HomeMy WebLinkAbout20120894 Ver 2_Approval Letter_20130201North Carolina Department of Environment and Natural Resources
Pat McCrory
Governor
Orange County
Attn: Frank Clifton
131 W Margeret Lane
Hillsborough, NC 27278
Subject Property:
Division of Water Quality
Charles Wakild, P. E.
Director
February 1, 2013
John E. Skvarla, III
Secretary
DWQ Project # 12 -0894 v2
Orange County
Buckhorn- Mebane EDD Water and Sewer Improvements Phase 2
Haw Creek (UT) [030602, 16- 20 -(1), WSV, NSW)
Approval of 401 Water Quality Certification and Authorization Certificate per the Neuse River Basin
Riparian Buffer Protection Rules (15A NCAC 02B.0233) with Additional Conditions
Dear Mr. Clifton:
You have our approval, in accordance with the attached conditions and those listed below, to place 611
within or otherwise permanently impact 0.683 acres of wetlands, 160 linear feet of stream 7,206 square
feet of Zone 1 Neuse River Basin protected riparian buffer and 4,307 square feet of Zone 2 Neuse River
Basin protected riparian buffer and temporarily impact 0.885 acres of wetlands, 15 linear feet of stream,
14,677 square feet of Zone 1 Neuse River Basin protected riparian buffer and 9,780 square feet of Zone
2 Neuse River Basin protected riparian buffer, as described within your application, received by the N.C.
Division of Water Quality (DWQ) on December 27, 2012 with additional information received on January
24, 2013. This Certification replaces the Certification issued to you on October 26, 2012. After
reviewing your application, we have decided that the impacts are covered by General Water Quality
Certification Number(s) 3884 (GC3884), which allows you to use Nationwide Permit(s) NW12 when
issued by the US Army Corps of Engineers (USACE). In addition, you should obtain or otherwise comply
with any other required federal, state or local permits before you go ahead with your project including
(but not limited to) Erosion and Sediment Control, Non - discharge, and other regulations. This approval
to proceed with your proposed impacts or to conduct impacts to waters as depicted in your
application shall expire upon expiration of the 404 or CAMA Permit.
This approval is for the purpose and design that you described in your application. If you change your
project, you must notify us and you may be required to send us a new application. if the property is
sold, the new owner must be given a copy of this Certification and approval letter and is thereby
responsible for complying with all conditions. If total fills for this project (now or in the future) exceed
one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described
in 15A NCAC 02H .0506 (h). This approval requires you to follow the conditions listed in the attached
certification and any additional conditions listed below.
One
T14ort - ' ar(l inu
Orange County — Buckhorn- Mebane EDD Water and Sewer Improvements Phase 2
Page 2 of 3
February 1, 2013
Additional Conditions of Certification:
I. Impacts Approved
The following impacts are hereby approved as long as all of the other specific and general conditions
of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including
incidental impacts:
Type of Impact
Amount Approved
Plan Location or Reference
(Units)
Wetland —temporary
0.885 (acres)
PCN attachment for Wetland Impacts
(Section C.2)
Wetland — permanent
0.683 (acres)
PCN attachment for Wetland Impacts
(Section C.2)
Stream —temporary
15 (linear feet)
PCN attachment for Stream Impacts
(Section C.3)
Stream — permanent
160 (linear feet)
PCN attachment for Stream Impacts
(Section C.3)
Zone 1 Buffers —
14,677 (square ft.)
PCN attachment for Buffer Impacts
temporary
(Section C.6)
Zone 1 Buffers —
7,206 (square ft.)
PCN attachment for Buffer Impacts
permanent
(Section C.6)
Zone 2 Buffers —
9,780 (square ft.)
PCN attachment for Buffer Impacts
temporary
(Section C.6)
Zone 2 Buffers -
4,307 (square ft.)
PCN attachment for Buffer Impacts
permanent
(Section C.6).
2. Protective Fencing
The outside buffer, wetland or water boundary and along the construction corridor within these
boundaries approved under this authorization shall be clearly marked with orange warning fencing (or
similar high visibility material) for the areas that have been approved to infringe within the buffer,
wetland or water prior to any land disturbing activities to ensure compliance with 15 NCAC 02H .0500.
3. Diffuse Flow
All constructed stormwater conveyance outlets shall be directed and maintained as diffuse flow at
non - erosive velocities through the protected stream buffers such that it will not re- concentrate
before discharging into a stream as identified within 15A NCAC 28.0233 (5). If this is not possible, it
may be necessary to provide stormwater facilities that are considered to remove nitrogen (and
phosphorus if in the Tar - Pamlico River Basin). This may require additional approval from this Office.
4. You must revegetate all disturbed areas within the buffers as described in your application. If you
need additional information on plantings, see Guidelines for Buffer Restoration available at:
http://purtal.ricdenr.org/c/document library /set file ?uuid= e46ec613- 9Of3- 4e22 -973c-
57c863afc737 &grougld= 38364.
S. Certificate of Completion
The applicant and /or authorized agent shall provide a completed Certificate of Completion Form to
the DWQ Webscape Unit within ten days of project completion (available at:
h *.t :mortal 'Xde-ir.or we \w9 sv p/wsL401 cPnsa.iduermrt�a,)�forms).
Orange County — Buckhorn- Mebane EDD Water and Sewer Improvements Phase 2
Page 3 of 3
February 1, 2013
This Certification can be contested as provided in Articles 3 and 4 of General Statute 150B by filing a
written petition for an administrative hearing to the Office of Administrative Hearings. You may obtain a
petition form from the Office of Administrative Hearings at httu: / /www.ncoah.com/ or call (919) 431-
3000 for information.
Within sixty (60) calendar days of receipt of this Certification, you must file the petition with the Office
of Administrative Hearings. A petition is considered filed when the original and one (1) copy is received
in the Office of Administrative Hearings during normal office hours (Monday through Friday between
8:00am and 5:00pm, excluding official state holidays).
The petition may be faxed to the Office of Administrative Hearings at (919) 431 -3100, provided the
original and one copy of the petition is received by the Office of Administrative Hearings within five (5)
business days following the faxed transmission.
Mailing address for the Office of Administrative Hearings:
Office of Administrative Hearings
6714 Mail Service Center
Raleigh, NC 27699 -6714
One (1) copy of the petition must also be served to DENR:
Lacy Presnell, General Counsel
Department of Environment and Natural Resources
1601 Mail Service Center
Raleigh, NC 27699 -1601
Unless such a petition is filed, this Certification shall be final and binding.
Sincerely,
g �JLM
Karen Higgins, Superviso
Wetlands, Buffers, Stormwater —
Compliance & Permitting Unit
Enclosures: GC3884
cc: USACE Raleigh Regulatory Field Office
DWQ Raleigh Regional Office
DLR Raleigh Regional Office
Mark Lacy, Hobbs, Upchurch & Associates, P.A., 300 SW Broad Street, Southern Pines, NC 28387
File Copy
Filename: 120894v20rangeCoBuckhorn- MebaneEDDWaterand5ewerlmprovementsPhase2 (0range)401 NBR.docx