HomeMy WebLinkAbout20120712 Ver 1_Application_20120730L! 'U
FED -62013
DE%- t<.- QUALI 1
�; `;.;.vi ibYkT�B STATE OF NORTH CAROLINA
�vETtArJ ^uv �,�J� Bi ;; ^JCH
DEPARTMENT OF TRANSPORTATION
PAT MCCRORY
GOVMMR
Mr. Tom Stevens
U.S. Army Corps of Engineers
Regulatory Field Office
2407 W. 5th St
Washington, NC 27889
2/6/2013
Dear Sirs:
Mr. Stephen Lane
N. C. Dept of Env. And Natural Resources
Division of Coastal Management
400 Commerce Avenue
Morehead City, NC 28557
ANTHONY J. TATA
SUMTARY
Garry Ward
N. C. Dept. of Env. And Natural Resources
Division of Water Quality
943 Washington Square Mall
Washington, NC 27889
Subject: Request for Modification to CAMA Major Development Permit (89 -12), and 401
Neuse Riparian Buffer Authorization (DWQ project number 20120712) USACE NWP 23
(SAW- 2011 - 01774) and revised application for USACE NWP 23 permit for the proposed
Craven #176. TIP Number: B -4488, Debit from WBS Element No. 33725.1.2
References: B -4488 Section 404 NWP 23 Permit issued July 7, 2012 (SAW -2011-
01774)
B -4488 Section 401 Water Quality Certification and Neuse Riparian Buffer
Authorization issued July 3, 2012 (DWQ No.20120712);
B-4488 CAMA Major Development Permit issued July 27, 2012 (CAMA permit
No. 89 -12)
The purpose of this document is to submit a modification request for the Section 401
Water Quality Certification, Neuse Buffer Authorization, The CAMA Major Permit, and
for USACE NWP 23. An additional modified permit drawing/buffer drawing is included
in this modification - request.
Permit Site Impacts
The modified permit drawing highlights the following changes and additional, impacts:
160 Sq. Ft. of temporary wetland impacts (Hand Clearing) to allow for the installation of
the end (wing) wall of the proposed culvert. This area is highlighted, in the attached,
drawing and the impacts have been added to the impact table as hand clearing.
Moratorium Extension
In order for the Bridge Demolition Plan to be accomplished the contractor has requested a
two week extension into the moratorium through February 28h, This request has been
M
approved by Travis Wilson (WRC) email attached. NCDOT respectfully requests this to
be included in the permit modification.
Compensatory Mitigation
No additional permanent wetland impacts are needed.
Section 404: The USACE has determined that the above - described activities will require
an email requesting modification and hard copies to follow in the mail.
Section 401: We are hereby requesting a modification to the 401 Water Quality
Certification from the NCDWQ issued July 3, 2012 (DWQ No. 20120712.). We are
providing an email requesting modification and hard copies to follow in the mail to
NCDWQ; for their approval.
CAMA: The NCDOT respectfully requests that the referenced CAMA Major
Development Permit (89 -12) be modified to reflect the changes in jurisdictional impacts as
outlined in this letter and presented in the attached revised drawings.
If you have any questions or need additional information, please contact Jay Johnson at
(252),341-9802.
Sincerely,
Jay Johnson
Cc: Garcy Ward NCDWQ
Tom Steffens USACE
Stephen Lane CAMA
Sonia Carrillo NCWQ
Johnson, lay >S
From:
Johnson, Jay B
Sent:,
Wednesday, February 06, 2013 8:51 AM
To:
Wilson, Travis W.
Cc:
Vorwerk, Paul J; Metcalfe, Johnny; Bunn, Eddie J; Edens; Sidney J; Mcmannen, Brad T;
Blankenship, Andrew, Steffens, Thomas A SAW
(Thomas.A .Steffens @saw02.usace.Eirmy.mil), Ward, Garcy; Lane, Stephen; Brame, Bill Jr.
Subject:
RE: Craven Co. Bridge #176 Demolition
Hi Travis, Thank you for your response. After or onsite meeting yesterday (2/5) the contractor has indicated that the two
week extension should be enough time for him to accomplish his Bridge Demolition pending how long it takes for
agencies to turn around the permit modification request so that they can begin work.
From: Wilson, Travis W.
Sent: Friday, February '01, 2013 9:33 AM
To: Mcmannen, Brad T; Blankenship, Andrew; Johnson, Jay B; Ward, Garcy; Steffens, Thomas A SAW
(Thomas.A. Steffens O)saw02.usace.armv.mil); Steffens, Thomas A SAW (Thomas.A. Steffens (a)saw02.usace.army.mil)
Cc: Vorwerk, Paul J; Metcalfe,.36hnny; Bunn, Eddie J; Edens, Sidney J
Subject: RE: Craven Co. Bridge #176 Demolition
Without knowing how long into the moratorium,the.contractor needs I cannot give a definitive answer. However WRC
would not object to allowing in'water work to complete the demolition of Bridge # 176 in Craven Co through February
28, 2013. Will this two week extension provide suitable time for the contractor to complete the necessary in water
work?
NOTE: NEW PHONE NUMBER AND MAILING ADDRESS
Travis W. Wilson
Eastern Region Highway Project Coordinator
Habitat Conservation Program
NC Wildlife Resources Commission
1718 Hwy 56 West
Creedmoor, NC 27522
Phone: 919 - 707 -0370
Fax: 919 - 528 -2524
Travis.Wilson@ncwildlife.org
From: Mcmannen, Brad T
Sent: Thursday, January 24, 2013 1:09 PM
To: Blankenship, Andrew; Johnson, Jay B; Ward, Garcy; Steffens, Thomas A SAW
(Thomas.A.Steffensasaw02 .usace.army.mil); Steffens, Thomas A SAW ( Thomas. A. Steffens(�.)5aw02 .usace.army.mil);
Wilson, Travis W.
Cc: Vorwerk, Paul J; Metcalfe, Johnny; Bunn, Eddie J; Edens, Sidney J
Subject: FW: Craven Co. Bridge #176 Demolition
Please find the bridge demolition plan submitted by Palmetto for B -4488 Slocum Creek for your review and approval.
Palmetto believes they will have the entire structure removed by Feb. 15, but in the case something happens and they
are delayed, we would like to request an extension of the moratorium.
If you have.any questions, please let me know.
Thanks,
Brad McMannen, PE
Assistant Resident Engineer
North Carolina Department of Transportation
209 S. Glenburnie Rd.
New Bern, NC 28560
(252) 514 -4759 (P)
(252) 514 -4716 (F)
Email correspondence-to and from this sender is subject to the N.C. Public Records Law and-may be disclosed to third
parties.
From: Michael Moore (mailto:mmoore@)palmettoii.com]
Sent: Wednesday, January 23, 2013 11:17 PM
To: Mcmannen, Brad T; Metcalfe, Johnny; gcanniffftalmettoii.com; bcopenhaverOyalmettoii.com; ce1lis(@l2almettoii.com
Subject: Craven Co. Bridge #176 Demolition
Gentlemen,
Please find the attached Derriolition Plan and supporting documents.
Michael E. Moore,
Construction Manager, Palmetto Infrastructure, Inc
Ph# 864 -387 -0841
2
0 M z
CO
I ti ;1 � ll �, � I c ` � � it � �_, � - _ � Y� � > 0 v\ xC� � r, rW� \.,�, (D jn',
(1 TEL
z
co
Lim)
4c)
Ui L Li
T,
LL
6b,
Z
'n
a7.<
IL
if
it it VIII l 1 2 I
j_j t
-, G I
�I �j 1 -24 1
( I II II 4 I i / I kC
j I
0 kJnJSN 0: ON 411
0,76,74 21 'o
F
p
sz
06
9! - DI<
I ca
of � . _ �.�� g � � � �� �,� �
Z5
9-r E
41 zj Q
10
E a
u &
r
T Ln
L