Loading...
HomeMy WebLinkAboutNCG030433_Ltr re Release_20190116 XJCC�r�3c��1-33 CREE = Wol s eed. January 16, 2019 NCDEQ Division of Stormwater Management DEMLR F�FCFIVL. 1612 Mail Service Center JAN 28 2019 Raleigh,NC 27699-1612 DENR-LAND QUALITY RE: Follow-up letter for stormwater release on 1/11/2019 STORMWATER PERMITTING To whom it may concern; This letter follows the telephone notification on 1/11/2019 of a cooling tower water release to stormwater. Cree experienced an overflow of cooling tower water on Friday,January 11,2019 at its Durham facility located at 4600 Silicon Drive. Our investigation revealed that proper maintenance was not conducted by the contractor who owns and operates the tower on site. Cree personnel provided courtesy reminders to said contractor leading up to the event. Approximately 50-gallons of cooling tower water was released. The released water overflowed both to ground and directly into a nearby stormwater drain. Subsequent examination of the affected outfall and spill area revealed no observable impact to the surrounding environment. Moving forward, Cree is working with said contractor to develop and follow an appropriate preventative maintenance schedule on this tower, and any other potential stormwater impacts within their control. Please let me know if you have any questions or concerns. Thank you and best regards; Sincerely, Donna La7.7ari Environmental Manager Cree, Inc. 4600 Silicon Drive Durham,NC 27703 USA Main:(919)313-5300