Loading...
HomeMy WebLinkAbout820003_30 Day POA_202104064/7/2021 Mail - Fontenot, Katie - Outlook FW: [External] 30 Day POA Extension for 82-003 Guyton, Steve <steve.guyton@ncdenr.gov> Wed 4/7/2021 6:56 AM To: Fontenot, Katie <katie.fontenot@ncdenr.gov> Cc: Harrison, Diane <diane.harrison@ncdenr.gov> Continue the POA for these 3 lagoons All of the other Zack McCullen farms are ok From: James Lamb[mailto:jlamb@prestagefarms.com] Sent: Tuesday, April 6, 2021 5:00 PM To: Zack McCullen <zackm@prestagefarms.com>; Guyton, Steve <steve.guyton@ncdenr.gov> Subject: [External] 30 Day POA Extension for 82-003 CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. https://outlook.office365.com/mail/inbox/id/AAQkAGM2NWE3OTJmLThiOWMtNGNINC1 hYTkOLTJIZjMzZDM2ZDU 1YwAQAMe9D6gH10EyiSFxjQv2z... 1/7 4/7/2021 Mail - Fontenot, Katie - Outlook PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 82-003 County: Facility Name: McCullen Livestock Company LLC Sampson Certified operator Name: Zack McCullen IV Operator Number: 996418 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: 1 2 4 Spillway(Y or N): N N N N Level(inches): 18 18 18 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 4/6/21 Weather permitting. hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Zack McCullen IV Phone: 910-385-6166 Facility Owner/Manager (print) Facility Owner/Manager (signature) Date: 4/6/2021 https://outlook.office365.com/mail/inbox/id/AAQkAGM2NWE3OTJmLThiOWMtNGNINC1 hYTkOLTJIZjMzZDM2ZDU 1YwAQAMe9D6gH10EyiSFxjQv2z... 2/7 4/7/2021 Mail - Fontenot, Katie - Outlook 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Namelldentifier (ID): 1 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = 18.0 19.0 inches inches 1.0 inches top of dike surface area according to design d. (area at below structural freeboard elevation) 60900 e. line c112 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 2880 ft2 37961 gallons 180 94948 certified herd # 2880 days ft3 actual waste produced = current herd # x line g = 94948 ft3 certified herd # i. volume of wash water according to structural design ft3 j. excess rainfall over evaporation according to design ft3 k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k}11000) x line I = 0 35525 162656 gallons 1 /11 /2021 1.48 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 297 Ibs/1000 gal. Ibs. PAN https://outlook.office365.com/mail/inbox/id/AAQkAGM2NWE3OTJmLThiOWMtNGNINC1 hYTkOLTJIZjMzZDM2ZDU 1YwAQAMe9D6gH10EyiSFxjQv2z... 3/7 4/7/2021 Mail - Fontenot, Katie - Outlook PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Namelldentifier (ID): r2 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. 18.0 19.0 inches inches 1.0 inches top of dike surface area according to design (area at below structural freeboard elevation) 63000 ft2 e. line c112 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 2880 39270 gallons 180 94948 certified herd # 2880 days ft3 actual waste produced = current herd # x line g = 94948 ft3 certified herd # i. volume of wash water according to structural design ft3 j. excess rainfall over evaporation according to design ft3 k. (lines h + i + j) x 7.48 x 30 0 35525 days/line f= 162656 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k}11000) x line I = 1 /11 /2021 1.60 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 323.1 Ibs/1000 gal. Ibs. PAN https://outlook.office365.com/mail/inbox/id/AAQkAGM2NWE3OTJmLThiOWMtNGNINC1 hYTkOLTJIZjMzZDM2ZDU 1YwAQAMe9D6gH10EyiSFxjQv2z... 4/7 4/7/2021 Mail - Fontenot, Katie - Outlook PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Namelldentifier (ID): 4 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c112 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 2880 certified herd # 18.0 19.0 inches inches 1.0 inches 63000 ft2 39270 gallons 180 94948 2880 days ft3 actual waste produced = current herd # x line g = 94948 ft3 certified herd # i. volume of wash water according to structural design ft3 j. excess rainfall over evaporation according to design ft3 k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)/1000) x line I = 1 /11 /2021 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 0 35525 162656 gallons 1.29 Ibs/1000 gal. 260.5 lbs. PAN II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 2. Structure ID: 3. Structure ID: 1 2 3 line m = line m = line m = 296.9 Ib PAN 323.1 Ib PAN Ib PAN https://outlook.office365.com/mail/inbox/id/AAQkAGM2NWE3OTJmLThiOWMtNGNINC1 hYTkOLTJIZjMzZDM2ZDU 1YwAQAMe9D6gH10EyiSFxjQv2z... 5/7 4/7/2021 4. Structure ID: 5. Structure ID: 6. Structure ID: 4 Mail - Fontenot, Katie - Outlook line m = 260.5 Ib PAN n. lines 1 + 2 + 3 + 4 + 5 + 6 = line m = Ib PAN line m = Ib PAN 880.5 Ib PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR- 2 PAN balance (Ib..acre) t. TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s u. application window' 10298 Pivot 1 CB/Hay 22.67 240.00 5440.8 MAR-SEP 10298 Pivot 2 CB/Hay 13.02 270.00 3515.4 MAR-SEP v. Total PAN available for all fields (sum of column t) = IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) _ x. Crop's remaining PAN balance (line v from section III) = y. Overall PAN balance (w - x) = 8956.2 Ib. PAN 880.5 Ib. PAN 8956.2 Ib. PAN -8075.7 Ib. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: Self reported originally to DWR on 2/4121. Called back in on 415121. This is an extension for another 30 days. https://outlook.office365.com/mail/inbox/id/AAQkAGM2NWE3OTJmLThiOWMtNGNINC1 hYTkOLTJIZjMzZDM2ZDU 1YwAQAMe9D6gH10EyiSFxjQv2z... 6/7 4/7/2021 Mail - Fontenot, Katie - Outlook James L. Lamb Environment Specialist Prestage Farms, Inc. P.O. Box 438 4651 Taylors Bridge Hwy. Clinton, N.C. 28329 W: 910-596-5814 https://outlook.office365.com/mail/inbox/id/AAQkAGM2NWE3OTJmLThiOWMtNGNINC1 hYTkOLTJIZjMzZDM2ZDU 1YwAQAMe9D6gH10EyiSFxjQv2z... 7/7