Loading...
HomeMy WebLinkAboutWQ0032769_Regional Office Historical File Pre 2018Mr, Mick Berry, City Manager City of Hickory P© Box 398 Hickory, NC 28603 lsdichaei F Easley, Go Vern William G. Ross Jr_, Secretary North Carolina Department of Environrraent and Natural Resources Coleen 1i. Sullins, Director Division of Water Quality June 23, 2008 Subject: Permit No. WQ0032769 Catawba SECC Wastewater Wastewater Collection System Extension Catawba County, North Carolina Dear Mr. Berry, In accordance with your complete application received on June 17, 2008, we are forwarding herewith Permit No. WQ0032769, dated June 23, 2008, to the City of Hickory for the construction only of the subject wastewater collection system extension, This permit shall be effective from the date of issuance until rescinded, and shall be subject to the conditions and limitations as specified therein. This cover letter shall be considered a part of this permit and is therefore incorporated therein by reference. Please pay particular attention to Permit Condition 3 which requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2T .0403 or any individual system -wide collection system permit issued to the Permittee. Permitting of this project does not constitute an acceptance of any part of the project that does not meet 1) 15A NCAC 2T; 2) the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; 3) and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable, unless specifically mentioned herein. Division approval is based on acceptance of the certification provided by a North Carolina -licensed Professional Engineer in the application. It shall be the Permittee's responsibiiity to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215=6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. t4Pr hCarofin �Vizturarliy Mooresville Regional Office 610 East Censer Ave., Suite 301 Mooress`i1ie, NC 2811.5 Phone' (704) 663-t 699 Fax ;704) 663-6040 Internet: maw ncrrmaterquaIity ©rg Customer Serl,ice. 1-877-623.6748 An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper Mr, Berry Page 2 June 23, ,2008 in accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to the City of Hickory for the construction and operation of approximately 15,757 linear feet of 14-inch force main, 48,263 linear feet of 16-inch force main, 1,278 linear feet of 16 inch gravity sewer a 1,320 gpm pump station (with duplex pumps, on -site audible and visual high water alarms and permanent generator), a 1,400 gpm pump station (with duplex pumps, on -site audible and visual high water alarms and permanent generator), a 1,500 gpm pump station (with duplex pumps, on -site audible and visual high water alarms and permanent generator), and the discharge of 0 gallons per day of collected domestic wastewater into the City of Hickory existing sewerage system in conformity with 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources and considered a part of this permit. The sewage and wastewater collected by this system shall be treated in the City of Hickory WWTP (NPDES No, NC0025542) prior to being discharged into the receiving stream. The Division has expressed concern over the receiving treatment plant capacity and recognizes that efforts are in progress to address the concern. However, issuance of this construction only permit does not guarantee issuance of a permit to operate. Requests for permit modifications to place a sewer into operation are required and will be evaluated on an individual basis in the order received. Approval will be based on a review of the downstream sewer and receiving plant capacity, Construction of this permitted system is at the Permittee's own risk and the Permitee shall be held accountable per G.S. 143-215,67(a) should compliance issues arise. Assessing subsequent impacts to the downstream collection system and treatment facility is the complete responsibility of the City of Hickory. Hickory must utilize whatever tracking tools necessary for planning additions of sewer flow in order to maintain compliance with the WWTP permitted limits. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjjudicatory hearing upon written request within 30 days following receipt of this permit, This request must be in the form of a written petition, conforming to Chapter 150B of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall be final and binding. If you need additional information concerning this matter, please contact Dee Browder at (704) 663-1699.. Sincerely, 4 en H, Sullins cc: Mooresville Regional Office, Collection System Permit File Scott E. Snyder, HSMM of NC, Inc. Surface Water Protection Central Files PERCS NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES RALEIGH WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT This permit shall be effective from the date of issuance until rescinded and shall be subject to the following specified conditions and limitations: 1. This permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this permit; 15A NCAC 2T; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials unless specifically mentioned herein. 2. This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. 3. The wastewater collection facilities shall be properly maintained and operated at all times. The Permittee shall maintain compliance with an individual systern-wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2T .0403 If an individual permit is not required, the following performance criteria shalt be met as provided in 15A NCAC 2T .0403: a. The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and any contravention of the groundwater standards in 15A NCAC 2L .0200 or the surface water standards in 15A NCAC 2B .0200. b. A map of the sewer system shall be developed and shall be actively maintained. c. An operation and maintenance plan shall be developed and implemented. d. Pump stations that are not connected to a telemetry system shall be inspected every day (i.e. 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer lines shall be inspected at least once per every six-month period of time. f. A general observation of the entire sewer system shall be conducted at least once per year. g. Inspection and maintenance records shall be maintained for a period of at least three years. h. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina General Statute §143-215 1C. 4. This permit shall not be transferable. In the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change of the Permittee, a formal permit request shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request shall be considered on its merits and may or may not be approved. 5. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. 6. Per 15A NCAC 2T .0116, upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form attached to this permit shall be submitted with the required supporting documents to the address provided on the form. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable, 7. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of the wastewater collection facilities. 8. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T; the Division's Gravity Sewer Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000 as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143- 215.6A through §143-215,6C. 9. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. 10. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by other government agencies (local, state and federal) which have jurisdiction, including but not limited to applicable river buffer rules in 15A NCAC 2B .0200, erosion and sedimentation control requirements in 15A NCAC Ch. 4 and under the Division's General Permit NCGO10000, and any requirements pertaining to wetlands under 15A NCAC 2B ,0200 and 15A NCAC 2H :0500. 11. Noncompliance Notification: The Permittee shall verbally report to a Division of Water Quality employee at the Mooresville Regional Office, telephone number (704) 663-1699, as soon as possible, but in no case more than 24 hours or on the next working day, following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any failure of a pumping station or sewer line resulting in a by-pass directly to receiving waters without treatment of all or any portion of the influent to such station or facility, Voice mail messages or faxed information is permissible, but shall not be considered as the initial verbal report. Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone number (800) 858-0368 or (919) 733-3300. Persons reporting any of the above occurrences shall file a spill report by completing Part I of Form CS-SSO (or the most current Division approved form), within five days following first knowledge of the occurrence. This report shall outline the actions taken or proposed to ensure that the problem does not recur. Part II of Form CS-SSO (or the most current Division approved form) can also be completed to show that the SSO was beyond control. 12. This permit shall be for the construction of the wastewater collection facilities only. No flow shall be made tributary to the subject facilities until a permit modification application is submitted (with the appropriate fee), a modified permit is issued, and the Engineer's Certification is received and approved by the Division. Issuance of this Construction only (No flow/0 flow) permit does not prioritize or obligate the Division to guarantee future issuance of a sewer extension permit modification. 13. Pump and haul permit requests will not be considered for this collection system permit, In accordance with 15A NCAC 2T .0204, Pump and Haul permits are not acceptable long-term domestic wastewater treatment alternatives. Delays in permitting or construction of additional capacity at the receiving wvvrp do not constitute an environmental emergency or an unavoidable delay in construction of systems previously permitted under this Section. The decision to apply for a No Flow/0 Flow permit is the decision of the applicant and affiliated parties. The applicant should be aware that the existing Wl/VTP must supply a current FTSE_10/07 Form and receive a sewer extension permit approval prior to wastewater flow becoming tributary. 14. Issuance of a Construction Only/No Flow sewer extension permit does not prioritize, or obligate the Division to issue an NPDES permit request for modification for expansion. NPDES permitting final decisions can only be made after the Division receives and evaluates a formal permit application for the proposed discharge, In accordance with the North Carolina General Statutes, the practicable wastewater treatment and disposal alternative with the least adverse impact on the environment is required to be implemented. Permit issued this the 23rd day of June, 2008. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION for Coleen H. Sullins, Director Division of Water Quality By Authority of the Environmental Permit Number WQ9032769 anagement Commission Fast Track Engirteering Certifjcat*on Permit No. WQ0032 2` --rcti February 19, 2008 Own erNVQCSt P Mick Berry, City Manager Hickory, NC 28603 PO Box 398 Hickory, NC 28603 PE Scott Snyder HSMM of; inc, 1460,JJQ4tn B. White Sr, Blv Spartanburg, SC 29306 Complete and submit this form to the permit issuing regional office with the following;. One copy of the project record drawings (plan & profile views of sewer lines) of the wastew system extension Supporting design calculations (selected pumps, system curve, operating point, available storage if portable generator(s) or storage greater than longest past three year outage reliability option selected) for any pump stations permitted as part of this project Changes to the project should be clearly identified on the record drawings or in written summary form. Permit modifications are re uirpd for any cranes resulting in non-comclianee with this permit, regulations or minimum design criteria. ollection This project shall not be considered complete nor allowed to operate until this Engineer's Certification and all required supporting documentation have been received by the Division. Therefore, it is highly recommended that this certification be sent in a manner that provides proof of receipt by the Division, ENGINEER'S CERTIFICATION El Partial 0 Final , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (. periodically, ij weekly, Elfull time)) the construction of Catawba SECC Wastewater, a Catawba County projector the Permittee, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 2T; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable, the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials. North Carolina Professional Engineer's seal, signature, alndlda e: A,p. SEND THIS FORM & SUPPORTING DOCUMENTATION WiTH REQUIRED ATTACHMENTS TO THE FOLLOWING ADDRESS MOORESVILLE REGIONAL OFFICE SURFACE WATER PROTECTION 610 EAST CENTER AVENUE, SUITE 301 MOORESVILLE NC 28115 The Permittee is responsible for tracking all partial certifications up until a final certification is received. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shelf subject the Permittee to appropriate enforcement actions. DESIGN ALC l for TIONS SOUTHEAST CATAWBAC COUNTY PUMP TI HICKORY, NC 10-Jun-11 Scott . Snyder, RE, AECO TECHNICAL SERVICES OF NORTH CAROLINA, Inc, 1 CORPORATE CENTER DRIVE SMITE " LElt, H, NC 27607 AECOM PROJECT NO 60155536 A:COM Project Catawba SEC C '` a eater Project No 60956 Title Calculations Des By DBR/SES Dept. CED Ckd By DSS/SES Sketch SK - Phase Date 12/5/07 Rev Date 6/10/11 Sheet No, 1 of 2� Proiect Description The proposed project incorporates three principal pump stations to transfer wastewater from the southeast portion of the County to the City of Hickory Catawba WWTP, A pump station located at the Sherrill's Ford Elementary School will replace the existing treatment system and NPDES permit of the school as well as accept pumped flows from the Key Harbor and Village Center developments. This station will pump to a second station located near Terrapin Creek along Molly's Backbone Road, This station will also accept the flows from the Terrapin Creek development and then pump to a third pump station located near Balls Creek along Browns Chapel Road. Pump stations and force mains serving the Key Harbor and Village Center development will eventually become part of this collection system. However, the engineering design package for these systems will be included as part of a separate project, Below is the criteria used for the preliminary design calculations, e id Village Cen Key Harbor Terrapin Creek Commercial/Industrial 250 360 per home 90,000 00 360 per home 540,000 100 360 per home 36,000 Initiat Development Size 2 Village Center Commercia Village Center Office Space 300, 00 20 gpd/1,t300 SF 36,000 gpd/person - assume 150 ft2 120000 25 per office 20,000 Other Sherrill's Ford Elementary Schoo Total Estimated Flow 7000 permitted flow 7000 729,000 Project Catawba SECC Wastewater Title Calculations Des By DBR/SES Ckd By DSS/SES Dept CED Sketch SK - Project No 60956 Phase Date 12/5/07 Rev Date 6/10/11 Sheet No. 2 of " ABLE P STATION SF Elementa School Ke Harbor Subdivision 7,000 Peak at 2.5xADF 7,000 693,000 1,732,500 4,9 101.4 375.0 481.3 1,203.25 SF Pump Station Terrapin Creek Subdivision 100 360 Total Flow Peak at 2.5xADF 693,000 481.3 36,000 25.0 506.3 ,265.75 729,000 1.822,500 TC Pump Station Total Flow Peak at 2.5xADF 729,000 506.3 729,000 1,822,500 506.3 1,265,75 Calculations for the pump stations are based on 14" force main between the Sherrill's Ford PS (SF) and Terrapin Creek PS (TC) and 16" force main between the TC and Ball's Creek PS. Hydraulic gradients along the force main were evaluated to find the maximum head condition that the pumps would see. These critical design conditions are summarized as follows: SF PS — High point in the line located approximately 5,655-feet from the pump station. Pipe elevation at this point is approximately 929-feet. TC P5 - High point in the line located approximately 13,000-feet from the pump station, Pipe elevation at this point is approximately 940-feet. Discharge at the Ball's Creek PS is at an elevation of 786-feet, Ball's Creek PS - High point in the line located approximately 16,640-feet from the pump station. Pipe elevation at this point is approximately 927-feet. Calculations for each pump station are as follows: Title Catawba SECC Wast Calculatiorts Des By DBRISES Dept CED cadBy D/FSketch �� �..� Protect No 9 Phase Date 12/5/07 Rev Date /1 0/11 Sheet N; Sherrill's Ford PS Suction Elevation = 848.5 feet Discharge Elevation at TC = 770.73 Total FM Length = 15,757 feet Critical Design Point mm 929 ft t 5,655 feet Sherrill' Ford lump Station Equi h n Piping Len the "« 12" Pump Station Fittings # Reg. Eq. Length' Eq. Ft Pipe Pump Station Flttinps; # Reg, Length/ Eq. Ft Pipe "x6"Reducer 3.5 6"x12" Reducer 1 20 20 d" 90-deg Elbow 1 15.2 15,2 12°" 90 deg Elbow 6" 22-deg elbow 2 3.09 1 g.1 t 12" 4-deg elbow g" Valve 6" Tee Side Row g" Tee Through Flow 6" Piping Associated wIPS Equivalent PS piping length 0 12°" Check Valve 0 12" Valve 0 12" Tee Side Flow 12" Tee Through Flow 12"x14" Reducer 35 12"° Piping Associated PS - Friction -Water Pipe Fittings, Crane Co. Technical Paper No. 409 reprinted in Cameron Fquil nt PS piping length 1 29.8 29.8 2 15.9 31.8 1 49.7 49 2 7 96 5.92 259.7 .4 0 9 1 7 7 32 32 306 V) 9 N CO CO o 0 c, w 0 0 a ACOM Project Catawba SECC Wastewater Project No 60956 Title Calculations Phase Des By DBRISES Ckd By DSS/SES Date 12/5/07 Dept CED Rev Date 6/10/11 Sketch SIB - Sheet No. 5 of 25 Based on a review of available pumps from the Fairbanks Morse submersible, non -clog inventory that will meet this calculated head range, the following pump was selected: 5" 5433MV with a 50 HP motor pump curve for the selected model is attached to the end of the calculation section. 110.00 - 80.00 00.00 40.00 20.110 0.00 Sherri Ford Pump Station 200 400 600. N00 1000 1200 Flaw (GPM) 1400 C=110 t=140 a. .._....Pump (u_r`,�e 1000 Based on this graph, the selected pump will be capable of pumping at approximately 1240 gpm,@ 101 ft TDH for a C value of 130. Project Catawba SESEC(i Title Calculations Des By DBR/SES Project No 609p6 Phase Date 12/5/07 Dept CED Rev Cate 6/10/11 Ckd By S/ F Sketch Sk Sheet No rtt" 25 Terrapin Creek PS Suction Elevation = 764,29 feet Discharge Elevation at all's Creek - 786 feet Total FM Length = 19,346 feet Critical Design Point = 940 ft 13,000 feet Terrapin reek Pump to rrEquivalent Piping era the 4" Pump Station Fittings # Rep. Eq. Length' Eq. Ft Pipe Pump Station Fitt has 4°' 90-deg Elbow 4°' 22. -deg elbow 4"" Valve 4°' Tee Side Flow 4" Tee Through Flow 4°' Piping Associated w/PS Equivalent PS piping length 4'512" Reducer 10.1 10.1 12" 90-deg Elbow 6.37 10,74 12" 4 -deg elbow 0 12" Check Valve 12" Valve 12" Tee Side Flew 0 12" Tee Through Flow 12"x14", Reducer 21 12" Piping Associated PS Equivalent PS piping length ter Pipe Fittings, Crane Co. Technical Paper No. 409 as reprinted in Car t'eron 12" # Req.,Length'; Eq. Ft Pipe 1 1 29.8 29 2 15.9 31 1 49.7 49.7 2 7.96 15.92 2 9.7 119.4 29 0 29 308 Terrapin Creek Pump Station Head Loss Calculations Suction elev Critical Elevation Discharge EIevator Critical Pipe Length Flow gpm 780 1040 iloo 1300 1400 1560 2300 2350 7 :,29 940 786 13000 Velocity fps 1.24.1 .... 1.66 1,76 2.07 2.23 2.49 3.67 3.75 feet Pipe Size feet Actual Dia inchesr 16 14,696 feet Eq Pipe Length (f Static Head 4" Friction 175,71 8,05 175.71 13.71. 175.71 16,21 175.71 20.71. 175.71 2316 175.71 2 175.71 59.52 175.71 - 61,93 C-Fa 100 12" Friction 0,63 1.07 1.18 1.61 1.85 2,26 4.63 4,82 inch 4 4,3 21 16" Friction 1 - Pipe diameter based on SDR 26 PVC piping 2 - Pipe diameter based on class 350 DIP piping 3 - Pipe diameter based on class 350 DIP piping 12.71 21.63 24,00 32,69 37.49 45.80 93.93 87.78 inches3 12 12.64 308 TDH 197,09 212, 2 216.10 230,72 238.81' 252.79 333.79 9.20 4" Friction 4,95 8,44 9.36 12.75 14.62 17.86 36.63 2 C-Factor 130 12" Friction 0.39 0 66 0.73 0,99 1.14 1.39 2.85 2,96 16" Friction 7.82 13.32 14.77 20.12 23.08 28.19 57,81 TDH .87 198,12 200,57 209.57 214.54 223,15 273,00 60.16 .276 95 4" Friction 4.32 7.36 8.16 11,11 12.75 15.57 33.23 C-Factor 140 12" Friction 0 4 0, 7 0.63 0.86 0,99 1.21 2.48 2.58 16" Friction 6.82 11.61 1?:41' 17.54 29.12 24.58 50.41 52,45 TDH 187.18 195.25 197,38 205.23 209,57 217.07 260. 4 263.98 Piping Friction Loss . Eq Pipe Length/100 * f where f = 0,.2083 (100/c) q 1%02 /0, h 411655 I = friction head loss in feet of water per 100 feet of pipe (fi` h2,0/100 ft pipe) c = Hazen -Williams roughness constant = volume flow (gal/min) cl€1 = inside hydraulic diameter (inches:). Pump Curve 236 222 206 188 Calculations Summary Page 6 Project Catawba SECC Wastewater Project No 60956 Title Calculations Des By DBRISES Ckd By DSS/SES Dept CED Sketch SK - Phase Date 12/5/07 Rev Date 6/10/11 Sheet No, of 25 Based on a review of available pumps from the Fairbanks Morse submersible, non -clog inventory that will meet this calculated head range, the following pump was selected: 4" 5434MV with a 135 HP motor — pump curve for the selected model is attached to the end of the calculation section. 400.00 3 50, 00 300.00 -.. 200.00 150,00 0 Terrapin Creek Pump Station Pump 1000 1500 2000 25t0 Flow (GPM) Based on this graph, the selected pump will be capable of pumping at approximately 1280 gpm @ 208 ft TDH for a C value of 130. Project Title Catawba SECe Calculations Des By DBR/ E Ckd By DSS/SES Bait's Creek Suction Elevation = 779.5 feet Discharge Elevation at Catawba WTP = 782.67 feet Total FM Length = 28,917 feet Critical Design Point = 927 ft 16,640 feet Dept CED Sketch Pura taticr Fittinq 4" 99-deg Elbow 4" 22,5-deg elbow 4" Valve 4" Tee Side Flow 4" Tee Through Flow 4"" Piing Associated MPS Equivalent PS piping length Project No 60956 Phase Date 12/5/07 Rev Date Sheet No. 9 of 6/10/11 SK Balls Creel Pump Sto ten l:quivaletPit) tt gtlis a 12°° E. Rec. Eq. Length1 Eq. Ft Pipe Pump Station Fittings # Req. Length1 Ed. Ft Roe 4'"x12" Reducer 1 25 25 12" 90-deg Elbow 2 29.8 59.6 12" 45-deg elbow 2 15.9 31.8 12°" Check Valve 1 49.7 49.7' 12°` Valve 2 7.96 15,92 12" Tee Side Row 59.7 1194 12'" Tee Through Flea' 12""x14" Reducer 4"" 10.1 10,1 5.7 10,74 0 0 21 on -Water Pipe Fittings, Crane Co. Technical Paper No. 409 as 12" Piping Associated /PS Equivalent PS piping length sprinted in C eron 339 Balls Creek 'Pump Station, Head Loss Calculations Su 'on eev 779 inches in esinches' Elevation 27 fet Pipe Siz ischaraeE v 782.67 feet Actua 4 12 4,696 4.3 12. PipeLength 16640 feet Eq Pipe Length (feet) 2 C-Fac C-Fact C-Facto 0 0 4 Pump Cu How Velocity $F-Iead 4 Fric • 2" Friction 6" Friction TDH 4" Friction 2" Friction 6" Friction TDH 4" Friction 2" Fri Pm fp 6" Friction TDH 7 0 .24 47, .05 0.69 72. 0 4.9 0.4 0. 4, 0, 7 ,7 0, 2 220 040 47, 7, 9 .0 8,44 0.72 7.04 7 .70 7.36 0.6 4.86 170, 207 2.07 47.5 20. .78 4184 2 3 2.75 25, 87. 0 1 0. 2,4 182.02 192 400 2.2 4 2.04 47. .2 .54 92.91 12.7 .09 25.7 187.10 50 2. 47, 2. 2 4, .6 .4 6 0 14.48 .24 29.26 192.4 60 249 147. 29.02 2.4 5 2 7. 7.86 .08 2 2.9 7 14 .46 195.87 174 700 2.7 47, .02 2. 2 6 .7 25318 20. 0 42. 2 2. 41 18,26 .57 6, 204.2 00 3.67 147.5_ 59.52 20,24 36,63 .14 74,00 2 1.271 2.74 64.52 246,70 1 - Pipe diameter based on SDR 26 PVC piping Piping Friction Loss Eq Pipe Length/100 * f where f = 0,2083 (100/03 552 q' 552 / d h4 2- Pipe diameter based on class 350 DIP piping f = friction headloss in feet of water per 100 feet of pipe (ft h,20/100 ft pipe) 3 - Pipe diameter based on class 350 DIP piping c= 1azen-WiIIirns roughness constant q = volume flow (gal/min) dhinside hydraulic diameter (inches) Calculations Summary Page 9 COM Project Catawba SECC Wastewater Project No 60956 Title Calculations Des By DBR/SES Ckd By DSS/SES Dept CED Sketch SK - Phase Date 12/5/07 Rev Date 6/10/11 Sheet No, 1 1 of 25 Based on a review of available pumps from the Fairbanks Morse submersible, non -clog inventory that will meet this calculated head range, the following pump was selected: 4" 5434MV with a 125 HP motor — pump curve for the selected model is attached to the end of the calculation section. 0,00 0 500 Balls Creek Pump Station Flow (GPM) 2 00l0 t0 ( 140 pump Based on this graph, the selected pump will be capable of pumping at approximately 1320 gpmta 188 ft TDH for a C value of 130, COM Project Catawba SECC Wastewater Title Calculations Des By DBR/SES Ckd By DSS/SES Project No 60956 Phase Date 12/5/07 Dept CED Rev Date 6/10/11 Sketch SK - Sheet No. 12 of '),5 Pump Station Cycle Calculations hernit's Ford Purnp Station Pump iculations n uent Flow 4 Peaking Factor 2,5 n . Flow Peak Force Main 203.25 14 gp - avg in, diameter Pump Selection Wet Well Entrance Chamber Wet Well Main Chamber 1240 gpm C=130 noth id h 7.83 0 '.5 0 Storage volume 1446. Pump on -Pump o Volume 5061.4 At average influent flow Fill Time 0. 2 allons/foot e allons inute Run Time 6,67 inu ycle Time Cycles/Fir 17,2 ,49 inutes c cle :coM Projec Catawba SECC Wastewater Title Calculations Des By DBR/SES Ckd By DSS/SES Dept CED Sketch SK Project No 60956 Phase Date 12/5/07 Rev Date 6/10/11 Sheet No. 13 of 25 Wet Well Entrance Chamber Wet Well Main Chamber Influent Flow Peakin. Factor Inf. Flow Peak 1302.5 Force Main 16 Pum+ Selection Stara •e volume Pump on -Pump off 1280 Length 7,833 11.5 1446.1 Volume 5061.4 Pump Station Cycle Average influent flow Flow from SF PS Time of SF PS Cycle SF Cycles per hour Fill Time 10.02 in, diarnete gallons Run Time 7.04 Cycle Time 17.06 a Cycles/Hr 3,52 cycles minutes Minutes Minutes Sum of SF pum + 36,000 ..d new C=130 pumping time Approx, Based on Table Approx. Based on Table C) 0 z 0 c) CD cry 0) Project Catawba SECC Wastewater Title Calculations Des By DBR/SES Ckd By DSS/SES Dept CED Sketch Si{ Project No 60956 Phase Date 12/5/07 Rev Date 6/10/11 Sheet No. 15 of 25 34 25 153,92 4,38 41 1265 41.05 1265 2 45 45.044 46 47 4 49 25 50 25 51 25 51.57 1265 52 1265 53 1265 54,882 6 0 0 0 0 0 1280 1280 1280 634,62 1418,92 SF PS Start 2683.92 348.92 i061.855 TC PS Sta 5059,04 5029.04 013.29 1280 3821.tt4 1280 2566.04 1280 1311.64 1280 56,04 1280 0.82 0 24,72 0 49.72 0 0 0 1265 1280 1265 1280 74.72 2 124.72 149.72 5060.45 5058.68 5043.68 7 1265 1280 5028.68 58 1265 58,24 1265 5 25 60 25 61 25 25 62,232 25 62 1280 5013.68 1280 5010,08 1280 4056,28 1280 2801.28 1280 1280 1280 1546.28 291.28 0.12 SF PS Stop TC PS Sto Fill Time 0.022 Run Time 7,165 Fill Time 9. Run Time 7,35 1265 35 1265 36 1265 37 1265 7,879 1'265 38 1265 39 1265 40 1265 Project Catawba SECC Wastewater Title Calculations Des By DBR/SES Ckd By DSS/SES Dept Sketch SK CED Project No 60966 Phase Date 12/5/07 Rev Date 6/10/11 Sheet No. 1 6 of Wet Well Entrance Chamber Wet Well Main Chamber Influent. Flow Peaking Factor Inf. Flow Peak Force Main Pump Selection Stora.e volume Pump on -Pump off Volume Flow from TC PS Time of TC PS Ccle TC Cycles per hour 1280 16 1320 Lensth gpm - avg gpm in. diameter Width 7.833 10 11.5 10 1446.1 . allons/foot 5061.4 Pump Station C cle 1280 Fill Time l 10.43 Run Time C cle Time feet gallons 6.44 f 6.87 3.56 cycles minutes Minutes Minutes Minutes Pumped from TC Approx. Based on Table Approx. Based on Table COM Project Catawba SECC Wastewater Title Calculations Des By DBR/SES Ckd By DSS/SES Dept CED Sketch SK - Project No 60956 Phase Date 12/5/07 Rev Date 6/10/11 Sheet No17 of 25 Ball's Creek Pump Station Cycle Analysis Time Flow in Flow Out Total Volume 5 6 7 7,04 8 10 10.78 11 16 17 17.06 18 19 20 20.953 21 22 23 0 1280 1280 1280 1280 1280 1280 1280 1280 1280 0 1320 1320 1320 1320 1320 0 1320 0 1320 0 0 0 0 0 0 1280 0 1280 0 1280 0 1280 0 1280 0 1280 1320 1280 1320 1280 1320 1320 1320 1320 1320 1320 26.885 0 1320 allons 1280 2560 3840 5061 5059.15625 5019.15625 4979.15625 4939.15625 4937,55625 3670.35625 2350.35625 1030,35625 0,75625 0.75625 0.75625 0.75625 0.75625 0.75625 0.75625 0.75625 77.55625 1280.75625 2560.75625 3840.75625 5060.59625 3800.75625 3760.75625 3720.75625 3680.75625 3676.75625 3808.75625 2488.75625 1168.75625 0.55625 0.55625 29 0 D 0.55625 30 0 0 0.55625 BC PS Start TC PS Off BC PS Stop TC PS On Run Time 6.83 Fill Time 10.173 Run Time 5.932. Project Catawba SECC Was Title Calculations Des By DBR/SES Ckd By DSS/SES 34.12 35 36 37 37.953 1280 1280 1280 1280 1280 39 1280 1280 43 44 44.896 45 46 51 51.18 52 53 54 54,953 55 56 57 58 58.22 1280 1320 1280 1320 0 1320 0 0 1280 1280 1280 1280 1280 1280 1280 1280 1280 1280 1320 1320 1320 1320 Dept CED Project No 60956 Phase Date 12/5/07 Rev Date 6/10 Sketch SK - Sheet No. 0,55625 0.55625 0,55625 1280.55625 2560.55625 3840.55625 5060.39625 5058,51625 5018,51625 4978.51625 4938.51625 4932.1162 3823.31625 2503.31625 @183.31625 0.59625 0.59625 0.59625 0.59625 0,59625 0.59625 0.59625 230.99625 1280,59625 2560,59625 3840.596 25 5060.43625 3800.59625 3760,59625 3720.59625 3680.59625 3671.79625 59 0 1320 2642,19625 0 1320 1322.19625 0 1320 2.19625 TC PS On BC PS Start TC PS oft BC PS Sty. TC P5 On TCPS0 BC PS Sto Fill Time Run Time 6.943 Fill Time 10.057 Run Time 6.047 Project Catawba SECC Wastewater Project No 60956 Title Calculations Phase Date 12/5/07 Des By DBRISES Dept CED Rev Date 6/10/11 Ckd By DSS/SES Sketch SK - Sheet No. 19 of 25 Gravity Flow Calculations Sherritls Ford Pump Station: Gravity flow to SherriIls Ford Pumping Station is designed to handle design flows from two sources: 1) Village Center development, Average Daily Flow = 146,000 gpd. 2) Key Harbor development, Average Daily Flow = 540,000 gpd. Both of these flows will be pumped to this gravity line so flows seen by the gravity piping will actually be closer to peak flows at these two sites. For the purposes of this report, a peaking factor of 2,5 was assumed to estimate the pumping rate for each pump station. The gravity sewer is therefore expected to see the following flows: Location Village Cen e Only ADF (gpd) 146,000 Key Harbor Only 540,000 Combined 686,000 ADF (gpm) Peak (gpm) 375.0 937.5 476.4 1191 Sewer has been designed with a minimum slope such that at the lower flow, the velocity is equal to or greater than 2.0 ftls and at the maximum flow, the pipe is flowing at half full or less. FlowMaster was used to determine velocities through the gravity sewer line during low and peak flows. The following table shows the velocities achieved for a flow rate of 250 gpm. A 16" PVC sewer line was chosen because it allows the velocity to maintain a minimum of 2.0 ftis at low flows and has the capacity to handle the peak flow. A roughness coefficient of 0.13 was used for the PVC pipe to meet the minimum design criteria. SS o SSMH8 ngth (feet)Slope (%) Velocity at 2 gpm ft/s 8 4 QA5 SSMH8 to SSMH7 87.88 0.45 SSMH7 to SSMH6 255.91 2.96 SSMH6 to SSMH5 222,54 7.00 SSMH5 to SSMH4 177.36 3.05 SSMH4 to SSMH3 SSMH3 to SSMH2 SSMH2 to Bar Screen Bar Screen toSS SS H1 158.98 0.45 42.01 0A5 40.23 0 45 H 20 0.45 27.02 0.45 2.41 2.41 4.69 6.33 4.73 2.41 2.41 2.41 2.41 2,41 Project Catawba SECC .er Project No 60956 Title Calculations Phase Des By DBR/SES Dept CED Ckd By DSS/SES Sketch SK - Date 12/5/07 Rev Date 6(10/11 Sheet No, 20 of 25 Terrapin Creek Pump Station: Gravity flow to Terrapin Creek Pump Station is designed to handle flows from two sources: 1) Sherrills Ford Pump Station = 693,000 gpd 2) Terrapin Creek development, Average Daily Flow = 36,000 gpd At design head condition C = 130, pumps selected should produce a flow rate of 1240 gpm from the Sherrills Ford Pump Station. Although flows from the Terrapin Creek development will be low and intermittent, the 1240 gpm flow being pumped from the Sherrills Ford Pump Station will re -suspend any solids deposited by the gravity flow from the development. SSMH1 to Wetwell: FlowMaster was used to calculate the velocity through a 16" PVC gravity sewer line for a flow rate of 1240 gpm. The velocity is 3.90 This with a slope of 0,50°/0. Ba Is Creek Pump Station: Gravity flow to Balls Creek Pump Station is designed to handle flow being pumped from the Terrapin Creek Pump Station, At design head condition C = 130, pumps selected should produce a flow rate of 1280 gpm from the Terrapin Creek Pump Station. FlowMaster was used to calculate the velocity through a 16" PVC gravity sewer line for a flow rate of 1280 gpm. The results are shown in the table below. SSMH2 to Bar Screen Bar Screen to SSMH1 SSMH1 to Welvvell Length (feet) Slope (%) Velocity at 1280 gpm (ftJs) 11 11 7.5 0.45 1,1 0.5 3.78 5 27 3,93 A:COM Project Catawba SECC Wastewater Project No 60956 Title Calculations Phase Date 12/5/07 Des By DBR/SES Dept CED Rev Date 6/10/11 Ckd By DSS/SES Sketch SK - Sheet No. 21 of 25 Manual Bar Screen Calculations The Manual Bar Screen will be designed to be 2'-1" high with a 1,5 ft wide channel at the bottom of the structure that opens up to a 3.5 ft wide area that serves as an automatic bypass. The slope of the screen channel is designed to maintain a minimum of 3.0 ft./s to prevent the settling of solids. The slope of the channel was determined using the rectangular channel flow model in FlowMaster in order to obtain a minimum of 3.0 ft/sec through the channel with the 250 gpm flow so that any solids deposited by the gravity flow from the school would be re -suspended. Sherrills Ford Pump Station: Using a roughness coefficient of 0.013, a slope of 2%, and a flow rate of 250 gpm, the velocity across the bar screen structure is 3.38 ft./s. As the flow rate increases to 1203.25 gpm, this velocity increases to 5.85 ft./s. Balls Creek Pump Station: Using a roughness coefficient of 0.013, a slope of 2%, and a flow rate of 1280 gpm, the velocity across the bar screen structure is 5.96 ft./s. Screen will be designed with a 1.5 ft wide channel at the bottom of the structure that opens up to a 3.5 ft wide area that serves as an automatic bypass. The depth of the 1.5 ft wide channel is designed to handle the peak flow with a 75% blocked screen area before any bypass occurs. Calculations are based on the following head loss equation: h = (V2-v2)/(2*g)* 1/0,7 Where: h = head loss in feet V = velocity through screen fps v = velocity in channel before screen, fps g = acceleration due to gravity, f/s2 Screen design includes 318"xl 1/2" bars spaced 1 1/2” on center across the 1.5 ft wide channel. The channel has been designed with a 2% slope to ensure sufficient velocities through the screen to prevent settling of solids. Sherrill's Ford Pump Station — Smallest flow coming in is the gravity flow from the school @ 7,000 gpd. Other flows are coming from pump stations that will be designed to pump at approximately 250 and 950 gpm. The slope of the channel was determined using the rectangular channel flow model in FlowMaster in order to obtain a minimum of 3.0 ft/sec through the channel with the 250 gpm flow so that any solids deposited by the gravity flow from the school would be re- suspended. Calculations for head loss were performed assuming an initial water height of 1.5 feet in the channel to determine areas of the channel and screen bars. Using these two areas, velocity in the channel and through the screen was calculated. Project Catawba SECC Wastewater Project No 60956 Title Calculations Phase Date 12/5/07 Des By DBRISES Dept CED Rev Date 6/10/11 Ckd By DSS/SES Sketch SK Sheet No. 22 of 25 o = V*A Where: Q = Flow in ft/sec V = Velocity in ft/sec A = Area in ft2 These velocities were then used to calculate head losses in an iterative fashion until a channel depth was found that would be sufficient to handle the design flows without bypassing the screen until the screen was 75% blocked. The critical calculations are shown below: inches Channel Width Channel Height Channel Area Bar Spacing Bar Width Percent Blockage 18 12 1.5 0.37 75 feet 1.5 1.5 0.03125 ft2 11 total bars Criteria Village Center @ 145,000 - Min Velocity in hannel Total Flow Sherrill's Ford PS Total Flow Terrapin and Ball's Creek PS Flow gpm 250 1203.25 1280 ec 0.56 2.68 2,85 Heig • ht in Chan nel 0,11 1.5 1.5 Velocity Area of in Channel Channel ft2 ft/sec 0,165 3.381 2.25 1,19 2.25 1.29 Area of Bars 0.0034375 0.046875 0.046875 Velocity through Head Loss Screen Screen ft/sec 75% Blocked Screen Velocity and Head loss ft/sec ft 3.45 0.010873026 13.79 3.966 1.22 0 001354519 4.87 0 4 4 1.29 0.001532827 5.18 0.559 1 - Based on Flow Master Calculations using flow, in concrete channel 1„5 ft wide at 2% slope for Village center velocity check. Based on these calculations, if the channel is 1,5 ft + 0.559 ft in depth, it will contain the flow at 1280 gpm with a screen that is 75% blocked. This is a total depth of 2' 1". Project Catawba. SECC Wastewate Title Calculations Des By DBR/SES Ckd By DSS/SES Dept CED Sketch SK - Project No 60956 Phase Date 12/5/07 Rev Date 6/10/11 Sheet No. 23 of Buovancv Calculations for Wet Well and Valve Vault Valve Vault: The same calculation is used for all three pump stations, Volume of Structure = 10'-0" x 20'-0" x 8'-0" = 1600 ft. Buoyancy = Total Volume of Structure x Density of Water 1600 ft.3 x 62.4 lbselft.3 = 99,840 lbs. Tindall 36" Top = 53,933 lbs. Tindall 60" Base = 68,575 lbs. Tindall Vault Total Concrete Weight = 122,508 Ibs. Tindall Vault Weight — Total Buoyancy = 122,508 Ibs. — 99,840 Ibs. = 22,668 Ibs. Tindall Vault weight is 22,668 Ibs. heavier than weight of water. Sherri lls Ford: Wetwell: Volume = 7°-10" x 10'-0" x 17'-1" = 1338,2 ft,3 Volume = 11'-6"° x 10'-0" x 17'-1 " = 1964,6 ft.3 Total Volume of Structure = 3302.8 ft.3 Buoyancy = Total Volume of Structure x Density of Water 3302.8 ft.3 x 62.4 Ib./ft.3 = 206,094.7 Ibs, Tindall 24" Top = 73,724 Ibs, Tindall 60" Riser = 41,100 lbs. Tindall 60" Riser = 41,100 lbs. Tindall 60" Base = 73,982 Ibs.. Tindall Vault Total Concrete Weight = 229,906 Ibs.. Tindall Vault Weight — Total Buoyancy = 229,906 Ibs. — 206,0947,7 = 23,811.3 Ibs, Tindall vault weight is 23,811,3 lbs, heavier than weight of water,. Bar Screen Structure: Volume of Structure = 6'-0" x 3'-0" x 5'-5 IA" = 98.1 Buoyancy = Total Volume of Structure x Density of Water 98.1 ft.3 x 62.4 Ibs.fft.3 = 6121.4 Ibs. ACOM Project Catawba SECC Wastewater Title Calculations Des By DBR/SES Dept CED Ckd By DSS/SES Project No 60956 Phase Date 12/5/07 Rev Date 6/10/11 Sketch SK - Sheet No. 24 of 25 Assuming 5" thick walls and 6" slab thickness: Volume of slab = 3'-10" x 6'-10" x 5'-5 'A = 13.09 ftr Volume of concrete in walls = 6'-10" x 3'-10" x 5 -5 = 143 ft.3 Total Volume — Volume inside walls = Volume of Concrete in Walls 143 ft.3— 98.1 ft.3 = 44.9 ft.3 Volume of Concrete in Walls + Volume of Stab = Total Volume of Concrete in Structure 44.9 ft.3 + 13,09 ft.3 = 57.99 ft.3 Density of Concrete x Total Volume of Concrete = Weight of Concrete 150 IbsJft.3 x 57.99 ft.3 = 8698.5 lbs. concrete Tindall Vault Weight — Total Buoyancy = 8698.5 Ibs,— 6121.4 Ibs, = 2577,1 lbs. Concrete weight is 2577.1 lbs. heavier than weight of water. Terrapin Creek: Wetwell: V = 7'-10" x 1 0'-©" x 15'-9 '/2" = 1237 ft.3 V = 11 '-6" x 10'-0" x 15'-9 '/2„ = 1816 ft.3 Total Volume of Structure = 3053 ft.3 Buoyancy = Total Volume of Structure x Density of Water 3053 ft.3 x 62,4 Ib./ft.3 = 190,509 lbs. Tindall 12" Top = 41,494 lbs. Tindall 60' Riser = 41,100 Ibs, Tindall 60' Riser = 41,100 Ibs, Tindall 60" Base = 73,982 Ibs. Tindall Vault. Total Concrete Weight = 197,676 Ibs, Tindall Vault Weight — Total Buoyancy = 197,676 lbs. ¢- 190,509 Ibs. = 7,167 lbs. Concrete weight is 7,167 Ibs. heavier than weight of water. Additional weight from the added concrete in the bottom of the wetwell, weight of the soil, and weight of the equipment will provide ample coverage for buoyancy, Balls Creek: Wetwell: V = 7'-10" x 10'-0" x 15'-1" = 1181.5ft` V = 11'-6" x 10.-0" x 15'-1" = 1734.6 ft: ^A6=- COM Project Catawba SECC Wastewater Project No 60956 Title Calculations Phase Date 12/5/07 Des By DBR/SEG _ Dept CED Rev Date 6/18/11 Total Volume of Structure = 2916 ft. Buoyancy = Total Volume ofStructure xDensity ofWater 2916ft."x 02.4 /b,/fL'= 181.963|b». Tindall 12~Top =41.484|bm. Tindall 48^Riser =33.QO1|bo� Tindall OU^Riser =41,18O|ba. Tindall 0O"Base =73.g82|bs. Tindall Vault Total Concrete Weight = 189.577 ibu. Tindal|VauhWeight-Tota|Buoy ncy=18Q.577|bs.-181.Q83|bs�=7.614|bs. Concrete weight ia 7.614|bs. heavier than weight ofwater. Additional weight from the added concrete in the boMn/n ofthe vveNve||, weight ofthe ap||, and weight of the equipment will provide ample coverage for buoyancy, Bar Screen Structure: V = 6'0^ x 3'-0~ x 4-4' 7/8" = 83.8ft.3 Buoyancy = Total Volume ofStructure xDensity ufWater 83.8fta . x 82.4 |bajft o = 5229.9 |bs. Assuming 5~thick walls and O^stab thickness: Vnumeofslab = 3''10^ x6-1O~ x4'-4 7/8~ = 13.09ft,3 Volume Vfconcrete inwalls =6''1O^ x 3''18"x4'-4 7/8~ = 122fL 3 Total Volume - Volume inside walls = Volume ofConcrete in Walls 122Mn� -981 ft.' = 219f.z Volume of Concrete in Walls + Volume nfSlab = Total Volume mfConcrete inStructure 219ft.'+13.00ft?=37ft? Density of Concrete xTotal Volume ofConcrete = Weight of Concrete z o Tindall Vault Weight - Total Buoyancy = 5550 lbs. - 52299 lbs= 320.1 lbs Concrete weight is 301|bo.heavier than weight of water, Additional weight from the added concrete inthe bottom Vfthe wek*e|.weight ufthe soil, and weight of the Pum• Data Sheet - Fairbanks Morse Pum•, 60 Hz Company: HD Supply Engineered Products DivisOntawbe County PS Name: David Grose Date: 10/26/2007 Size: 5"5433MV Type: 5430-SOLIDS HANDLING Synch speed: 1800 rpm Curve: 330504A Specific Speeds: Speed: 1770 rpm Dia: 11.375 in Impeller, T5C1A Ns: 2158 Nss: 5977 Dimensions: Suction: 5 in Discharge: 5 in Temperature: 104 "F Power: --- Pressure: 85 psi g Eye area: — Sphere size, 3.5 in Flows 1200 US gpm Head: 103 ft Eff: 75% Power: 41.6 hp NPSHr: 20.6 ft Shutoff head: 142 ft Shutoff dP: 61 4 psi Min flow 500 US gpm BEP: 79% @ 1517 US gpm NOL power: 49 hp @ 2239 US gpm Max power, 60.1 hp @ 2400 US gpm 12 in 25 ,v 50 z Fairbanks Morse Pentair Water Flow: 1200 US gpm Head: 103 ft Secondary Operating Point: 1200 US gpm, 93 ft Water Temperature: 60 'F Sa 1 Vapor pressure, 02563 psi a Viscosity 1.105 of, Atm pressure: 6991 psi a NPSHa: -- Consult Fairbanks Morse Pump, 60 Hz to select a motor for this pump. 65 E 50 hp 40 hp 65 - 30 hp 25 hp 20 hp 250 500 750 1000 1250 1500 1750 2000 2250 2500 250 500 750 1000 1250 1500 1750 2000 2250 2500 US gptif Curve efficiencies are typical. For guaranteed values, contact Fairbanks Morse or your local distributor. Las eficienclas en dunes son tiptoes. Para valores garanttzados contacts a Fairbanks Morse o a su distribuldor Flow Speed Head Effidency Power NPSHr US gpm rpm ft % hp ft 1440 1770 93.6 78 43 6 24.2 1200 1770 103 75 41 6 20,6 960 1770 113 72 38 18 2 720 1770 121 66 33 2 16.6 480 1770 H2Optimize - Fairbanks -Morse 8 Selected from catalog: Fairbanks Morse Submersible.60 Vers: 3 Pum. Da Sheet - Fairbanks Morse Pum 60 Hz Company: HD Supply - Engineered Products Divistiieta Name: David Grose Date: 11 /6/2007 Size: 4"5434MV Type: 5430-SOLIDS HANDLING Synch speed: 1800 rpm Curve: T4D1B Specific Speeds: Dimensions: Temperature: --- Pressure: --- Sphere size: 3 in Speed: 1780 rpm Dia: 15,1875 in Impeller: T4D1B Ns: -- Nss: --- Suction: 4 in Discharge.: 4 in Power: --- Eye area: -- UNNIC Flow: Head: Power: NPSHr: Shutoff head: Shutoff dP: 1300 US gpm 206 ft 68% 98.8 hp 24.9ft 277 ft 120 psi Min flow: 300 US gpm BEP: 69% @ 1467 US gpm NOL power: 134 hp @ 2256 US gpm Max power: 156 hp @ 2376 US gpm Flaw Speed US gpm rpm 1560 1780 1300 1780 1040 1780 780 1780 520 1780 I 200 13 in at 2 50 a 0 Z Terrapin Creek PS 500 Flow: 1300 US gpm Fairbanks Morse Pinta r Maur Head: 205.9 ft Secondary Operating Point: 1300 US gpm, 191.9 ft Water SG: 1 Viscosil NPSHa: Temperature: 60 °F Vapor pressure: 0.2563 psi a 05 cP Atm pressure: 699.3 psi a Consult Fairbanks Morse Pump, 60 Hz to select a motor for this pump. 1000 1500 500 1000 1500 US gpm Curve efficiencies are typical. For guaranteed values, contact Fairbanks Morse or your local distributor. Las eficiencias en curves son ttpicas. Para valores garantizados coritacte a Fairbanks Morse o e su 75 hp 60 hp 2000 Head ft 188 206 222 236 248 Efficiency 69 68 66 61 51 Power hp 108 98.8 88.7 76.6 63.7 2000 NPSHr ft 29.8 24.9 20.5 20 20 H2Optimize - Fairbanks -Morse 8 : Fairbanks Morse Subxnersibile.60 Vers: 3 Pumt Data. Sheet - Fairbanks Morse Puma, 60 Hz Company: HD Supply - Engineered Products Divisi€3etawba - Ball Creek PS Name: David Grose Date: 11/6/2007 Size: 4"5434MV Type: 5430-SOLIDS HANDLING Synch speed: 1800 rpm Curve: T4D1B Specific Speeds: Dimensions: fVuOttliWitoki Temperature: --- Pressure: --- Sphere size: 3 in Speed: 1780 rpm Dia: 14,75 in Impeller. T4D1B Ns: --- Nss: --- Suction: 4 in Discharge: 4 in Power: --- Eye area: --- Flow: Head: Eff:. Power: NPSHr: 1300 US gpm 192 ft 68% 92.3 hp 24.9 ft Shutoff head: 260 ft Shutoff dP: 113 psi Min flow: 300 US gpm BEP: 69% @ 1420 US gpm NOL power: 122 hp @ 2177 US gpm Max power: 156 hp @ 2376 US gpm Flow US gpm 1560 1300 1040 780 520 H2Optimize - Fairbanks -Morse 8 Speed rpm 1780 1780 1780 1780 1780 16 in 150 100 50 Fairbanks Morse P.utair Water Flow: 1300 US gpm Head: 191.6 ft Secondary Operating Point: 1300 US gpm, 171.2 ft swor Water SG: 1 Viscosity; 1.105 cP NPSHa: --- 4 Temperature: 60 °F Vapor pressure: 0,2563 psi a Atm pressure: 699.3 psi a Consult Fairbanks Morse Pump, 60 Hz to a motor for this 75hp ,, 60 hp 500 1000 1500 2000 500 1000 1500 US gpm Curve efficiencies are typical. For guaranteed values, contact Fairbanks Morse or your local distributor. Las eficiendas en curves son tipicas. Para vaiores garantizados contacte a Fairbanks Morse o a su ''''110111,18,811,018,16 p• Head ft 174 192 207 220 232 Efficiency 68 68 66 61 52 Power hp 101 92.3 82,6 70.9 58.5 NPSHr ft 29,6 24.9 20.7 20 20 2000 Selected from catalog: Fairbanks Morse Submersible,60 Vers: 3 AECOM 864,234, 000 10 Patewood Drive, Bldg, Vl, Suite 800 864.2 4,3069 Greenville, SC 29615 Letter f Transrruttal Attention: Rob Krebs Date: 11 Project reference: Catawba County SECC Wastewater ollection System Project number60956-202.3 We are sending you the following Number of originals:. Number of copies: 1 Description: tt inei Enclosed please find the completed Fast -Track Engineering Certi ication and supporting documentation for the Catawba'ounty SECC Wastewater Collection project in Catawba County, NC. Please contact us if you have any questions. Thanks. in the world 's built, natural and social errwironments