Loading...
HomeMy WebLinkAbout20061804 Ver 5_Stormwater Info_20130201Soil & Environmental Consultants, PA 11010 Raven Ridge Road • Raleigh, North Carolina 27614 • Phone. (919) 846 -5900 • Fax: (919) 846.9467 www.SandEC.com February 1, 2013 tq, -18o�v3 S &EC Project # 6658.P6 To: N.C. Division of Water Quality WEBSCAPE Unit Attn: Karen Higgins /Annette Lucas 512 N. Salisbury Street -9th floor Raleigh, NC 27603 Re: The Village at Flowers Plantation Stormwater Management Plan -POD NW-8 (Phase 1) DWQ Project #20061804, Ver.3 /Certification No. 3766 Johnston County, NC On behalf of Mrs. Rebecca Flowers, please find the attached Stormwater Management Plan for POD NW -8 (Phase 1). According to the Individual 401 Water Quality Certification Approval Certification No. 3766, Condition No. 9, °a final, written stormwater management plan for each phase of this project shall be submitted to the DWQ 401 Oversight/Express Permitting Unit for review and approval'. Therefore, please see attached Stormwater Management Plan for your review and anticipated Approval. Please contact me at DEdwardsa- SandEC.com or (919) 846- 5900 if you have any questions.. Sincerely, Soil & Environmental Consultants, PA Deborah Edwards Environmental Specialist Attachments: 1) Flowers Plantation Pod NW 8 Sitework Calculations 2) Overall POD map (east side of Buffalo Rd.) 3) Flowers Plantation NW-8 PH1 -26 Lots - Flowers Crest Cover Sheet 4) POD NW -8 PH1 Overall Site Plan -C -1 & C -2 5) POD NW -8 PH1 Erosion & Sediment Control Plan 6) POD NW -8 PH1 Bioretention Details Flowers Plantation Pod NW 8 Owner /Developer: Rebecca Flowers 4880 NC 42 East Clayton, NC 27520 Phone: (800) 343 -0659 MiLAM STOCKS ENGINEERING P.A. 1100 Eastern avenue Phone: 252.459.8196 PO Box 1108 Fax: 252.459.8197 Nashville, NC 27856 Mobile: 252.903.6891 Email: mstocks@stocksengineering.com I YR: 0.92 cfs IThe current property is forested. The post condition will utilize a Bioretention cell for both nutrient reduction and peak flow reduction. The proposed site will utilize a Bioretention cell to offset the nutrient requiremen, The nutrients remaining nutrients will be bought down in the amount of $1,899.1 �lcw�2s Po p ^%,J 8 C coow�i3�E. 'Csy E t o i- M 1% .4-1 (wocO�FA7 cam( = ss �M�&2utvvs (rQ4ss (2.ub ^C. x 98� t(`f.g3�c x �i� "/ -s11 etc Watershed Model Schematic 1 - pm- Development Project: Pre vs Post Calcs.gpw Hydraflow Hydmgraphs by Intellsolve v9.22 2 - Post Development 3 - Outflow io Wednesday, Jan 8, 2013 Hvdrograph Return Period Recap WdMftw"mgmphsbylntelisalvev9.22 Hydrograph Summary Report 3 Horattow Hydrographs by Intelisolve v9.22 Hyd. Hydrograph Peak Time Time to Hyd. inflow Maximum Total Hydrograph No. type flow interval peak volume hyd(s) elevation strge used description (origin) (cfs) (min) (min) (cuff) (tt) (Cuff) 1 SCS Runoff 0.820 2 720 5,018 — - -- ---- Pre - Development 2 SCS Runoff 11.66 2 718 23,459 — ---- -- Post Development 3 Reservoir 0.220 2 1110 6,825 2 290.95 18,035 Outflow Pre vs Post Calcs.gpw Return Period: 1 Year Wednesday, Jan 9, 2013 4 Hydrograph Report Hydraflow Hydrographs by Intelisohre v9.22 Wednesday, Jan 9. 2013 Hyd. No. 1 Pre - Development Hydrograph type = SCS Runoff Peak discharge = 0.920 cfs Storm frequency = 1 yrs Time to peak = Hyd. volume = 12.00 hrs 5,018 cuft Time interval Drainage area = 2 min = 7.590 ac Curve number = 55 Basin Slope = 10.0% Hydraulic length = 1000 ft Tc method = KIRPICH Time of conc. (Tc) = 3.86 min Total precip. = 3.00 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (C%) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 ' 0 2 4 Hyd No. 1 6 8 Pre - Development Hyd. No. 1 —1 Year Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 l I I I 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) 5 Hydrograph Report Hydreflow Hydro9raptks by Intelisolve v9.22 Wednesday, Jan 9, 2013 Hyd. No. 2 Post Development Hydrograph type = SCS Runoff Peak discharge = 11.66 cfs Storm frequency = 1 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 23,459 cuft Drainage area = 7.590 ac Curve number = 74 Basin Slope = 10.0% Hydraulic length = 1000 ft Tc method = KIRPICH Time of conc. (Tc) = 3.86 min Total precip. = 3.00 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 12.00 10.00 8.00 wa 4.00 1X II ' 0 2 4 Hyd No. 2 6 8 Post Development Hyd. No. 2 —1 Year Q (cfs) 12.00 Kral-1161 8.00 6.00 4.00 2.00 ' " ' ' ' 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) 6 Hydrograph Report Hydraflow Hydrographs by IntelisoNe v9.22 Wednesday, Jan 9, 2013 Hyd. No. 3 Outflow Hydrograph type = Reservoir Peak discharge = 0.220 cfs Storm frequency = 1 yrs Time to peak = 18.50 hrs Time interval = 2 min Hyd. volume = 6,825 cuft Inflow hyd. No. = 2 - Post Development Max. Elevation = 290.95 ft Reservoir name = Bioretention Max. Storage = 18,035 cuft Storage Indication method used. Outflow Q (�) Hyd. No. 3 —1 Year Q () 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 4 8 12 16 20 24 28 32 Time (hrs) -- Hyd No. 3 — Hyd No. 2 9= Total storage used = 18,035 cult Pond Report ' Hydraftow Hydrographs by Intelisolve v9.22 Wednesday, Jan 9, 2013 Pond No. 1 - Bloretention Pond Data Contours - User - defined contour areas. Average end area method used for volume calculation. Begining Elevation = 290.00 ft Stage I Storage Table Stage (R) Elevation (ft) Contour area (sgtt) Incr. Storage (cuf) Total storage (tuft) 0.00 290.00 16,759 0 0 1.75 291.75 21,249 33.257 33,257 Culvert I Orifice Structures Weir Structures [A] [B] [C] [PrfR$rI [A] [B] [C] [D] Rise (in) = 24.00 0.00 0.00 0.00 Crest Len (R) = 14.00 0.00 0.00 0.00 Span (in) - 24.00 0.00 0.00 0.00 Crest Fa. (R) - 291.00 0.00 0.00 0.00 No. Barrels = 1 0 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert 8. (ft) = 287.00 0.00 0.00 0.00 Weir Type = Riser -- - - Length (ft) = 54.00 0.00 0.00 0.00 Multi -Stage = Yes No No No Slope M = 15.00 0.00 0.00 n/a N -Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 ExflQin/hr) = 0.000 (by Contour) Multi -Stage = n/a No No No TW Elev. (R) - 0.00 Stage (ft) 2.00 1.80 1.60 1.40 1.20 1.00 0.80 0.60 0.40 020- 000 NoW CNverM floe mdliawe are arm"W under WM (ic) and adlet (oc) comroi Weir risers ducked rar aifwe CMWAbre (k) end sLrrurgerw (e) Stage I Discharge Elev (ft) 292.00 291.80 291.60 29140 291.20 291.00 290.80 290.60 290.40 290.20 290.00 0.00 3.00 6.00 9.00 12.00 15.00 18.00 21.00 24.00 27.00 30.00 Total Q Discharge (cis) Neuse River Basin: Total Nitrogen Loading Calculation Worksheet Project Name: Rowers Plantadon - Pod NW 8 Date: 11312013 By: X Varnell Chocked BY: ::i `# 0 I ry 1 .0 4' 7 3.35 2.60 14." 0.7 3.35 1.95 4." 4.6 3.35 1.42 21.74 0.0 3.35 0.46 2.60 0.00 0.46 1.95 0.00 0.46 1.42 1.72 0.46 4.23 0.00 0.46 2.04 0.00 0.46 0.94 0.22 0 1.94 i:14 xN: 3.14 0.62 ::i `# 0 I ry 1 .0 4' 7 3.35 2.60 14." 0.7 3.35 1.95 4." 4.6 3.35 1.42 21.74 0.0 3.35 0.95 0.00 0.35 41.39 MMMmmMHW§7-1_U pals are 3.6 Bioretention without IWS = 35% TN reduction Total TN After BMP = 3.84 lbelactyr NUTRIENT OFFSET MITIGATION PAYMENT SUMMARY Jurisdiction: Rocky Mount Basin: Tar/Pamlico Project Name: Nash County EMS Address: Parkland Avenue and Executive Drive Engineer of Record: Stocks Engineering Date: 11/4110 Site Characteristics Acreage 7.01 acres Redevelopment Site: No (Yes or No) BMP(s) Utilized: Bioretention Preaevelopment Wrogen Loading Nitrogen Ibtyear 0.43 lb /acre/year Post-Development Nitrogen Loading Nitrogen 41.39 Ibtyear 5.90 lb/acre/year Nitrogen Umits Nitrogen 25.236 Ibtyear 3.60 lb/acre/year Post -BMP Nitrogen and Phosphorous Loading Nitrogen 26.92 lb/year 1 3.84 Ib/acre/year Nutrient Bu -Down Summary Nitrogen = 1.66 lb/year 0.24 lb/acre/year NCEEP Offset Payment Schedule Nitrogen = $20.29 per lb. Buydown Calculations Nitronen = [($ fib) (# of Ibtyr) (30 yrs) Total Nitrogen Buydown $ 1,899.14 Total Nutrient Offset Mitigation Payment = $1,898.14 slzf - Tb'r A ` vot-4j w& F -x - Q V = a. 0.5 + o . 47 X T A o.o$'f- o.el k d. (4 s 0. (NCO V= 3l0 3o k TZv 7 Zv xA, w 3� to3o x � x o.tvo x 7.59 IIQ� Sal AF m tJ U.o.,.,.J : DE-PrW r2 rofc #* S i4, S31 CF / l FT M&; /, S31 wF G M �� rb = 1. o'• A= 7.59 4c - s 341- d-) - h .5,QV9 r - 1 -5 a-$bv.i ?yU L C.0) &7. -0 •o 500 'o ��o •o x ss,l °d 5• o = S 1 s 7) ss•I =b �" x� g car QfCOM Permit Number. (to be wv~by DWry MA V =EW b < STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM BIORETENTION CELL SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required lnformafion. Project name Contact name Phone number Date Drainage area number 252.4591196 January 3, 2013 1 - Pod NW 8 II. DESIGN INFORMATION Y (Y or N) Site Characteristics 3 in Drainage area 330,60 it2 Impervious area 115,717 to Percent impervious 35.0% % Design rainfall depth 1.0 inch Peak Flow Calculations Is pre/post control of the 1 -yr, 24-hr peak flow required? Y (Y or N) 1 -yr, 24-hr runoff depth 3 in 1 -yr, 24-hr Intensity 0.12 Whr Pre-development 1 -yr, 24-hr peak flow 0.920 ft' /sec Post -development 1 -yr, 24-hr peak flow 0.220 0 /sec Pre/Post 1 -yr, 24-hr peak control -0.700 felsec Storage Volume: Non-SA Waters ft' Minimum volume required 16,531.0 fe Volume provided 16,759.0 ft OK Storage Volume: SA Waters 1.5' runoff volume ft' Pre-development 1 -yr, 24-hr runoff ft' Post- development 1 -yr, 24-hr runoff ft' Hnimum volume required 0 ft Volume provided ft' Cell Dimensions Ponding depth of water 12 Inches OK Ponding depth of water 1.00 It Surface area of the top of the bioretention cell 16,759.0 ft OK Length: ft Width: ft -or- Radius ft Media and Soils Summary Drawdown time, ponded volume 6 hr OK Drawdown lime, to 24 inches below surface 18 hr OK Drawdown time, total: 24 hr ln4b soih. Soll permeability 0.10 inlhr Insufficient. Increase infiltration rate or include underdrains. RlanUng media sofk Soil permeability 2.00 inlhr OK Sol composition % Sand (by volume) 86% OK % Ftrtes (by volume) 10% OK % Organic (by volume) 4% OK Total: 100% Phosphorus Index (P- Index) of media 30 (unitiess) OK Form SW4014moretenvon -Rev.8 June 25.2010 Parts 1 and II. Design Summary, Page 1 of 2 Permit Numbe (to be provtded by D*q Basin Bevations Temporary pool elevation 291.00 fmsi Type of bioretention cell (answer'Y' to only one of the two following questions): Is this a grassed cell? Y (Y or N) OK Is this a cell with tressishrubs? N (Y or N) Planting elevation (top of the mulch or grass sod layer) 290 fmsl Depth of mulch inches Bottom of the planting media soil 288 fmsl Planting media depth 2 ft Depth of washed sand below planting media soil 0.33 It Are underdrains being installed? Y (Y or N) How many dean out pipes are being Unstalled? 18 OK What factor of safety Is used for sizing the underdraims? (See 2 OK BMP Manual Section 12.3.6) Additional distance between the bottom of the planting media and 1 ft the bottom of the cep to account for underdralns Bottom of the cell required 286.67 fmsl SHWT elevation 284 fmsi Distance from bottom to SHWT 2.67 ft OK Internal Water Storage Zone (MIS) Does the design Include IWS N (Y or N) Elevation of the top of the upturned elbow fmsl Separation of IWS and Surface 290 it Planting Plan Number of tree species 0 Number of shrub species Number of herbaceous groundcover species Additional Information Does volume in excess of the design volume bypass the Y (Y or N) OK bioretention cell? Does volume in excess of the design volume flow evenly distributed N (Y or N) Excess volume must pass through filter. through a vegetated filter? What Is the length of the vegetated filter? it Does the design use a level speeder to evenly distribute W N (Y or N) Show how flow is evenly distributed. Is the BMP located at least 30 feet from surface waters (50 feet If SA waters)? Y (Y or N) OK Is the BMP localed at least 100 feet from water supply wells? Y (Y or N) OK Are the vegetated side slopes equal to or less than 3:1? Y (Y or N) OK Is the BMP located in a proposed drainage easement with access to a public Right of Way (ROW)? Y (Y or N) OK Inlet velocity (from treatment system) 0.22 Nsec OK Is the area surrounding the cell likely to undergo development in N (Y or N) OK the future? Are the slopes draining to the bkuetentlon cols greater than 20%? N (Y or N) OK Is the drainage area permanently stabilized? Y (Y or N) OK Pretreatment Used (Indicate Type Used with an ')C In the shaded cell) Gravel and grass (81inches gravel followed by 3-5 ft of grass) Grassed swale OK Forebay X Other Four sw401- 8loreW&n -Rev.e June 2S. 2010 Parts I and 11. Design Summary, Page 2 of 2 0 ME 2 Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submKW package will resuft in a request for addklmW IMormation. This will delay Heal review and approval of the project. initial in the space provided to Indicate the following design requirements have been met If the applicant has designated an spent, the agent may initial below. ff a requirement has not been met, attach Justification. Pagel Plan Initial 8W HO. C-1 1. Plans W- 50' or larger) of the entire site showing: - Design at ultimate bull -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Cep dimensions, - Pretreatment system, - High flow bypass system, - Maintenance access, - Recorded drainage easement and public right of way (ROW), - Clean out pipe locations, - Overflow device, and - Boundaries of drainage easement. C --T 2. Plan details (1' = 30' or largo) for the bioretontion cell showing: - Cep dimensions • Pretreatment system, - High flow bypass system, - Maintenance access, - Recorded drainage easement and public right of way (ROW), - Design at ultimata build-out, - Off -eilo drainage (if applicable), - Clean out pipe locations, - Overflow device, and - Boundaries of drainage easement. - Indicate the P -Index between 10 and 30 VC-5 3. Section view of the Woratention cell (1' = 2(Y or larger) showing: - Sloe slopes, 3:1 or lower - Underdrain system (if applicable), and - Biaetentiom cell layers (ground level and slope, pre - treatment, polling depth, mulch depth, fig media depth, washed sand, fitter fabric (o choking stone if applicable), #57 stone, underdrai ns (9 applicable), SHWT level(s), and overflow structure) 4. A sops report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in the field by DWO, by completing & submitting the sods Investigation request form. County soil maps are not an acceptable source of sops information. All elevations shall be in feet mean sea level (frost). Results of soils tests of both the planing soil and the in situ soil must include: - Sal permeability, - Sou composition (% sand, % fees, % organic), and - P- index. 5. A detailed planing plan (1' = 20' or larger) prepared by a qualified individual showing: A variety of suitable species, - Sizes, spacing and locations of plantings, - Total quantity of each type of plant specified, - A planting detail, - The source nursery for the plants, and - Fertilizer and walerfng requirements to establish vegetation. C •5 6. A construction sequence flet shows how the bioretention cep will be protected from sediment until the entire drainage area is stabilized. 7. The supporting calculations (including underdrain calculations, 9 applicable). B. A copy of the signed and notarized inspection and maintenance (I &M) agreement. 9. A copy of the deed restriction. Form sw40149arenerdion-Rev.7 Pert III, Page 1 of 1 . cq P C �h CXl F TAE©TLER No. 011E P 5 Engineer's computation Pad v c 0 3 n C 1n' (1 Cti b O A � Z N It a it i� -tt (p � s ! Nit In N TAE©TLER No. 011E P 5 Engineer's computation Pad it -+ C g �i h 6 �C4 v c n C 1n' (1 Cti b O A a i� -tt (p � s ! Nit 11 II N it -+ C g �i h 6 �C4 fj4.j s Pob Af w 8 Skimmer Sediment Basin Worksheet (Drainage Area Must be Less Than 10 Acres) Area Disturbed = -7. co Acres Runoff Area = 7.51 Acres Quo = C X I X A =. X x i.4 x7-57 — . &(.0 cfs Basin Volume Calculation: Volume of Sediment = • d Ac.) x (1800 cf sed. /year) x (1 year) 2 &00 cf Assume foot of basin depth, therefore area of the pit --1� Square Feet Try ( wide) x ( long) x ( foot deep) Sediment Basin Surface Area Calculation: Surface Area (SF) = Quo x 325 sf /cfs x 325 sf /cfs =�sf Surface Area — Use ( wide) x ( 11 long) x ( .3 foot deep) Sediment Basin Surface Area — de- Weir Design and Velocity Check: Qio = P9. G(a dfs; Q = CLH3n; H = [Q/CL]m [ 19. �� / (2.68)( 2O )]213 = O•,4Y/ feet Velocity Check -> ( )/( ZO ) ( O•Sf ) = M 3 fps, OK ✓ 3*'%/ Skimmer Orifice Design. RE at � 'maoao — Bmtn Water Staeps Figure 2. Skimmer orifice diameter as a function of the basin volume and bashi doWatering Cane. Basin Volume (From Worksheet: Basin Dewatering Time (1 -3 Days): 2 Skimmer Orifice Diameter (From Chart): Z Permit Number. (to be provided by DWQ) Drainage Area Number: Bioretention Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMW elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important operation and maintenance procedures: - Immediately after the bioretention cell is established, the plants will be watered twice weekly if needed until the plants become established (commonly six weeks). - Snow, mulch or any other material will NEVER be piled on the surface of the bioretention cell. - Heavy equipment will NEVER be driven over the bioretention cell. - Special care will be taken to prevent sediment from entering the bioretention cell. - Once a year, a soil best of the soil media will be conducted. After the bioretention cell is established, I will inspect it once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problemw. How I will remediate the problem: The entire BMP Trash debris is present. Remove the trash debris. The perimeter of the Areas of bare soil and /or Regrade the soil if necessary to bioretention cell erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one -time fertilizer application. The inlet device: pipe, The pipe is clogged (if Unclog the pipe. Dispose of the stone verge or swale applicable . sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the swale if necessary to swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Stone verge is clogged or Remove sediment and clogged covered in sediment (if stone and replace with clean stone. applicable). Form SW401- Bioretention O&M -Rev.3 Page 1 of 4 BMW element: Potential problems: How I will remediate the problenr. The pretreatment area Flow is bypassing Regrade if necessary to route all pretreatment area and /or flow to the pretreatment area. gullies have formed. Restabilize the area after grading. Sediment has accumulated to Search for the source of the a depth greater than three sediment and remedy the problem if inches. possible. Remove the sediment and restabilize the pretreatment area. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. The bioretention cell: Best professional practices Prune according to best professional vegetation show that pruning is needed practices. to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one -time fertilizes application to establish the ground cover if a soil test indicates it is necessary. Tree stakes /wires are present Remove tree stake /wires (which six months after planting. can kill the tree if not removed). The bioretention cell: Mulch is breaking down or Spot mulch if there are only random soils and mulch has floated away. void areas. Replace whole mulch layer if necessary. Remove the remaining much and replace with triple shredded hard wood mulch at a maximum depth of three inches. Soils and/or mulch are Determine the extent of the clogging clogged with sediment. - remove and replace either just the top layers or the entire media as needed. Dispose of the spoil in an appropriate off -site location. Use triple shredded hard wood mulch at a maximum depth of three inches. Search for the source of the sediment and remedy the problem if possible. An annual soil best shows that Dolomitic lime shall be applied as pH has dropped or heavy recommended per the soil test and metals have accumulated in toxic soils shall be removed, the soil media. disposed of properly and replaced with new planting media. Form SW401- Bioretention O&M -Rev.3 Page 2 of 4 BMP element: Potential problems: How I will remediate the roblem: The underdrain system Clogging has occurred. Wash out the underdrain system. if applicable) The drop inlet Clogging has occurred. Clean out the drop inlet Dispose of the sediment off -site. The drop inlet is damaged or replace the drop inlet. The receiving water Erosion or other signs of Contact the NC Division of Water 1733-1786. damage have occurred at the Quality 401 Oversight Unit at 919 - outlet. Form SW401- Bioretention O &M -Rev.3 Page 3 of 4 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Flowers Plantation Pod NW 8 BMP drainage area number:NA Print name:Rebecca Flowers Title:Owner / Developer Address:4880 NC 42 East. Clayton NC 27520 Date: l ---1 D - 13 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, T Mi ct'. ej 51y) ,4t , a Notary Public for the State of U c-e , County of IJ"M , do hereby certify that a6,- -cca -r—lowcrUs personally appeared before me this -J PH' day of JMV 7.013 and acknowledge the due execution of the forgoing bioretention maintenance requirements. Witness my hand and official seal, 1 1�1(X46iI, ST0^K� Rey Putl(c E,frl� W, IL C. 514� SEAL My commission expires S' Z " 70l45— Form SW401- Bioretention I&M -Rev. 2 Page 4 of 4 GENERAL NOTES: (LOCAL JURISDICTION) BEFORE YOU DIG, CALL NORTH CAROLINA ONE CALL CENTER www.ncocc.org 1. Any discrepancies In layout should be brought to the Engineer's attention prior to construction. 2. Written dimensions supercede scaled dimension. All dimensions are edge of pavement or face of curb, unless noted otherwise. 3. All materials, Installation, testing and Inspection of water and sewer utilities to most current Johnston County standards. 4. All streets noted as "PUBLIC" shall meet NCDOT minimum standards for subdivision streets. 5. All lots to be served by public water and public sewer. 6. A 10' utility, drainage and road maintenance easement Is reserved along and adjacent to all street right of ways, 7. Flared end sections are to be used on both 'inlet and /or outlet ends of storm sewer unless otherwise noted. 8. Fire hydrants are to be Installed as shown on plans. 9. Maintain minimum 3' cover for all water pipe. 10. Waterline pipe shall be SDR 21 class 200 PVu unless otherwise noted and installed a minimum of 4' off edge of pavement. 11. Corporation stops shall be rated a minimum of 300 PSI. 12. Where Waterline Crosses: A. Sanitary Sewers Waterline shall cross above and maintain 2' vertical separation or 10' of horizontal separation. If this separation cannot maintain or If waterline passes bel,6w sewer line then both waterline and sewer line shall be class 50 ductile Iron pipe for a minimum of 10' each side of crossing. B. Storm Sewer: Where waterline crosses above maintain 1' vertical separation. If this separation cannot be maintained or where waterline and /or sanitary sewer crosses below storm sewer,, waterline and /or sanitary sewer shall be class 50 ductile Iron pipe for minimum; of 10' each side of crossing. 13. All gravity sewer line Is SDR 35 PVC except as follows: All sewer line less than 3' deep or greater than 14' deep shall be minimum class 50 ductile iron. 14. Each prime contractor performing excavations or underground work shall be responsible for the location of any existing utilities In the area of their work. Notify the utility locator service (1- 800 - 632.4949) at least 48 hours prior to commencing construction it order that existing utilities in the area may be flagged and staled. Contractor shall use all care necessary when working in areas known or suspected to contain underground utilities, including hand digging. 15. The contractor Is responsible for relocating c,7y existing utilities that conflict with the proposed construction. In oddition, the contractor Is responsible for repair and replacement of ory utilities, curb and gutter, pavement, etc. that may be damaged during construction. Damaged Items shall be repaired to at least the quolitf, of the original workmanship. The contractor shalt field veri `y depth of existing utilities and relocate if proposed grading causes utilf:;f cover to be less than minimum required. 16. All temporary erosion control measures shall be inspected after each rain event and necessary repairs shall be done as required. 17. Each lot shall have a 4" sewer service and a 3/4" water service provided. Sewer service and water service .shall have 10' min. separation. 18. Water services are to be "ganged" where possible. Where "ganged" service crosses under the road, the line muri. be 1". All service pipe under , roads shall be sleeved.' 19. Waterline to be pressure tested at minimum 175 psi. 20. Ductile Iron pipe sanitary sewer must be Interior coated with Sewper Coat or Protecto 401, per Johnston County requirements. 21. Contractor to test sewer & water line accordi=ng to Aqua North Carolina's 2012 standards. 1. Topographical data performed by True Line Surveying, Curk Lane, PLS, North Carolina. Boundary Information supplied by owner, taken from approved planned building group plan set. 2. The contractor shall notify and cooperate with all utility companies of firms having facilities on or adjacent to the site before disturbing, altering, removing, relocating, adjusting or conne -acing to said facilities. 3. All excavation Is unclassified and shall include all materials encountered. 4. All structural fill material shall be free of all sticks, rocks, and clumps of mud. 5. Unusable excavated materials and all waste resulting from clearing and grubbing shall be disposed of off -site by the contractor in an approved solid waste landfill. 6. Location of underground utilities are approximate and must be field verified. Contact the NC One Call Center at least 48 hours prior to digging @ 1.800.632.4949. True Line Surveying has only located the utilities that are above ground at the time of field survey. Underground lines shown hereon are approximate or as reported by various responsible parties. The surveyor does not guarantee that any underground strucfi, res such as utilities, tanks and pipes are located hereon. 7. All pipe lengths are horizontal distances and are approximate. 8. All work shall comply with all applicable codes, regulations, and /or local standards Imposed by local utility. 9. All construction and materials shall meet Flowers Plantation PUD appoved details and NCDOT Standards, latest edition. All work within NCDOT right -of -way shall meet the specifications and standards of NCDOT. 10. All concrete pipe is to be ASTM C -76, Class III with ram -nek. 11. This property is not located In a Flood Hazard Zone per FEMA Map. 12. All lot dimensions shown are approximate. Consult the boundary survey of actual site boundary information. 13. An evaluation of 404 jurisdictional wetlands was conducted. Wetlands are shown on the plans. 14. The contractor shall be responsible for all work zone traffic control In or adjacent to NCDOT right -of -way. All signs, pavement markings and other traffic control devices shall conform to the Manual on Uniform Traffic Control Devices (MUTCD), 1988 edition as amended. 15. Prior to placing CABC stone base, the contractor should notify the Geotechnical Engineer to inspect and proof roll the subgrade. Any stone place without prior approval will be the sole responsibility of the contractor. 16. DESIGO/FIELD CONDITIONS quite easily may vary from that represented In the Initial soils report and /or topographical report. Isolated areas may show up weak and adverse soils or groundwater conditions may be discovered that were not revealed during the Initial soils investigation. Therefore, the Contractor is to be aware that Stocks Engineering, P.A. will no;f and cannot be held responsible for any failures to either a street or parking lot pa cement design as a result of soil conditions. 17. All utility services, (power, telephone, cable, etc.) are proposed to be underground. Do not seed cr mulch disturbed areas until all underground utilities have been installed. Utility Contractors to bring Main Services to R/W as shown in plans. 18. All Iln *s that wrap around cut -de -sacs shall have the proper size and degree rnecho:nical joint (MJ) elbows installed. 19. Property is to be served by Public (Aqua America) Sewer and Water. 20. No taps shall be made into the existing Village at Flowers Plantation system without prior 48 hours to Heater Utilities, Inc. An Inspector from Heater Utilities shall also be present at the time of the tap. 21. Regulatory signs, stops signs and street name signs shall be manufactured from high intensii ',y reflective materials. 22. All ex:cass topsoil and unclassified excavation is to be hauled off -site, unless otherwise directaid by the owner. 23. All site construction must be Inspected by The Project Engineer or Architect at the following stagea: A. Completion of grading subgrade prior to placing Stone Base. B. Completion of Stone placement prior to paving. C. F'Inal Inspection when all work is complete. 24. The surveyor did not visibly see any cemeteries in any open areas unless otherwise noted. 25. This property does not depict encumbrances that are found during a thorough title search. 26. Concrete Sub shall be responsible for all score joints and expansion joints. 27. All ors -site curb and gutter to be as shown on plans. Curb and gutter within NCDOT right -of -way to be 30" standard. 28. All curb and gutter and sidewalk concrete Is to be minimum 3,000 psi at 28 days, air entrained. 29. Contrc :tor to furnish all paint striping as shown. 30. All dimensions are to edge of pavement (EOP) unless Indicated otherwise. 31. Contractor SHALL NOT POUR any concrete before forms are inspected by the Civil engine -er and /or owner. Any concrete that has not been approved by the engineer and /or owner will be the responsibility of the contractor. 32. Contractor shall saw -cut to provide smooth transitions where existing asphalt and /or curb and gutter Is to be removed. 33. The contractor shall provide all the material and appurtenances necessary for the complete installation of the utilities. All pipe and fittings shall be inspected prior to being covered. A mir,..'mum of 24 hours notice shall be given to the inspector prior to covering pipe or blockings. 34. lnforrnatlon concerning underground utilities was obtained from available records and field conditt�ons when possible, but the contractor must determine the exact location and elevation of all existing utilities by digging test pits by hand at all utility crossings well in advance of trenching. If the clearances are less than specified on the plans or 12 Inches, which ever is less, contact the project engineer and the Owner prior to proceeding with construction. 35. The contractor Is responsible for the design and Implementation of all required /necessary sheeting, shoring, and special excavation measures required on the project to meet OSHA, Federal, State and Local regulations pursuant to the installation of the work indicated on the drawings. The Owner and Stocks Engineering, P.A. accept no responsibility for the design to install said items. 36. The ccntractor shall Include in the contract price daily record keeping of the as­wbuilt condition of all of the underground utilities, construction stakeout associated with the project. Preparation of the necessary /required as -built plans to be submitted to the city of Clayton and all other information required In connection with release of bonds. 37. All water line and sewer line installation shall conform to the standards and details of the Heater Utilities and the State of forth Carolina Department of Health Construction Permit. 38. The Lcnd Disturbance Permit must be kept on the work site and shown upon request. 39. The c«ntractor` shall Include In the contract price all material and labor associated with the testing of the water and sewer lines required by Aqua America. 40. The cccnfroctor shall Include in the contract price any de- watering necessary to construct the project as shown on the plans. 41. The acntractor shall include In the price, any and all costs associated with providing a professional engineer on site If required, during the construction of the storm water management facilities, underground utilities, etc. as required for as -built certification. 42. All grass, topsoil and 'building debris material' dumped onsite shall be_ removed in the base 'bid prior to placement of structural fill material. 43. All geroerated waste shall be disposed of off -site in an approved landfill location. 44. Rip -Ratio shall be placed on . ditch back slopes to prevent scouring of ditch bank. 45. Marker, Balls shall be installed per Johnston County Specifications and a #12AWG THHN insula*ed locating wire shall be installed per Aqua America Specifications. J OwnerlDeve�qper: The e l Compa -4880 NC 42 East Clayton, 0 I \ \' \ ♦ \ - -. -�. _ _ _ _ _ _ _ _ - _ _ \ -� .� 1 \ \ \ ` \ \ i t t t t 1 1 111 �i i t i 1 t ♦ \ `. , \ �,� �` `` \ \ `\ �' ,� a `` � '`" � ` ` � -�•� "`�" � ��� `` � `' -� -- -.. _ .._. .,` t\ \t \ ♦ ,, /1> e \� \� \\\ .� . __- _ \ \ \ \ \ �. \ \ t t t \ \ \ \ t t 1 t t } t i tttlt\ ^ t t \t t IN \ \� �\ •. -__ --~ �-- _� _ _ ____ - __ \ \ \ \ `'- `'` \ \ \ t t \ \ \ \ \ i t tt i t t t } } I ! / f ilttt \ \t 1 t t \ � ♦ '` -. � :', �, � -„. ° -• -.. -,... " -. -. ',-.. ` \ \. � - -... _ ........, ..•. -- •-' ' J - _ ..... - .,_. _ _ _ •- _,,.~ `� -� \ e \ \ \ \ \ \ } } l � \ \ \ l t l t } t } i / / / ll \ \t i l �- - t � lttt i\ ti t t ; o ±• -- : ' .... ; _.,, ~ .• - -� - _. -• •` �• �- '` \ \ \ \ � �- _ "'• .- -- �- - -- � _ _ .,, ° �•, ,,, � '` 1 i .• -- 1 } t l \ \ \ t 1 i 1 } t } t t 1 } ( / `" i itll i l } ! t ♦ •�, "' •� % �. '� , -.- � ° -..; �• '' �- •� `` �.° �.'` �: ti • \ \ e , � � ` \ ~ `' -� -- - --'' ...- -,,. --- _ -_. _ -� � -.. \ � � ���; -\ �i 1 i } /' ! } i } t \ \ \ \ t t } t t t i } i i 1 r f / ( t \tl t\�t i t t i t �. '-. '` ' � ~- "•• •`- -.. �- '• -- -- -.. `` ., \ \ ♦ ♦ "` \ \ \ �• ... _ _ � _ � •,, -- -' _,•.._ - .`" -" _ _ _ ..,.. .•„• �• •,, -- ...e � \�`�.a.` 1 } ! } I t `' \ \ t � 1 } } I I 1 } ! \ltt \i t l t t t ;•f -- \ \ \ \ \ _ - - "'� ~ _ \ l IN IN \ •.. ,`,- -. '° .. \ .... .... -... ,••- �• N, \ e ♦ \ \ \ \ \ � � ..- •,.' .,,,. r- .._. _ � ..., .� �. � �• ;s/rf s.•.... , -•-• -• � } d / } [ i 1 \ i 1 t t { ) 1 1 j �...•- t \t itt 1 t t � \ '� �°;'':` `'? '< », \ '.��' �" .. '` '` �" ' �•' �,.. �, '� � \ � \ ♦ \ \ ♦\ \\ 1 '\ \ 1 \ .•'' `.., , � �, •-• ""' �,,, ...- •^°° -- -- ._ -... -.. � `�' ~ \. \ \ >` �� _� /// /(1 /��((,�.'^•_, �� ^ -� =.=�� { i i � ! ! /t t i � 1 t t t 1 f 1 ! j j 1 j � � 4 i \ \ \t t`1\ } � l \ , t \ \ `1 \ `` •,� �' \ \ \ \ \ \ ♦ \ �' �,• ` �. ..+• °.' '\ ♦ \ /r/j %' -." yl,: • �. _• Jam..- ...- --- .r \o \ \ '` 04 ♦�`♦ --- _' -. \ \ ' %�/ / ! /' 1 / ! l I \ r IN \1 \OW } i `♦ ♦ \ \ \ \ \ \ \ \ \ \ ; "` .- •_ -_ _ _ .,,., _..... --• -- -•- � \ \ •-. � / /''• � } , j 1 r / / / / / ! / / � ! j 1 1 r r 1 1 1 f i \t \t \t \ti i t } t 1 r-�_ \ \ t� � 1 \ � \ \ \ \ \ \ \ \.� `'. _ _- - ~\ '-� � � -- -_,� ;, /-��a t t i t t t I f 1 1 // ff , ! t l 1 I! i 1 t i 1 I 1 f ti�t\t1t � • }fir t i \ \ \ \ \,\ _ � _ -� \ i t } t \ \ \ \ \ \ \ �• _ ..... _ - --- - .....�., �- •.•-• fii !I / -- ` - 1 I } }tit \ \ \ \ t l i ( t \ I e I / / / ! / I ( ! { I \ i 1 1 1 t �. \ \ \ \ \ ♦ \\ . - - \ �. _ /e/ /j/ -- . f1 } t \ 1 \ \ \ \ \ \ .••. -,,,�4 t-: ,,, ! 1 } ; i 1 \ \, ♦\ ♦ ♦♦ \ \�,• \'�., .. �-...�....-- --�- ----.. -� `~�- -._.. � rife 1 %ll •-.... '.... 'r 1}I }li t \♦ \ \ \ j ♦ \ -. -- -.. _`- - _ _ -" rr/ f 1 �� - -� 1fa }i` \� \o\ \ \ \ \1 \ \\ 1 1 t 1 t 1 i ! / t i 4 ) i I t i \ \i1\tCtt t 1 { 1 \ \ \ \ Ij I / 1 I ( j 1 i } { i f 1 r 1 t I - t t 1 c. =. '•`. ♦ \ \ / I -- `° - % \ \ \ } l } 1 I t t 1 { 1 t CURVE TABLE CURVE 11 LENGTH I RADIUS DELTA TANGENT CHORD DIRECTION CHORD LENGTH Cl 221.37 810.00 15 9'427 111.38 N45°11 '44"E' 220.68 C2 236.32 1690.00 8' 0 °42" 1 118.35 1 S41.26'1 "W 236.12 ! / \\ \♦ \ ` - w _''1 --- - r,.-.��- /rir /1/ . ..- - t��� \ \ \ \\ \ \\ t it i l 1 } i i ( ( l t I { 1 I j \ --- 1 r \ .� \ \ \ \• -- .,, - . � -.. ,••„ -- .•, -., _. _ _.. -.,1 /I `�•�,�•:,. -- •.,,. -.iii //- ...... -- \ \ \ \ \ \ 1 t 1 } ! 1 / 1 t I I } t I 1 1 r t i 11it tilt t t t \ t it �I 1\ ♦ \ \.`\�_ -- ��•1 Y- -_- - �� ~�-�- i -- -�\ \\ \ \ \ \ _ \ \ -,. - .,. _ . _ , - .,.. l •�f � - ems; - -- _' j ` -• , ...~ z> •, / . __`'. ,,,`` ``, -• ••.._ i � ., ,1 .•.•. -r. - - --'- - _-r,. -- _ -- .,= �..• -- � \� \� --'° • / i , \ � \ } 1 l } i t [ } } 1 t 1 t I t f 1 1 t ! I ( I i 1 \ 1 / 1 '` / ' / -` ' `--- ..-. -. - - f ^ ~• - '~ -•- _ -•; - ..... _ - �- \♦ -- _' �\ , \ 14 [ t t } t 1 1 t } t i I I t t 1 t I ! f t \ } � � •,. • ` -,\ .. / -_.. � . •... - - .,.-- _._.._. --- - -, / ! I [ } i } 1 t } 4 i } 1 } � t [ I t t t ! \ I � � i \ l _ e _ __ _ _ I _ �' = - >P I 1 i } 1 1 t 1 i 11\ 1 1 } • ,Jur%J aDlC� IiINAI LdC- TCANDS I 1 I} t t ! 1 - - ., ' /r!I ! 1 f i I f t 1 1 1 1 I 1 1 t } } t t } } t t t l t t / \\ t\ \\ \t� \alit t l \\ I f z- / r/ \\ ti p- �- r" •- � -' ° r !. ARE-A­ 5867 .,.S� F ;%,_/_ I t( 1 1 f 1 1 1 1 I! t t } } } t 1 cl s t } t 1 t t 1 t t I > \l 1 1 tl t t 1 l .- / � ...•• f •, • ... - / / .- "• ..- • / - -' / / j J j 1 1 { ` { I 1 } \ i } } } ! I o t 1 t ) t r Jg o \ ,. ,, , ,- ...-• / / -- , ,... --• r / .r / --• •-' ... - _ �'` / r / / �/ /! 1(/ 1 } l 1 t � } � 1 � t t it \t tt t\ i t t / ` \\ t \ \ \ .. -- ,- ' . --- _ ,.•. --' / .-- ' / / ° ' - �... `' . --- = `' _ .,,,,. / r r / f "` 1 !) s t ! I.... • f ! 4 t \ \ � 1 1 ! \ \ t � i �` \ r r ,, / f / 1 i t t \ t 1 1 ! }' } IN • - --- -' ° , .' i ..- --- ° _• ._ ._..._ ..,• ---•". _...� ,,• • • r r / ,, , r .r � .,. �, ...-. _ . = 1 1 \ t � \ t j 1- � 3 4 1 i j •��`�s . \t / / / �' / - = �� - �•� \. I �. i 1 t t 1 t \ \ t ! \ \ t 1: Sat tr ,.-.- /.-' ,,. ,. r / .- . .,,. ,- .- ,_..,. � ♦ • ''� t \ $ _J' e': s 10,49 SY !. -�® \> \ o t ! t \ \ 0.2� Ac. i� "3 1 t t I \ \ �*` ` .-'r l 1 \I \ ./ / / / Al, ' / '.i �, -"• / / /'/ I J I '� ,,,.» " ^•. •� �\n/ • I I t } t t \ (�r�• j t Vo t\ \ , t t • t �•� \ -> / , /f / . -' ---- °• t / i } t } \ ! \ ,\ \ f�1 / /. / / / r �. 1{x,515 S.F. \ L \ \ f \ --_ - -- - "� /� / /e/ r �,�' °�'�.��/ /� •' . '�� �� . �" � +� /� 1 I i f t , \ � t % \ 1 - \ \\ \ / tr 0'24 Ac.. 647 S. \ \ .•.- _....- -' .- ' _` -- _ .._ , ,, ,,,, / / / / / r• / .,,. ! ,. / / .- / / .- -' _ _... -, •• . _... _... _ --' � i 1 1 � � 1 ! � Os22 •.._ - _... _ .r• "'' / _ ,..,. -' ` • ...- _ .... --- ••'^' '' / / f •,/ / ,�. / ,,- r '' ..• � ..- . ,� j ! � \ \ ' t �r t \ A` \ }"'y,` . ..:- /-�! - ~- " r / I / / /' / / '' / r / -" ..' � j� l ! � \ � ®�� -37.6 ` � \ r /N \ t \ � I r _ _ _._`� ._ .. _ _ _ _ -. �- -' " '.,- ' . r / � / / / / '' / / r / / �' ° "' - ~' •- -., ,, �'•~ ~„ ` , � f / l t � - /\ tip' T • � r �' .\ \ \\ •. }\ °' \ t \ �. s �: • : t - -':@, \ W \ \ 9,6.78 S.� - - - - _ _ , \ \ �s t l i `�•:::1 \ ' \ _ _ ._ - ..... - ...- -• _„ "" ...." -' ..- .,,.' / / -•' `, .-' / ✓ i' '" ` ` ` -.. `` \ � ,o } 1 0 8,33 S.F. \ 1 � g, ,� 100. / ,,. -- - - _ .... - y .r _ •- - -- • ....- -- / ,- / / / r /, ` , / ,. ,, / / .- y - \ � -. _ _ - ,.'' \ 1 ;;• • , 0.1 s A4'. \ 1 ' .l _ } � . ;f�•'� : t�;:: � 1 } i \ t / f I I •- -' \ \ i! r ___ _ - - �rr i/r ° °,• / / r / -- �\ \ ._ .. '/ / / '� l 1 1 i �o.� \ Lt --.}_ } t 1 t ti \i }} / // r r ' r^ • s r ~ f r / J •'' r /' / ./ / •• / ' \' \ ~ ` _ -- ! '"", 1 '" l \ 1 I '! •ry i I t t ,•' � •-' _ _ ,_,.. ' ,,. ''' ..'' / .- ,• / / ,.•- "' \ ..,, '`• .. . l e j �" �• ,,, 1 ` .: � ;•�� ty �' ' •t t t `ti /' ! I /,�/ t r / /- �'r/ / /-" .... / .- "' /' .-•- " "` -' �' / /' -'' '� ''• r �'' �" / �' \ `' `` -._. ,•._ X, � ! �, I / ,'. '�'' • /�.� / � / � / ! ,� / /, // it /e / - _ 10,080fS.F. •. r. ® SFi 11 J` , 0.23, Ac. a. 7 Ac. / ' / IJ �40, ,,ice / / s / / •-' .-'\ -^ ,.. / /.- r " -' ' ° --' - ' ` `` \ \ \ \ 'I�'C S ! / ,�I/ I III iI! I f '•'' /�/ r /frf i ref, / / ! l " J / /' •'/ f -/ - 'f / ♦ / ' / / i '" f/ / ! e rr ` \ \, �\ \ ` .1 . - �'fr 8,7 S.F. f / / t I'' ;yt// !✓ �t -- /raj . ✓ / / j .891 �, S.F. i.20 AC. Air- / el \ \ ` \ ` -- /- _' -~ -- / :.: %.. / f /8,700 S.F. ! j' / 1 t / �"� l /! , •' r , f / f. 0.20 Ac. 7377' S.F-. 0.17 Ac. / / ` ! ! /' / ,r .•• ✓': /. / / ! / ".'. '^` ^.. '"`• " ! `•' �•' ': a 1 i \ 8 ,77,� S.F. •. � e ! ! r �+1 � \ , •,/� A ! /!!!t / / ! _- �. _ 4s 'C;i�.. ». I / \ �\ �.2i Ac. 1 // // I / 'rj /// / f/ ! // ' -- '`^ ,/\ \\ 7.577 S.F. / 6�• /// `\ \ ! / / / / /i/,p / •j ••-,O 17 Ac. - :!`` / ` \ j l / ,6CSe' 1 ! //! / / / ! I / �\ ( r / t °' -- . _ - _ ` 370 / \ ° ' ` / ♦ 8,904 l!', ./ `�\ 0 A .20 \ j t J r•o� ,,� � /btu' ! /fit /i IN 1\ t\ t t t f / ! \\ \ .* // �rj / ^\ 7,617 eF. W !! .. \\ \ / f ?t1 !'r /� �.!• /,, fi/ % y jl I/! \\ \ \ \ \ \ \\ \ i I \ \ ` \ / / 0.17 Ac. \\ fl /! S.F. i / / !/! %•I !� \ , ♦ \ \ \ \ \ \ t t \ \ t `Y • ! / > 0.20 Ac. % .o`t' / / '` \ \ \ \ 7,734 S.F. ! [ /} } /j/ /• \ \ \ \ \ \ \ \ IN \ \ 0.18 Ac. s \ \ \ \ \ ~', \ \ \ \ ` \ �° \ \` \\ / /1 \'` ! s ! W / %� t' flyf DSO . ! } i t / i / �• I% �� '. / f I tl ♦ \ \ \ \ \ \ \ . \ ♦ \ \ \ �/ 1 l ! 8 847 F•� [9y' 1� / r I / r/ ♦ ��/ �`.t' /.:. og / ! 0.20 Ac. 1 / " l/ '- B� �! I \ \ \ \ `\ ` • \ \ . 8,237 S.F. ♦ '. ` \ '� \ \ �' \ 0.19 AC. \ \\ `\ \\ \\ `\ �.\ \\ `\ '•. �\, \\ \ \ \ w \\ x�, c'� \\ `' rr }.w i. s s j , /I o\ t i/� !A/ I N, • /1 1 9,23!Y S.F. % • OF( `:.. INV \', ° \ 301.47 \ \\ \ 1. \ r�O - \ S\ / .::,:::' w 1 / f' \r ! }!/! a:. \ \ ♦ \,� \ \ �� ` ` \\ \ \ \ \ 9.17 AC. ,��� 6• \`_ >,- ;'.''`;';.: ,, >: ; ' / 1 9,23,4 S.F.( \ iNt 3�1. `` • ` . \ \ ` \ �° \ " '.mss: 6� // a.;q Ac,1 } Yt v 1 25 9,15 eMT ♦ \ \ \. \ \ \ \ . t 1 1 �, \ ' / 9,7391S.F. 'r. >� /voce%// \ \ \ \ > \ ♦ \ .\ , \ \ \ \ \ \ \ ! t \ ®o ` :�., 0.22 Ac° \• ! / I / // . \ ♦ \ \ \ \ ` \ \ \ \ ♦ \ `` \ `` \ `^ '. °� \ \ ` • \\ t 1 ( i [ 11 t ® \ �► °o ...,: !.``�+ . \ / [ . /��� . / / / f �qy f / /,�l // INLE \ \ \ \ \ \ ♦ \ \ \ \ \ \ . \ \ t t 4 } t t t t �o l \ \ ' . > s .o xs \ Al v r ./ YNV IN 98.89 r / ' / /. n / I// YNV OUT 98.66 I \ \ \ \ \ \ \ \ \ o \ \ \ \ \ \ } i t �' . 7,2aQ S.F. \ r ,�° i ,�l/ i f . f / •` '�k 1, I. 5'F \ \ \ \ \ \ \ \ \ \ \ \ ♦ \ t } i 1 I \ \ 0.17 oac.. q .✓ �/ / / /,' // r / / 1 I t t t N. \ \ \ \ \ \ ♦ \ \ \ \ \ \ t l t 1 i } 1 1 t t t ,, \ -\ \ \ '\ • � '' \ - ''• \ ct ° F` _ ;:.:. � /! ! � j ,r r f`/ d! // \ '"�- -..._ /y�' \ \ \ \ \ \ \ \ \ i i t 1 ! t t i \ \ �o \ \ \ l 1 t i i l \ o \ _ i -: % ss.�: r . ' f > ,-y t t t t t l \ \ \ \ \ �'C 4 912 S.F \ \ l t t \ \ \ '' \ '• \ i \ \ \ \ t t } i 1 i t `, \ \ \ \ - 0:30 Ac.. - • r. • .�' ."!g, \ \ l t I f 1 ! ! I f f f f t t \ t 1 \ \ /// / r ✓/' / /! // / / IJ II /1 l / l / \\ IN \ \\ \ \\ \\ \ \\ ol tt ��/ rrr / rrr✓�s` r' ♦� i' le e ♦ 1 } i I/' I / //i / /1� >tt.,.: �ir TOP 2 94. INV « - fi . / - 'r/ ,/ �/ ' //-'r .!-'.'- � f.Pr /ir/ rri/r r ;, / ./ r/ r " °,.., //` aj .; r/ / / j � /• / / /rr�i r i j � // /.• ° ,, /,..'�r „ ,�0� 28853 UP , 2'62 // W '� e _ / - / ? ,.• iii . � i ./'' _ > .�'� .✓' '� N, 1 1 � 1 1 1 r 1 A � 1 \ i N, a \ \\ VIII. \ �I v 0 x 04 c0a 0 cv Q N v- w. " • ,. ui of I LW I PR uj ,• • 0 w ea STA C/L STA CA 0 T 24 LF 1 W 0.3% w/6 MAT 303. PROBLE -- - - - 150' OFFSET LEFT - - -- - -- -- -- 4W OFFSET LEFT EXISTING C/L - •-- •- •- •- -• -4Q' OFFSET RIGHT --- - - - -- --150' OFFSET RIGHT i STA iO +00 = STA 11+90.07 STREET 1eA'+ C L = LEV. 308.37 Vj.H. #2 s �I STA 10 +03.08 = STA 11 +86.99 STREET "A "- i4l.H. TOP 308.28 1 1 ]MV. IN 292.19 i INV. OUT 291.99 1 j � 4 I , /1 1 ! ( t t INV. FES 297.25 m. ! 1 i VPI STA = 14 +66.29 VPI EL = 304.08 g1 = -1.00% 92 = 3.00% CURVE LEN = 200.00 K = 50.01 E =1.00 d / t 1 1 r !t / d � !! 1 � t I / t I l / t r t r r r rr r d M.H. #E3 r STA 12•!-28.00 LINE "B"' t r M.14. Top 1314.00 r r INV. 114,297-40 (PLU�FOR FUTURE) r rr INV, OUT 297.20 rn tti ice os / / t 1 1 r !t / d � !! 1 � t I / t I l / t r ; in f4 6 x N ca N N 21 p { N o ci al� f ♦. li e € i rn tti ice ' C0 i -- - - w en T {� CCI 2 - a N C1I.to N - �r Gam_ _ "�j "00 0 tC] CCi _ ©O (\T C) - w � + ) t ` o `�_.. _ __ --- -� • r rri � ° ¢ -. N.-- ra y k. • .- 325.00 ° _=Y M `'- M Lo Pl- to T 0) o Gs 325.00 325.00 a Imn (n twit ((n W fi Lo S?_ - _ - _._ 320.00 A W „ , 320.00 j rn F- - _ _ - _,_._ -. -. Go tq- 315.00. It W 315.00 !` ___`�""� ---- Q- P"�` .- 315.00 { v~i ter-•- - - ° '•� ,� ABOVE �- J SANITARY SEWER �• � 310.00 310.0 0 ,.�,.. . �- - 310.00 - ^• - .--�.� -.. �...�.._.. � , -� ./' .� '+°•� _{ wr ••n ^ ~ � Yom' Mr i,__ .�. �ti -� ..�` '\ �` • `-••�' ~•• +..�_..�.. �Grr� _ ^- ' /-V�+ � N� L..'.' -- �` .. _ .. .. . --.- ��._' -7 : � V Jq ter'"'. -'^ "_ _"_ `. oO�O- +' •�'� ��' ,- � -,--'- .. • ....., � '�.- ."'- "" ""+. �•-- "� 1, are''". -.-..- ----- , ,� �,, .r .. /' 305.00 305 00 . �`���Q�' oo � - _._-- ,' A -• p ..RD., 6e, 1 ONTI NUES BENDS s --- � C 1 E-a •� EI i l , EE PLAN MEW) 300.00 Ii I it i i ._ _ -� - a � 300.00 ........... , 300 00 - - .. �. _w 24" RCP .� 8" PLUG li it �� as - iURE OBE." __.___^ _.. - _ X.- _ _ - _ 224 bee L�' QII>' S. 295.00 m 295.00 i. 10 _ 295.00 I li -II �s m pv� g.. 330 LF' Pvc.:s,Sz:o M� -8u PRIG =SS: �- In ' 290.00 if -�i- - n e• I�s� 132 ��.� %�'� 1 290.00 29 0.00 W � ci in m am HC� .. N �. to Nat co _._ N - -- d)t C1G N Oe ,= h N (_ N N �N E-. ONE }- N �INy h N N •hi N !a. 0c 285.00 -- zzz 285.00 - - - -z - -_ ___ ziz Z_ 285.00 - - -}- - Z _ Y Q , f Li l `e 00 Qo (6 o6 0 0 0 0 0 0 0 0 © 0 0 0 0 p to n �o I n n ISO n n ro n I r 10 +00 11+00 12-00 13 +00 14 +00 10 +00 11+00 12 +00 13 +00 14 +00 15 +00 16 +00 17 +00 18 +00 r ; in f4 6 x N ca N N 21 p { N o ci al� f ♦. li e vi marms coop ORIFICE B&F ES Q FL PER QETAIL Of gi lo, 17 Ile Ps it FENCE Nt 21 AV NIN, 22 oor OUTLIE INL INV IN 98-89 INV Mill Jill WA / ' Ile \\ N \ 8 EROSION LEGEND SILT FENCE SILT FENCE OUTLET b � * � - � pq Lu � � �|L4 0. C44 C4 WE CL Lu w to Z co ca wZrol ENW-1 TEMTORARY INLET PROTECTION PERMANENT SEEDING TEMPORARY PIPE INLET PROTECTION OUTLET PROTECTION CHECK DAM EX. PIPE ROCK DAM TEMPORARY PROTECTION 13 CONCRETE TRUCK WASH-OUT b � * � - � pq Lu � � �|L4 0. C44 C4 WE CL Lu w to Z co ca TOP DAM 150.99 4" VII ..- - CEIVnPEDESODGROW _ .. � r� ___ .. ._.._.._.,_.. �. .. �...,... _..... __ .. _..e.. ON SANDY SOILS W7H AN IN17MA77ON RATE OF 2 PONDING INCH/NR OR GREATER 4 "0. DEP7f! TOP OF BlORETENTtON t78OO 4„ ca :.:. :• . 0. 4: _ ...... ........._ .. ,.::::::.,;_.:...,..;: ....:..:: y - CLASS 8 RIP RAP LINED •... .:...: - ..... .. - �:�:. 'r ' :ZB5�88 %YY SHED SAND.`:.::;'......:.:;_ . FaR A aE'PTH 12" IN ,. � Y)3- •{ M TV ... •..:;:..:;. .': is S %ORGANt AATE >. ......: .::.•. :: ::.:...:.:....'. ; . ::" ..; ::.:: . '.: • .' ... • PNOSPNOROUS iNaEX<3D' °:' •.. ter 'CHO KING: JNC STONE :...•:::.::; : s:::: wa • x. �fb 7771-17-1 :.i - PERFORATED PVC SOCK DRAIN 1. After the site is completely stabilized, contact Stocks Engineering 0 252 - 459 -8196 for verification of completion and stabilization. 2. Contact Thad Valentine of NCDENR —Land Quality Section 0 919 - 791 -4200 for approval to remove all temporary erosion control measures. 3. Upon approval from NCDENR —Land Quality Section, berg^ the conversion of the bioretention area from a temporary sediment trap to a permanent BMP cs follows. 4. Construct silt fence around the toe of the interior side slope of the bioretention area (BA) to protect the BA from sediment contamination during tixe Conversion Procedure. Leave an opening at the downstream and of the BA just wide enough for construction machinery to enter /exit. 5. Bring the side slopes surrounding the BA to proposed grade. 6. Seed /sad the side slopes as per specifications. (Contractor Is responsible to maintain and protect seed /sod to promote successful establishment during Conversion Procedure. If damage or death to seed /sod occurs, Contractor must replace affected area immediately.' 7. Once seed /sod has been Installed, Contractor shall exc4vate the bottom of the BA to a depth equal to the greater of the following: a. 1 foot below any evidence of sedimentation upon in situ soils, or, b. 4 feet below the proposed bottom of BA elevation. 9. Excavated material must be disposed of in an approveld off —site location. 9. Care must be taken to prevent any sedimentation /re— sedimentation during this process, as contamination of the In situ soils or the designed soil .media will compromise the functionality of the BA. If any sedimentation occurs during this process. Contractor shall remove sediment Immediately. 10. Contact Stocks Engineering 0 252-- 458 -8196 to Inspect excavated BA before continuing construction. 11. Upon approval of Stocks Engineering, continue constn cG,�ng BA per details. Establish appropriate permanent vegetation In BA as soon as possible. 12. Upon completion of BA construction, remove sediment from alit fence and dispose of at an approved off —site location. 13. Contact Stocks Engineering 0 252- 459 -8196 to [nape.--.', completed BA before removing slit fence and placing the BA in service. NOT i SCALE SOCK DRAIN 6" 157 STONE WASHED SAND it Y j ~I c4 N w to M p 1 W N Q a . k �i r • ri CD CD 04 "04 i 'S l - it Uj fit Uj Uj c {r f: tR A,