Loading...
HomeMy WebLinkAboutNCC202016_Notice of Termination_20210505Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 5/5/2021 9:53:00 AM (NOT Submittal) Approve by Georgoulias, Bethany A 5/6/2021 1:10:54 PM (NOT Request Review- NCC202016) • Georgoulias, Bethany A reassigned the task to Georgoulias, Bethany A 5/6/2021 9:46 AM The task was assigned to Morman, Alaina. The due date is: May 10, 2021 5:00 PM 5/5/2021 9:53 AM 1 � NORTH CAROLINA Enrlronmenral Quallly Certificate of NCC202016 Coverage (COC) Enter the Certificate of Coverage Nmber No.* 2020 Annual Fee Status 2021 Annual Fee Status PAID Nt3y be blank (if not yet billed). Information associated with this permit: Project Name TL 182 Removal Phase 1 Address Greensville Blvd, Greensville, NC County Pitt Latitude 35.6199 Longitude -77.3326 Permittee Listed Virginia Electric and Power Company Legally Responsible Mark Allen Individual NC Reference No. NCG01-2020-2016 E&SC Plan ID Pitt-2020-011 Original NOI 25502 Tracking No. Date COC Issued 5/15/2020 Prior Rescission Cate populates only if COCwas already rescinded at time of submittal. Date Reason for Rescission/Termination Request: Reason for r Project Closed -Out Termination of r Sale (Another Owner/Operator obtained a new COC) Coverage * r Mistake or Invalid Coverage r Other Addional IVbre information about the basis of this request, if needed. Explanation Supporting upload Supporting Documentation if applicable. Documentation Mist beRYforrrat Project Close-out Information: Final Close-out 4/28/2021 Inspection Approval Project Close-out 20210428 cover letter & sed insp report PITT-2020- Approval 315.2KB 011 TL 182 Removal Pha.... pdf Documentation Mist be FDFforrrat North Carolina General Statute 143-215.66 (1) provides that: Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case underthis Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules ofthe Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars ($10,000). rJ I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. *This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name* Donald Hoover Title * Manager, Electric Transmission and Substation Construction Organization * Virginia Electric and Power Company Date * 05/05/2021 Email for chelsea.l.sachs@dominionenergy.com Confirmation * Contact Telephone* 8047731046 NOT Certification NCG01 Notice of Termination (NOT) Certification Form Form.pdf Mist be FDF Forrrat Is this COC Already Ensure this CCChas not been rescinded since subrrittal! Rescinded? Additional Email CCd on Notification Errails (Optional) donald.hoover@dominionenergy.com Original Permittee CCdonWificationErrails Email craig.r.hurd@dominionenergy.com Original Site Contact CCd on Notificaiton BTails Email james.e.clay@dominionenergy.com 596.22KB