HomeMy WebLinkAbout20210701 Ver 1_Pre-Filing Meeting Request_20210406DWR Pre -Filing Meeting Request Form
ID#*
Regional Office*
Reviewer List*
20210701
Version *
1
Mooresville Regional Office - (704) 663-1699
Alan Johnson
Pre -Filing Meeting Request submitted 4/6/2021
Contact Name *
Contact Email Address*
Project Name*
Project Owner*
Project County*
Owner Address:
Patrick R. Korn
prkorn@terracon.com
1-85 Commerce Center
Northpoint Development
Rowan
Street Address
4805 Montgomery Road
Address Line 2
STE 310
City State / Rovince / Region
Cincinnati OH
Fbstal / Zip Code Country
45212 USA
Is this a transportation project?* r Yes ( No
Type(s) of approval sought from the DWR:
fJ 401 Water Quality Certification - I— 401 Water Quality Certification -
Regular Express
fl Individual Permit I— Modification
I— Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes (' No
Do you know the name of the staff member you would like to request a meeting with?
Please give a brief project description below and include location information. *
Northpoint Development proposes to develop a commercial shopping
center at the south east corner of S Main Street and Webb Road in
Salisbury, NC (35.601805, -80.537455). The proposed development
consists of roadway and parking infrastructure, a one building
commercial complex, and two stormwater detention ponds.
Please give a couple of dates you are available for a meeting.
4/20/2021
4/22/2021
4/26/2021
4/30/2021
Please attach the documentation you would like to have the meeting about.
1-85 Commerce Center Overall Site 4.6.21.pdf 273.68KB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
IP&
Submittal Date 4/6/2021
POND#1
300
DISCLAIMER: WETLAND SURVE
PER GPS NOT SURVEY GRADE
SHEET I
LEGEND
± 41 AC
.1111101111 _Oj024 ACRE 111013111111111114111111111011101111110
dam iamastmmea,IIIIIII'IIIIIII m
1111111111111111111111111111111111111111111111111111111111111111
Iiiiiiiiiiii!Ii!!!!!
mumaiu
immomemommummuomminummi
WETLAND O003 ACRE
�I
WETLAND 'WI'
*0.097 ACRE
- - IIIII■■
11llh1/1111111IIIII' IU111hI111U1II%1II0 I fIII IIIIIII% I ' 101111 teik
® I��goll1111
•
WEBB RD
TRIBUTARY
DITCH 'TI'
*I77 LF
WETLAND 'W4'
*0.058 ACRE
PROJECT
BOUNDARY
INTERMITTENT
TRIBUTARY 'T2'
±130 LF
—1 ,eet
1-85 COMMERCE CENTER
T THOMAS
SHEET
i
OSITE
&
H U T T O N
lj
CLIENT:IENT:
1020 Euclid Avenue
NORTHPOINT DEVELOPMENT
Charlotte, NC 28203 • 980.201.5505
I
LOCATION: ROWAN COUNTY, NC
DATE: 4/06/21 DRAWN BY: MR
JOB NUMBER: J-29101 REVIEWED BY: WBS
SHEET:
SCALE:
3
1"= 300'
www.thomasandhutton.com