HomeMy WebLinkAboutWQ0015811_Permit (Issuance)_19980910f
State of North Carolina
Department of Environment
and Natural Resources
Division of Water Quality
James B. Hunt, Jr., Governor
Wayne McDevitt, Secretary
A. Preston Howard, Jr., P.E., Director
Q E NF1
RECE VED
September 10, 1998
Rodney M. Tart
Harnett County Department of Public Utilities
P.O. Box 1187
Dunn, NC 28335
5EP211998
FAYETTEVILLE
REC. C7FICE
Subject: Permit No. WQ0015811
Harnett County Department of Public
Utilities
Larry Godwin Subdivision -Phase II
Wastewater Collection System
Harnett County
Dear Mr. Tart:
In accordance with your application received August 28, 1998, attached is Permit No.
WQ0015811, dated September 10, 1998, to Harnett County Department of Public Utilities for the
construction and operation of the subject wastewater collection extension.
This permit shall be effective from the date of issuance until rescinded and you shall be subject to
the conditions and limitations as specified in the North Carolina Gravity Sewer Design Criteria adopted
February 12, 1996 and the attached permit.
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina
as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted for the
construction and operation of approximately 177 linear feet of 8 inch PVC gravity sewer, 218 linear feet of
9 inch DIP gravity sewer, 158 linear feet of 8 inch PVC gravity sewer and 84 linear feet of 8 inch DIP
gravity sewer to serve 12 three bedroom homes and the discharge of 4,320 GPD of collected domestic
wastewater into the Harnett County Board of Commissioners' Wastewater Treatment Plant's existing
sewerage system, pursuant to the application received August 28, 1998. and in conformity with the North
Carolina Gravity Sewer Design Criteria.
The sewage and wastewater collected by this system shall be treated in the Buie's Creek/Coats
Wastewater Treatment Facility (NPDES Permit No. NC0003091) prior to being discharged into the
receiving stream.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the
right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of
this permit. This request must be in the form of a written petition, conforming to Chapter 150B of North
Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447,
Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding.
The issuance of this permit does not preclude the Permittee from complying with any and all
statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local,
state, and federal) which have jurisdiction.
P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone (919) 733-5083 FAX (919) 733-0719
An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper
If you need additional information concerning this matte please contact Jan Arnold at
(919) 733-5083 extension 524.
Sinc
A. Preston Howard, Jr., P.E.
cc: Harnett County Health Department
Fayetteville Regional Office, Water Quality Section
Haywood D. Bowden, PE
1
NORTH CAROLINA
ENVIRONMENTAL MANAGEMENT COMMISSION
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
RALEIGH
GRAVITY SEWER COLLECTION SYSTEMS PERMIT
This permit shall be effective from the date of issuance until rescinded and shall be subject to the
following specified conditions and limitations:
1. This permit shall become voidable unless the facilities are constructed in accordance with the
conditions of the Division of Water Quality Gravity Sewer Design Criteria adopted February 12,
1996.
2. This permit is effective only with respect to the nature and volume of wastes described in the
application and other supporting data.
3. The facilities must be properly maintained and operated at all times.
4. This permit is not transferable. In the event there is a desire for the facilities to change ownership, or
there is a name change of the Permittee, a formal permit request must be submitted to the Division of
Water Quality (Division) accompanied by an application fee, documentation from the parties involved,
and other supporting materials as may be appropriate. The approval of this request will be considered
on its merits and may or may not be approved.
5. Construction of the gravity sewers shall be scheduled so as not to interrupt service by the existing
utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State.
6. Upon completion of construction and prior to operation of this permitted facility, a certification
and a copy of the record drawings (i.e., as constructed plans) must be received from a professional
engineer certifying that the permitted facility has been installed in accordance with the Division of
Water Quality Gravity Sewer Design Criteria adopted February 12, 1996, and other supporting
materials. If this project is to be completed in phases and partially certified, you shall retain the
responsibility to track further construction approved under the same permit, and shall provide a final
certificate of completion once the entire project has been completed. A copy of the record drawings,
indicating the facilities constructed in the phase being certified, shall be submitted with each partial
certification. Mail the Certification and one (1) copy of the "Record Drawings" to the Non -Discharge
Permitting Unit, P.O. Box 29535, Raleigh, NC 27626-0535.
7. A copy of the Record Drawings shall be maintained on file by the Permittee for a minimum of five
years from the date of the completion of construction.
8. Failure to abide by the conditions and limitations contained in this general sewer permit or the North
Carolina Gravity Sewer Design Criteria may subject the Permittee to an enforcement action by the
Division, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C.
9. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance
conditions, the Permittee shall take immediate corrective action, including those as may be required by
this Division, such as the construction of additional or replacement wastewater collection facilities.
1
10. Noncompliance Notification:
The Permittee shall report by telephone to the Fayetteville Regional Office, telephone number
(910) 486-1541, as soon as possible, but in no case more than 24 hours or on the next working day,
following the occurrence or first knowledge of the occurrence of either of the following:
a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of
adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or
breakage, etc.; or
b. Any failure of a sewer line resulting in a by-pass directly to receiving waters without treatment of
all or any portion of the influent to such station or facility.
Persons reporting such occurrences by telephone shall also file a written report in letter form within
five (5) days following first knowledge of the occurrence. This report must outline the actions taken
or proposed to be taken to ensure that the problem does not recur.
Permit issued this th- Oth day of September, 1998
NORTH 1' OLINA NTAL MANAGEMENT COMMISSION
a -A. Preston Howard, Jr., P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
Permit Number WQ0015811
2
Permit No. WQ0015811
September 10, 1998
ENGINEER'S CERTIFICATION
Partial Final
I, , as a duly registered Professional Engineer in the State of North
Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the
project, for the
Project Name Location and County
Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation
of the construction such that the construction was observed to be built within substantial compliance of this
permit, the certificate of coverage, the North Carolina Gravity Sewer Minimum Design Manual, and other
supporting materials.
Signature Registration No.
Date
The above Engineer's Certification must be completed and submitted to the address below with one (1)
copy of the "Record Drawings" (i.e., as -constructed plans) of the wastewater collection system This
project shall not be considered complete and allowed to operate until this Engineer's Certification and the
"Record Drawings" plans have been submitted. Any wastewater flow made tributary to the wastewater
collection system prior to completion of this Engineer's Certification shall be considered a violation of the
permit and shall subject the Permittee to appropriate enforcement actions.
NORTH CAROLINA DIVISION OF WATER QUALITY
WATER QUALITY SECTION
PERMITS AND ENGINEERING UNIT
POST OFFICE BOX 29535
RALEIGH, NORTH CAROLINA 27626-0535
3
Procedure 4 Request Form
TO FROM: Michael Wicker, Water Quality Supervisor
Fayetteville Regional Office, Water Quality Section
TO FROM: Thelma Williams
State Engineering Review Group
Telephone (919) 733-5083 extension 524
Application Number: 1, bD1 S ? t O County: 401
Applicant:4401,.#
Project Name: C ALt
DF-e. fi VED
c{:; 0 A 1998
FAX (919) 733-0719
FAYETTEVILLE
REG. C FlCE
As tt. P sr
Receiving Facility: Permit Number. Ak_0 }3 DON
Flow Volume: 1/ ,5,a b GPD Flow Type: 44 Domestic Commercial Industrial
ZAIrlietit'. am)24 U)11X4eil
,✓c,:S
Approval: ►`"
Comments: i /c. iviisr, , 's a,/11.,-$.5,e. F/4 ,., Fes,•
318 cie S000 41Gi)
Denial:
Regional Signature: £%.�-3--
Application N=
Applicant: ll`\
Project Name:
Receiving Facility:
Flow Volume: Li"( 3GPD
Approval:
Comments: h YtT-
Regional Signature:
Application Number:
Applicant:
Project Name:
VP T/ 9
1 County: ita,,44Pi
Flow Type: )C..
Permit Number:
Domestic _ Commercial Industrial
Denial:
tiJ P S //yy��ft-
,f • 6 ill! 61G b
County:
Receiving Facility: Permit Number:
Flow Volume: GPD Commercial Industrial
Approval:
Comments:
Flow Type: Domestic
Denial:
611; rlee4:
Regional Signature:
TOTAL P.O1
P. 1
FILE MODE
* * * COMMUNICATION RESULT REPORT ( SEP. 8.1998 1:35PM ) * * *
TTI ENVIRONMENTAL MGMT
OPTION ADDRESS (GROUP) RESULT PAGE
955 MEMORY TX
19197330719
OK P. 1/1
REASON FOR ERROR
E-1) HANG UP OR LINE FAIL E-2) BUSY
E-3) NO ANSWER E-4) NO FACSIMILE CONNECTION
SEP--04-199S 10:33 FROM DEM WATER QUALITY SECTION TO. FRO
Procedure 4 Request Form
TO FROM: MichaelWicker, onOffice, V� SuQ �ry Section
TO FROM: Thelma Williams
State Engineering Review Group
Telephone (919) 733-5083 extension 524
Application Number: 1
Applicant: _J44t1<f
Project Name:
Receiving Facili
Flow Volume:
Approval:
Comments:
33rg re 4000 *GA
1/,,cap_
Dial°
GPD
Da:
P.01
Dirk: R1VED
cF19 0 A 1996
FAX (919) 733-7
FAYETTEVILLE
REG, OFFICE
Pecmit Number. Ale.04530271
Flaw Type: Y G Domestic Industrial
r, : auiliei 11-0//
Regional Signature: dam' _s0 T/9 ir
Application i bar: $ 0 +
Applicant
Project Name:
Receiving Facility:
97h!2. a414PS _