HomeMy WebLinkAbout820678_Plan of Action_20210506Mr. Larry Ammons
L&W Farms, Inc.
805 McDaniel Rd.
Roseboro, NC 28382
To Whom it may concern:
This letter is just to let you know that we have had Greg
Swain, a professional engineer from Wilmington, NC. to
come out and overlook our problem on our #1  lagoon
slopes. We also have talked with Wade Blackburn from
Herrels, NC. As soon as Wade can get to it, the issue will
be taken care of. We will be follow all the guide -lines.
Sincerely,
Larry Ammons
(910-337-2599)
i
RECEIVED
MAY 0 4 202i
ICE OW
R. Gregory Swain, P.E.
Mr. Larry Ammons
L&W Farms, Inc.
805 McDaniel Rd
Roseboro, NC 28382
Subject: Lagoon Berm Repair
Dear Mr. Ammons:
RECEIVED
MAY 04 2021
NC DEQ/DWR
Central Office
April 26, 2021
I visited the site at 6719 Old Mintz Hwy, Garland, NC with you on April 24, 2021 to
observe the areas of both adjacent lagoons. According to DEQ inspection report
from 4/16/21, you are required to submit a plan of action to repair/restore the
back slopes in certain areas.
As we discussed and I observed, there are areas along the rear east side of both
lagoons and along north end of lagoon #2 that require work. There does not
appear to be structural impairment at this time that would require liner material
or compacting liner material, only to reestablish and stabilize the top surface to
prevent further erosion. In addition to back slope erosion, we observed one area
of top dike on Lagoon #1 that has settled and appears to be approximately 6"
below design top elevation. Please follow the below steps:
1. Add topsoil as required to return slopes and tops of berms to original
shape/slope along back slopes of both lagoons in the subject areas as
shown on attached aerial photo.
2. Reestablish permanent vegetation by sod or seeding with quick
establishing (such as annual rye) and other permanent grass such as
hulled Bermuda seed. Roll areas to lightly compact all newly placed soil.
3. Mulch affected areas with straw or hay as available.
4. Low top of dike area:
a. Remove existing vegetation in approximately 50' long area of dike
b. Compact sandy clay layer along with topsoil above in area to
approximately 2" above adjacent current top elevation to allow
further settling.
c. Establish permanent vegetation with seeding and mulch as listed
above.
If you have any questions, please don't hesitate to contact me. I have attached
pictures to help document the described actions.
R. Gregory Swain, P.E.
305 Wendover Ln Wilmington, NC 28411
Tel. (910) 590-5179 email wpman84@gmaiLcom
Sincerely,
4
R. Gregory Swain,
P.E.
Aerial View of Repair Areas
R. Gregory Swain, P.E.
305 Wendover Ln Wilmington, NC 28411
Tel. (910) 590-5179 email wpman84@gmail.com
RECEIVED
MAY 04 2021
NC DEd/DWH
Central Mice