Loading...
HomeMy WebLinkAbout20051854 Ver 2_Worksheets_20070605Project Name: Moores Chapel Retail Project No. DWQ OS-1854v2 Pond 1 SUBMITTED DESIGN: REQUIRED DESIGN: elevations 2.7 average depth status Bottom of Basin (ft) 690 Permanent Pool (ft) 694 4 ft. depth ok Temporary Pool (ft) 694.81 0.81 ft. depth ok areas Permanent Pool SA (sq ft) 29185 11074 sq. ft. ok Drainage Area (ac) 11.86 12363 based on avg depth ok Impervious Area (ac) 7.48 63.1 % - volumes Permanent Pool (cu ft) 79938 Temporary Pool (cu ft) 95527 26590 cu. ft. ok Forebay (cu ft) 21005 26.3 % check forebc other parameters SA/DA 2.4 2.14 - Orifice Diameter (in) 3 0.15 cfs drawdown - Design Rainfall (in) 1 7.4 day drawdown check drawc Linear Interpolation of Correct SA/DA Im ervious Next Lowest 60 Project Impervious 63.1 Next Highest 70 4 ft. Permanent Pool Depth SA/DA fron (Avg. Depth) 2.03 2.277940723 1.08 2.14 2.39 1.19 2.4 2.653160528 1.43 `' 3 ft 4 ,~~ ~~s~o7