Loading...
HomeMy WebLinkAbout20210701 Ver 1_Pre-Filing Meeting Request_20210406DWR Pre -Filing Meeting Request Form ID#* Regional Office* Reviewer List* 20210701 Version * 1 Mooresville Regional Office - (704) 663-1699 Alan Johnson Pre -Filing Meeting Request submitted 4/6/2021 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Owner Address: Patrick R. Korn prkorn@terracon.com 1-85 Commerce Center Northpoint Development Rowan Street Address 4805 Montgomery Road Address Line 2 STE 310 City State / Rovince / Region Cincinnati OH Fbstal / Zip Code Country 45212 USA Is this a transportation project?* r Yes ( No Type(s) of approval sought from the DWR: fJ 401 Water Quality Certification - I— 401 Water Quality Certification - Regular Express fl Individual Permit I— Modification I— Shoreline Stabilization Does this project have an existing project ID#?* r Yes (' No Do you know the name of the staff member you would like to request a meeting with? Please give a brief project description below and include location information. * Northpoint Development proposes to develop a commercial shopping center at the south east corner of S Main Street and Webb Road in Salisbury, NC (35.601805, -80.537455). The proposed development consists of roadway and parking infrastructure, a one building commercial complex, and two stormwater detention ponds. Please give a couple of dates you are available for a meeting. 4/20/2021 4/22/2021 4/26/2021 4/30/2021 Please attach the documentation you would like to have the meeting about. 1-85 Commerce Center Overall Site 4.6.21.pdf 273.68KB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature IP& Submittal Date 4/6/2021 POND#1 300 DISCLAIMER: WETLAND SURVE PER GPS NOT SURVEY GRADE SHEET I LEGEND ± 41 AC .1111101111 _Oj024 ACRE 111013111111111114111111111011101111110 dam iamastmmea,IIIIIII'IIIIIII m 1111111111111111111111111111111111111111111111111111111111111111 Iiiiiiiiiiii!Ii!!!!! mumaiu immomemommummuomminummi WETLAND O003 ACRE �I WETLAND 'WI' *0.097 ACRE - - IIIII■■ 11llh1/1111111IIIII' IU111hI111U1II%1II0 I fIII IIIIIII% I ' 101111 teik ® I��goll1111 • WEBB RD TRIBUTARY DITCH 'TI' *I77 LF WETLAND 'W4' *0.058 ACRE PROJECT BOUNDARY INTERMITTENT TRIBUTARY 'T2' ±130 LF —1 ,eet 1-85 COMMERCE CENTER T THOMAS SHEET i OSITE & H U T T O N lj CLIENT:IENT: 1020 Euclid Avenue NORTHPOINT DEVELOPMENT Charlotte, NC 28203 • 980.201.5505 I LOCATION: ROWAN COUNTY, NC DATE: 4/06/21 DRAWN BY: MR JOB NUMBER: J-29101 REVIEWED BY: WBS SHEET: SCALE: 3 1"= 300' www.thomasandhutton.com