Loading...
HomeMy WebLinkAboutNCC202016_NOT Closeout Documents_20210505ROY COOPER Governor DIONNE DELLI-CATTI Secretary BRIAN WRENN Virector NORTH CAROLINA Environmental Quality May 3, 2021 SEDIMENT AND EROSION CONTROL & CONSTRUCTION STORMWATER INSPECTION REPORT Virginia Electric and Power Company d/b/a Dominion Energy North Carolina Attn: Mr. Mark Allen, Director, ET Project Development & Execution 10900 Nuckols Road, 4th Floor Glen Allen, VA 23060 RE: TL 182 Removal Phase 1 (Pitt-2020-011) Dear Sir, Attached is a copy of the inspection report prepared following an onsite inspection of the project referenced on the report. This report is intended to inform you of the project's compliance with the North Carolina Sedimentation Pollution Control Act of 1973 and Construction NPDES Stormwater General Permit. Please review this report carefully as it may contain corrective actions needed and/or comments which will assist you in meeting the required performance standards. It is our desire that any and all possible problems be discussed and resolved at the earliest possible time. To facilitate this effort, please contact me at the address/phone number below should you have any questions. Sincerely, J. Randall Jones, Jr., PE Environmental Engineer (252) 946-6481 Enclosure: Sediment/Construction Stormwater Inspection Report e:-�eD E1A 5oy"xnmenS aE Cnv�ienmvnwi quaa� North Carolina Department ofEnvironmental nvironmental Quality I Division of Energy. Mincra[ and Land Resources Washington Regional office : 943 Washington Square Nial[ Washington, North Carolina 27889 252 3-}b.b 18i Sediiiieiitatioii/CojistrLICtiOlI Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481 County: Pitt Project: TL I82 Removal Phase 1 Person financially responsible: Virginia Electric and Power Company - Mark Allen, Director of Engineering Address: 10900 Nuckols Rd 4th Floor, Glen Allen, VA 23060 1. Project Location: Various, Greenville Pictures: No 2. Weather and soil conditions: Sunny, warm, dry 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes 5. Violations: River basin: Tar -Pamlico Project #: PITT-2020-011 Initial inspection: No If no, check violations below: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Inspection report: Sent Report 9. Corrective action needed: NIA Title: Date given/sent: May 03, 2021 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self - monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO 1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edoes.deq.nc.gov/FormsNCGO I - Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Randall Jones Date of inspection: April 28, 2021 cc: Others present: Time arriving on site: 2:00 PM Time leaving site: 4:00 PM Yes