Loading...
HomeMy WebLinkAbout20210731 Ver 1_Pre-Filing Meeting Request_20210409DWR Pre -Filing Meeting Request Form ID#* Regional Office* Reviewer List* 20210731 Version * 1 Washington Regional Office - (252) 946-6481 Holley Snider Pre -Filing Meeting Request submitted 4/9/2021 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Owner Address: Jeff Harbour jeff.harbour@terracon.com Barnards Creek HDD and underground/overhead feeders Duke Energy New Hanover Street Address 1451 Military Cutoff Road Address Line 2 City State / Rovince / Region Wilmington NC Fbstal / Zip Code Country 28403 US Is this a transportation project?* r Yes (' No Type(s) of approval sought from the DWR: fJ 401 Water Quality Certification - I— 401 Water Quality Certification - Regular Express I— Individual Permit I— Modification r Shoreline Stabilization Does this project have an existing project ID#?* r Yes (' No Do you know the name of the staff member you would like to request a meeting with? no Please give a brief project description below and include location information. * The creek crossing consists of installing 2-8" conduits approximately 1200' via directional bore under Barnards Creek. Additional work includes the installation of 2-6" conduits approximately 305' via directional bore along the access road to Watermark Marina near the intersection of River Rd. and Independence Blvd., installation of overhead facilities required for the transition to underground, and the removal of existing distribution poles and overhead distribution conductors in the marsh area along River Rd. south of Independence Blvd. in the in the vicinity of the Barnards Creek bridge. The work associated with this project was originally proposed to accommodate the expansive growth of the River Lights development. Due to the location of this development in relation our existing distribution infrastructure, the Echo Farms feeder is the sole source of power for the area. Based upon past studies on the Echo Farms feeder, the overhead lines along Independence Blvd and River Road were found to be loaded beyond the appropriate planning limits. Considering this, the existing distribution infrastructure would need to be upgraded to meet the increasing load of the River Lights development. Last year, as work was underway to upgrade the previously mentioned overhead lines, equipment accidentally struck a Cape Fear Public Utility Authority (CFPUA) sewer main, resulting in a significant spill. After this incident, work was stopped and CFPUA began working on their infrastructure to mitigate the damage that was done. Considering this situation, and talk of the Barnards Creek bridge being widened, it was evident that a new design needed to be pursued to meet this need. As a result, the proposed underground option was formulated as a method for ensuring that the Echo Farms feeder could be upgraded without further compromising any neighboring utilities positioned near the bridge at Barnards Creek. This proposed infrastructure will largely parallel the high-pressure gas line that Piedmont Natural Gas installed beneath Barnards Creek back in '13. Please give a couple of dates you are available for a meeting. 4/28/2021 4/30/2021 Please attach the documentation you would like to have the meeting about. Fig_topo.pdf pdf only 1.17MB By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 4/9/2021 tf DUKE ENERGY® CI Project Study Area 0 1,000 2,000 n Cape Fear River Basin DATA SOURCES: USGS Topo tile base map service of The National Map (TNM), data refreshed May 2020; Project Study Area Feet based on data provided by Duke Energy. PM: JH Project No. 70217131 ir erracon Project Location EXHIBIT NO. Drawn By: KT Scale: 1 in = 2,000 ft River Road-Barnards Creek HDD-UG-OH New Hanover County, North Carolina I Checked By: SB Filename: Fig_topo.mxd Approved By: JH Date: April 2021 2401 Brentwood Road, Suite 107 Raleigh, NC 27604 Phone: (919)873-2211 Fax: (919)873-9555