HomeMy WebLinkAbout20070545 Ver 2_401 Application_20130113CAIN
MEMo /FAX 3237 LAKE POINTE DR.
BELMONT, NC 28012
ri
i
TO: NC DIVISION OF WATER QUALITY
FAX:
FROM: RICHARD CAIN
DATE: 1 -28 -13
SUBJECT: PERMITS FOR DOCK AND SHORELINE
STABILIZATION
MY WIFE AND I ARE DESIRING TO ACQUIRE PERMITS TO
CONSTRUCT A PERSONAL USE DOCK AND TO STABILIZE
THE SHORELINE ON A LOT THAT WE OWN.
I HAVE ENCLOSED MAPQUEST IMAGES TO SHOW
LOCATION AND LATITUDE AND LONGTITUDE OF LOT.
ALSO ENCLOSED ARE COPIES OF DRAWING FOR
PROPOSED DOCK AND A SURVEY PLAT SHOWING
PROPOSED POSITION OF DOCK.
PLEASE CALL ME WITH ANY QUESTIONS OR
SUGGESTIONS.
THANK YOU VERY MUCH.
RICHARD CAIN
VID @ /-;h
AN 3 1 2013
?
0
C SCAM
No NCGS Mor
found w
BAIRD, P.L.S.
YOR & PLANNER
BAIRD ROAD
R. SC 29710
3/831 -2661
I
80 120
40 FEET
f
i
var g 1
7 ,
ar Fd. a
.ats �8/zs9 PLAT OF SURVEY FOR
Richard G. & Cynthia M.
b6r Fd.
)/a from Comer
S 7,
UP 914«o 81
1
o10"P
a1Z�PP'
%T o
46T. N
a
*10.0 j
°1r,P
ZIP- _
CITY OF BELMONT
GASTON COUNTY NORTH CAROLINA
27 JULY 2011
198,43.
0.328 Acre
PID# : 204005
1540 REFLECTION POINTE BLVD.
i
Iro
O This is o Plat of Survey o
i in a subdivision approved
o+ There are no new propert
proposed .by this plat.
i Reference: M.B. 67, page 86 -88, L
Pbinte — Phase 2, 2
/ FIRM' Map 3710359100K
i� 4 Jos H. Balyd, PLS, ',etata That this Plot
fi0� supeMsion from an a*tuol field survey mods
• boundar surveyed are cle rly Indicated
the ratio of precision. as oaloulatsd, (p 1 :1:
SEAL Plat was not preparod in aacordarrae with ti.S
2966 DQ ::� Witness my ortglnal etgntturs, seal, and reg
,, L- - 27 th day of July , A.D.. 2011.
1
Thomas E Holland, Sr, PE
352 Bethel Church Rd, Clover, SC
Client; River Construction Co.
15825 Oleander Blvd, Charlotte NC
Project; Richard Cain
Lot 101 Reflection Pointe
3237 Lakepointe Belmont NC
Sheet 1 of 2 Overview
Not to Scale
W
�.� WatkWaY 11 a a Ramp
s
0
0
ro
N
0
I Covered
ro
boathouse
I 6000# boat lift
e
I � �
0
I
i
i
�
I
— -6�
Floating
Dock
0
Revised 11/8/2008
GASTON i..OVM" u ODE �ii �l/i M� si eY 1Vr�
i�l�is;'i.',; �;,;_'� '; '�z�� �:CF�a� n1(�►�PLIAI�IC
R,�
I
0I
I
I
CA
s o Q~
e
[!; 11 .t
No
found w UW'-
d
N 02015'401'E
• N" • 21.88.
4
t
1216/7e8
F
/8�
id
a201 1WPM ftarn comer
ore
°,rlp
3 °swo .
PLAT OF SURVEY FOR
CITY OF BELMONT
GASTON COUNTY NORTH CAROLINA
27 JULY 2011
0.928 Acre
PW :704008
1840 REPLW10N PC= 800.
ap
a�
,%o
I
�Q- I
`
'Fhb b o Plat of Survey of on edetbo lot
o � qw*w I� n t�
; two
,�i Reference: M.B. 87. peas 88-88. Lot 287. R ooVon
/ aou+te — Phoee 2. 20 cot 03.
FUN Map 371030100K.
,' da N. &g4 PLB, Blab *A ab PM em drone undo my
0 i a,spavhlaa ere in Map em* 677 .paw
ti� `iL �no! evtvgwd an deft Indbebd dnd rdn.= the
`7 1M ta8e of pnapbr4 ■ ewmbw. b 1 118.2401 a,d 110t I*
SEAL Plato, at 0,WW d In a.-, ' m 10 08.47 -SO ar - N I I
Mo e o 0 ad rogwacue manner 16
27 t-29 o,
2011.
G
Imagery Date: 41'10/2010 U 1994
0
It
L
r
1540 Reflection Pointe Blvd, Belmont, NC
2013 Google
j
35'09'23.55" N 81`02'03.98" W elev 172 m
Gloo sIc eart i
Eye alt 1.18 km
mapquest
Map of:
1540 Reflection Pointe Blvd
Belmont, NC 28012 -6761
Notes
1�
O
N
a`Z?
rn 2000ft
epquest 500m
>r
h
New Rule for North Carolina Drivers
(Jan 2013) Gastonia - If you drive in North
Carolina you better read this... learn More
Ins u can ce. Comparisons. org
Rd
p
a
.a
i�
v
co
5_
I
®2013 MapQuesj, a 4l�ortions®2013N#CVTEOX�ns Privacy
02013 MapQuest, Inc. Use of directions and maps is subject to the MapQuest Terms of Use. We make no guarantee of the accuracy of their content, road
conditions or route usability. You assume all risk of use. View Terms of Use
Get Directions even quicker! features.mapquest.com /toolbar/
mapquest
Map of:
1540 Reflection Pointe Blvd
Belmont, NC 28012 -6761
Notes
500ft
rT1a�UE5t 100m
New Rule for North Carolina Drivers
(Jan 2013) Gastonia - If you drive in North
Carolina you better read this... Learn More
Insurance.Comparisons.org
67
1`N
02013 MapQuest - Portions 02013 N AV T E A 1 Terms I Privacy
02013 MapQuest, Inc. Use of directions and maps is subject to the MapQuest Terns of Use. We make no guarantee of the accuracy of their content, road
conditions or route usability. You assume all risk of use. View Terms of Use
Get Directions even quicker! features.mapquest.com/tootbar/ kcial
mapquest
Map of:
1540 Reflection Pointe Blvd
Belmont, NC 28012 -6761
Notes
Ivd
31vtt
a
r
4f 'krirck Rd
f
a
n
bl ':- r ;;�
New Rule for North Carolina Drivers
(Jan 2013) Gastonia - If you drive in North
Carolina you better read this... Learn More »
Insurance. Comparisons. org
��-
rKinson avrl
( 74gyyi
r? �' ` Belmont
O
0 Elmores Crossroads
S!�
ly-lc p w Hav,
�a
Darxei Sro"
&(ancai Garden
d
oHarb
W
o, Rvd
`h
� 4�h
aka Wytre
I
X
0-
TU
CHARLOTTF.DOU
WTt AIRPOR
T
Dixie
gsvd
asl�°p'°-t
atrr-
5000ft ",'rAFbCf iP1q 6
" mapquest - .
2000m 1 , ; ARr-t NA – – _ ®2013 MapQuest - Portions 62013 NAV40 I Terms I Priv
02013 MapQuest, Inc. Use of directions and maps is subject to the MapQuest Terms of Use. We make no guarantee of the accuracy of their content, road
conditions or route usability. You assume all risk of use. View Terms of Use
Get Directions even quicker! features.mapquest.com /toolbar/ MOI
mapquest
Map of:
1540 Reflection Pointe Blvd
Belmont, NC 28012 -6761
Notes
New Rule for North Carolina Drivers
(Jan 2013) Gastonia - If you drive in North
Carolina you better read this... Learn More
Insurance.Comparisons.org
Rockwell Park - Hemphill
IS21 QHeights
0 M Holly
Horre<_tead 49
a
AM"
Qlowell
l74 oBelmont E C KK."t. E N B U R G
CHARLOTTE
� m �
� 27
d�
ah P
�fy
OS " ?pto" OEast Forest
_ Caroline Acres _
`•o
—North
rile pq 50 oast 50 00m 0Quail Hollow
—�
.* 02013 MapQuest - Portions 02013 NAVTEO 1 Terms 1 Privacy
02013 MapQuest, Inc. Use of directions and maps is subject to the MapQuest Terms of Use. We make no guarantee of the accuracy of their content, road
conditions or route usability. You assume all risk of use. View Terms of Use
Get Directions even quicker! features.mapquest.com /toolbar /`
i,
N
1540 Reflection Pointe Blvd, Belmont, NC
a
2013 Google �'����I(Ilk
`o�ot WA T F9�G
y
o -r
Office Use Only:
Corps action ID no.
DWQ project no.
Form Version 1.4 January 2009
Pre - Construction Notification (PCN) Form
A. Applicant information
1. Processing
la. Type(s) of approval sought from the Corps:
[p!g�ction 404 Permit Section 10 Permit
1 b. Specify Nationwide Permit (NWP) number. or General Permit (GP) number. q >r6&0 s-(,,
1c. Has the NWP or GP number been verified by the Corps?
Yes [914o
1 d. Types f approval sought from the DWQ (check all that apply):
[Dr0l Water Quality Certification - Regular Non-404 Jurisdictional General Permit
401 Water Quality Certification - Express Riparian Buffer Authorization
le. Is this notification solely for the record
because written approval is not required?
For the record only for DWQ
401 Certification:
Yes E1<0
For the record only for Corps Permit:
[]Yes (ble--
1f. Is payment into a mitigation bank or in -lieu fee program proposed for
mitigation of impacts? If so, attach the acceptance letter from mitigation bank
or in -lieu fee program.
Yes E JX6
1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h
below.
Yes �No
1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)?
[] Yes No
2. Project Information
2a. Name of project
/► j J ,1,;� IMS f -�
2b. County:
cz 6 D
2c. Nearest municipality / town:
2d. Subdivision name:
N j�-
2e. NCDOT only, T.I.P. or state project no:
3. Owner Information
3a. Name(s) on Recorded Deed:
Wyk 62
3b. Deed Book and Page No.
(� 8-
3c. Responsible Party (for LLC if
applicable):
30. Street address:
?
fie. City, state, zip:
3f. Telephone no,:
3g. Fax no.:
70q Ya — O y 6
3h. Email address:
�, , C' jq/ V
J
Page 1 of 10
PCN Form - Version 1.4 January 2009
on
4. Applicant Information (if different from owner)
4a. Applicant is:
Agent Other, specify:
4b. Name:
4c. Business name
(if applicable):
4d. Street address:
4e. City, state, zip:
4f. Telephone no.:
4g. Fax no.:
4h. Email address:
5. Agent/Consultant Information (if applicable)
5a. Name:
5b. Business name
(if applicable):
5c. Street address:
5d. City, state, zip:
5e. Telephone no.:
5f. Fax no.:
5g. Email address:
Page 2 of 10
B. Project Information and Prior Project History
1. Property Identification G 9 W9 ,
1a. Property identification no. (tax PIN or parcel ID):
1b. Site coordinates (in decimal degrees):
Latitude ° S` Longitude: AVa 66- 9
1c. Property size:
acres
2. Surface Waters
2a. Name of nearest body of water to proposed project:
4e-
2b. Water Quality Classification of nearest receiving water.
2c. River basin: vQ�
3. Project Description
3a. Describe the existing cfn2 dion the site and the general la d u.in vicinity of this
�Q��NL application: &( / � ttN e a t�
� �
N / �
• r� W 71---
3b. List the total estimated acreage of all existing wetlands on the property:
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: Q
3d. Explain the purpose� the Q'fk proj
3e. Descrft the overall prgj, in detail, includi g the of equipment to be sect:
,,E�1NN ✓P �' F,0 i �u✓ .2 vrT�O /�/! a ✓ �P
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
project (including all for phases) in the past?
Yes 0 No Q- tIn/known
Comments:
4b. If the Corps made the jurisdictional determination, what type
of determination was made?
Preliminary Final
4c. If yes, who delineated the jurisdictional areas?
Name (if known):
Agency /Consultant Company:
Other.
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
5. Project History
5a. Havp permits or certifications been requested or obtained for
this project (including all prior phases) in the past?
[]Yes No E]t'nknown
5b. If yes, explain in detail according to 'help file° instructions.
6. Future Project Plans
6a. Is this a phased project?
❑ Yes o
6b. If yes, explain.
Page 3 of 10
PCN Form - Version 1.4 January 2009
C. Proposed Impacts Inventory
1. Impacts Summary
1 a. Which sections were completed below for your project (chedc all that apply):
❑ Wetlands ❑ Streams —tributaries ❑ Buffers JM6pen Waters ❑ Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a.
Wetland impact
number
Permanent (P) or
Temporary
2b.
Type of impact
2c.
Type of wetland
2d.
Forested
2e.
Type of jurisdiction
Corps (404,10) or
DWQ (401, other)
2f.
Area of
impact
(acres)
W1 -
Choose one
Choose one
Yes/No
-
W2 -
Choose one
Choose one
Yes/No
W3 -
Choose one
Choose one
Yes/No
W4 -
Choose one
Choose one
Yes/No
W5 -
Choose one
Choose one
Yes/No
W6 -
Choose one
Choose one
Yes/No
-
2g. Total Wetland Impacts:
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a.
Stream impact
number
Permanent (P) or
Temporary (T)
3b.
Type of impact
3c.
Stream name
3d.
Perennial (PER) or
intermittent (INT)?
3e.
Type of
jurisdiction
3f.
Average
stream
width
(feet)
3g.
Impact
length
(linear
feet)
S1 -
Choose one
-
S2 -
Choose one
-
S3 -
Choose one
-
-
S4 -
Choose one
-
-
S5 -
Choose one
-
S6 -
Choose one
-
-
3h. Total stream and tributary impacts
3i. Comments:
Page 4 of 10
PCN Form — Version 1.4 January 2009
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individually list all open water impacts below.
4a.
Open water
impact number
Permanent (P) or
Temporary
4b.
Name of waterbody
(if applicable)
4c.
Type of impact
4d.
Waterbody
type
4e.
Area of impact (acres)
01 -
Choose one
Choose
02 -
Choose one
Choose
03 -
Choose one
Choose
04 -
Choose one
Choose
4f. Total open water impacts
4g. Comments:
5. Pond or Lake Construction
If pond or lake construction proposed, the complete the chart below.
5a.
Pond ID number
5b.
Proposed use or
puce of pond
5c.
Wetland Impacts (acres)
5d.
Stream Impacts (feet)
5e.
Upland
(acres)
Flooded
Filled
Excavated
Flooded
Filled
Excavated
P1
Choose one
P2
Choose one
5f. Total:
5g. Comments:
5h. Is a dam high hazard permit required?
Yes [ffNo If yes, permit ID no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If any impacts require mitigation, then ou MUST fill out Section D of this form.
6a. Project is in which protected basin?
Neuse [] Tar - Pamlico 0 Catawba 0 Randleman [] Other.
6b.
Buffer Impact
number —
Permanent (P) or
Tem ra
6c.
Re4son for impact
6d.
Stream name
6e.
Buffer
mitigation
required?
6f.
Zone 1
impact
(square
feet )
6g.
Zone 2
impact
(square
feet
61 r
Yes/No
62 -
Yes/No
B3 -
Yes/No
134' -
Yes/No
B5 -
Yes/No
66 -
YesMo
61h. Total Buffer Impacts:
6i. Comments:
Page 5 of 10
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for
impacts to Waters of the U.S. or Waters of the State?
❑ Yes 9-40
2b. If yes, mitigation is required by (check all that apply):
❑ DWQ ❑ Corps
2c. If yes, which mitigation option will be used for this
project?
❑ Mitigation bank
❑Payment to in -lieu fee program
❑ Permittee Responsible Mitigation
3. Complete If Using a Mitigation Bank
3a. Name of Mitigation Bank:
3b. Credits Purchased (attach receipt and letter)
Type: Choose one
Type: Choose one
Type: Choose one
Quantity:
Quantity:
Quantity:
3c. Comments:
4. Complete If Making a Payment to In -lieu Fee Program
4a. Approval letter from in -lieu fee program is attached.
❑ Yes
4b. Stream mfigation requested:
linear feet
4c. If using stream mitigation, stream temperature:
Choose one
4d. Buffer mitigation requested (DWQ only):
square feet
49. Riparian wetland mitigation requested:
acres
4. Non - riparian wetland mitigation requested:
acres
4g. Coastal (tidal) wetland mitigation requested:
acres
4h. Comments:
5. Complete If Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
Page 6 of 10
PCN Form — Version 1.4 January 2009
S. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires
buffer mitigation?
Yes
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
Zone
6c.
Reason for impact
6d.
Total impact
(square feet)
Multiplier
6e.
Required mitigation
(square feet)
Zone 1
3 (2 for Catawba)
Zone 2
1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund).
6h. Comments:
Page 7 of 10
E. Stormwater Management and DMuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1a. Does the project include or is it adjacent to protected riparian buffers identified
Yes
Q-Wo
within one of the NC Riparian Buffer Protection Rules?
1 b. If yes, then is a diffuse flow plan included? If no, explain why.
❑ Yes
❑ No
2. Stomrvvater Management Plan
2a. What is the overall percent imperviousness of this project?
%
2b. Does this project require a Stormwater Management Plan?
Yes
F4 o
2c. If this project DOES O require a Stormwater Management Plan, explain why:
4/V %icsr.� Xe-
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
2e. Who will be responsible for the review of the Stormwater Management Plan?
3. Certified Local Government Stormwater Review
3a. In which local government's jurisdiction is this roject?
1
❑ Phase II
3b. Which of the following locally- implemented stormwater management programs
❑ NSW
USMP
apply (chi all that apply):
Water Supply Watershed
Other.
3c. Has the approved Stormwater Management Plan with proof of approval been
[]Yes
QW0
attached?
4. DWQ Stormwater Program Review
❑Coastal counties
❑HQW
4a. Which of the following state-implemented stormwater management programs apply
(check all that apply):
HORW
Session Law
2006 -246
Other.
4b. Has the approved Stormwater Management Plan with proof of approval been
[]Yes
❑ No
attached?
5. DWQ 401 Unit Stormwater Review
5q. Does the Stormwater Management Plan meet the appropriate requirements?
[]Yes
❑ No
5b. Have all of the 401 Unit submittal requirements been met?
[]Yes
No
Page 8 of 10
PCN Form — Version 1.4 January 2009
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
1a. Does the project involve an expenditure of public (federal/state/local) funds or the
Oyes No
use of public (federal/state) land?
1 b. If you answered "yes' to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State
❑Yes ❑ No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1c. If you answered °yes° to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
letter.)
❑ Yes ❑ No
Comments:
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Welland Standards,
❑Yes
or Riparian Buffer Rules (15A NCAC 2B .0200)?
2b. Is this an after- ftwfact permit application?
Oyes 040,
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in
[]Yes ON/0
additional development, which could impact nearby downstream water quality?
3b. If you answered 'yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. if you answered 'no," provide a short narrative description.
4. Sewage Disposal (DWQ Requirement)
4a. Cleary detail the ultimate heat, ent methods and disposition (non - discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
Page 9 of 10
PCN Form — Version 1.4 January 2009
S. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or
habitat?
Yes
5b. Have you checked with the USFWS concerning Endangered Species Act
impacts?
[]Yes 9 No
5c. If yes, indicate the USFWS Field Office you have contacted.
-
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
S. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat?
Yes L! -Vo
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
0 Yes Lam°
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA - designated 100 -year floodplain?
Yes ELMtr""
8b. If yes, explain how project meets FEMA requirements:
8c. What source(s) did you use to make the floodplain determination?
6C,
Applicant/Agents Printed Name
Applicant/Agent's Signature
(Agents signature is valid only if an authoraation
letter from the applicant is provided.)
Date
Page 10 of 10