HomeMy WebLinkAbout820352_5 Day POA_20210420PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES FIVE (5) DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft' 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 2000 certified herd # JD TEACHEY 82-352 4/20/2021 19.0 inches inches 19.0 inches 162475 ft2 1924246 gallons 180 211997 2000 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) days ft3 211997 ft3 ft3 ft3 382445 gallons 0 94777 Ibs/1000 gal. 0 Ibs. PAN II. TOTAL VOLUME OF WASTE STORED WITHIN STRUCTURAL FREEBOARD ELEVATIONS FOR ALL WASTE STRUCTURES FOR FACILITY 1. structure ID: A line I = 165017 gallons 2. structure ID: B line I = 166869 gallons 3. structure ID: line I = gallons 4. structure ID: line I = gallons 5. structure ID: line I = gallons 6. structure ID: line I = gallons n. lines 1 +2+3+4+5+6= o. line n / 27154 = 331886 gallons 12.22 acre -inches III. TOTAL ACRES AVAILABLE TO RECEIVE WASTE DURING 5 DAY DRAW DOWN PERIOD" While this section deals with hydraulic loading capacities, applications cannot exceed agronomic rate for receiving crop according to its certified waste plan. 2Fields with no remaining PAN balance, no receiving crop, and/or completely saturated are not considered available to receive waste. p. tract # q. field # r. soil type s. crop t. acres u. remaining IRR-2 PAN balance (lb/acre) v. maximum application rate (in/hr) w. maximum application amount (inches) 10744 P1 GoA corn 48.50 81.00 0.5 1 10744 P2 Ly soybeans 33.70 92.00 0.5 1 10744 1 A GoA corn 3.66 117.00 0.5 1 10744 1B Ly corn 1.71 135.00 0.5 1 10744 2A GoA corn 4.39 121.00 0.5 1 10744 2B Ly corn 2.53 135.00 0.5 1 10744 3 Ly soybeans 1.83 149.00 0.5 1 10744 10B Ly soybeans 1.39 149.00 0.5 1 x. total acres available during 5 day draw down (sum of column t) = 97.71 acres IV. FACILITY'S PoA OVERALL HYDRAULIC LOAD TO BE LAND APPLIED PER ACRE PoA (5 Day) 2/21/00 y. line o = line x 0.13 inches per acre to be applied within 5 days If unable to land apply hydraulic load listed in line y, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new hydraulic load based on new information. Plan to land apply hydraulic load: 1. Describe moisture conditions of fields? (e.g. Is there water standing in field; does irrigation equipment mar down in field; "trafficability" across soils; will soils absorb application without runoff, etc.) drying with some wet spots to avoid 2. Date and amount of last rainfall event? DATE: 3. Dates of last waste application event per field: 04/11/21 AMOUNT: 3.00 inches 12/30/2020 4. Given optimum soil and weather conditions, is irrigation equipment capable of applying the volume in line "n" at appropriate seasonal (i.e. winter) application rates within 5 days? yes 5. Irrigation schedule for next 5 days - include daily schedule; proposed application rates and amounts per irrigation event; changes made in gun sizes, nozzles, "o" rings, operating time, travel speed, etc. to meet proposed changes in application rates and amounts; and any other information for consideration. Irrigate daily with pivots and 2 reels. Utilize driest parts of fields. PoA (5 Day) 2/21/00 PoA (5 Day) 2/21/00 PoA (5 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES FIVE (5) DAY DRAW DOWN PERIOD I. TOTAL VOLUME TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 2. Current liquid volume in structural freeboard a. current liquid level according to marker A b. designed structural freeboard zone (Normally 12 inches or greater) c. line b - line a (inches within structural freeboard) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 2000 certified herd # 11.0 12.0 inches inches 1.0 inches 162475 ft2 101276 gallons 180 211997 2000 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 5 days/line f = 4. Total volume of waste to be land applied during 5 day draw down I. total volume to be land applied line e + line k = days ft3 211997 ft3 0 94777 ft3 ft3 63741 gallons 165017 gallons REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN THE STRUCTURAL FREEBOARD ELEVATIONS. (Click on the next Structure tab shown below) PoA (5 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES FIVE (5) DAY DRAW DOWN PERIOD I. TOTAL VOLUME TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 2. Current liquid volume in structural freeboard a. current liquid level according to marker b. designed structural freeboard zone (Normally 12 inches or greater) c. line b - line a (inches within structural freeboard) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 2000 certified herd # 11.0 12.0 inches inches 1.0 inches 159900 ft2 99671 gallons 180 211483 2000 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 5 days/line f = 4. Total volume of waste to be land applied during 5 day draw down I. total volume to be land applied line e + line k = days ft3 211483 ft3 111930 ft3 ft3 67198 gallons 166869 gallons REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN THE STRUCTURAL FREEBOARD ELEVATIONS. (Click on the next Structure tab shown below) PoA (5 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES FIVE (5) DAY DRAW DOWN PERIOD I. TOTAL VOLUME TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 2. Current liquid volume in structural freeboard a. current liquid level according to marker b. designed structural freeboard zone (Normally 12 inches or greater) c. line b - line a (inches within structural freeboard) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # certified herd # actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 5 days/line f = 4. Total volume of waste to be land applied during 5 day draw down I. total volume to be land applied line e + line k = inches inches inches ft2 gallons days ft3 ft3 ft3 ft3 gallons 0 gallons REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN THE STRUCTURAL FREEBOARD ELEVATIONS. (Click on the next Structure tab shown below) PoA (5 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES FIVE (5) DAY DRAW DOWN PERIOD I. TOTAL VOLUME TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 2. Current liquid volume in structural freeboard a. current liquid level according to marker b. designed structural freeboard zone (Normally 12 inches or greater) c. line b - line a (inches within structural freeboard) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # certified herd # actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 5 days/line f = 4. Total volume of waste to be land applied during 5 day draw down I. total volume to be land applied line e + line k = inches inches inches ft2 gallons days ft3 ft3 ft3 ft3 gallons 0 gallons REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN THE STRUCTURAL FREEBOARD ELEVATIONS. (Click on the next Structure tab shown below) PoA (5 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES FIVE (5) DAY DRAW DOWN PERIOD I. TOTAL VOLUME TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 2. Current liquid volume in structural freeboard a. current liquid level according to marker b. designed structural freeboard zone (Normally 12 inches or greater) c. line b - line a (inches within structural freeboard) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # certified herd # actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 5 days/line f = 4. Total volume of waste to be land applied during 5 day draw down I. total volume to be land applied line e + line k = inches inches inches ft2 gallons days ft3 ft3 ft3 ft3 gallons 0 gallons REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN THE STRUCTURAL FREEBOARD ELEVATIONS. (Click on the next Structure tab shown below) PoA (5 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES FIVE (5) DAY DRAW DOWN PERIOD I. TOTAL VOLUME TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 2. Current liquid volume in structural freeboard a. current liquid level according to marker b. designed structural freeboard zone (Normally 12 inches or greater) c. line b - line a (inches within structural freeboard) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # certified herd # actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 5 days/line f = 4. Total volume of waste to be land applied during 5 day draw down I. total volume to be land applied line e + line k = inches inches inches ft2 gallons days ft3 ft3 ft3 ft3 gallons 0 gallons REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN THE STRUCTURAL FREEBOARD ELEVATIONS. (Click on the next Structure tab shown below) PoA (5 Day) 2/21/00