Loading...
HomeMy WebLinkAbout20120712 Ver 1_Application_20120730L! 'U FED -62013 DE%- t<.- QUALI 1 �; `;.;.vi ibYkT�B STATE OF NORTH CAROLINA �vETtArJ ^uv �,�J� Bi ;; ^JCH DEPARTMENT OF TRANSPORTATION PAT MCCRORY GOVMMR Mr. Tom Stevens U.S. Army Corps of Engineers Regulatory Field Office 2407 W. 5th St Washington, NC 27889 2/6/2013 Dear Sirs: Mr. Stephen Lane N. C. Dept of Env. And Natural Resources Division of Coastal Management 400 Commerce Avenue Morehead City, NC 28557 ANTHONY J. TATA SUMTARY Garry Ward N. C. Dept. of Env. And Natural Resources Division of Water Quality 943 Washington Square Mall Washington, NC 27889 Subject: Request for Modification to CAMA Major Development Permit (89 -12), and 401 Neuse Riparian Buffer Authorization (DWQ project number 20120712) USACE NWP 23 (SAW- 2011 - 01774) and revised application for USACE NWP 23 permit for the proposed Craven #176. TIP Number: B -4488, Debit from WBS Element No. 33725.1.2 References: B -4488 Section 404 NWP 23 Permit issued July 7, 2012 (SAW -2011- 01774) B -4488 Section 401 Water Quality Certification and Neuse Riparian Buffer Authorization issued July 3, 2012 (DWQ No.20120712); B-4488 CAMA Major Development Permit issued July 27, 2012 (CAMA permit No. 89 -12) The purpose of this document is to submit a modification request for the Section 401 Water Quality Certification, Neuse Buffer Authorization, The CAMA Major Permit, and for USACE NWP 23. An additional modified permit drawing/buffer drawing is included in this modification - request. Permit Site Impacts The modified permit drawing highlights the following changes and additional, impacts: 160 Sq. Ft. of temporary wetland impacts (Hand Clearing) to allow for the installation of the end (wing) wall of the proposed culvert. This area is highlighted, in the attached, drawing and the impacts have been added to the impact table as hand clearing. Moratorium Extension In order for the Bridge Demolition Plan to be accomplished the contractor has requested a two week extension into the moratorium through February 28h, This request has been M approved by Travis Wilson (WRC) email attached. NCDOT respectfully requests this to be included in the permit modification. Compensatory Mitigation No additional permanent wetland impacts are needed. Section 404: The USACE has determined that the above - described activities will require an email requesting modification and hard copies to follow in the mail. Section 401: We are hereby requesting a modification to the 401 Water Quality Certification from the NCDWQ issued July 3, 2012 (DWQ No. 20120712.). We are providing an email requesting modification and hard copies to follow in the mail to NCDWQ; for their approval. CAMA: The NCDOT respectfully requests that the referenced CAMA Major Development Permit (89 -12) be modified to reflect the changes in jurisdictional impacts as outlined in this letter and presented in the attached revised drawings. If you have any questions or need additional information, please contact Jay Johnson at (252),341-9802. Sincerely, Jay Johnson Cc: Garcy Ward NCDWQ Tom Steffens USACE Stephen Lane CAMA Sonia Carrillo NCWQ Johnson, lay >S From: Johnson, Jay B Sent:, Wednesday, February 06, 2013 8:51 AM To: Wilson, Travis W. Cc: Vorwerk, Paul J; Metcalfe, Johnny; Bunn, Eddie J; Edens; Sidney J; Mcmannen, Brad T; Blankenship, Andrew, Steffens, Thomas A SAW (Thomas.A .Steffens @saw02.usace.Eirmy.mil), Ward, Garcy; Lane, Stephen; Brame, Bill Jr. Subject: RE: Craven Co. Bridge #176 Demolition Hi Travis, Thank you for your response. After or onsite meeting yesterday (2/5) the contractor has indicated that the two week extension should be enough time for him to accomplish his Bridge Demolition pending how long it takes for agencies to turn around the permit modification request so that they can begin work. From: Wilson, Travis W. Sent: Friday, February '01, 2013 9:33 AM To: Mcmannen, Brad T; Blankenship, Andrew; Johnson, Jay B; Ward, Garcy; Steffens, Thomas A SAW (Thomas.A. Steffens O)saw02.usace.armv.mil); Steffens, Thomas A SAW (Thomas.A. Steffens (a)saw02.usace.army.mil) Cc: Vorwerk, Paul J; Metcalfe,.36hnny; Bunn, Eddie J; Edens, Sidney J Subject: RE: Craven Co. Bridge #176 Demolition Without knowing how long into the moratorium,the.contractor needs I cannot give a definitive answer. However WRC would not object to allowing in'water work to complete the demolition of Bridge # 176 in Craven Co through February 28, 2013. Will this two week extension provide suitable time for the contractor to complete the necessary in water work? NOTE: NEW PHONE NUMBER AND MAILING ADDRESS Travis W. Wilson Eastern Region Highway Project Coordinator Habitat Conservation Program NC Wildlife Resources Commission 1718 Hwy 56 West Creedmoor, NC 27522 Phone: 919 - 707 -0370 Fax: 919 - 528 -2524 Travis.Wilson@ncwildlife.org From: Mcmannen, Brad T Sent: Thursday, January 24, 2013 1:09 PM To: Blankenship, Andrew; Johnson, Jay B; Ward, Garcy; Steffens, Thomas A SAW (Thomas.A.Steffensasaw02 .usace.army.mil); Steffens, Thomas A SAW ( Thomas. A. Steffens(�.)5aw02 .usace.army.mil); Wilson, Travis W. Cc: Vorwerk, Paul J; Metcalfe, Johnny; Bunn, Eddie J; Edens, Sidney J Subject: FW: Craven Co. Bridge #176 Demolition Please find the bridge demolition plan submitted by Palmetto for B -4488 Slocum Creek for your review and approval. Palmetto believes they will have the entire structure removed by Feb. 15, but in the case something happens and they are delayed, we would like to request an extension of the moratorium. If you have.any questions, please let me know. Thanks, Brad McMannen, PE Assistant Resident Engineer North Carolina Department of Transportation 209 S. Glenburnie Rd. New Bern, NC 28560 (252) 514 -4759 (P) (252) 514 -4716 (F) Email correspondence-to and from this sender is subject to the N.C. Public Records Law and-may be disclosed to third parties. From: Michael Moore (mailto:mmoore@)palmettoii.com] Sent: Wednesday, January 23, 2013 11:17 PM To: Mcmannen, Brad T; Metcalfe, Johnny; gcanniffftalmettoii.com; bcopenhaverOyalmettoii.com; ce1lis(@l2almettoii.com Subject: Craven Co. Bridge #176 Demolition Gentlemen, Please find the attached Derriolition Plan and supporting documents. Michael E. Moore, Construction Manager, Palmetto Infrastructure, Inc Ph# 864 -387 -0841 2 0 M z CO I ti ;1 � ll �, � I c ` � � it � �_, � - _ � Y� � > 0 v\ xC� � r, rW� \.,�, (D jn', (1 TEL z co Lim) 4c) Ui L Li T, LL 6b, Z 'n a7.< IL if it it VIII l 1 2 I j_j t -, G I �I �j 1 -24 1 ( I II II 4 I i / I kC j I 0 kJnJSN 0: ON 411 0,76,74 21 'o F p sz 06 9! - DI< I ca of � . _ �.�� g � � � �� �,� � Z5 9-r E 41 zj Q 10 E a u & r T Ln L