Loading...
HomeMy WebLinkAboutNCC201809_Notice of Termination_20210504Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 5/4/2021 4:45:37 PM (NOT Submittal) Approve by Georgoulias, Bethany A 5/6/2021 10:56:40 AM (NOT Request Review- NCC201809) • Georgoulias, Bethany A reassigned the task to Georgoulias, Bethany A 5/6/2021 9:45 AM The task was assigned to Morman, Alaina. The due date is: May 7, 2021 5:00 PM 5/4/2021 4:45 PM 1 � NORTH CAROLINA Enrlronmenral Quallly Certificate of NCC201809 Coverage (COC) Enter the Certificate of Coverage Nmber No.* 2020 Annual Fee Status 2021 Annual Fee Status OPEN May be blank (if not yet billed). Information associated with this permit: Project Name DP Electrical - Lot 13 Address 701 Bricksteel Lane, Garner, NC County Wake Latitude 35.6749 Longitude -78.5451 Permittee Listed DP Investment Properties LLC Legally Responsible David Pruitt Individual NC Reference No. NCG01-2020-1809 E&SC Plan ID SEC-033345-2020 Original NOI 24921 Tracking No. Date COC Issued 5/11/2020 Prior Rescission Cate populates only if COCwas already rescinded at time of submittal. Date Reason for Rescission/Termination Request: Reason for r Project Closed -Out Termination of r Sale (Another Owner/Operator obtained a new COC) Coverage * r Mistake or Invalid Coverage r Other Addional IVbre information about the basis of this request, if needed. Explanation Supporting upload Supporting Documentation if applicable. Documentation MstbeRYforrrat Project Close-out Information: Final Close-out 4/21/2021 Inspection Approval Project Close-out Certificate of Completion - DP Electrical.pdf 115.26KB Approval Must be FDFforrrat Documentation North Carolina General Statute 143-215.66 (1) provides that: Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules of the Commission implementing this Artcle shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars ($10,000). rJ I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. *This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature CA Avw 66�9a� Type Name* Karlton Layman Title * Project Manager Organization* DP Electrical Date * 05/04/2021 Email for karlton@dpelectrical.com Confirmation * Contact Telephone* 919-208-0071 NOT Certification NCG01 Notice of Termination (NOT) Certification Form 682.6KB Form 05-05-2021.pdf Mist be FDF Forrrat Is this COC Already Ensure this CCChas not been rescinded since subrrittal! Rescinded? Additional Email (Optional) Original Permittee Email CCd on Notification Errails David@dpelectrical.com CCd on Notification Bmils david@dpelectrical.com Original Site Contact CCd on Notificaiton Errails Email david@dpelectrical.com