Kennedy (per 15A NCAC 02T .0106) Title: Town Manager 3. Consulting Engineer's name: Nicholas J. Antrilli License Number: 38549 Fiuu: WithersRavenel, Inc. Mailing address: 115 MacKenan Drive City: Cary State: NC Zip: 27511- Telephone number: (919) 469-3340 Email Address: nantrilli@withersravenel.com II. DISTRIBUTION SYSTEM INFORMATION 1. Distribution system project name (name of subdivision, shopping center, etc.): Section 7.1 Subdivision Phase 1 2. Project county: Chatham 3. USGS map name: Pittsboro 4. Owner of reclaimed water generating facility: Old North State Water Company, LLC 5. Permit number of reclaimed water generating facility: WQ0039375 6. List the owner(s) of any intermediate reclaimed water lines if different from the applicant, or the generating facility. N/A 7. Permit number for reclaimed water line immediately upstream: N/A 8. Pipe diameter for for reclaimed water line immediately upstream: N/A 9. Specify the proposed destination of the reclaimed water: Future Residential Development 10. Capacity of proposed distribution system: 300,000 gallons per day 11. Explanation of how capacity was determined: (See attached calculations) III. DISTRIBUTION LINE DESIGN INFORMATION 1. Complete the table below for by providing the required infoilation on the proposed distribution lines: Diameter (inches) Length (linear feet) Pipe Material High Elevation (ft) Discharge Elevation (ft) 4 2,577 PVC 510 510 2. Station location of air release valves: Grant Drive Sta. 32+35 Note: Air release valves must be provided at all high points along the line where the elevation difference exceeds 10 ft. FORM: RWDL 06-16 Page 1 of 5 DocuSign Envelope ID: A6DAB4A1-FC8C-4A1 F-AB30-5DF3AD63CFC0 III. DISTRIBUTION LINE DESIGN INFORMATION (Continued) 3. Complete the table below by providing the location of each design criteria in the specification and/or plans in accordance with 15A NCAC 02U .0403. Items that are not applicable shall be marked N/A. Design Criteria Page Number in Plans Page Number in Specifications Labeling on reclaimed water piping, valves, storage facilities, and outlets 4.0 4.2 & 8.01 8.03 5 Color coding on reclaimed water piping, valves, etc. N/A 12 Method of securing valves and outlet for operation by authorized personnel only 0.1 16 Locking mechanism for hose bibs N/A N/A Cross connection control devices N/A 3 IV. SETBACKS (15A NCAC 02U .0701) 1. Provide the actual minimum distance (in feet) from any reclaimed water storage units and/or pump station within the distribution system to each item listed (distances greater than 500 feet may be marked N/A): Setback Parameter Pump stations within distribution system Reclaimed Water Storage Units Required Actual Required Actual Any private or public water supply source N/A 100 N/A Any property line N/A 50 N/A Any well with exception of monitoring wells 100 N/A 100 N/A Surface waters (streams — inteunittent and perennial, perennial waterbodies, and wetlands) classified as SA 100 N/A 50 N/A Surface waters (streams — inteunittent and perennial, perennial waterbodies, and wetlands) classified as SA 25 N/A 50 N/A 2. Do the pump stations and storage units comply with all setbacks found in the river basin rules (15A NCAC 2B .0200)? ❑ Yes or ❑ No ✓ If no, list non -compliant setbacks: N/A 3. Are any setback waivers required in order to comply with 15A NCAC 02U .0701? ❑ Yes or ® No ✓ If yes, have these waivers been written, notarized, signed by all parties involved and recorded with the County Register of Deeds? ❑ Yes or ❑ No ✓ If yes, have the required Non -Discharge Wastewater System Waiver (FORM: NDWSW) forms been included with this application package? ❑ Yes or ❑ No FORM: RWDL 06-16 Page 2 of 5 DocuSign Envelope ID: A6DAB4A1-FC8C-4A1 F-AB30-5DF3AD63CFC0 V. SEPARATION DISTANCES 1. Provide the actual minimum separation distance (in feet) from the reclaimed water distribution system to each item listed in accordance with 15A NCAC 02U .0403(h), (i), and (j): Separation Parameter Horizontal Vertical Required Actual Required Actual Any water line (feet) 10 10 1.5 1.5 Any well 50 N/A N/A Sewer lines (reclaimed over sewer) 2 2 1.5 1.5 Final earth grade N/A 3 4 2. Are the separation requirements listed above met? ® Yes or ❑ No ✓ If No, has documentation been provided to show that piping and integrity testing procedures meet water main standards in accordance with 15A NCAC 18C? ❑ Yes or ❑ No Note: In no case shall reclaimed water lines be closer than 25 feet to a private well. VI. PUMP STATION INFORMATION IF MORE THAN ONE PUMP STATION, PROVIDE ADDITIONAL COPIES OF THIS PAGE AS NECESSARY. 1. Are there any reclaimed water pump stations proposed as part of the distribution system? ❑ Yes or ® No ✓ If no, then skip the remaining items in Section VI. 2. Complete the table below by providing the required infoination regarding the reclaimed water pump station(s) Pump Station Design Plan Sheet Number Specification Page Number Internal dimensions (L x W x H or y x H) ft ft ft Volume gallons Inlet Elevation ft Outlet Elevation ft Number of pumps Pump capacity GPM Lead pump on elevation ft Lag pump on elevation ft Lead pump off elevation ft Lag pump off elevation ft High water elevation ft Audible/Visual high water alaun 3. What is the 100-year flood elevation? (ft) 4. Precautions to be taken to protect the pump station from flooding: (ft) FORM: RWDL 06-16 Page 3 of 5 DocuSign Envelope ID: A6DAB4A1-FC8C-4A1 F-AB30-5DF3AD63CFC0 VII.STORAGE TANK INFORMATION IF MORE THAN ONE STORAGE TANK, PROVIDE ADDITIONAL COPIES OF THIS PAGE AS NECESSARY. 1. Are there any reclaimed water storage tanks proposed as part of the distribution system? ❑ Yes or ® No ✓ If no, then skip the remaining items in Section VII. 2. Complete the table below by providing the required infounation regarding the reclaimed water storage tank(s) Storage Tank Design Plan Sheet Number Specification Page Number Type of storage tank Select Internal dimensions (L x W x H or y x H) ft ft ft Storage Volume gallons Inlet Elevation ft Outlet Elevation ft High water elevation ft Audible/Visual high water alaiiu 3. What measures will be taken to reduce the risk of overflow? FORM: RWDL 06-16 Page 4 of 5 Doi:uSign Envelope ID: A6DA84A1-FC8C-4A1F-AB30-6DF3AD53CFCO Professional Engineer's Certification: 1 Nicholas J. Antrilli, PE , attest that this application for Chatham Park Section 7.1 Phase 1 has been reviewed by me and is accurate, complete and consistent with the information supplied in the engineering plans, calculations, and all other supporting documentation to the best of my knowledge. 1 further attest that to the best of my knowledge the proposed design has been prepared in accordance with this application package and its instructions as well as all applicable regulations and statutes. Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that 1 have reviewed this material and have judged it to be consistent with the proposed design. Note: In accordance with NC General Statutes 143-215.6A and 143-215.68, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. North Carolina Professional Engineer's seal, signature, and date: oaa4aoaoaaaeao. 000 ^`N C A ii10 ffpa oanuo�oov / 00 + SEAL. E 4 4 G G P a—rracuskpneney: i 0 38549 c a N1AhdsS. e N.-05F54002A81E43n... %• p'C t °000nov°, ,t)",4� �Ao°aeooa aW417' 1/24/2021 Applicant's Certification (signing authority must be in compliance with 15A NCAC: 02`i' .0106): o° v a V o 1, CH e1 S F �s �W !" Cee_ (signing authority na e — PLEASE PRINT) (title) attest that this application for R P Stwo (facility name) has been reviewed by me and is accurate and complete to the best of my knowledge. 1 understand that any discharge of wastewater from this non -discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. 1 further certify that the applicant or any affiliate has not been convicted of an environmental crime, has not abandoned a wastewater facility without proper closure, does not have an outstanding civil penalty where all appeals have been exhausted or abandoned, are compliant with any active compliance schedule, and do not have any overdue annual fees under Rule 15A NCAC 02U .0105. Note: In accordance with NC General Statutes 143-215.6A and 143-215.6t3, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed S 10,000 as well as civil penalties up to $25,000 pery{olation. Signature: i:ORM: RWDL 06-16 Date: YiZZ/24 Page 5 of 5 1761 1015 FILED CHATHAM COUNTY NC TREVA B. SEAGROVES REGISTER OF DEEDS FILED Sep 18, 2014 AT 02:57:26 pm BOOK 01761 START PAGE 1015 END PAGE 1022 ., 6 INSTRUMENT # 09147 BOOK 17 1 P4OE 1 O 15 EXCISE TAX (None) AN ORDINANCE TO EXTEND THE CORPORATE LIMITS OF THE TOWN OF PITTSBORO, NORTH CAROLINA Excise{Transfer Tax Stamps: N/A Dated: September 11, 2014 By and Between: BRIEF DESCRIPTION: N/A TAX IDENTIFICATION NUMBER: N/A Prepared By: Paul S. Messick, Jr., Gunn & Messick, LLP P.D. Box 880, Pittsboro, NC 27312 Return to: Town of Pittsboro P.U. Box 759, Pittsboro, NC 27312 1761 1016 A-2014-01 CERTIFIED COPY This is 4 true copy of a portion of the minutes of the Town of Pittsboro Board o C.mmission/rs meetin held o • 4 • —7 ,■,Y .. ■ AN ORDINANCE TO EXTEND THE CORPORATE LIM 3► 4 e F. l...loyd, CMC ' OF THE TOWN OF PITTSBORO, NORTH CARt5101,4af Pittsboro. North Carolina `tc wn Clerk Hof 17 tJ 1 AGE 1 O 16 Whereas, the Board of Commissioners has been petitioned by Chatham Park, LLC under G.S.164A 31, as amended, to annex the area described herein: and Whereas, the Board of Commissioners has by resolution directed the Town Clerk to investigate the sufficiency of said petition; and Whereas, the Town Clerk has certified the sufficiency of said petition and a public hearing on the question of this annexation was held at Town Hall, Pittsboro, North Carolina at 7:00 o'clock pm on the 25th day of August, 2014, after due notice by publication of legal advertisement on the 14th day and the 21.a day of August, 2014, and Whereas, the Board of Commissioners does hereby find as a fact that said petition meets the requirements of G. S, 160A-31, as amended; Now, Therefore Be It Ordained by the Board of Commissioners of the Town of Pittsboro, North Carolina; Section 1. By virtue of the authority granted by G.S. 16OA-31, as amended, the following described territory is hereby annexed and incorporated as part of the Town of Pittsboro as of the 8a' day of September, 2013. (See Attached — Schedule A, attached hereto and incorporated herein by reference.) Section 2. Upon and after the 8th day of September, 2014, the above describe territory and its citizens and property shall be subject to all debts, laws, ordinances and regulations in force in the Town of Pittsboro, and shall be entitled to the same privileges and benefits as other parts of the Town of Pittsboro. Said territory shall be subject to the municipal taxes according to GS 160A-31 (c), as amended. Section 3. The Clerk of the Town of Pittsboro shall cause to be recorded in the office of the Register of Deeds of Chatham County, and in the office of the Secretary of State at Raleigh, North Carolina, an accurate map of the annexed territory, described in Section 1 hereof, together with a duly certified copy of this ordinance. 1 1761 1017 BOOK 17 61 PAGE i O 17 A-2014-01 Adopted the 8th day of September, 2014. TOWN OF P By: Mayor ORO CERTIFIED COPY This is a true copy of a portion of the minutes of the Town of Pittsboro Board of ,. mmissioners meting .. • ; ce F. Lloyd, M • Town of Pittsboro, North arolina Town Clerk 1761 1018 BOOK 17 61 P40E M S Attachment Schedule A CERTIFIED COPY This is a true copy of a portion of the minutes of the Town of Pittsboro Board of Cmissionrs meetin heron if- Or Alice F. Lloyd, CM Town of Pittsboro, North Carolina Town Clerk 1761 1019 r BOOK I7biPAGE1019 CHATHAM PARK INVESTORS, LLC ANNEXATION OF A PORTION OF TRACT 3 COMMENCING AT AN EXISTING RIGHT-OF-WAY MONUMENT ON THE EASTERN RIGHT -OF --WAY OF SUTTLES ROAD (SR1809). HAVING N.C. GRID COORDINATES (NAD 83/2011) IN FEET OF N=725,885.845 AND E=1,952,893.611; SAID RIGHT-OF-WAY MONUMENT BEING THE SOUTHWEST CORNER OF TRACT 1 OF THE CHATHAM PARK INVESTORS, LLC PROPERTY AS RECORDED IN PLAT BOOK 2014, PAGE IN THE OFFICE OF THE CHATHAM COUNTY REGISTER OF DEEDS. THENCE NORTH 27 DEGREES 11 MINUTES 00 SECONDS 'WEST FORA DISTANCE OF 3,558.19 FEET TO A POINT ON THE COMMON LINE OF TRACTS 1 AND 3 AS SHOWN ON THE ABOVE REFERENCED PLAT. SAID POINT BEING THE POINT AND PLACE OF BEGINNING OF THIS ADDITIONAL AREA TO BE ANNEXED. THENCE SOUTH 00 DEGREES 00 MINUTES 03 SECONDS EAST FOR A DISTANCE OF 520.93 FEET TO A POINT. THENCE AROUND A CURVE TO THE RIGHT HAVING A RADIUS OF 25.00 FEET, AN ARC LENGTH OF 39.27 FEET, AND A CHORD BEARING AND DISTANCE OF SOUTH 44 DEGREES 59 MINUTES 57 SECONDS WEST FOR 35.36 FFFT TO A POINT. THENCE SOUTH 89 DEGREES 59 DES 57 SECONDS WEST FOR A DISTANCE OF 45.29 FEET TO A POINT. THENCE AROUND A CURVE RIGHT HAVING A RADIUS OF 227.50 FEET, AN ARC LENGTH OF 192.42 FEET, AND A CHORD BEARING AND DISTANCE OF NORTH 21 DEGREES 35 MINUTES 14 SECONDS WEST FOR 186.73 FEET TO A POINT. THENCE NORTH 02 DEGREES 38 MINUTES 34 SECONDS EAST FOR A DISTANCE OF 177.10 FEET TO A POINT. THENCE NORTH 36 DEGREES 05 MINUTES 35 SECONDS EAST FOR A DISTANCE OF 97.00 FEET TO A POINT. THENCE AROUND A CURVE TO THE LEFT HAVING A RADIUS OF 1017.46 FEET, AN ARC LENGTH OF 138.38 FEET, AND A CHORD BEARING AND DISTANCE OF NORTH 32 DEGREES 11 MINUTES 49 SECONDS EAST FOR 138.27 FEET TO THE POINT AND PLACE OF BEGINNING. THIS PROPERTY CONTAINS 56,527 SQUARE FEET IN AREA (1.298 ACRES) AND REFERENCE IS HEREBY MADE TO AN ANNEXATION PLAT PREPARED BY COOPER AND ASSOCIATES SURVEYORS, F.A. DATED JULY 08, 2014. CERTIFIED COPY This is a true copy of a portion of the minutes of the Town of Pittsboro Board of C m $ions meeting heJ Alice F. Uoyd, CrMC Town of Pittsboro, North Carolina Town Clerk 1761 1020 it airman ruuuurr rft rZ 13 g • _., f " zu Uctr. - a a, = 5' - <:: -ez rg t • % ., d CI n 0 s A = F. uoyd, CM wn tit Pittsbor©, North Carolina Town Clerk A 0 d 1' r' Zkp iiiiiiiii !jiu1111i 1lI;, 1pa€(�'i'f14--IR�y1y?I[rsi�ii YEE.mi.i��.n niy'•I^� ^'H: n: yi «t �.'i•: :I �sK • in:nwra,:nley�4'�' rR41i3► r,�ik, ttkR14��i�iC##,,r YR r i Ir0.e_iltlr1/2■1iM 111111 IN11111111 BOOK -y.17 6 1 PAGE 1020 It I 5114 r di 1 tl 1 .,. .. _ COOPER AND ASSOCIATES Aoo PoefeR ISF,ALR WAY, Stifir 20$ C.4RY, APRIH C4RCILeA 27513 TW7e1Cda- 14110-166»170 (C-14111) TRACT A PORTION OF■� CI-LATHAM PARK Met PAPAW Alter Irt fi LLC A[maAur. pm. sem 1761 1021 Bann 17 6 ! 46E1021 'This map is not a certified survey and has not been reviewed by a local government agency for compliance with any applicable land development regulations." 1761 10 22 sa 1761P40E1022 )0019 (MN Ni 03Q1 Q. 1! OfFlgati li et L1i •'� � tr Y� =.i ui it i it iir ii it i M 'iikiG iLik Lk ii %R� �iFl !# ltii t3OtrMIaltilia 11 IUUi hhiIi II . d 1, CERTIFIED COPY'"'"''" } This i3 A PORTION OF TRACT She min CHATHAM PARK Board ONYr[R cHAD" t MAIL aw"'ei LCC held on 0.101)91110t RAT •r oMq OR& P.t2E.fir W40 fi Co, true copy o1 c punlon of s cot:Iv2mw, TES A ce F. Lloyd, CMC Town of Pittsboro, North Carolina Town Clerk Type Of Instrument: Prepared By: Mail To/Hold For: BK 1809 PG 0167 FILED CHATHAM COUNTY NC LUNDAY A. RIGGSBEE REGISTER OF DEEDS FILED Jul 28, 2015 AT 10:23:39 am BOOK 01809 START PAGE 0167 END PAGE 0171 INSTRUMENT # 07090 EXCISE TAX $8,455.00 Special Warranty Deed Kenneth L. Eagle, 2235 Gateway Access Point, Suite 201, Raleigh, NC 27607 Kenneth L. Eagle, 2235 Gateway Access Point, Suite 201, Raleigh, NC 27607 The real property conveyed by this Deed does not include the primary residence of the Grantor Excise Tax $8,455.00 Tax Parcel Numbers: 60745; out of 7101; 7099; 80309; 80308; 83663 NORTH CAROLINA SPECIAL WARRANTY DEED THIS DEED is made this 27th day of July, 2015, by and between: GRANTOR: Chatham Park Investors LLC Address: 100 Matrix Drive, Box 8000, Cary, NC 27513 GRANTEE: Chatham Development One Inc. Address: 100 Matrix Drive, l3ox 8000, Cary, NC 27513 (The designation of Grantor and Grantee as used herein shall include said parties, their heirs, successors and assigns, and shall include the singular, plural, masculine, feminine or neuter as required by the context.) WITNESSETH: THE GRANTOR, for a valuable consideration paid by the Grantee, the sufficiency and receipt of which is hereby acknowledged, has and by these presents does grant, bargain, sell and convey unto the Grantee, in fee simple, all that certain real property, tying and being in Chatham County, North Carolina, and being more particularly described as follows (referred to herein as the "Property"): SEE EXHIBIT A ATTACHED HERETO AND INCORPORATED BY REFERENCE The Property was acquired by Grantor by instruments recorded in the office of the Chatham County, North Carolina Register of Deeds in Book 1567, Page 800, Book 1651, Page 843, Book 1651, Page 852, and Book 1791, Page 546. TO HAVE AND TO HOLD the Property and all privileges and appurtenances thereto belonging to the Grantee in fee simple. AND THE GRANTOR covenants with the Grantee that Grantor has done nothing to impair such title to the Property as Grantor received, and Grantor will warrant and defend such title against the lawful claims of all persons claiming by, under or through Grantor, except for the exceptions described on Exhibit B attached hereto and incorporated by reference. BBC 1809 PG 0168 Special Warranty Deed Page 2 IN WITNESS WHEREOF, the Grantor has caused this Deed to be executed in its company name by its duly authorized Manager, the day and year first above -written. CHATHAM PARK INVESTORS LLC By: Ref Name: Title: Manager North Carolina, Wake County 1 certify that the following person personally appeared before me this day and acknowledged to me that he executed the foregoing document on behalf of Chatham Park investors LLC in the capacity indicated: Tc w.a " +y R 5 i,. , * k Date: 3 to I Y i a© is - (affix seal or stamp here) *1Ist►rotlt►u+t' 16„,..„„ste , Notary Public Printed/Typed Name: Key, Kei- • L My Commission Expires: fi y . / d, 2 v Z t BBC 1809 PG 0169 Special Warranty Deed Page 3 EXHIBIT A PROPERTY DESCRIPTION Lying and being in Center Township, Chatham County, North Carolina, and being more particularly described as follows: Beginning at an iron pipe set on the southern margin of the right of way of Russett Run Road (North Carolina Secondary Road 1658) located North 26 degrees 03 minutes 43 seconds East I4268.35 feet from N.C.G.S. Survey Monument "Adrn.in", said Monument having NC grid coordinates NAD 83 (2011) ofN=717,17190 and E=1,945,477.51, then from said Beginning point running with the southern margin of the right of way of Russett Run Road the following three (3) lines: (1) North 79 degrees 59 minutes 27 seconds East 122.91 feet to an iron pipe set; (2) North 79 degrees 59 minutes 27 seconds Fast 85.72 feet to an iron pipe found; and (3) along a curve to the right having a radius of 531.40 feet, an arc length of 167.18 feet, and a chord bearing and distance of North 89 degrees 00 minutes 13 seconds East 166.49 feet to an iron pipe found; then leaving the right of way of Russett Run Road and running the following thirteen (13) lines: (1) South 19 degrees 02 minutes 26 seconds West 32.23 feet to an iron pipe found; (2) South 89 degrees 31 minutes 29 seconds Fast 43.80 feet to an iron pipe found; (3) South 75 degrees 09 minutes 47 seconds East 38.12 feet to an iron pipe found; (4) South 42 degrees 38 minutes 36 seconds East 61.19 feet to an iron pipe found; (5) South 19 degrees 27 minutes 04 seconds East 124.20 feet to an iron pipe found; (6) South 67 degrees 12 minutes 49 seconds West 62.44 feet to an iron pipe found; (7) South 20 degrees 37 minutes 39 seconds West 598.01 feet to an iron pipe found; (8) North 89 degrees 57 minutes 21 seconds East 57.41 feet to an iron pipe set; (9) South 00 degrees 48 minutes 21 seconds East 325.16 feet to an iron pipe set; (10) South 26 degrees 03 minutes 56 seconds West 509.13 feet to an iron pipe set; (11) South 3 l degrees 36 minutes 52 seconds West 500.98 feet to an iron pipe set; (12) South 27 degrees 57 minutes 08 seconds West 314.53 feet to an iron pipe set; and (13) South 51 degrees 11 minutes 12 seconds West 230.72 feet to an iron pipe set on the eastern margin of the right of way of Suttles Road (North Carolina Secondary Road 1809); then with the eastern margin of the right of way of Suttles Road, the following eleven (1 1) lines: (1) North 26 degrees 28 minutes 21 seconds West 152.61 feet to an iron pipe set; (2) along a curve to the left having a radius of 1,091.66 feet, an arc length of 462.69 feet, and a chord bearing and distance of North 38 degrees 36 minutes 52 seconds West 459.23 feet to an right of way monument found; (3) along a curve to the right having a radius of 727.50 feet, an arc length of 237.84 feet, and a chord bearing and distance of North 41 degrees 23 minutes 27 seconds West 236.78 feet to an iron pipe set; (4) along a curve to the right having a radius of 727.50 feet, an arc length of 164.06 feet, and a chord bearing and distance of North 25 degrees 33 minutes 51 seconds West, 163.72 feet to an iron pipe set; (5) along a curve to the right having a radius of 727.50 feet, an arc length of 276.39 feet, and a chord bearing and distance of North 08 degrees 13 minutes 12 seconds West 274,73 feet to a right of way monument found; (6) North 02 degrees 39 minutes 49 seconds East 195.90 feet to a right of way monument found; (7) along a curve to the right having a radius of 437.46 feet, an arc length of 0.69 feet, and a chord bearing and distance of North 02 degrees, 42 minutes 33 seconds East 0.69 feet to an iron pipe set; (8) along a curve to the right having a radius of 437.46 feet, an arc length of 254.71 feet, and a chord bearing and distance of North 19 degrees 26 minutes 03 seconds East 251.12 feet to a right of way monument found; (9) North 36 degrees 06 minutes 50 seconds East 41.80 feet to an iron pipe set; (10) North 36 degrees 06 minutes 50 seconds East 73.99 feet to a right of way monument found; and (11) along a curve to the left having a radius of 517.46 feet, an arc length of 239.23 feet, and a chord bearing and distance of North 22 degrees 52 minutes 11 seconds East 237.11 feet to an iron pipe set; BK 1809 PG 0170 Special Warranty Deed Page 4 then leaving the right of way of Suttles Road and running the following two (2) lines: (1) North 64 degrees 42 minutes 26 seconds East 73.38 feet to an iron pipe set; and (2) North 39 degrees 38 minutes 41 seconds West 90.63 feet to an iron pipe set on the eastern margin of the right of way of Suttles Road; then running with the eastern margin of the right of way of Suttles Road, the following three (3) lines: (1) North 02 degrees 39 minutes 51 seconds East 96.23 feet to an iron pipe found; (2) North 02 degrees 39 minutes 51 seconds East 71.68 feet to an iron pipe found; and (3) North 02 degrees 39 minutes 51 seconds East 82,09 feet to an iron pipe found at or near the intersection of Suttles Road with Russets Run Road; then running along a line as the right of way of Suttles Road becomes the right of way of Russett Run Road, North 38 degrees 04 minutes 27 seconds East 35.25 feet to an iron pipe found on the southern margin of the right of way of Russett Run Road; then running with the southern margin of the right of way of Russett Run Road, the following seven (7) lines: (1) North 80 degrees 03 minutes 40 seconds East 133.55 feet to an iron pipe set; (2) North 49 degrees 20 minutes 07 seconds East 48.17 feet to an iron pipe found; (3) North 83 degrees 37 minutes 12 seconds East 140.18 feet to an iron pipe found; (4) North 79 degrees 22 minutes 50 seconds East 72.09 feet to an iron pipe set; (5) North 79 degrees 22 minutes 50 seconds East 345.48 feet to an iron pipe found; (6) North 79 degrees 40 minutes 22 seconds East 84.67 feet to an iron pipe found; and (7) North 89 degrees 06 minutes 02 seconds East 19.96 feet to the point of Beginning, containing 56.361 acres, more or less, and being described on a may by James S. Armstrong, Professional Land Surveyor, of Withers & Ravenel entitled "Subdivision Map, A Portion Of Chatham Park Planned Development District, Owner: Chatham Park Investors LLC", dated December 30, 2014 (CAD File No. BD_14I63). BK 1809 PG 0171 Special Warranty Deed Page 5 EXHIBIT B TO SPECIAL WARRANTY DEED TITLE EXCEPTIONS 1. Ad valorem property taxes for 2015 and subsequent years. 2. All rights of way, easements, restrictions, and other matters of record in the Chatham County, North Carolina Registry that affect the Property. BK 01963 PG 0998 FILED ELECTRONICALLY CHATHAM COUNTY NC LUNDAY A. RIGGSBEE REGISTER OF DEEDS FILED Dec 20, 2017 AT 08:37:02 AM BOOK 01963 START PAGE 0998 END PAGE 1002 INSTRUMENT # 14179 EXCISE TAX $0.00 Type Of Instrument: Special Warranty Deed Prepared By & Mail To: Kenneth L. Eagle, 2235 Gateway Access Point, Suite 201, Raleigh, NC 27607 The real property conveyed by this Deed does not include the primary residence of the Grantor. The preparer of this Deed gives no opinion regarding title to the real property conveyed by this Deed. Excise Tax $0 Tax Parcel Nos. 75037, 7146, and 75038 NORTH CAROLINA SPECIAL WARRANTY DEED THIS DEED is made this 19th day of December, 2017, by and between: GRANTOR: Chatham Park Investors LLC, a North Carolina limited liability company Address: 100 Weston Estates Way, Cary, NC 27513 GRANTEE: 15-501 East LLC, a North Carolina limited liability company Address: P. O. Box 3557, Cary, NC 27519 (The designation of Grantor and Grantee as used herein shall include said parties, their heirs, successors and assigns, and shall include the singular, plural, masculine, feminine or neuter as required by the context.) W1TNFSSETH: THE GRANTOR, for a valuable consideration paid by the Grantee, the sufficiency and receipt of which is hereby acknowledged, has and by these presents does grant, bargain, sell and convey unto the Grantee, in fee simple, that certain real property, lying and being in Chatham County, North Carolina, and being more particularly described as follows (referred to herein as the "Property"): SEE .EXHIBIT A ATTACHED HERETO AND INCORPORATED BY REFERENCE TO HAVE AND TO HOLD the Property and all privileges and appurtenances thereto belonging to the Grantee in fee simple. The Property was acquired by the Grantor by the following Deed recorded in the office of the Register of Deeds for Chatham County, North Carolina: Book 1875, Page 47. AND TH-tE GRANTOR covenants with the Grantee that Grantor has done nothing to impair such title to the Property as Grantor received, and Grantor will warrant and defend such title against the lawful claims of all persons claiming by, under or through Grantor, subject to the following exceptions (all recording references are to the office of the Register of Deeds for Chatham County, NC.) 1. Ad valorem property taxes on the Property for 20 € 8 and subsequent years. 2. Matters affecting the Property shown on a plat recorded in Plat Slide 2007-489. 3. Easements/rights of way to Carolina Power and Light Company recorded in Book 384, Page 868 and Book 369, Page 250. 4. Access and Utility Easement described in deed recorded in Book 1375, Page 559. 5. All other rights of way, easements, and other matters of record in the office of the Register of Deeds for Chatham County, North Carolina that affect the Property. submitted electronically by "Norris, Russell, Eagle & Morley, PLLC" in compliance with North Carolina statutes governing recordable documents and the terms of the submitter agreement with the Chatham County Register of Deeds. BK 01963 PG 0999 Special Warranty Deed Page 2 IN WITNESS WHEREOF, Grantor has caused this Deed to be executed in its company narne by its duty authorized Manager, the day and year first above -written. CHATHAM PARK NVESTORS LLC I3y: Name II_ Title: Manager North Carolina, Wake County I certify that the following person personally appeared before me this day and acknowledged tome that he executed the foregoing document on behalf of Chatham Park Investors LI..0 in the capacity indicated. ! t .a f Y R +rs, q Date: December L (affix seat or stamp here) 2017 L Notary Public ;, Printed/Typed Name: - - e- L 6, My Cor#mission Expires: !y____..___.._—D_.'..._..__... _... ___..........._. BK 01963 PG 1000 Special Warranty Deed Page 3 EXHIBIT A TO GENERAL WARRANTY DEED PROPERTY DESCRIPTION LYING AND BEING in Center Township, Chatham County, North Carolina, and being more particularly described as follows in accordance with a survey by ,lames S. Armstrong, Professional Land Surveyor, of Withers & Ravenel, entitled "Boundary Map Of Calvin A. Mellott Tracts", dated March 31, 2016, and revised and sealed on June 6, 2016, and being identified with CAD FILE: BD 16051 (the "Survey"). All recording references herein are to the office of the Register of Deeds for Chatham County, North Carolina. TRACT I (CHATHAM COUNTY TAX PARCEL 75037): BEGINNING at a rebar found at the southwest corner of Tract III described herein, said rebar being on a common line of Tract III described herein and the eastern boundary line of property conveyed to Chatham Park Investors LLC by deed recorded in Book 1567, Page 800 (see Plat Slide 2002-407 and Plat Slide 2014-254), and also being a common corner with other property conveyed to Chatham Park Investors LLC by deed recorded in Book 1567, Page 800 (see Plat Slide 2001-223), said rebar having North Carolina Grid Coordinates NAD 83 (2011) NAVD 88 ofN-726,214.63 and E1,953,510.05), and said rebar being located North 04 degrees 54 minutes 47 seconds West 9456.82 feet (CGRI:D) from N.C.G.S. "Gunter", which has North Carolina Grid Coordinates NAD 83 (2011) NAVD 88 of N-716,792.56 and E = 1,954,319.99, then North 88 degrees 15 minutes 42 seconds East 900.36 feet to the POINT OF BEGINNING, said point being a common corner with the southeast corner of Tract II described herein; then with the eastern boundary line of Tract II described herein, North 02 degrees 37 minutes 04 seconds East 2527.83 feet to a point at the northeast corner of Tract II described herein; then with the northern boundary line of Tract II described herein, South 88 degrees 37 minutes 04 seconds West 900.00 feet to a point in the eastern boundary line of property conveyed to Chatham Park Investors LLC by deed recorded in Book 1587, Page 800 (see Plat Slide 2002-4(37 and Plat Slide 2014-254); then with the eastern boundary line of said property of Chatham Park Investors LLC, North 02 degrees 37 minutes 00 seconds East 54.30 feet to a point; then with the eastern boundary line of said property of Chatham Park Investors LLC and the southern boundary lines of properties owned now or formerly by Ducka Kelly (see deed recorded in Book 762, Page 738), Thomas M. Dalsimer and Diana J. Dalsimer (see deed recorded in Book 1759, Page 731 and Plat Slide 91-391), Charles Brian Sinnmons and Lorene K. Simrnons (see deed recorded in Book 936, Page 114 and Plat Slide 91-391), William A. Routs and wife, Patricia Routt (see deed recorded in Book 1026, Page 535), Susan Martel Turner (see deed recorded in Book 1302, Page 1022 and Plat Slide 2000-9), Warner F. Hyde and Raiford B. Hyde (see deed recorded in Book 1.447, Page 996 and Plat :Slide 2000-9), Robert Parks and Donna 13. Morris (see deed recorded in Book 1332, Page 408), and Thomas Stephen Kennedy (see deed recorded in :Book 907, Page 304 and Plat Slide 2001-481), South 88 degrees 46 minutes 30 seconds East 3311.98 feet to a 36" Oak Tree at the northeast corner of this Tract I and in the western boundary line of property conveyed to Chatham Park Investors LLC by deed recorded in Book 1569, Page 1092 (see Plat Slide 2008-144); then with the western boundary line of said property of Chatham Park Investors LLC, the following two (2) lines: (1) South 03 degrees 15 minutes 25 seconds West 135.82 feet to an iron pipe found; and (2) South 02 degrees 12 minutes 42 seconds West 2279.16 feet to an iron pipe found; then with the northern boundary line of the property conveyed to Chatham Park investors LLC by deed recorded in Book 1567, Page 800 (see Plat Slide 2001-223 and Plat Slide 2008-144), South 88 degrees 15 minutes 42 seconds West 2434.87 feet to the POINT OF BEGINNING, and containing .138.351 acres according to the Survey. BK 01963 PG 1001 Special Warranty Deed Page 4 TRACT 1i11(CHATHAM COUNTY TAX PARCEL 7146); BEGINNING at a rebar found at the southwest corner of Tract Ill described herein, said rebar being on a common line of Tract III described herein and the eastern boundary line of property conveyed to Chatham Park Investors 1.1,C by deed recorded in Book 1567, Page 800 (see Plat Slide 2002-407 and Plat Slide 2014-254), and also being a common corner with other property conveyed to Chatham Park investors LLC by deed recorded in Book 1567, Page 800 (see Plat Slide 2001-223), said rebar having North Carolina Grid Coordinates NAD 83 (2011) NAVD 88 ofN" 726,214.63 and E=1,953,510.05), and said rebar being located North 04 degrees 54 minutes 47 seconds West 9456.82 feet (GRID) from N.C.G.S. "Gunter", which has North Carolina Grid Coordinates NAD 83 (2011) NAVD 88 of N=716,792.56 and E — 1,954,31.9.99, then North 88 degrees 15 minutes 42 seconds East 437.01 feet to the POINT OF BEGINNING, said point being a comrnon corner with the southeast corner of Tract Ill described herein; then with the eastern boundary line of Tract Ill described herein, North 02 degrees 37 minutes 02 seconds East 656.42 feet to an iron pipe found at the southeast corner of property conveyed to Rocky Crissman and wife, Janie C. Crissman by deed recorded in Book 1499, Page 378 (see Plat Slide 2007-489); then with the eastern boundary line of said property of Crissman, North 02 degrees 37 minutes 02 seconds East 499.94 feet (passing an iron pipe found at 300.02 feet) to an iron pipe found at the northeast corner of said property of Crissman; then with the northern boundary line of said property of Crissman, South 88 degrees 12 minutes 27 seconds West 436.94 feet to an iron pipe found at the northwest corner of said property of Crissman, said iron pipe being in the eastern boundary line of property conveyed to Chatham Park Investors I.,LC by deed recorded in Book 1567, Page 800 (see Plat Slide 2002-407 and Plat Slide 2014-254); then with the eastern boundary line of said property of Chatham Park Investors LLC, North 02 degrees 37 minutes 00 seconds East 1377.49 feet to a point in the western boundary line of Tract I described herein; then with the western boundary fine of Tract 1 described herein, the following two (2) lines: (1) North 88 degrees 37 minutes 04 seconds East 900.00 feet to a point; and (2) South 02 degrees 37 minutes 04 seconds West 2527.83 feet to a point on the northern boundary line of the property conveyed to Chatham Park Investors LLC by deed recorded in Book 1.567, Page 800 (see Pat Slide 2001-223); then with the northern boundary line of said property of Chatham Park Investors I..LC, South 88 degrees 15 minutes 42 seconds West 463.35 feet to the POINT OF BEGINNING, and containing 40.589 acres according to the Survey, TRACT III (CHATHAM COUNTY TAX PARCEL 75038): BEGINNING at a rebar found at the southwest corner of this Tract III, said rebar being on a common line of this Tract 11I and the eastern boundary line of property conveyed to Chatham Park investors LLC by deed recorded in Book 1567, Page 800 (see Plat Slide 2002-407 and .Plat Slide 2014-254), and also being a common corner with other property conveyed to Chatham Park Investors LLC by deed recorded in Book 1567, Page 800 (see Plat Slide 2001-223), said rebar having North Carolina Grid Coordinates NAD 83 (2011) NAVD 88 ofN=726,214.63 and E=1,953,510.05), and said rebar being located North. 04 degrees 54 minutes 47 seconds West 9456.82 feet (GRID) from N.C.G,S. "Gunter", which has North Carolina Grid Coordinates NAD 83 (2011) NAVD 88 of N=716,792.56 and E 1,954,319.99, then with said eastern boundary line of Chatham Park Investors LLC, North 02 degrees 37 minutes 00 seconds East 656.02 feet to an iron pipe found, a common corner with the southwest corner of property conveyed to Rocky Crissman and wife, Janie C. Crissman by deed recorded in Book 1499, Page 378; then with the southern boundary line of Crissman, North 88 degrees 12 minutes 24 seconds East 437.05 feet to an iron pipe found, a cornrnon corner with the southeast conger of said property of Crissman in the western boundary Hne of Tract 11 described herein; then with the western boundary line ofTract II described herein, South 02 degrees 37 minutes 02 seconds West 656.42 feet to a point, the southeast corner of this Tract III in the northern line of the foregoing described property conveyed to Chatham Park Investors LLC by deed recorded in Book 1567, Page 800 (see Plat Slide 2001-223); then with the northern boundary line of Chatham Park Investors I.,LC. South 88 degrees 15 minutes 42 seconds West 437.0.1 feet to the point of Beginning, and containing 6.546 acres according to the Survey. BK 01963 PG 1002 NON -WARRANTY CONVEYANCE Special Warranty Deed Paige 5 Grantor also conveys to Grantee, without any warranties of title, any and all right, title, and interest that Grantor may own in and to any portion of the property described in the following deeds that is not included in the foregoing descriptions of Tract I, Tract 11, and Tract 1I1: (1) Book 363, Page 33; (2) Book 391, Page 57; (3) Book 1375, Page 561; and (4) Book 1862, Page 864, less and except any prior conveyances by Grantor or previous owners of portions of those properties described in said deeds. (end of page) WithersRavenel TECHNICAL SPECIFICATIONS for the Reclaimed Water Distribution System to serve the Chatham Park Section 7.1 Subdivision, Phase 1 Chatham County January, 2021 024420 ILL �L l 'ZZ' Z1 JL'PHER toy., wsww WR Project No. 02150098.62 115 MacKenan Drive I Cary, NC 27511 1 919.469.3340 It 919.467.6O08 1 wvnv.withcrsravcrci corn I Lrcense No. C-0832 Asheville I Cary I Greensboro I Pittsboro I Raiejh 1 Wilminrr0pn SECTION 6 RECLAIMED WATER DISTRIBUTION SYSTEM JURISDICTIONAL AGENCY APPROVAL All reclaimed water lines shall be designed and constructed in accordance with the State of North Carolina Administrative Code (NCAC) Title 15A 02U, and as referenced in 02T, North Carolina Department of Environmental Quality (DEQ), and Division of Water Quality (DWQ). The engineering requirements set forth herein are intended to supplement rather than supersede other applicable local, county, state, and federal requirements. In the case of conflict, the more stringent requirements shall apply. CONTRACTOR CERTIFICATION OF INSTALLATION PROCEDURES When requested in the Special Provisions or by the design engineer prior to installation, the Contractor shall furnish to the Town of Pittsboro an affidavit (certification) from the pipe manufacturer (or his designee) stating that the Contractor is familiar with the manufacturer's suggested installation methods and procedures and the manufacturer's suggested installation methods and, procedures are consistent with The Town's requirements. When required by the Special Provisions, the pipe manufacturer or his designee will review the Contractor's methods and, procedures for pipe installation in the field. The Contractor will make any adjustments in the installation as recommended by the manufacturer or his representative. If necessary, the Contractor may be required to reinstall or provide corrections to pipe installed prior to the field review at no cost to the Town. Once the manufacturer, or his representative has reviewed the Contractor's installation methods and the Contractor has adjusted his installation methods as recommended by the same, the manufacturer or his representative shall furnish to the Town of Pittsboro an affidavit (certification) that the Contractor's installation methods and procedures, at the time of the review, complied with the manufacturer's installation practices. The affidavit must provide the name of the manufacturer's representative witnessing the pipe installation. DESIGN CRITERIA FOR DISTRIBUTION LINES The requirements in this specification apply to all new, and retrofitted distribution lines. Location Reclaimed water lines shall be extended along the roadway to the adjacent property line. A dedicated street right of way, or Town of Pittsboro utility, and pipeline easement shall be utilized. The dedicated easement shall be twenty (20) feet wide and recorded as "Town of Pittsboro Utility Easement." The dedicated easement shall contain Town utilities unless otherwise approved by the Town Manager, Town Engineer, or Public Utilities Director through an approved encroachment agreement. Where the twenty (20) feet wide easement is undersized too due depth/ or diameter requirements for construction, operations, and maintenance the Town Engineering Department may approve an increase in dedicated easement to accommodate the new utility. Unless approved in a written waiver by the Town Engineer, or Public Utilities Director no permanent structures, equipment, retaining walls, embankments, impounds, or other elements that would inhibit maintenance operations shall be constructed. The written request waiver shall Standard Specification for Reclaimed Water Distribution System 1 I Page include the following: description of all special condition (s), including appropriate protection measures of potable water, reclaimed water, and sanitary sewer mains, and access for maintenance purposes. Fences may cross over easements provided that appropriate access gates have been installed to allow maintenance operations. At the discretion, and approval by the Town, fill or cut slopes are not allowed to extend into reclaimed water main easements except by specific approval. All relocations of existing or permitted reclaimed water infrastructure including service piping and meter boxes shall be permitted and inspected in conformance with Town policies and procedures. Any reclaimed water that leaves the reclaimed water distribution system other than by means of a properly permitted use must be disposed of into the Town of Pittsboro sanitary sewer system, unless otherwise approved by the Town of Pittsboro with special provisions for discharge and disposal. This includes any reclaimed water from blow offs, testing, line flushing, and/or line breaks. In no case shall reclaimed water from blow offs, testing, flushing, line breaks or other unpermitted uses be discharged onto the ground surface or drainage systems, storm water ponds, streams, or other non -treated systems. Any unpermitted discharge of reclaimed water shall be reported to the Town of Pittsboro immediately and treated as a wastewater spill in accordance with established policies by the Town of Pittsboro and NCDEQ. In all cases where potable water is used to supplement a reclaimed water system, there shall be an approved RPZ or Air Gap between the potable water system and the reclaimed water system. Units shall be tested per the requirements set forth in the Town of Pittsboro Chapter 25, Utilities Ordinance, Article VI Cross Connections between a Private Supply and The Town of Pittsboro Water System. In all cases where potable water is used to supply reclaimed water distribution mains on an interim basis until such time when reclaimed water is available, there shall be an approved reduced pressure principle backflow preventer, (RPZ), constructed in accordance with the Cross - Connection Ordinance. The RPZ backflow preventer shall be provided on the branch supply line feeding the reclaimed water system and shall be located within 25 feet of the branch connection with the main potable water trunk line. A reduced pressure principle backflow preventer located on the branch feed to the reclaimed water system will preclude the need for individual backflow preventers on each service connection and allow all reclaimed water services to be constructed as described herein under typical reclaimed service standards and specifications. Cross -Connection Control There shall be no direct cross connections between the reclaimed water and potable water systems. In all cases where reclaimed and municipal potable water are supplied to the same structure and/or other same facility, a reduced pressure principle backflow preventer shall be provided on the municipal potable water service. The privately owned and maintained reclaimed water service piping and other appurtenances shall be identified in conformance with the North Carolina Plumbing Code. When reclaimed water distribution mains are unavailable but planned for future construction in accordance with the Reclaimed Water System Master Plan; any service lines to secondary water use facilities, shall be constructed in accordance with reclaimed water standards as described herein including all requirements for requisite color and text identification. Standard Specification for Reclaimed Water Distribution System 2 I Page Relation to Potable Water Mains and Other Utilities a) Separation between Potable Water Mains and Reclaimed Water Mains Parallel Installations: Preferred 10 feet horizontal separation (pipe edge to pipe edge) AND water line at least 18 inches above reclaimed water line measured vertically from top of reclaimed water pipeline to bottom edge of water main. Crossings (Water Main over Reclaimed Water Pipeline): All water main crossings of reclaimed water mains shall be constructed over the reclaimed water line. At a minimum, 18 inches of clearance shall be maintained between the bottom edge of the water main and the top edge of the reclaimed water main. When the minimum 18-inch clearance cannot be maintained, both the potable water and reclaimed mains shall be constructed of ductile iron pipe in conformance with water main construction standards extending at least 10 feet on both sides of the crossing. When DI is required for low clearance crossings, reclaimed mains shall be restrained and connected to purple PVC reclaimed main lines with restrained MJ sleeves or other approved couplings and wrapped with purple polyethylene wrap as specified herein. When less than 18 inches of separation is provided, the void space between the pipe crossing shall be filled with minimum 500-psi, quick setting, non-excavatable flowable fill extending at least 3 feet on both sides of the crossing. Typical potable water service lines may cross above reclaimed water mains made of C900 PVC pipe constructed as specified herein and in general conformance with water main specifications. Crossings (Water Main Under Reclaimed Water Pipeline): At a minimum, 18 inches of separation shall be maintained and both potable water and reclaimed water mains shall be constructed of ductile iron in conformance with water main standards extending at least 10 feet on both sides of the crossing. If local conditions prevent 18 inches of clearance, the void space between the pipe crossing shall be filled with minimum 500- psi, quick setting, non-excavatable flowable fill extending at least 3 feet on both sides of the crossing. DI reclaimed lines used for low clearance crossings shall be restrained and connected to the typical purple PVC reclaimed main line with restrained MJ sleeve or other approved restraining coupling and shall be wrapped with purple polyethylene wrap as specified herein. b) Separation Between Reclaimed Water and Sanitary Sewer Reclaimed water mains shall be laid with at least 10 feet of horizontal separation from existing sanitary sewer lines, measured laterally edge to edge unless the elevation of the bottom of the reclaimed water main is at least 18 inches above the top edge of the sanitary sewer, with a horizontal separation of at least 3 feet. In cases where a reclaimed water main and a sanitary sewer main cross, the crossing shall be constructed at a 90°degree angle. In all cases where a reclaimed water main must cross within 18 inches of an existing sewer main, the reclaimed water main shall be constructed of ductile iron, with joints in conformance with water main standards, extending at least 10 feet on both sides of the crossing. The void space between the pipes shall be filled with minimum 500-psi, quick setting, non-excavatable flowable fill extending at least 3 feet on both sides of the crossing. When DI is required for low clearance crossings, reclaimed mains shall be restrained and connected to purple PVC reclaimed main lines with restrained MJ sleeves or other approved couplings and wrapped with purple polyethylene wrap as specified herein. Standard Specification for Reclaimed Water Distribution System 3 I Page c) Separation Between Reclaimed Water and Storm Sewer Reclaimed water mains shall be laid above or below storm sewer mains with a minimum vertical separation of 18 inches when horizontal separation is from 3 feet to 10 feet laterally, unless otherwise approved by the Director of Engineering. Where a reclaimed water main and a storm sewer cross, the crossing shall be constructed at a 90°degree angle and the reclaimed water main shall cross at least 18 inches above or below the storm sewer. In all cases where a reclaimed water main must cross within 18 inches of an existing storm sewer main, the reclaimed water main shall be constructed of ductile iron extending at least 10 feet on both sides of the crossing with joints in conformance with water main standards. The void space between the pipes shall be filled with minimum 500-psi, quick setting, non-excavatable flowable fill extending at least 3 feet on both sides of the crossing. When DI is required for low clearance crossings, reclaimed mains shall be restrained and connected to purple PVC reclaimed main lines with restrained MJ sleeves or other approved couplings and wrapped with purple polyethylene wrap as specified. d) Separation between Reclaimed Water and Wells Reclaimed water distribution lines shall not be less than 100 feet from a well. Where the required minimum separation from wells cannot be met, the Director of Engineering must approve, and the piping and integrity testing procedures meet potable water main standards. In no case shall the separation be less than 25 feet from a private well or 50 feet from a public well. Sizing Reclaimed water distribution system piping shall be sized in accordance with the good design procedures, and master plan for reclaim water. The minimum pipe size for reclaim water shall be four (4) inches. The design shall provide adequate pressure throughout the system, or as directed by the Town of Pittsboro. Installation All utility extension permits must be obtained prior to construction. All reclaimed water mains shall have a minimum cover of 3 feet measured from the top of the pipe to the finished grade. When reclaimed water mains are installed along a roadway, which does not have curb and gutter, the reclaimed water main shall be installed at sufficient depth to prevent conflict with future road improvements or vertical alignment changes. Vertical Realignments of all Piping Material: All piping material shall be restrained, blocked, and anchored per the Town of Pittsboro approved detail, or per plan detail. Anchoring, and trust blocks shall be formed, and poured to the provided dimensions. DISTRIBUTION PIPING, VALVING, OUTLETS, AND OTHER APPURTENANCES All new distribution piping in the reclaimed water system, including service lines, valves and other appurtenances shall either be colored purple, and embossed, or be integrally stamped/marked with the words "CAUTION: RECLAIMED WATER - DO NOT DRINK," or be installed with a purple identification tape and tracer. All PVC pipe shall be colored purple, and text identified as described above, no exceptions. The warning shall be stamped on opposite sides of the pipe and repeated every 3 feet or less. Standard Specification for Reclaimed Water Distribution System 4 I Page Existing potable or non -potable water lines that are being converted to reclaimed water use should first be accurately located and tested in accordance with regulatory requirements. If required, the necessary actions to bring the line and appurtenances into compliance with current regulatory standards, should be taken. If the existing lines meet approval of the reclaimed water supplier and NCDEQ, the lines can be approved for reclaimed water distribution. If verification of the existing lines is not possible, the lines should be uncovered, inspected, and identified prior to use. • Polyethylene wrap, locator tape, and tracer wire: Refer to Section 2 General Provisions for Utility Construction of the Town Pittsboro Standard Specifications • Marker balls approved by the Town of Pittsboro shall be installed along reclaimed water lines at a maximum spacing of 100 feet and depth not to exceed 2 feet. Generally, these can be the non -programmable type balls. Additionally, the programmable style marker balls shall be provided at all bends, fittings, and reducers. These `smart balls' shall be loaded with the following information: depth to pipe (from the ball), diameter of the pipe, type of fitting or feature, pipe material. All electronic marker balls shall be provided in purple color for reclaimed water and shall be designed to reflect a specific signal back to the electronic locator. The electronic marker balls shall be installed during pipe laying and provisions shall be made to assure they are not damaged during backfill operations. Electronic marker balls shall be tested by the utility contractor at the completion of backfill operations to assure they are all working properly. Any defective units shall be replaced. All marker ball locations shall be provided on the as -built drawings and the coordinates of these markers shall be provided as append points file, GIS shape file or equivalent. • Where approved by the Town of Pittsboro the use of tracer wire maybe used instead of the marking balls. The tracer wire shall be purple in color, and 18-gauge wire. All PVC piping shall be AWWA C900. Pantone 522 purple or equivalent. Cut sheet of material manufacture shall be submitted for approval by the Town, or Town representative. The use of C901 rolled tube/pipe is not allowable. Pipe size 4 to 24 inch shall be designed, and manufacture in compliance with AWWA C900. Minimum pressure rate of 200 psi, and standard pipe lengths of twenty (20) feet. C9O0 PVC PIPE SIZES Nominal Pipe Diameter Pressure Rating Dimension Ratio Wall Thickness (inches) Outside Diameter 4 - inch 235 18 0.267 4.8 6 - inch 235 18 0.383 6.9 8 - inch 235 18 0.503 9.05 10 - inch 235 18 0.617 11.1 12- inch 235 18 0.733 13.2 16 - inch 200 21 0.829 17.4 18 - inch 200 21 0.929 19.5 20 - inch 200 21 1.029 21.6 24 - inch 200 21 1.229 25.8 Standard Specification for Reclaimed Water Distribution System 5 1 Page PVC Pipe shall not be exposed to direct ultraviolet radiation (sunlight) for more than 30 days, whether the time is continuous or cumulative. PVC pipe shall be protected from direct ultraviolet radiation for any time of exposure exceeding 30 days. PVC pipe that has been discolored by exposure to ultraviolet radiation is unacceptable. Installation and execution: The Owner or Contractor shall provide all materials, labor, tools, equipment and incidentals required for excavation, installation, backfilling and testing of water mains and associated appurtenances shown on approved plans. 1. Pipe Installation: Reclaimed water main piping shall be installed in accordance with AWWA C600. Pipe shall be installed on reasonably consistent grade and straight alignments, and all joints shall be properly fitted. All pipe and appurtenances shall be placed in trenches with suitable equipment to prevent damage to materials. Pipe and appurtenances shall not be dropped into the trench. Damaged or defective materials shall be permanently marked and removed from the project. All foreign matter or dirt shall be removed from pipe and fittings. Pipe interior shall be clean. Pipe that cannot be swabbed clean shall not be used. Materials with evidence of oil, tar or grease shall be permanently marked and removed from the project. Chlorine powder or tablets shall not be placed in pipe during installation. Pipe jointing shall be accomplished according to manufacturer requirements. Bell and spigot shall be cleaned and lubricated before jointing. Pipe installation shall progress with bell ends facing the laying direction. Manufacturer's maximum allowable joint deflection shall not be exceeded. Pipe cutting for inserting valves, fittings or closure pieces shall be square, neat and properly chamfered according to manufacturer requirements. During installation, electrical continuity shall be maintained of the tracer wire between valves. If a wire is cut or otherwise requires splicing, the ends of the wire shall be bared, twisted together and connected with an electrical "twist cap". While backfilling the reclaim water main trench, locator tape shall be placed 24 inches above pipe. Locator tape shall bear the words: "Warning - Reclaimed Water Main Below". 2. PVC pipe shall be installed in accordance with AWWA C605. In the Town of Pittsboro, the contractor shall bed pipe in a #78A four (4) inches below and one (1) foot above pipe. At a minimum, all PVC pipe shall be installed at a Type 4 laying condition as specified by AWWA C605 for depth of installation from three (3) feet to ten (10) feet measured from the top of the pipe. The Type 4 laying condition requires the pipe to be bedded on a minimum of 4 inches of select granular material that will conform to the bottom of the pipe. Select granular material shall consist of Class 1 or Class 2, well -graded sand, gravel, crushed gravel, crushed stone or crushed slag composed of hard, tough and durable particles, and shall contain no more than 10 percent by weight of material passing a 0.075 mm (No. 200) mesh sieve and no less than 95 percent by weight passing the 25 mm (1 inch) sieve as defined by ASTM D2321. Pipe laying on a flat bottom trench is unacceptable. Standard Specification for Reclaimed Water Distribution System 6 I Page Class 1 or Class 2 embedment material shall be compacted to the top of the pipe at 95% or greater Standard Proctor Density Test. Careful attention shall be placed on compacting embedment under the haunches of the pipe to prevent any potential voids. When using mechanical compactors, avoid contact with the pipe. When compacting over the pipe crown, a minimum cover of at least 8-inches or more in conformance with the manufacturer's requirements shall be maintained over the top of the pipe prior to compacting. The maximum embedment sizing shall be limited to materials passing a 3/-inch sieve for angular materials or 1-Y2 inches for rounded rock. Embedment materials consisting of select material or native soils shall be well drained, granular, free of rocks and other foreign materials and shall be selected and placed to prevent gouges, crimping, or puncture of pipe, joints or appurtenances. 3. For all other pipe material, the trench bottom shall be prepared with minimum 4- inch thickness of #78M bedding stone and bell holes shall be prepared in the bedding. The #78M shall be placed to spring line (encompassing the haunches), and to a foot above pipe. 4. Reaction Blocking: All water main fittings shall be installed with thrust restraint. Reaction blocking shall be transit -mixed concrete of minimum 3,000 psi 28-day compressive strength placed in adequate quantities for the size and shape of fitting being installed. Reaction blocking shall be formed and poured such that mechanical joint bolts remain accessible. The blocking shall be backed by firm solid earth. Where manufactured joint restraint is used, concrete blocking shall be used only as recommended by the joint restraint manufacturer. All blocking shall be formed, and poured per the provided dimensions NOT over formed, and poured. The concrete shall be given twenty-four (24) to cure prior to backfill and compaction. Valves and Appurtenances Valves shall be installed on all branches from feeder -reclaimed water mains according to the following schedule: 4 valves cross, and 3 valves at tees. Setting Valves and Valve Boxes: Valves shall be set at locations shown in approved plans. Valve to pipe connections shall be mechanical joint. A cast iron valve box shall be installed, accurately centered over the valve operating nut. Valve boxes shall be installed to the project finished grade. When not in pavement, the valve box shall be protected with a precast concrete donut. The donut shall be dug into the ground approximately two inches so the donut is level, fully flush with the ground and even with the top of the valve box. Valve boxes in paved sections shall be finished flush with final grade and shall be supported at the top with a poured concrete collar at least 2-Y2 feet in diameter. Testing standards when connecting to an existing system may require that 4 valves ultimately be located at crosses, three (3) valves at tees, etc. beyond the minimum standard to assure adequate testing can be achieved. In such cases, the valves shall be shown on the plan drawings and included in the testing plan submitted by the Engineer of record. Standard Specification for Reclaimed Water Distribution System 7 I Page Where no reclaimed water line intersections exist, a main line valve shall be installed at every distance of 500 feet between valves, or as approved by Town Engineer, Public Utilities Director, or their authorized representative. All valves for reclaimed water applications, 12-inches in diameter and smaller shall be resilient seated wedge gate valves in conformance with the requirements of AWWA C509, (grey or ductile iron body) or AWWA C515, (reduced wall ductile iron body) and provided with a full circumferential pipe opening. All gate valves shall be designed for a working pressure of 250-psi with a minimum ULFM rating of 200-psi. Gate valves shall be fusion -bonded epoxy, (FBE) coated both interior and exterior at a minimum of 10mils and the FBE coating shall be provided in conformance with AWWA C550. All gate valves shall be assembled with stainless steel bolts. All gate valves 12-inches in diameter and smaller shall be installed in the vertical position and shall be provided with mechanical joint fittings. Gate valves shall be restrained by wedge action retainer glands or other approved manufacturer provided restraining systems. In all cases, the valve and piping shall be restrained on both sides to sufficiently allow the valve to function as a dead end. All gate valves shall open left with a non -rising stem and be provided with a 2-inch square operating nut. All gate valves shall be constructed with triple 0-ring seals in which 2 0- rings are located above the thrust collar and 1 0-ring is located below the thrust collar. The two upper 0-rings shall be replaceable with the valve fully open and subjected to full rated working pressure. The gate valve wedge shall be fully encapsulated in molder rubber and fully retractable. All valves shall be rated for bi-directional flow. All sealing gaskets shall be made of EPDM rubber materials. Gate valves 16-inches through 24-inches shall comply with all specifications outlined for gate valves 12-inches and smaller in the previous section including the 250-psi pressure rating. Gate valves 16-inches through 24-inches shall be fabricated exclusively with ductile iron construction in conformance with AWWA C515. As additional requirement, gate valves 16-inches through 24-inches if installed vertically shall be provided with a minimum of 2 feet of overhead clearance between the top of the operator nut and the finished subgrade. Gate valves 16 through 24 inches in diameter shall be provided with a 4:1 spur gear reducer. Gate valves, 16 inches and larger, installed in a horizontal position, shall only be provided, as permitted by the Public Utilities Director for special circumstances where vertical alignment is not possible. All horizontal gate valves shall meet or exceed the specifications outlined herein for vertical gate valves including the 250-psi pressure rating. All horizontal gate valves shall be equipped with bevel gears resulting in 4:1 or 6:1 turn ratios through 24-inches in diameter. All gate valves for reclaimed water applications shall be painted purple, Pantone 522 with approved field application paint by the contractor prior to installation or otherwise wrapped in purple polyethylene wrap for required identification as a reclaimed water Standard Specification for Reclaimed Water Distribution System 8 I Page valve. Valves shall be properly located, operable and at the correct elevation. All valves and reducers shall be rodded to the tee or cross if one is located within 10 feet as shown in the Details. If reducers cannot be rodded, concrete blocking or other restraining methods will be required. The maximum depth of the valve nut shall be 5 feet. When valve extension kits are used, they must be manufactured by the same company, which manufactured the valve. Combination Air Values Combination air valves shall be provided to purge air from the system at startup, vent small pockets of air while the system is being pressurized and running and prevent critical vacuum conditions during draining. Combination air valves approved for use in reclaimed water installations shall be installed at all high points of reclaimed water lines 8 inches in diameter or larger and at other locations, such as major changes in slope, as directed by the Town. A high point shall be determined as any high location where the difference between the high elevation and adjacent low elevation exceeds 10 feet unless otherwise determined by the Public Utilities Director based on special circumstances. The combination air valve shall automatically exhaust large volumes of air from the system when it is being filled and allow air to re-enter the pipe when the system is being drained. The reclaimed water main shall be installed at a grade, which will allow the air to migrate to a high point where the air can be released through an air valve. A minimum pipe slope of 1 foot in 500 feet should be maintained. The valve shall have a minimum two (2) inch NPT inlet and 200-PSI working pressure. Combination air valves shall be sized by the Engineer and approved by the Town. Combination air valves shall be of the single housing style with Type 304 or 316 stainless steel body that combines the operation of both an air/vacuum and air release valve. The valve must meet the requirements of AWWA C512 and be installed in accordance with the Details. The valve shall have a minimum two (2) inch NPT inlet and the inlet body shall be rated for minimum 250-PSI working pressure. Combination air valves sized from 2 to 4 inches shall be provided with NPT inlets and outlets unless otherwise submitted for approval with flanged connections. The combination air valve shall be provided with cylindrical shaped floats and anti -shock orifice made of high -density polyethylene. Combination air valves with spherical floats shall not be accepted. All combination air valves shall be installed in accordance with the Details. The combination air valve shall be installed in standard eccentric manhole as shown in the Town approved detail drawings. The manhole frame and cover shall be stamped "Reclaim Water" with the Town of Pittsboro, and town log. The combination air valve shall be provided with a controlled diameter saddle tap in the same sizing as the combination air valve assembly and isolated with a gate valve of the same size. The isolation gate valve shall be provided with NPT threads and connected with "no lead" brass or bronze ball valves may be used in lieu of gate valves for installations' 2-inches or smaller. The isolation valve shall be rated for 200-psi service or greater. Standard Specification for Reclaimed Water Distribution System 9 I Page The contractor shall paint the inside of all manholes housing ARV's with Pantone 522 purple paint and stencil the words "CAUTION: RECLAIMED WATER - DO NOT DRINK" on the outside of the manhole in at least 2 locations on both sides of the ASRV. The lettering shall be at least 3 inches in height and be painted in black visible paint that can be easily noticed from ground level. Valve Boxes Valve boxes shall be cast iron, screw or telescopic type, with a 5-inch opening. Valve box ring adjustments will not be allowed. Valve box covers shall be square in shape (NOT round) and shall be designed for AASHTO H-20 truck loadings. All valve box covers shall be of non -interchangeable shape with potable water covers and cast on the top surface with a recognizable inscription indicating "RECLAIMED WATER". All valve box covers shall be painted, Pantone 522. The valve box shall be centered over the operating nut and seated on compacted backfill without touching the valve assembly. All valve boxes shall be encased in a trowel finished 2' x 2' x 6" pad of 3,000-psi concrete beneath the asphalt with the cover flush with the top of the pavement or flush with the finished grade. Precast concrete valve box encasements may not be used for valve box encasement outside of paved areas. The maximum depth of the valve nut shall be 5 feet. When valve extension kits are used, they must be manufactured by the same company that manufactured the valve. For valve box and manhole adjustment procedures refer to Section 2, Infrastructure and Utility Construction. No valve box, meter box, manhole or clean -out shall fall in sidewalks, ramps, or curb/gutter. Appurtenances Pipe fittings shall conform to AWWA C153 for compact fittings. Fittings shall be mechanical joint in accordance with AWWA C111. Fittings shall be ductile iron with a minimum working pressure rating of 250 psi. Fittings shall be cement mortar lined and seal coated in accordance with AWWA C104. Fittings shall have an outside coating of bituminous material that is maintained through storage, handling and installation. Fittings shall not be installed without a complete and thorough bituminous coat. All fittings shall be restrained to C900 pipe with an approved wedge action retainer gland or other approved restraining method. All DI fittings for reclaimed water use shall be identified by painting or wrapping with polyethylene wrap in Pantone 522 purple. At the discretion of the Town of Pittsboro, Meg -a -lug retainer glands may be accepted in certain instances when joint restraint is required. Blow -offs installed on reclaimed water mains at the end of cul-de-sacs shall be a minimum of 2 inches. Where there is not sufficient pressure to thoroughly flush the system, a larger blow off will be required. Blow -off assembly sizing for distribution mains, 4 through 8 inches in diameter, shall be Standard Specification for Reclaimed Water Distribution System 10 I Page the typical 2-inch assembly as shown in the Town approved details. The 2-inch valves shall be gate type provided with threaded connections with a non -rising stem and a 2- inch operating nut, 0-ring seals and screwed ends. A full-size valve is required on mains that are planned to be extended. Typical 2-inch blow off assemblies shall be provided with SDR 21 purple PVC pipe rated at 200-psi and labeled for use with reclaimed water systems. The SDR 21 PVC pipe shall be joined with bell and spigot joints restrained by solvent weld. The PVC pipe shall be joined to the threaded connections of the 2-inch gate valve with PVC transition couplings with metal threads. The metal inserts of the transition couplings shall be made of stainless steel, "no lead" brass or bronze. The transition couplings shall be connected to the gate valve with threaded "no lead" brass nipples. Threaded PVC pipe and joints with connections threaded in PVC shall not be allowed. All threaded connections shall be provided with metal threads to maintain the pressure rating of the blow off assembly. For blow -off assemblies on main lines larger than 8-inches in diameter, a blow off assembly design including calculations for sizing shall be provided by the design engineer of record and approved by the Engineering Department. a) All blow -offs shall drain to the nearest sanitary sewer manhole when there is a sewer manhole within 200 feet. In cases where a sewer manhole is not within 200 feet, the blow -off assembly may be omitted at the discretion of the Town Engineer, and or Public Utilities Director in cases where another blow off assembly is in close proximity. b) Everything blow -off assemblies for reclaimed water installations in which the system will be initially charged with potable water, shall be required to maintain an air gap separation from the blow off discharge pipe to the sanitary sewer manhole. c) A typical potable water blow -off assembly may be utilized in lieu of a standard reclaimed water blow off assembly, in cases where a dead end reclaimed water main An approved Pantone 522 purple paint is required to meet color identification requirements and referenced herein as the color code identification for reclaimed water piping, valves and other appurtenances. Field application of Pantone 522 purple to valves, fittings, manholes and other appurtenances shall be implemented in conformance with manufacturer specifications including surface preparation. In all cases a minimum film thickness of 18-mils shall be applied. For applications open to daylight, the paint shall have UV protection. The paint shall consist of a two -coat system consisting of a part high solid cured epoxy as the primer with a polyurethane top coat. For applications not exposed to sunlight, the paint shall be a two -coat application of a high solids cured epoxy. All fittings, valves, blow offs and appurtenances other than pipeline joints shall be restrained with approved wedge action retainer glands. All wedge action retainer glands shall be manufactured as a one-piece retainer gland for use with typical DI mechanical joint fittings, gate valves and PVC C900 pipe. The wedge action retainer glands shall be rated to provide restraint up to a 200-psi pressure rating for sizes through 24 inches with a safety factor of 3 to1. Approved wedge action retainer glands shall be made of ductile Standard Specification for Reclaimed Water Distribution System 11 I Page iron, coated with a manufacturer applied epoxy coating or polyester powder coating, including stainless steel bolts and nuts. Reclaimed water service taps Individual reclaimed water services and multiple branch services shall be provided from the reclaimed water main to each reclaimed water meter in accordance with the Town approved details. Multiple branch services for reclaimed water shall not exceed one (1) branch lines unless otherwise approved by the Public Utilities Director. Service connections shall be made perpendicular to the reclaimed water main and shall run straight to the reclaimed water meter. The use of C901 rolled/tubed material is not allowed, only ridge pipe shall be used. All reclaimed water meter boxes and vaults shall be located at the right of way or easement of private property. Reclaimed water meter boxes shall not be placed in streets, sidewalks, parking areas or obstructed by fencing or buildings. Exceptions to these conditions will be at the discretion of the Public Utilities Director. Provisions for backflow prevention shall be in accordance with the NC Plumbing Code for plumbing. Normally no backflow provisions will be necessary on reclaimed water systems. Approved backflow prevention devices shall be required on the potable water system for all customers with reclaimed water service. Units shall be tested per the requirements set forth in the Town of Pittsboro Chapter 25, Utilities Ordinance, Article VI Cross Connections between a Private Supply and The Town of Pittsboro Water System. The reclaimed water meter shall be sized based on applicant water budget calculations using the approved method. The minimum size of reclaimed water meters shall be %-inch diameter and the minimum services shall be 3/-inch diameter. Multiple branch service sizing shall be determined by the designer. Service taps to existing reclaimed water mains shall be made by a licensed utility Contractor of the Developer. Materials Direct taps shall not be allowed with C900 PVC, or Ductile Iron pipe for reclaimed water mains. The maximum size for saddle taps is 2 inches in diameter. All taps larger than 2- inches shall be installed by inline fittings or tapping sleeves. All tapping of C900 PVC reclaimed water mains shall be implemented with shell type cutting tools classified for use with PVC pipe that retains the coupon cut while penetrating the pipe wall. Twist drill bits and auger bits shall be prohibited. Service Saddles All service saddles shall be fabricated with an 85-5-5-5 waterworks brass and fabricated in a controlled diameter configuration to prevent over tightening the bolts and distorting or stressing the PVC pipe. Service saddles shall provide full support around the entire circumference of the pipe. All service saddles shall be manufacturer approved for use with Standard Specification for Reclaimed Water Distribution System 12 I Page C900 PVC pipe in conformance with AWWA C800. Service saddles shall be provided in a 2-piece bolted design for 4 through 8-inch pipe diameters and in a 3-piece assembly for 10 and 12-inch diameters. All service saddles shall be provided with an EPDM rubber gasket 0-ring design in conformance with ASTM D2000. Service saddle outlets shall be provided with AWWA tapered threads. Tapping Sleeves MJ tapping sleeves shall be fabricated of cast iron or ductile iron construction in a two- piece assembly with mechanical joint connections to the main line and flanged connection to the tapping valve. All MJ tapping sleeves shall be rated for a working pressure of 200- psi or greater and provided with a 1-inch test plug for testing. All tapping sleeves shall be hydrostatically tested up to 200-psi for thirty (30) minutes before a tap is made. Tapping sleeves shall NOT be air tested. All mechanical joint tapping sleeves shall be manufacturer fabricated and approved for installation on the specific main line pipe material, whether C900 PVC pipe. In all MJ tapping sleeve applications, the tapping sleeve and tapping valve shall be provided by the same manufacturer. Stainless steel tapping sleeves may be used in lieu of mechanical joint tapping sleeves for C900 PVC reclaimed water mains 6-inch through 12-inch in diameter at sizing as shown in the following table. All stainless -steel tapping sleeves shall be manufactured in conformance with AWWA C223. All SS tapping sleeves shall be provided in a two-piece assembly with a full circumferential gasket and a 3/ inch teat plug. The back band shall be a minimum 14-gauge stainless steel and the front band (where the outlet is located) shall be a minimum 12-gauge stainless steel. The bolt bars shall be a minimum 7-gauge stainless steel. All SS tapping sleeves shall be manufacturer rated for a working pressure of 200- psi or greater and hydrostatically tested to 150-psi for thirty (30) minutes before a tap is made. Stainless steel tapping sleeves shall NOT be air tested. STAINLESS STEEL TAPPING SLEEVE SIZES Nominal Main Size (inches) Nominal Branch Size (inches) 6 4 8 4 8 6 10 4 10 6 12 4 12 6 12 8 Standard Specification for Reclaimed Water Distribution System 13 I Page Tapping saddles shall not be used with PVC pipe. Corporation Stops shall be ball type, fabricated with "no Lead" brass. The inlet shall have AWWA Standard threads as per AWWA C800. Taps shall be located at 10:00 or 2:00 o'clock on the circumference of the pipe. The outlet connection of the corporation stop shall be sized for IPS, Iron Pipe Size polyethylene piping and provided with a solid stainless - steel insert stiffener manufactured by the same manufacturer of the corporation stop ball valve. The outlet connection to the polyethylene service piping shall be by compression connections provided with the corporation stop ball valve. Service taps shall be staggered alternating from one side of the reclaimed water main to the other and at least 12 inches apart. The taps must be a minimum of 24 inches apart if they are on the same side of the pipe. No tapping shall be made within 3 feet of the end of the reclaimed water main. Service Piping Polyethylene service piping shall be provided as minimum 3/-inch to maximum 2-inch, IPS, (iron pipe size), inside diameter controlled, piping in conformance with ASTM D2239 and rated for 200-psi. All polyethylene service piping shall comply with NSF14, AWWA C901 and meet all requirements of PE 3710 code designation. The piping shall be provided with no breaks or fittings in service installation lengths of 100 feet or less. All polyethylene service piping shall be provided in purple color, Pantone 522, for reclaimed water applications with the words, "CAUTION - RECLAIMED WATER DO NOT DRINK" labeling the piping as reclaimed water service piping. All PE piping shall be provided with tracer wire. Trace wire shall be #12 AWG Copper Clad Steel, Extra High Strength with minimum 1,150 lb. break load, with minimum 30 mil purple HDPE insulation thickness.and attached in at least 3 feet intervals with non-metallic fasteners. The tracer wire may be attached to the pipe by the pipe manufacturer or attached in the field. The tracer wire shall be connected visibly inside the meter box for use by Town of Pittsboro utility locating staff. All connections to PE piping shall be provided with stainless steel insert stiffeners provided by the same manufacturer of the corporation stops and/or the meter setters and approved by the manufacturer for use with PE piping. Copper Setters The minimum service size for reclaimed water copper setters is 3/-inch in diameter. "Copper setters" shall consist of "no lead" brass components (meeting UNS C89833 as per ASTM B584) and be installed in reclaimed water applications as shown in the details and provided with a lockable, full port "no lead" ball valve on the inlet side of the meter and a second full port "no lead" ball valve on the outlet side of the meter. "Copper setters" shall be provided in a 15-inch vertical rise at the shape and configuration shown in the Town approved detail. "Copper setters" shall be installed in the center of the meter box such that the top of the inlet and outlet piping is visible for inspection. "Copper setters" shall be provided with "no lead" compression connections sized for polyethylene piping as specified herein for both inlet and outlet connections. Typical saddle nuts shall be provided with reverse or left-hand threads for connecting reclaimed Standard Specification for Reclaimed Water Distribution System 14 I Page water meters with reverse or left-hand threads. The top of the ball valve shall be text identified for use with reclaimed water by a manufacturer installed metal tag. Water Meters Reclaimed water meters for 3/-inch services will be provided by the Town of Pittsboro with reverse or left-hand threads. Reclaimed water meters shall be color identified by purple Pantone 522 cover and casing. Water Meter Box Meter boxes for 3/-inch reclaimed water services shall be made of heavy duty fiberglass reinforced polymer. The box shall be molded as one piece and provided in a circular shape with a diameter of 20 inches and a depth of 24 inches. The box shall be provided with pre-cut entry areas approximately 3 inches wide by 4 inches high for the service pipe entrance and exit. The plastic box shall be provided in purple color dyed into the fiberglass construction. The meter box cover shall be made of light weight polymer concrete dyed purple, Pantone 522 with the words, "CAUTION RECLAIMED WATER -DO NOT DRINK", embossed in the cover. The meter box cover shall be provided as a solid polymer cement cover with no reader door. The meter box cover shall be provided with one (1) stainless steel locking bolt. The stainless -steel locking bolt shall be provided in a Penta head configuration. The box and cover shall be load rated for a vertical load of 20,000-Ibs. The inside of meter box shall be labeled indicating, "CAUTION RECLAIMED WATER -DO NOT DRINK" in lettering at least 1-Y2 inches in height that is clearly legible when opening the cover. All fittings and connections shall be "no lead" brass conforming to UNS C89833 as ASTM B584. Meter Boxes for 1-Y2 and 2-inch services shall be made of fiberglass reinforced polymer and provided with heavy duty rated polymer concrete covers as indicated in the Standard Details. All meter box covers shall be consistently color -coded purple (Pantone 522 C) and marked on the top surface with recognizable inscription indicating "RECLAIMED WATER -DO NOT DRINK" painted with a protective bituminous coating before being shipped from the factory. No valve box, meter box, manhole or clean -out shall fall in sidewalks, ramps, or curb/gutter. For valve box and manhole adjustment procedures refer to Section 2, Infrastructure and Utility Construction TESTING AND INSPECTIONS A. GENERAL 1. Town of Pittsboro staff must be present for all pressure testing, disinfection and flushing activities. 2. All reclaimed water used in testing and inspection must be disposed of properly per the Towns requirements. 3. All valves will be turned by Town staff only. Others who turn Town valves shall Standard Specification for Reclaimed Water Distribution System 15 I Page be subject to fines of up to $15,000 per indecent. 4. All materials must be approved by the Town of Pittsboro prior to installation. Materials rejected by the Town shall be immediately removed from the job site. 5. The Contractor shall furnish all materials, labor, and equipment to perform all testing and inspections to the satisfaction of the Town of Pittsboro. The Town shall provide water for testing purposes on reclaimed water mains in accordance with Town Standard. 6. In cases where the reclaimed water system will initially be supplied with potable water, all reclaimed system testing shall be conducted with potable water. No system testing shall occur with potable water until such time after the backflow preventer assembly has been inspected and made operational by the Town. B. TESTING 1. Hydrostatic Testing a) No valve in the Town reclaimed water system shall be operated without authorization in accordance with the Town Standard Procedure. A section of reclaimed water main which is to be hydrostatically tested shall be slowly filled with reclaimed water at a rate which will allow complete evacuation of air from the line. Hand pumps shall not be used for the pressure testing of reclaimed water mains. Taps used for testing purposes shall be removed after testing and repaired using a stainless steel full circle repairclamp. b) After all air has been expelled from the water main, the line shall be tested to a pressure of 200 psi as measured at the lowest elevation of the line for a duration of 2 hours. The pressure gauge used in the hydrostatic test shall be calibrated in increments of 10 psi or less. The pressure gauge shall be liquid - filled and indexed for an operating range of 300-psi or less with a minimum dial size of 4 inches. At the end of the test period, the leakage shall be measured with an accurate water meter. c) Any measured leakage not within the allowable limits as specified in the following table shall require repair of the reclaimed water main and additional testing until the standards are met. For pipe sizes other than those shown, the Contractor shall test within the allowable leakage amounts as specified by AWWA C605. All visible leaks shall be repaired regardless of the amount of leakage. Maximum Leakage Allowed per AWWA C605 Pipe Size inches Allowable Leakage at 200-psi (Gal/Hour per 1000-ft of Pipe) 4 0.38 6 0.57 Standard Specification for Reclaimed Water Distribution System 16 I Page Maximum Leakage Allowed per AWWA C605 Pipe Size inches Allowable Leakage at 200-psi (Gal/Hour per 1000-ft of Pipe) 8 0.76 12 1.15 16 1.53 18 1.72 20 1.91 24 2.29 2. Disinfection a) All additions or replacements to the reclaimed water system shall be disinfected with chlorine in conformance with AWWA C651 before being placed in service under the supervision of the Town's Infrastructure Field Technician in the following manner: i. Taps shall be made at the control valve at the upstream end of the reclaimed water main and at all extremities of the line including valves. ii. A solution of water containing 70% HTH available chlorine shall be introduced into the reclaimed water main by regulated pumping at the control -valve tap. The solution shall be of such a concentration that the reclaimed water main shall have a uniform concentration of not less than 50-ppm and not more than 100 ppm total chlorine immediately after chlorination. The chart below shows the required quantity of 70% HTH compound to be contained in solution in each 1,000 feet section of line to produce the desired concentration of 100 ppm. Required Hypochlorite Concentration Pipe Size (inches) Pounds of High Test Hypochlorite (70%) to reach 50-ppm per 1,000 feet of line Pounds High Test Hypochlorite (70%) to reach 100-ppm per 1000 feet of line 6 0.88 1.76 8 1.56 3.12 10 2.42 4.84 12 3.50 7.00 14 4.76 9.52 Standard Specification for Reclaimed Water Distribution System 17 I Page Required Hypochlorite Concentration Pipe Size (inches) Pounds of High Test Hypochlorite (70%) to reach 50-ppm per 1,000 feet of line Pounds High Test Hypochlorite (70%) to reach 100-ppm per 1000 feet of line 16 6.22 12.44 20 9.76 19.52 24 14.00 28.00 iii. The HTH Solution shall be circulated in the reclaimed water main by opening the control valve and systematically manipulating blowoffs and taps at the reclaimed water main extremities. All reclaimed water leaving the system during this test must be disposed of through either an approved use or sent to the sanitary sewer. The HTH solution must be pumped in at a constant rate for each discharge rate so a uniform concentration will be produced in reclaimed water mains. iv. HTH solution shall remain in reclaimed water mains for no less than 24-hours or as directed by the Town's Infrastructure Field Technician. v. Extreme care shall be exercised at all times to prevent the HTH solution from entering existing reclaimed watermains. 3. Flushing a) At the completion of disinfection, chlorinated water flushed from the reclaimed water main shall be disposed of in conformance with all Federal, State and local regulations. b) In accordance with all applicable regulations, a neutralizing chemical shall be applied to minimize chlorine residual in the flushing water before discharging from the reclaimed water main, unless an alternate plan is submitted in writing and approved by theTown. c) Free residual chlorine after 24 hours shall be at least 10 ppm or the Infrastructure Field Technician will require that the lines be re- chlorinated. d) Flushing of lines may only proceed after 24 hours of disinfection contact time and as directed by Town staff, provided the free residual chlorine analysis is satisfactory. Standard Specification for Reclaimed Water Distribution System 18 I Page 4. Bacteriological Sampling a) Reclaimed water leaving the system because of line flushing must be returned to a sanitary sewer. Bacteriological sampling shall consist of 2 consecutive sets of acceptable samples taken at least 24-hours apart and collected from each 1,200- foot section of water main and all dead ends and branches. Samples for bacteriological analysis shall be witnessed by the Town staff after flushing is completed. The Contractor shall furnish the sample bottles, the testing agency and shall secure these samples. The Contractor shall make arrangements with the laboratory that all test results be submitted directly to the Town or designee. All costs for laboratory testing shall be borne by the Contractor. b) The laboratory secured for testing shall be certified by the State Laboratory of Public Health. All sample bottles provided by the laboratory shall be sterilized and treated with a dechlorinating agent, such as sodium thiosulfate. The sample bottles shall be provided with tamper proof seals that will be adhered to the bottles by Town staff. The bottles and tamper proof seals shall be accompanied by a chain of custody form provided by the certified laboratory conducting the testing. All samples shall be taken in compliance with the sampling protocols provided by the certified laboratory and processed for delivery under the direct supervision of Town staff. The samples shall be kept in a cooler at approximately 40-degrees Fahrenheit or 4-degrees Celsius and delivered to the certified lab for testing as soon as possible. The time at which the sample is taken shall be recorded on the chain of custody form by Town staff. Any samples processed at the laboratory more than 30-hours following collection shall be declared invalid. All samples shall therefore be submitted to the lab within 24-hours of collection. c) When a sample has a positive hit for fecal chloroform, the Contractor shall immediately rechlorinate reclaimed water mains and proceed with such measures as are necessary to properly disinfect those reclaimed water mains again. A positive hit for total chloroform however does not require the lines to be retested. d) The new reclaimed water system shall be valved -off from the existing reclaimed water system until a satisfactory bacteriological sample has be obtained and the Town has authorized the use of the new reclaimed water system. 5. Marker Ball and Marker Tape Testing a) Testing of the marker balls and tape shall be performed by the Contractor at the completion of the project to assure they are all working properly. It is the Contractor's responsibility to provide the necessary equipment to test the markers. Any defective, missing, or otherwise non -locatable units shall be replaced. 6. Completion of Testing a) At the completion of testing and after reclaimed water main lines and services have been successfully inspected, reclaimed service lines shall be locked at the Standard Specification for Reclaimed Water Distribution System 19 I Page angle ball valve. The locks will be provided by the Town and shall prevent any unauthorized use of reclaimed water until the meter has been set. b) In the interim period between constructing the service line and setting the meter, any unauthorized use of reclaimed water shall be subject to fines and penalties as provided under Town ordinances. c) Any relocation of the reclaimed service assembly shall require a separate permit from the Town of Pittsboro unless otherwise authorized by the Town's reclaimed water coordinator. d) At such time when the meter is set, the lock will be removed from the meter yolk. Only after the reclaimed service installation has been confirmed by water testing, shall the meter be installed and made operational. Standard Specification for Reclaimed Water Distribution System 20 I Page McKIM&CREED ENGINEERING TECHNICAL MEMORANDUM TO: Kent Jackson, PE --. Town of Pittsboro FROM: Wes Hutchins, PE --m McKim & Creed DATE: January 19, 2021 RE: Chatham Park Section 7.1 & Mellott Reclaim Distribution System Potential Expansion Analysis McKIM & CREED #: 01561-0008 • f Background & Purpose McKi.rn and Creed received subdivision plans for three developments commonly referred to as Section 7.1, Mellott Phase 1, and Mellott Phase 2 in Chatham Park, designed by WithersRavenel. This development is located in the Town of Pittsboro (Town), NC, and was included in the North Village Utility Plan Update Jor Reclaimed Water submitted. on February 11., 2019, approved and updated on June 17, 2019, d.escr.ibed as Sections 5.1 and 5.4. 'The new Chatham Park Decentralized Water Resource Recovery Facility (DWRRF), currently under construction east of the proposed development, will supply the reclaimed water for this area when available. Currently, a 6-inch dry reclaimed water line was previously installed on Grant Drive to serve future phases of development. The proposed Section 7.1 and Mellott developments will connect into this 6-inch line and a future 12-inch reclaimed distribution line along Chatham Park Way which originates at the DWRRF through a proposed 4-inch reclaimed line to be installed in Grant Drive Extension. As the 12-inch connection line along Chatham Park Way does not yet exist, the proposed 4-inch line included in this development will connect to the existing 6-inch line as a dry pipe and will be capped until the connecting 1.2-inch is constructed. The purpose of this memorandum is to report model -predicted hydraulic characteristics for this area's reclaimed water system under future huildout conditions summarized in the June 17, 2019 update to the North Village Utility Plan Update for Reclaimed Water. Engineering Technical Memorandum Chatham Park Section 7.1 & Mellott Reclaim Distribution System Potential Expansion Analysis January 19, 2021 Page 2 of 15 The analysis found that the reclaimed distribution system pipeline sizes, as originally designed and shown, are appropriately sized when additional reclaimed water becomes available, and the proposed demands as indicated in the area are serviced. Details of this analysis follow. Model Criteria The North Carolina Administrative Code (NCAC) T15A:18c.0405b states a water distribution system should provide at least 30 psi during peak flow conditions. Additionally, the AWWA Manual of Water Supply Practices M32 recommends a maximum design velocity of 10 feet per second (fps) with 5 fps as a more desirable range. These are the standards against which the reclaimed water system design has been compared in this memorandum. Reclaimed Water System in Section 7.1 & Mellott Planned potable and reclaimed waterlines for the proposed developments are shown in the WithersRavenel exhibit shown in Figure 1 & Figure 2 and attached as Appendix A. Reclaimed water lines are shown in magenta. The design consists of approximately 5,300 total linear feet (LF) of 4-inch pipe along the future Grant Drive Extension. Engineering Technical Memorandum Chatham Park Section 7.1 & Mellott Reclaim Distribution System Potential Expansion Analysis January 19, 2021 Page 3 of 15 $0.10irLyyaA n�✓.1 .wr. �1. '�.4+ 4. 044 N•4 , '- Af • `Sel��• LL Iw"[ :.1.i..�. •- :• a a ca • I _ Y 4• r _____aoa p.m- i � US IJ71 ` .. i Al:: 5 i. ,TTi!•; "-�. �r --_• --• 1 r" " ! , n ! ^{ r- .-- ., �O• _ qlpryy,�4. "_ } } C! 33 C • 2 �i •_a. _- Y '• a �,.� fir'• . ' �, S'r•11.�77s� ---.wl -- ...� ��N . dLrtWYdfR1dM.V 1111 �.r.L..YJ 4.0 Figure 1. Planned water lines for Section 7.1. A larger version of this exhibit, provided by WithersRavenel, can be found in Appendix A. Engineering Technical Memorandum Chatham Park Section 7.1 & Mellott Reclaim Distribution System Potential Expansion Analysis January 19, 2021 Page 4 of 15 uaY4i?iSL ���+ "ram , IS "i : i' Lrd } w. ��.�J _ 4r/1 i. Ili 1.0 . 1. :'1 �+ _ M N ; e�AF ` •..I.. r- .. J 7 w �� AM f -.:1 »i , ,. 6 `'i l' '♦ L �...._ __ ..�« 1 ` . 4 t� } —t r � + M,a per .....,' �.....�f•+F. Tp'/-r, Sri. .l' �� r. 777. ill'~.1: r 4.1 AK11•1A — T r.: . Figure 2. Planned water lines for Mellott Phase 1 & 2. A larger version of this exhibit, provided by WithersRavenel, can be found in Appendix A. The proposed development will consist primarily of residential units with a few parcels identified as an activity center or park. Lot counts for each development are listed below: • Section 7.1 -154 Total Units • Mellott (Phase 1 & 2) -196 Total Units Model for Proposed Conditions For the proposed design, the 4-inch main will not immediately serve any demands. The proposed Section 7.1 and Mellott developments will not include reclaimed water demands in the residential areas included in this project. Future loading and reclaimed demands will be included in a separate evaluation. Engineering Technical Memorandum Chatham Park Section 7.1 & Mellott Reclaim Distribution System Potential Expansion Analysis January 19, 2021 Page 5 of 15 The future loading information, as described in the June 17, 2019 update of the North Village Utility Plan Update for Reclaimed Water, can be found in Figures 3 and 4, as well as Appendix B. • 1 1 • .r•. • OF.. 0•4.ei smyeems W ;ftw►r. I. f 1 "we .. r 1 AV wort 4aw• 1•4i. •/ Fire R.“ c1Wee r rwt. is4pr itir?kr Vpiller • lig d.ar4Wier! rr,1 s tool nl 1 o Dow NI t ra►1K lin is VT le.r5ra 4.4111t1..a,�li Figure 3 — Total demands (gpd) per model junction Engineering Technical Memorandum Chatham Park Section 7.1 & Mellott Reclaim Distribution System Potential Expansion Analysis January 19, 2021 Page 6 of 15 1- • w. r.m.•NH w• •..• CIL%TIIA0M P.ft RI< NIA) ValleC l an' I vq.tian { ir'sp. rlimpimodEMAIkkoime Imo •K • rleye. 'Paw H •— . 1.7•Z.Ir 7 %%•*01 • �did�/rr. r • Clan . • i N;7A► 'T 40► i�rli� � tr.r • R+. v. •-•• ' W..n ►4■ M IRMO • Figure 4 — Demand loading per category The values listed in the figures for proposed future loading are presented in Table 1 for clarity. The demands associated with the 7.1 Regional Center are not included in this evaluation as the current development plan only includes residential areas for Section 7.1 and Mellott. As noted in Table 1 and on the previous figures, no demands will be included in the residential lots in these two areas. Engineering Technical Memorandum Chatham Park Section 7.1 & Mellott Reclaim Distribution System Potential Expansion Analysis January 19, 2021 Page 7 of 15 Table 1— Future Demand Loading Use Type Demand Subtotal (gpd) Non -Residential Indoor Reuse 5.2 40,560 6.1 22,880 Village District North 4,867 Village District South 10,951 7.1 Regional Center** 64,004 Activity Center 40,560 Commercial Outdoor Irrigation 11,850 Residential Open Space Irrigation 8,363 Residential Outdoor Irrigation 5.1 Thompson St. Subdivision 10,123 Athletic Fields Irrigation 35,841 3M Industrial Demand 250,000 Total 499,999 The proposed development was evaluated in continuous simulation, which allows for predicting hydraulic system response to peak hour demands (PHD). Each demand category receives a diurnal pattern reflecting an expected distribution and timing of different types of demands. Irrigation is assumed to primarily occur in the morning hours, with a smaller peak in the evening hours. Additionally, residential open space and fields receive an irrigation pattern once in a 48-hour period to reflect every other day watering. Peaking factors and diurnal patterns applied to the model can be found in Section 5.4 of the June 17, 2019 version of the North Village Utility Plan Update for Reclaimed Water. For evaluation of the reclaimed master plan model, the criteria shown in Table 2 was established. These criteria align with those followed in other master planning documents associated with Chatham Park. Engineering Technical Memorandum Chatham Park Section 7.1 & Mellott Reclaim Distribution System Potential Expansion Analysis January 19, 2021 Page 8 of 15 Table 2 — Reclaimed Water Model Evaluation Criteria System Parameter Evaluation Criteria Value Design Standard/Guideline System Pressure Min. during ADD or MDD Min. during PHD Recommended Max Pressure 40 psi 30 psi 125 psi Town of Cary Water Distribution Master Plan NCAC T15A:18C.0405 (b) Town of Cary Water Distribution Master Plan Piping Hydraulics Max velocity during MDD 5 ft/sec AWWA M32 Figure 55, attached as Appendix C, reflects the model -predicted minimum junction pressures. Minimum system pressures were maintained above 40 psi, even during peak hour demand. Additionally, pipe velocities were kept below 5 ft/s throughout. Figure 5 - Model -Predicted Minimum Junction Pressures Engineering Technical Memorandum Chatham Park Section 7.1 & Mellott Reclaim Distribution System Potential Expansion Analysis January 19, 2021 Page 9 of 15 Figure 66, attached as Appendix D, shows the corresponding model -predicted maximum pressures at junctions, which may range from 50 psi upwards to 113 psi in the lower development sections. High pressures are generally expected during a combination of lower -demand hours. Model -predicted velocities are shown in Figure 7 and Appendix E. • i • 1 1, ("HA rHA%I P 1I X a1 ; L d 1 •._ Plan ildk - rsil 7.;.40, Direr USW Rom Lpd/+ • raillda+i Wan - R..M.•4 • A rw ■ •• will POP .. • h•••OWr • An. /ma • ..• ■w.... wdr.,. Y- I 410r/ .- w 07.r Maftawr. HAMma si.•.a.a u.,:,..... r�...�. n1�� C3r!To Figure 6 - Model -Predicted Maximum Junction Pressures Engineering Technical Memorandum Chatham Park Section 7.1 & Mellott Reclaim Distribution System Potential Expansion Analysis January 19, 2021 Page 10 of 15 r CHAYHHA M P A i{k %nA V 1 1.1gc. Lard tx..Plan 1\ �.� Champ F. tough nit./ Mil Rio Media • 'Mao AinSplo4 war...ai let. lima_,. LK.-I .IS. • •Ma - .8 141110'1. "Raft Figure 7 - Model -Predicted Maximum Pipe Velocities Conclusions for Section 7.1 and Mellott Developments The master plan model, explained in the June 17, 2019 North Village Utility Plan Update for Reclaimed Water found that the proposed 4" pipe diameters for reclaimed water lines in Chatham Park, including the Section 7.1 and Mellott developments, are sufficient to serve the proposed demands listed in the report. Demands included in the master planning effort were intended for commercial use only. As the planned residential development will not add any additional demand to the system, model results from the previous master planning effort are assumed to be valid. The connecting pipes in the area are not yet in place so the proposed 4-inch lines shown on the development plans will be installed as a dry pipe. The model showed that the projected reclaimed demands for the proposed overall development could be supplied with reclaimed water at a maximum velocity of less than 5 fps while maintaining pressures above 30 psi during peak conditions and would therefore be in compliance with both the AWWA M32 recommendations and NCAC T15A:18c.0405b requirements. 4444 McKIM&CREED APPENDIX A PROPOSED SECTION 7.1 & MELLOTT SITE LAYOUTS TOWN OF PITTSBORO UTILITY NOTIFICATION NOTES: 1. THE OWNER/CONTRACTOR SHALL NOTIFY THE TOWN OF PITTSBORO AT LEAST. HOURS PRIOR TO BEGINNING ANY CONSTRUCTION. ONCE CONSTRUCTION HAS BEGUN, AT LEAST. HOURS NOTICE SHALL BE GIVEN PRIOR TO ANY SORT OF DISRUPTION TO THE TOWN'S SERVICES SUCH AS TAPPING WATER MAINS, OPERATING VALVES, CLOSING STREETS, PLUGGING SEWERS, ETC. 2. NOTIFICATION MUST BE PROVIDED BY DIRECT COMMUNICATION. VOICEMAIL OR EMAIL WILL NOT BE CONSIDERED PROPER NOTIFICATION UNLESS ADEQUATELY RESPONDED TO BY A TOWN OF PRTSBORO REPRESENTATIVE. 3. THE OWNERICONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING ALL CUSTOMERS AFFECTED BY SERVICES INTERRUPTIONS. THE TOWN OF PRTSBORO WILL NOT APPROVE SERVICE INTERRUPTIONS UNTIL PROOF THAT PROPER CUSTOMER NOTIFICATION HAS BEEN PROVIDED. 4. EXISTING VALVES SHALL BE OPERATED ONLY WITH A REPRESENTATIVE OF THE TOWN OF PITTSBORO PRESENT. PIPE CORROSION POTENTIAL NOTES: 1. GEOTEGIES,INC. WAS REQUESTED TO PROVIDE THEIR OPINION OF THE POTENTIALTIALFOR CORROSION OF DUCTILE IRON PIPE (DIP) INSTALLATIONS FOR THIS PROJECT. PER THEIR REPORT DATED 03/20/17, THERE ARE NO CORROSIVE SOILS ON SITE. UTILITY LINE SIZING NOTES: 1. WATERLINE SIZING BASED ON REPORT TIRED, TIRE FLOW AVAILABILITY REPORT FOR PHASE 5.1 SUBDIVISION., PREPARED BY MCKIM 8 CREED, DATED APRIL 2019. FIRE ACCESS NOTES: 1. FIRE ACCESS MUST BE PROVIDED DURING CONSTRUCTION PHASE. 2. NO BUILDING MATERIALS ARE TO BE PLACED/ STORED IN MANNER AS TO PREVENT EMERGENCY VEHICLE ACCESS. N/F PRN TO III LLC. DB.1 77 PG. 718 OT6 BM. 201 PG. 291-293 PIN.9 52-087. EPDD ELECTRICAL NOTE: ELECTRICAL LAYOUT WILL BE PROVIDED AND DESIGNED BY DUKE ENERGY. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH TOWN OF PITTSBORO AND NCDOT STANDARD DETAILS AND SPECIFICATIONS, LATEST REVISIONS. TYPICAL LOT SERVICE LOCATIONS (SINGLE FAMILY) WF PRN00 PG.6. DB.1 LO PO.669 OTS B P. 2 IN. 95PG.291-296 PINZONE 160639 ZONE PDD EXISTING B• GRANT DRIVE (RECLAIMEDWATERLINE) (EXISTING 26' B-B W/97 RAN) (FUTURE 71'B-B W/ 47' RAN) PB 2015. PG.291-298 EXISTING IT WATERLINE 8 BLOWOFF EXISTING RECLAIMED WATERLINE VALVE(3) EXIST.6• PVC (RECLAIMED WATERLINE) TYPICAL LOT SERVICE LOCATIONS (RESIDENTIAL, TWO-FAMILY) EXISTING8• (RECLAIMED WATERLINE) EXIST.. DIP (WATERLINE) EXISTING 15• RCP N/F CHATHAM DEVELOPMENT ONE INC. DB. 1. PG.167 LOT 10 BM. 2015 PG. 291-298 PIN. 9752-165335 ZONE PDD / REMOVE EXISTING BOA AND TIE TO EXISTING 1T DIP WATERLINE IT6' REDUCER (WATERLINE) 6•DIP REMOVE EXISTING BOA AND TIE TO EXISTING 6• PVC RECLAIMED WATERLINE (1) 6• x a• RED. 6• PVC (RECLAIMED WATERLINE) WATERLINE SCM #4 / (WETLAND) • EXISTING 1T CPP (TO BE REMOVED) 6•GATE VALVE (TYP .) 60 LF STEEL CASING PIPE SORE B JACK N/F CHATHAM PARK INVESTORS LLC DB.1567 PG.. LOT BM. 2015 PG. 291-298 PIN. 975M5565 ZONE PDD APPROXIMATE LOCATION OF 1T DIP FORCE MAIN (BY OTHERS) 260 LF STEEL CASING , PIPE (BY OTHERS) 1- % v / 6'GATE VALVE \ (TYP.) HA PERENNIAL CHANNEL 30' 2 ' 1 50' ttI N/F ABJ VENTURE TWO, LLC DB. 1961 PG. 217 BM. 19 PG.6 PIN. 9752-29-2626 ZONE 0-1 6• PVC SCHEDULE 60SANITARY SEWER SERVICE (TYP. FOR PLL LOTS) 9 'x \ \ n \ \ DIP WATERLINE \ B XB TEE (2)6 GV \\ (1)6GV N/F MARY VALERIE BALLIT GESUALDO A. COSTANZO, CO -TRUSTEES DB. 721 PG.. BM. 96 PG.153 PIN. 9.00-2366 ZONE R-A2 EXISTING S' RAN, T NORTH AND EAST OF PROPOERTY LINE DB 361, PG. 312 I PB 13, PG.] / 6 DIP ATERLINE /9 41 0 6•X (3)6•GV — — 0 6•TEE - — — 0 — — — — 00 — — WATERLINE — — 0 6'DIP 1 0 — 0 — 0 — — 0 — — — 0 IMAGINE — — 0 — — 0 WAY 0 0 096 6•X ( iF 6•TEE )6 GV /.¢ rj li 11. 61PVC SCHEDUL 40 SANITARY SEWER SERVICE (TYP. FORALL LOTS) PVC SCHEDULE. SANITARY SEWER SERVICE (TYP. FOR ALL LOTS) �\ 37 (TYP. FOR _ 38 O 0 6'X6•TEE i`'.,.� iri Pft0 PE TPLgCE ® 47 11 r V 10 9 �`I�� I6I4 6 O 11 � li maii y,. �\/ © © 0 I I \ (WATERLINE) \ \ 6•DIP % / ) \\ \\ (WATERLINE) 6'OIP(WATERLINE) / / \ ) / FUTURE / AMENITY AREA / 6• PVC (RECLAIMED WATERLINE) AIR RELEASE VALVE ASSY. (RECLAIMED) (TO BE LOCATED AT HIGHPOINT) AIR RELEASE VALVE ASSY. (TO BE LOCATED ATHIGHPOINT) \ / / / STORMWATER \ / / BYPASS /\ _ - SYSTEM / 1 1/2 - 2" WM service for Amenity Center CX6•TEE 3)6GV \\A45 SF \\A\ 6•DIP (WATERLINE) 247\ 10SF \ - 6' BLOW -OFF ASSEMBLY TO BE INSTALLED WITH PHASE 61 BLOW -OFF ASSEMBLY (RECLAIMED) TO BE INSTALLED WITH N/F PHASE ROCKY CRISSMAN AND WIFE JANIE C. CRISSMAN DB. 1699 PG. 378 LOTS 132 NA 2007 PG. 089 PIN. 975237-7268 ZONE R-10 REVISED PER TOP 1ST 072720 REVIEW COMMENTS 2 REVISED PER TOP 2ND 08/2020 REVIEW COMMENTS TOWN OF PITTSBORO UTILITY NOTIFICATION NOTES: 1. THE OWNER/CONTRACTOR SHALL NOTIFY THE TOWN OF PITTSBORO AT LEAST. HOURS PRIOR TO BEGINNING ANY CONSTRUCTION. ONCE CONSTRUCTION HAS BEGUN, AT LEAST. HOURS NOTICE SHALL BE GIVEN PRIOR TO ANY SORT OF DISRUPTION TO THE TOWN'S SERVICES SUCH AS TAPPING WATER MAINS, OPERATING VALVES, CLOSING STREETS, PLUGGING SEWERS, ETC. 2. NOTIFICATION MUST BE PROVIDED BY DIRECT COMMUNICATION. VOICEMAIL OR EMAIL WILL NOT BE CONSIDERED PROPER NOTIFICATION UNLESS ADEQUATELY RESPONDED TO BY A TOWN OF PRTSBORO REPRESENTATIVE. 3. THE OWNER/CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING ALL CUSTOMERS AFFECTED BY SERVICES INTERRUPTIONS. THE TOWN OF PRTSBORO WILL NOT APPROVE SERVICE INTERRUPTIONS UNTIL PROOF THAT PROPER CUSTOMER NOTIFICATION HAS BEEN PROVIDED. 4. EXISTING VALVES SHALL BE OPERATED ONLY WITH A REPRESENTATIVE OF THE TOWN OF PITTSBORO PRESENT. 8' DIP WATERLINE PUE _. 8•X IT TEE (1)8'GV (2) IT GV N/F ROCKY CRISSMAN AND WIFE JANIE C. CRISSMAN DB. 1499 PG. 378 LOTS 182 BM. 2007 PG..9 PIN. 975237-7288 o GRAPHIC SCALE Soo 1 inch= 100 Ft ELECTRICAL NOTE: ELECTRICAL LAYOUT WILL BE PROVIDED AND DESIGNED BY DUKE ENERGY. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH TOWN OF PITTSBORO AND NCDOT STANDARD DETAILS AND SPECIFICATIONS, LATEST REVISIONS. #GATE VALVE (TYP) SCM #4 (WET POND/ FH AIR RELEASE VALVE AIR RELEASE VALVE (RECLAIMED) DIP WATERLINE Waterline Stub JURISDICTIONAL STREAM NOT SUBJECT TO BUFFERS 8'X IT TEE (1)8'GV (2) IT GV RECLAIMED WATERLINE 8' DIP WATERLINE 1T GATE VALVE (TIP.) 1T DIP / / WATERLINE 8'X8/TEE N/F ROBERT PARKS and DONNA B. MORRIS DB. 1332 PG. 408 PIN. 9752597288 8' DIP WATERLINE 4' PVCSCH 40 SANITARY SEWER SERVICE (TYP. FOR ALL LOTS) WATER METER (TYP. FOR ALL LOTS) IT BLOW -OFF ASSEMBLY #GATE VALVE (TYP) 4' PVC RECLAIMED WATERLINE # PVC RECLAIMED WATERLINE N/F CHATHAM PARK INVESTORS LLC. TRACT DB. 1875 PG.. PIN. 9752575218 TYPICAL LOT SERVICE LOCATIONS (SINGLE FAMILY) SEWER SERVICE',ATER METER Planners I Surveyors MELLOTT SUBDIVISION OVERALL UTILITY PLAN ob No. 02150048.62 Dace Revision PIPE CORROSION POTENTIAL NOTES: 1. GEOTECHNOLOGIES,INC. WAS REQUESTED TO PROVIDE THEIR OPINION OF THE POTENTIAL FOR CORROSION OF DUCTILE IRON PIPE (DIP) INSTALLATIONS FOR THIS PROJECT. PER THEIR REPORT DATED O3/20/17, THERE ARE NO CORROSIVE SOILS ON SITE. UTILITY LINE SIZING NOTES: 1. WATERLINE SIZING BASED ON REPORT TITLED,/FIRE FLOW AVAILABILITY REPORT FOR PHASE 5.1 SUBDIVISION', PREPARED BY MCKIM 8 CREED, DATED APRIL 2019. FIRE ACCESS NOTES: 1. FIRE ACCESS MUST BE PROVIDED DURING CONSTRUCTION PHASE. 2. NO BUILDING MATERIALS ARE TO BE PLACED/ STORED IN MANNER AS TO PREVENT EMERGENCY VEHICLE ACCESS. N/F SIMER THOM. M. ETUX DIANA J. )B 1759PG. 731 IN. 9752-091198 1' WATER METER (TIP. FOR ALL LOTS) N/F CHARLES BRIAN SIMMONS and LORENE K. SIMMONS DB. 936 PG. 114 PIN. 9752495198 / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / N/F WILLIAM A.ROUTT and / N/F / PATRICIA ROUTT SU54N MARTEL lI1RNER FIDEL / EMILIO CASTELLANO and / DB. 1026 PO.535 N HERNANDEZ PIN.9Z5259110Z / DB. 1302 PG. 1022 PIN. 97525952255 / PEREZ DB. 1800 PO.320 / / / / PIN. 975259-7288 / nnnn 4"PVC Sal SANITARY SEWER SERVICE (TYP. FOR ALL LOTS) 5. // IIarPDE r ti E // H ?W ,E 1 I g ss � I 11 // I / // / 2 ' ` PSCSAE 1 / I I / / I SCM #5' 1 78 / .(WET POND) // I FHA 1T DIP WATERLINE / / ASPHALT I (5'SEPARATION FROM / GREENWAY / / PROP. STORM PIPES) / N/F ROCKY CRISSMAN AND WIFE JANIE C. CRISSMAN DB. 1499 PG. 378 LOT BM. 2007 PG..9 PIN. 9752461083 # PVC RECLAIMED WATERLINE / / N/F / THOMASSTEPHEN KENNEDY / DB90Z PO.30 PIN.9752597288 TYPICAL LOT SERVICE LOCATIONS (RESIDENTIAL, TWO-FAMILY) SEWER 4SANITARY M 1ER R ■ SERVICE SEWER SERVICE•WATER METER 08n2,20 Drawn By Dene e Sheer No. 4.0 PITTSBORO, CHATHAM COUNTY, NORTH CAROLINA McKINI&CREED APPENDIX B PROPOSED CHATHAM PARK DEVELOPMENT OVERALL RECLAIMED DEMAND LOADING b-Map Doc\Demand_Loading_Final_MP.mxd co 0008\North Village Master Plan Update June 20 CHATHANI'A North Vitt�'e Land Use/Plan Legend Chatham Park WRF Total Demands (gpd) 90 - 2000 0 2000 - 10,000 Q 10,000 - 40,000 • 40,000 - 80,000 Tanks C� Tanks Pump Station PRVs Reclaimed Water Pipelines Reclaimed Service Area Reclaimed Service Area Planned Probable Expansion Potential Use Type Demand Subtotal (gpd) Non -Residential Indoor Reuse 5.2 40,560 6.1 22,880 Village District North 4,867 Village District South 10,951 7.1 Regional Center 64,004 Activity Center 40,560 Commercial Outdoor Irrigation 11,850 Residential Open Space Irrigation 8,363 Residential Outdoor Irrigation 5.1 Thompson St Subdivision 10,123 Athletic Fields Irrigation 35,841 3M Industrial Demand 111la Total 250,000 499,999 Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRcan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community 6/14/2019 Chatham Park North Village Utility Plan Update - Reclaimed Water Irrigation and Reuse Demand Loading Totals by Junction Chatham County, NC 1 inch = 2,000 feet MCKIM&CREED b-Map Doc\Demand_Loading_Final_MP.mxd U U) co 0008\North Village Master Plan Update June 20 Legend Demands Demand Type Residential Irrigation • Open Space Irrigation O Indoor Reuse Commercial Irrigation Athletic Field ▪ Chatham Park WRF Tanks C� Tanks • Pump Station PRVs Reclaimed Water Pipelines Reclaimed Service Area Reclaimed Service Area Planned Probable Expansion Potential Mellot Use Type Demand Subtotal (gpd) Non -Residential Indoor Reuse 5.2 40,560 6.1 22,880 Village District North 4,867 Village District South 10,951 7.1 Regional Center 64,004 Activity Center 40,560 Commercial Outdoor Irrigation 11,850 Residential Open Space Irrigation 8,363 Residential Outdoor Irrigation 5.1 Thompson St Subdivision 10,123 Athletic Fields Irrigation 35,841 3M Industrial Demand 111la Total 250,000 499,999 Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community A Kt 6/14/2019 Chatham Park North Village Utility Plan Update - Reclaimed Water Irrigation and Reuse Demand Loading by Type Chatham County, NC 1 inch = 2,000 feet MCKIM&CREED MCKIM&C EED APPENDIX C PROPOSED CHATHAM PARK DEVELOPMENT MODELED MINIMUM PRESSURES S:11561100081North Village Master Plan Update June 20181Reclaim191 - GIS191b-Map DoclMin_Pressures.mxdMin_Pressures CHATHAM PA North Vitt � e Land Use lan NC NAD 83 (US FEET) Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong K OpenStreetMap contributors, and the GIS User Community Legend Minimum Pressure (psi) 0 40 - 60 O 60-80 • >80 • Chatham Park WRF Tanks 0 Elevated Storage O Ground Storage • Pump Station • PRVs Reclaimed Water Pipelines Reclaimed Service Area Reclaimed Service Area Planned Probable Expansion Potential 6/14/2019 Chatham Park North Village Utility Plan Update - Reclaimed Water Modeled Minimum Pressures Chatham County, NC 1 inch = 2,000 feet MCKIM&CREED McKIM&CREED APPENDIX D PROPOSED CHATHAM PARK DEVELOPMENT MODELED MAXIMUM PRESSURES S:11561100081North Village Master Plan Update June 20181Reclaim191 - GIS191b-Map DoclMax Pressures.mxdMax Pressures CHATHAM PA North Vitt �� �e Land Use 1h. NIP NC NAD 83 (US FEET) Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong K OpenStreetMap contributors, and the GIS User Community Legend Maximum Pressure (psi) o <100 O 100 - 125 • >125 • Chatham Park WRF Tanks O Ground Storage • Pump Station • PRVs Reclaimed Water Pipelines Reclaimed Service Area Reclaimed Service Area Planned Probable Expansion Potential 6/14/2019 Chatham Park North Village Utility Plan Update - Reclaimed Water Modeled Maximum Pressures Chatham County, NC 1 inch = 2,000 feet MCKIM&CREED McKIM&CREED APPENDIX E PROPOSED CHATHAM PARK DEVELOPMENT MODELED MAXIMUM VELOCITIES S:11561100081North Village Master Plan Update June 20181Reclaim191 - GIS191b-Map DoclMax Velocities.mxd CHATHAM PA North Vitt� Land Use NC NAD 83 (US FEET) Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong K OpenStreetMap contributors, and the GIS User Community A Legend Maximum Pipe Velocities <1 ft/s 1-5ft/s >5 ft/s • Chatham Park WRF Tanks 0 Elevated Storage O Ground Storage • Pump Station • PRVs Reclaimed Water Pipelines Reclaimed Service Area Reclaimed Service Area Planned Probable Expansion Potential 6/14/2019 Chatham Park North Village Utility Plan Update - Reclaimed Water Modeled Maximum Pipe Velocities Chatham County, NC 1 inch = 2,000 feet MCKIM&CREED