HomeMy WebLinkAbout20210145 Ver 1_R.141_Permit Drawings_20210503SR (1315)NEWTOWN RD
SR(1008)WAXHAW INDIAN TRAIL RDSR (1388)
WILL PLYLER RD
SR (1339)LESTER DAVIS RDSR (1322)BYRUM RD12 MILE CREEKSR (2992)OPENGATE LNPROJECT
BEGIN
PROJECT
END SR(1008)WAXHAW INDIAN TRAIL RD0
PROFILE (HORIZONTAL)
RIGHT OF WAY DATE:
LETTING DATE:
STATE STATE PROJECT REFERENCE NO.
STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION
NO.
TOTAL
SHEETS
N.C.
SHEET
1
PROJECT ENGINEER
GRAPHIC SCALES
PLANS
PROFILE (VERTICAL)DEPARTMEN
T
O
F
TRA NSPORTATIONSTATE O F NORT
H CAR
O
LI
NA1020 20
2001020
4 2 0 4 8
PLANS PREPARED FOR THE NCDOT BY:
VICINITY MAP
N.T.S.
DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
40
P.E.
40
PROJECT LENGTH
DHV
D
T
V
=
=
=
=
=MPH
ADT
=ADT
DESIGN DATA
SIGNATURE:
P.E.
P.E.
ENGINEER
HYDRAULICS
SIGNATURE:
ENGINEER
DESIGN
ROADWAY
NC License Number F-0991
Charlotte, NC 28202
900 West Trade St., Suite 715
STV Engineers, Inc.
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
DETOUR
NIKKI T. HONEYCUTT, PE
PROJECT DESIGNER
TYPE OF WORK: GRADING, PAVING, DRAINAGE, & STRUCTURE
CONTRACT:NORTH CAROLINA
N/A
N/A
-L-
TO HWY 75 (WAXHAW HWY)
2011
2025
7%
45
CLARK E. GROVES
2018 STANDARD SPECIFICATIONS
Scale : 80
UNION COUNTY
TOTAL LENGTH OF PROJECT WBS 17BP.10.R.141 = .123 MILES
LENGTH OF STRUCTURE PROJECT WBS 17BP.10.R.141 = .005 MILES
LENGTH OF ROADWAY PROJECT WBS 17BP.10.R.141 = .118 MILES
13,000
6,500
MAJOR COLLECTOR
FUNC. CLASSIFICATION:TO HWY
16
(
P
ROVI
DENCE RD)
-L- STA. 18+56.29
BEGIN CULVERT
-L- STA. 18+81.71
END CURLVERT
-L- STA. 15+50.00
BEGIN PROJECT WBS 17BP.10.PE.141
-L- STA. 22+00.00
END PROJECT WBS 17BP.10.PE.141
SR 1315 (NEW TOWN ROAD)
See Sheet 1B For Standard Symbology Sheet
See Sheet 1A For Index of Sheets
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES.
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II.
ROW & UTIL
GRAPHIC SCALE
80'0'80'
SURFACE WATER IMPACTS PERMIT
ON SR 1315 (NEW TOWN RD)
LOCATION: BRIDGE #329 EAST FORK OF TWELVE MILE CREEK
SITE 1
of1 7
Permit Drawing
Sheet
Division Bridge Manager
GARLAND HAYWOOD, PENCDOT CONTACT:SaucieSLr:\hydraulics\permits_enviornmental\drawings\prm sht\R.141_hyd_prm_psh01_tsh.dgn3/30/2021TWELVE MILE CREEKEAST FORK OF17BP.10.PE.141
17BP.10.PE.141
17BP.10.PE.141
PROJECT WBS: 17BP.10.PE.141SEPTEMBER 17, 2021
AUGUST 16, 2019 NA 2011NAD 83
IMPERVIOUS DIKE, (TYP.)
IMPERVIOUS DIKE, (TYP.)
15" CMP
GR
SOI
L10' UTILITY EASEMENTN 09°26'27" WSOIL
SOIL
EXISTING R/W
EXISTING R/W60.00'SOI
LDB 6280 PG 58
DONALD L. DAVIS, ET AL
DB 6280 PG 58
DONALD L. DAVIS, ET AL
DB 6280 PG 58
DONALD L. DAVIS, ET AL
DB 6280 PG 58
DONALD L. DAVIS, ET ALTWELVE MILE CREEKEAST FORK OFEAST FORK OF TWELVE MILE CREEKGV
GVPWM
1
1
1
117+00-L-
(NEW TOWN ROAD)
SR 1315 20+0016+0018+0019+0021+00LEGEND
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
S S SURFACE WATER
DENOTES PERMANENT IMPACTS IN
AREA (AC)LENGTH (FT)
SW IMPACTS
TEMPORARY 0.02 17
SW IMPACTS
PERMANENT 0.01
E E IN WETLAND
DENOTES EXCAVATION
WETLAND
DENOTES FILL INFF
-
0.02 -
IN WETLANDS
EXCAVATION
IN WETLANDS
PERMANENT FILL
<0.01
PERMIT IMPACT
111
NC License Number F-0991
Charlotte, NC 28202
900 West Trade St., Suite 715
STV Engineers, Inc.
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
SHEET NO.PROJECT REFERENCE NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.8/17/993/30/2021r:\hydraulics\permits_enviornmental\drawings\prm sht\R.141_hyd_prm_psh02.dgnSaucieSLScale : 20 217BP.10.PE.141
of2 7
Permit Drawing
Sheet
GRAPHIC SCALE
0'40'40'
SITE 1
TEMP. FLEXIBLE HOSE
PUMP-AROUND PUMP
IN SURFACE WATER - S4
TEMPORARY IMPACTS
IN SURFACE WATER - S1
PERMANENT IMPACTS
IN WETLAND - W1
EXCAVATION
IN SURFACE WATER - S2
PERMANENT IMPACTS
IN SURFACE WATER - S4
TEMPORARY IMPACTS
IN WETLANDS - W2
PERMANENT FILL
IN WETLANDS - W3
PERMANENT FILL
IN WETLANDS - W2
PERMANENT FILL
IN SURFACE WATER - S3
PERMANENT IMPACTS
IN SURFACE WATER - S3
PERMANENT IMPACTS
IN SURFACE WATER - S2
PERMANENT IMPACTS NAD 83 NA 2011F
F
F
C
C
C
C
C
C
C
C
C
C
F
F
F
F
C
F
C
F
C
F
C
F
F
F F
C
IMPERVIOUS DIKE, (TYP.)
IMPERVIOUS DIKE, (TYP.)
TEMPORARY PIPE, (TYP.)
PUMP AROUND OPERATION
TOE PROTECTION
15" CMP
GR
SOI
L10' UTILITY EASEMENTN 09°26'27" WSOIL
SOIL
EXISTING R/W
EXISTING R/W60.00'SOI
LDB 6280 PG 58
DONALD L. DAVIS, ET AL
DB 6280 PG 58
DONALD L. DAVIS, ET AL
DB 6280 PG 58
DONALD L. DAVIS, ET AL
DB 6280 PG 58
DONALD L. DAVIS, ET ALTWELVE MILE CREEKEAST FORK OFEAST FORK OF TWELVE MILE CREEK560565565565
56
5
565565565565565565
565565565570
570
570
5
7
05705
7
0
570570
570570575
5
7
5575575575575
57557557558058
0580580
5805805805805 8 0
5
8
5
585585590GV
GVPWM
1
1
1
117+00-L-
(NEW TOWN ROAD)
SR 1315 20+0016+0018+0019+0021+00LEGEND
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
S S SURFACE WATER
DENOTES PERMANENT IMPACTS IN
AREA (AC)LENGTH (FT)
SW IMPACTS
TEMPORARY 0.02 17
SW IMPACTS
PERMANENT 0.01
E E IN WETLAND
DENOTES EXCAVATION
WETLAND
DENOTES FILL INFF
-
0.02 -
IN WETLANDS
EXCAVATION
IN WETLANDS
PERMANENT FILL
<0.01
PERMIT IMPACT
111
NC License Number F-0991
Charlotte, NC 28202
900 West Trade St., Suite 715
STV Engineers, Inc.
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
SHEET NO.PROJECT REFERENCE NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.8/17/993/30/2021r:\hydraulics\permits_enviornmental\drawings\prm sht\R.141_hyd_prm_psh03.dgnSaucieSLScale : 20 317BP.10.PE.141
of3 7
Permit Drawing
Sheet
GRAPHIC SCALE
0'40'40'
SITE 1
IN WETLAND - W1
EXCAVATION
IN SURFACE WATER - S2
PERMANENT IMPACTS
IN SURFACE WATER - S1
PERMANENT IMPACTS
IN WETLANDS - W2
PERMANENT FILL
IN WETLANDS - W3
PERMANENT FILL
IN SURFACE WATER - S4
TEMPORARY IMPACTS
IN WETLANDS - W2
PERMANENT FILL
IN SURFACE WATER - S3
PERMANENT IMPACTS
IN SURFACE WATER - S3
PERMANENT IMPACTS
IN SURFACE WATER - S4
TEMPORARY IMPACTS
IN SURFACE WATER - S2
PERMANENT IMPACTS NAD 83 NA 2011F
F
C
C
C
C
C
C
C
C
C
C
F
F
F
F
C
F
C
F
C
F
C
F
F
F F
C
SHEET NO.PROJECT REFERENCE NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.8/17/993/30/2021r:\hydraulics\permits_enviornmental\drawings\prm sht\R.141_hyd_prm_psh04.dgnSaucieSLScale : 20 417BP.10.PE.141
22+0020+00 21+00 23+00 24+00 25+00
17+0015+00 16+00 18+00 19+00 20+00
562
566
570
574
578
582
586
590
594
598
NC License Number F-0991
Charlotte, NC 28202
900 West Trade St., Suite 715
STV Engineers, Inc.
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
554
558
562
566
570
574
578
582
586
590
594
554
558
562
566
570
574
578
562
566
570
574
578
582
586
590
594
598
7of4Sheet
Permit Drawing
EL = 584.48
STA. 22+00.00
END PROJECT WBS 17BP.10.R.141
EXISTING GROUND
PROPOSED GRADE
BL-3
(+)4.9785%
EXIST (+)4.7025 %
EL=567.0'
PI=20+00.00 LT
EL=571.4'PI=20+50.00 LTEL=576.0'PI=21+00.00 LTEL=580.1'PI=21+50.00 LTEL=583.74'PI=22+00.00 LT(+)8.80%
(+)9.20%
(+)8.20%
(+)7.29%
-L- STA 18+56.29 -L- STA 19+81.71
E
X
IS
T
(-) 5.6988 %
EL = 585.09
STA. 15+50.00
BEGIN PROJECT WBS 17BP.10.R.141
TO BE REMOVED
EXISTING STRUCTURE
EXISTING GROUND
PROPOSED GRADE
B5797-2
BM-2
PI = 18+75.00
EL = 568.30'(-)5.1662%
(+)4.9785%
VC = 650'
K = 64
DS = 40 MPH
LOW POINT
ELEV 576.54
STA 18+81.01
BEGIN CULVERT END CULVERT
EL=582.94'PI=15+50.00 LTEL=579.90'PI=16+00.00 LTEL=576.30'PI=16+50.00 LTEL=571.90'PI=17+00.00 LTEL=569.10'PI=17+73.00 LTEL=566.00'PI=18+00.00 LTEL=563.50'PI=18+50.00 LTEL=563.30PI=18+58.00 LTEL=562.0'PI=18+86.00 LTEL=562.6'PI=19+00.00 LTEL=565.5'
PI=19+50.00 LT
EL=570.50'PI=17+50.00 LTPI=15+50.00 RTEL=584.15'PI=16+00.00 RTEL=580.9'PI=16+50.00 RTEL=578.1'PI=17+00.00 RTEL=575.2'PI=17+50.00 RTEL=572.0'PI=17+60.00 RTEL=571.7'PI=17+96.00 RTEL=569.5'PI=18+00.00 RTEL=569.3'PI=18+50.00 RTEL=562.5'EL=567.0'
PI=20+00.00 LT
300
420
100
3000
25
565.5
566.2
576.5
563.1
05/03/2018
DESIGN DISCHARGE
DESIGN FREQUENCY
BASE DISCHARGE
CFS
YRS
YRS
BASE FREQUENCY
OVERTOPPING ELEVATION
OVERTOPPING FREQUENCY
OVERTOPPING DISCHARGE CFS
CFS
YRS
FT
FT
FT
DESIGN HW ELEVATION
BASE HW ELEVATION
CULVERT HYDRAULIC DATA
DATE OF SURVEY
W.S. ELEVATION
AT DATE OF SURVEY FT
=
=
=
=
=
=
=
=
=
=
=
500+(-)6.50%(-)6.07%(-)5.60%
(-
)7.20%(-)5.80%
(-)8.80%(-)6.40%(-)2
.80%
(-)3.00%
(-)5.00
(-)11.48%(-)6.09%
(-)13.60
%(-)5.00%
(-)2.50%
(+)4.29%
(+)5.80%
(+)3.00%
CULVERT
PROPOSED
IMPERVIOUS DIKE, (TYP.)
IMPERVIOUS DIKE, (TYP.)
TEMPORARY PIPE, (TYP.)
PUMP AROUND OPERATION
TOE PROTECTION
SOIL
SOIL
DB 6280 PG 58
DONALD L. DAVIS, ET AL
DB 6280 PG 58
DONALD L. DAVIS, ET AL
DB 6280 PG 58
DONALD L. DAVIS, ET AL
DB 6280 PG 58
DONALD L. DAVIS, ET AL
15" CMP
SOI
LEAST FORK OF TWELVE MILE CREEKEAST FORK OF TWELVE MILE CREEKGR
1
1
1
(NEW TOWN ROAD)
SR 1315
-L-19+00LEGEND
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
S S SURFACE WATER
DENOTES PERMANENT IMPACTS IN
AREA (AC)LENGTH (FT)
SW IMPACTS
TEMPORARY 0.02 17
SW IMPACTS
PERMANENT 0.01
E E IN WETLAND
DENOTES EXCAVATION
WETLAND
DENOTES FILL INFF
-
0.02 -
IN WETLANDS
EXCAVATION
IN WETLANDS
PERMANENT FILL
<0.01
PERMIT IMPACT
111
NC License Number F-0991
Charlotte, NC 28202
900 West Trade St., Suite 715
STV Engineers, Inc.
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
SHEET NO.PROJECT REFERENCE NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.8/17/993/30/2021r:\hydraulics\permits_enviornmental\drawings\prm sht\R.141_hyd_prm_psh05.dgnSaucieSLScale : 20
SITE 1
GRAPHIC SCALE
0'20'20'
of5 7
Permit Drawing
Sheet
517BP.10.PE.141
WETLANDS - W1
EXCAVATION IN
IN SURFACE WATER - S2
PERMANENT IMPACTS
IN SURFACE WATER - S1
PERMANENT IMPACTS
IN SURFACE WATER - S4
TEMPORARY IMPACTS
IN WETLANDS - W3
PERMANENT FILL
IN WETLANDS - W2
PERMANENT FILL
IN SURFACE WATER - S3
PERMANENT IMPACTS
IN WETLANDS - W2
PERMANENT FILL
IN SURFACE WATER - S3
PERMANENT IMPACTS
IN SURFACE WATER - S2
PERMANENT IMPACTS
IN SURFACE WATER - S4
TEMPORARY IMPACTS
NAD 83 NA 2011F
F F
C
C
C
F
C
FFF
C F
F
F C
NAMES AND ADDRESSES
PARCEL NO.NAMES ADDRESS
1
PROPERTY OWNERS
3/30/2021
NCDOT
DIVISION OF HIGHWAYS
#
SHEET 6 OF 7
of6 7
Permit Drawing
Sheet
UNION COUNTY
DONALD L. DAVIS, ET AL
WAXHAW, NC 28173
5806 NEW TOWN ROAD
(NEW TOWN RD)
ON SR 1315
TWELVE MILE CREEK
EAST FORK OF
BRIDGE 329 OVER
PROJECT: 17BP.10.PE.141
Hand Existing Existing
Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream
No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design
(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)
S1 18+58.13 / 18+81.83 25'-5" X 10'-2" ALUMINUM BOX CULVERT 0.01 55
S2 18+66.82 / 18+71.36 Channel Excavation <0.01 45
S3 18+81.16 / 18+91.53 Bank Stabilization <0.01 11
W1 18+04.34 / 18+39.69 Excavation in Wetland <0.01
W2 18+97.55 / 19+20.59 Permanent Fill in Wetlands <0.01
W3 19+95.30 / 20+58.57 Permanent Fill in Wetlands 0.02
S4 18+58.13 / 18+81.83 25'-5" X 10'-2" ALUMINUM BOX CULVERT 0.02 17
TOTALS:0.02 <0.01 0.01 0.02 111 17
NOTES:
1 TEMPORARY IMPACTS LENGTH TOTAL = 73' (56' TAKEN INTO ACCOUNT IN PERMANENT IMPACTS)
2 PERMANENT SURFACE WATER BANK STABILIZATION IMPACT TOTAL = 38'
(27' TAKEN INTO ACCOUNT IN PERMANENT CHANNEL EXCAVATION IMPACTS)
ATN Revised 3/31/05
CULVERT #329 OVER EAST FORK OF TWELVE MILE
CREEK ON SR 1315 (NEW TOWN ROAD)
NC DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS
UNION COUNTY
3/30/2021
17BP.10.PE.141
WETLAND PERMIT IMPACT SUMMARY
SURFACE WATER IMPACTSWETLAND IMPACTS
SHEET 7 of 7