HomeMy WebLinkAbout20121029 Ver 1_DCM Permit_20130122. , . r .r • �- K .. - ,. .. ,.r � � . • � r ., _ - -rr.. � .,.. � ,,.o-,. ,. ... .. .:w � • ,.,.%firrN••>aahq
beY
P::f-,it Nt ni
7 -13 r
_ E
01
T 1
Exc cation and /or filling pursu_lnt to NCGS 1132-29
Issued to Fosters Seafood, 220 Loop Road, Belhaven, Ni C 27810
Authorizing development in Beaufort County adj. to Wrights Creek, at 220 Loop Road,
hear Belhaven , as requested in the permittee's application dated 10/11/12 (W -1. MP -2. MP-
3) and 9/24/12 (MP -4), including the attached workplan drawings (1), dated received in N11-IC on 11/9/12
This permit, issued on January 9, 2013 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
Boat Ramp
1) Unless specifically altered herein, this permit authorizes the construction of the boat ramp.facility all
as indicated on the attached workplan drawings.
2) The boat ramp shall either be poured at au upland location and pushed into place once hardened, or
poured entirely within a watertight containment structure. Live concrete shall not be allowed to
contact waters of the State or waters that will enter waters of the State.
(See attached sheets for Additional Conditions)
This permit action may be appealed by the permittee or
)iher qualified persons within twenty (20) days of the issuing
irate. An appeal requires resolution prior to work initiation or
continuance as the case may be'.
t
This permit must be accessible on -site to Department
Y personnel when the project is inspected for compliance.
Any maintenance. work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2016
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of 1he Secretary of DENR and the
Chairman of the Coastal Resources Commission.
This permit and its
Brax . Davis, Director
Division of Coastal Management
JAN 2 2 2013
Permittee
4)
I It,, C ' } .. >; `!� 7rj i:;� S (Urk�ri ltl
�. t7�:.r .i it (+ t:i. '� t3i.'., '1.' (� t :i l:Ctt i1.L , =•�: � G'! S' -:.�:i cal, i. ..}}
M;'. Offr- .'l zipv �.caT:v'1 Aner St. tl ��' ill'.:, V,� ° -�, IF ),M-, ;�, l.. �: ..n''n -���,' 7411 :. �.:1 ;� "l �.� rrlla,itnt Part s
S_ . C'� 1. _ (. ! J .L:. :�"
�i I.._ rect)n :i_-::d dC, C'in. f, ii t ^ r,,:ml nnod.lica' n. No Il•:: ",.:er C'.Z:, ---nd nt US.-s of }
structures shall be conducted on. L1 or over public trust waters Mthout permit modification.
No attempt shall be made by the permittee to prevent the Rill and free use by the public of all navigable
water at or adjacent to authorized work.
5) The permittee shall maintain the authorized work in good condition and in conformance with the terms
and conditions of this permit. The permittee is not relieved of this requirement if he abandons the
permitted activity without having it transferred to a third party.
6) This permit does not authorize the interference with any existing or proposed Federal project, and the
pennittee shall not be entitled to compensation for damage to the authorized structure or work, or injury
which may be caused from existing or future operations undertaken by the United States in the public
interest.
7)
I
r
X
8)
9)
'f
z•
4
The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S.
Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent
reflectors shall be attached to the structures in order to make them more visible during hours of darkness
or inclement Aveather.
This permit does not authorize any formalized boat slips.
The pier and associated structures shall have a minimum setback distance of 15 feet between any parts
of the structure and the adjacent property owner's riparian access corridor. This corridor is determined
by drawing a line parallel to the channel, then drawing a line perpendicular to the channel line that
intersects with the shore at the point where the upland property line meets the water's edge.
pla_nd Deve1g Foment
10) Unless specifically altered herein, this permit authorizes the grading and other land disturbing activities
associated with the development of the above referenced property, including the construction of the ice
room, all as expressly and specifically set forth in the attached permit application and workplan
drawings.
s
... �,. ..i -� ^__• ,ter .. .. � � r
�3�2A -3 JeZ.iQ.
13)
14)
15)
16)
r
i J'e 3 () i' 4
a
' o,,'- 1 scd ' iit t1G'? . lii r._ �,� r. '.1 t; Si '. .; E''.: .'t; 1,';rl .:',:.._ °d t0
tha-i erode: mite aC, r - : �.« - -,,a: a': ; :,, -
ria. u 1 �•..4 .t. : J �'o t �l �. niif' 1- ;t Slti �. 7C% .
div,.rsion swales or berms, etc.).
General
The permittee understands and agrees that, if future operations by the United States requires the
removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the
opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause
unreasonable obstruction to free navigation of the navigable waters, the permittee will be required, upon
due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions
caused thereby, without expense to the United States or the state of North Carolina. No claim shall be
made against the United States or the state of North Carolina on account of any such removal or
alteration.
This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the
written approval of the Division of Coastal Management.
The permittee and /or his contractor shall meet with a representative of the Division prior to project
initiation.
Nothing in this permit shall be construed as allowing any development activities to take place on lands
not owned by the permittee. The permittee is cautioned to exercise all available cautions in the
construction of the boat ramp to ensure that the authorized ramp does not exceed the limits of the
permittee's property.
a
R
i
NOTE:
NOTE:
NOTE:
ti
I
P er In i t 4 7 - I
Pa- e 4 of 4
Vii„ ".r.
Contact a repi%,sent'-Zti)'J,, (,,f Inc '-'�vi: -n -A t cd any
t: L c 4 or
-o' -3*,C-' 'a!
Tar Pamlico. Contact a represenTL'tl�'Cof the D.;vi--;L,-,a of Water Quality at (25219,46-64311 for
more information concerning allowable uses within the Tar Pamlico River Buffer.
The permittee and/or his contractor is urged to meet with a representative of the Division prior to
project initiation.
The N.C. Division of Water Quality has authorized the proposed project under DWQ Project No.
12-1029.
The U.S. Army Corps of Engineers authorized the proposed project under COE Action Id. No.
SAW-2012-01863.