Loading...
HomeMy WebLinkAbout20181034 Ver 1_Staff Report Davis, Erin B_20210506Mitigation Project Information Upload Initial Review and Submittal ID#* 20181034 Mitigation Project Submittal - 5/4/2021 Type of Mitigation Project:* rJ Stream r Wetlands r Buffer r Nutrient Offset (Select all that apply) Is this a Prospectus,Technical Proposal or New Site?* Project Contact Information Contact Name:* Paul Wiesner Project Information Existing 20181034 (DWR) ID#: Project Name: UT to Rush Fork Project Type:* C' DMS r Mitigation Bank County: Haywood Document Information .................................................................................................................................................................. Mitigation Document Type:* Mitigation Plans Version* 1 r Yes ( No Email Address:* paul.wiesner@ncdenr.gov Existing 1 Version: (nurrbers only) All attachments have been uploaded into Laserfiche for your review. Signature ............................................. Print Name:* Signature:* Paul Wiesner Staff Review Staff Review by Davis, Erin B ..................................................................................................................................................................................................................................................................................... Project Location: WaterResources\DWR - Wetlands Program\Non DOT\20181034\Ver 1 Staff Comments File Upload Jpgo-pdfo,ly Staff Review 05/06/2021 Completed Date: