Loading...
HomeMy WebLinkAbout20210145 Ver 1_Pre-Filing Meeting Information_20210503DWR Pre-Fil ing Meeting Req u est Form ID#*Ve rsion * Re gional Office * Re v ie we r List * Contact Name * Contact Email Addre ss * Proje ct Name * Proje ct Owne r * Proje ct County * Owne r Addre ss: Is this a transportation proje ct?* Type (s) of approv al sought from the DWR: Doe s this proje ct hav e an e xisting proje ct ID#?* Do you know the name of the staff me mbe r you would like to re que st a me e ting with? Ple ase giv e a brie f proje ct de scription be low.* 20210145 1 Mooresville Regional Office - (704) 663-1699 Donna Hood Pre-Filing Me eting Reque st submitte d 1/25/2021 Larry Thompson lthompson@ncdot.gov Replace Bridge No. 329 on SR 1315 over East Fork Twelve Mile Creek NCDOT Highway Division 10 Union City Albemarle State / Province / Region NC Postal / Zip Code 28001 Country USA Street Address 716 W Main Street Address Line 2 Yes No 401 Water Quality Certification - Regular 401 Water Quality Certification - Express Individual Permit Modification Shoreline Stabilization Yes No Donna Hood Please give a couple of dates you are available for a meeting. Ple ase attach the docume ntation you would like to hav e the me e ting about. Signature Submittal Date NCDOT proposes to replace the existing functionally deficient bridge on SR 1315 (New Town Rd) at East Fork Twelve Mile Creek with an improved bridge. STV Engineers is providing planning, design and Section 404/401 services on behalf of Division 10; a MCDC has been prepared; a delineation of waters of the U.S. has been completed - jurisdictional waters of the U.S. within the study area include East Fork Twelve Mile Creek, an unnamed tributary, and three wetlands; a NRTR was prepared by Rummel Klepper and Kahl, LLP. The proposed bridge replacement will include an approximate 0.9-mile offsite detour; the project has a Let date of September 17, 2021. 2/1/2021 2/2/2021 2/3/2021 2/4/2021 2/5/2021 R141 Figure 3 waters map.pdf 1.82MB R141 Figure 1 USGS map.pdf 2.2MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: · This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. · I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. · I also understand that DWR is not required to respond or grant the meeting request. Your project’s thirty-day clock started upon receipt of this application.  You will receive notification regarding meeting location and time if a meeting is necessary.  You will receive notification when the thirty-day clock has expired, and you can submit an application. 1/25/2021