HomeMy WebLinkAbout20110682 Ver 3_Engineering Inspection Emails_20130131ENGINEERING INSPECTION REPORT South Martha Washington Canal Project January 29, 2013 Attending: Dave Byrd (USFWS) and Wesley Shipp (QE). Time: 4:00pm — 4:30pm. Partly cloudy, warm (65 °F). Met Wesley as he was exiting the site with another employee and discussed Weir 2 progress. QE had four working employees on site. three welders and a dozer operator. Equipment included a crane, excavator, dozer, motor grader, dump truck, high capacity pump, generators, welding units, mobile office, enclosed trailer, fuel tank, portable toilet, a truck and a van. Work Status: Weir 1: work completed. Weir 2: QE has temporarily halted rip rap placement and work on attaching the pile caps below the flashboard bays. Cross braces between H -piles and sheeting are currently being attached and is expected to be completed this week. Structure painting is underway. Once painting is completed, riprap placement will be completed. Inclement weather (snow and rain) has slowed progress since the last inspection. E &S Control: In place and functional. No issues noted. Access road was wet, due to recent snowmelt, though discussions with Wesley indicated road conditions improved since Tuesday. Engineering Inspections: up to date. Photos: 4 Outstanding Issues: none. Next Scheduled Inspection: week of February 4th. Comments or revisions? Contact Dave Byrd 804 - 654 -1803, David_Byrd @fws.gov END OF REPORT Photo of the completed Weir 1, view looking downstream. Photo of Weir 2, view looking upstream. Photo of Weir 2, view looking downstream.